HomeMy WebLinkAboutTrans 2007-05-29 Item 3A - Resolution - 2008-2013 Transportation Improvement ProgramINFORMATION MEMO To: Mayor Mullet From: P ublic Works Directo Date: May 23, 2007 Subject: Six -Year Transportation Improvement Program (2008 2013) ISSUE Attachment III.A. Annual update of the Six -Year Transportation Improvement Program for the years 2008 2013. BACKGROUND The Transportation Improvement Program (TIP) is updated annually as required by RCW. The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into the regional and state TIP's. The TIP is primarily a financial planning document for projects competing for grants. Any project submitted for federal grant funding must be included in the local, regional and state adopted TIP's. The TIP is a rolling plan showing various funding sources: grants, developer, and local funds. Projects "roll" as funds or stages (design report, final design, construction) occur. Tukwila's TIP and CIP list many of the same transportation related projects. The TIP lists only those transportation- related projects planned within the next six years that are deemed regionally significant. The City's CIP lists transportation projects planned in the next six years and beyond, as well as water, sewer, surface water, and capital facilities. The TIP is required to be adopted by July 1 on an annual basis, while the CIP is prepared during summer /fall in conjunction with the City's budget preparation. Differences between the two may be due to priority changes, funding availability changes, or other factors that normally occur during the time between adoption of each document. ACTION TAKEN The attached spreadsheet is the "Draft" 2008 2013 TIP and was created by modifying the 2007 2012 TIP to add projects, remove projects, adjust project costs, and reprioritize the list of projects. Added: Project 31 Macadam Rd S 144 St Left Turn Pocket RECOMMENDATION Forward the resolution to the next Committee of the Whole meeting to hold a Public Hearing and adopt the updated annual Six -Year Transportation Improvement Program of 2008 2013. RT:ad attachments: Resolution Draft TIP Summary Spreadsheet Current Adopted Six-Year TIP (P:Projxn\TLPi05 -10 TTPltip2008 memo) z A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM, AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the ensuing six (6) calendar years (2008- 2013); and WHEREAS, a public hearing was held on the said Six -Year Transportation Improvement Program on June 11, 2007; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of 2007. ATTEST/AUTHENTICATED: Jane E. Cantu, CMC, City Clerk APPROVED AS TO FORM BY: Office of the City Attorney (P:PR0JEcTs \TIP\05 -10 TIFTIP RESOD rroN2008- 2013.Doc) Verna Griffin, Council President Filed with the City Clerk: Passed by the City Council: Resolution Number: (A) TOTAL 36,879 38,196 7,145 4,901 4,220 59,885 151,226 27,873 14,200 37,072 16,688 55,393 DRAFT 2008 2013 TIP SUMMARY Project Costs in Thou of Dcllars 5/23/07 2007-2012 2008-2013 2007 CIP FU t DING SOUP CES TIP TIP PROJECT TITLE Page No, 2008 2009 2010 2011 2012 2013 TOTAL Federal State TIB Developer Unsecured City 1 1 Neighborhood Traffic Calming Program 2 10 10 10 10 10 10 60 60 2 2 Greenbelt Trails 14 30 30 30 3 3 Annual Bridge Inspections and Repairs 31 100 100 120 120 180 180 800 800 4 4 Boeing Access Rd Bridge Replacement 32 50 14,375 14,425 7,444 6,981 5 5 Southcenter Parkway Extension 35 10,175 20,827 5,000 10,3071 6,219 6 6 Tukwila Urban Center Access (Klickitat) 36 16,604 16,604 3,436 5,000 7,865 303 7 7 Tukwila Intl Blvd (Phase II) 38 4,645 4,668 9,313 3,691 4,200 1,422 8 8 Tukwila Intl Blvd (Phase 111) 39 3,245 3,656 6,901 3,426 2,851 624 9 9 S 144 St (Phase 11) 41 235 1,138 1,373 753 620 10 10 Overlay Repair Program 42 1,250 1,250 1,250 1,250 1,250 1,250 7,500 7,500 11 11 Traffic Signal Interconnect Program 44 3,000 3,000 1200 1,800 12 12 Interurban Ave S 46 7,625 7,625 5,000 2,625 13 13 Tukwila Urban Center Transit Center 48 600 3,320 3,920 200 2,650 1,070 14 14 Andover Park West 49 1,461 1,461 345 1,116 15 15 S 144th St Bridge Sidwalks 68 25 25 25 16 16 Southcenter Blvd. 47 600 7,000 7,600 7 ,600 0 17 17 Andover Pk E Minkler Blvd 53 65 405 470 470 18 18 East Marginal Way (BAR to S 112 St) 51 35 625 660 570 90 19 19 W Valley Hwy S 156 St 54 41 725 766 300 3 166 20 20 S 133 St SR 599 Ramps Intersection 50 50 450 500 315 185 21 21 Minkler Blvd. 56 425 425 425 0 22 22 Andover Park E Industry Dr. Signal 55 41 316 357 169 188 23 23 S 180 St Andover Park W Intersection 65 210 210 30 100 80 24 24 S 168 St (S \C Parkway to Andover Pk E) 61 13 13,750 5,300 8,450 25 25 SC Blvd Widening (1-5 61st Ave S Bridge) 59 11,200 11,200 11,200 26 26 Tukwila Intl Blvd. S 116 St 60 4,675 4,675 1,350 1,900 1,425 27 27 Tukwila Intl Blvd. (Phase IV) 57 220 2,780 3,000 2,400 600 28 28 West Valley Hwy 62 630 630 530 100 29 29 Nelsen PI 64 200 200 200 30 30 Center -1 58 200 2,100 2,300 200 1,500 600 31 Macadam Rd S 144th St Left Turn Pocket 52 152 292 444 444 2007-2012 'IP PROJECTS REVISED: 31 Added Macadam Rd S 144th St Left Turn Pocket 2008 2013 DRAFT Transportation Improvement Program (TIP) wtrgton State Department of Transportation Agency: Tukwila Co. No.: 17 City No.: 1320 o 0_z ILL 1 2 19 1 00 2 14 3 16 5 Co. Name: MPOIRTPO: Greenbelt Trails Report Date: July 25, 2001 King Co. PSRC Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number ding MP or road E. Beginning MP or road F. Describe Work to be Done 3 Neighborhood Traffic Calming Program Various City Streets from: to: Program to address neighborhood tragic concerns using abiping, signage, roadway Improvements, traffic calming, and education to reduce speeding from: to: Provide safe connections to public traits to promote pedestrian and bicycle modes of transportation in lieu of motorized vehicles. Bridge Program Various City Streets from: to: Perform load ratings and bMannual Inspections as well as construct necessary repairs and maintenance. 14 4 Replacement Boeing Access Rd Bridge P Boeing Access Road from: Airpod Way to: 1 -5 Reconstruct bridge. Southcenter Parkway Extension Southcenter Parkway to: 5 200 St from: S 180 St Including curb Construct widening to 4 lanes with center turn pockets gutter, sidewalks, drainage, landscaping, and utility undergrounding. 16 6 KlickHat SC Pkwy 11-5 Access Revision from: 1 -5 Off Ramp to: S 168 St Design and construct safety and capacity improvements. r E 4 5 12 S 32 P 11 S 01 m a. o- Phase i Start (mm/ddyyyY) 6 7 8 9 ALL 11112007 Totals PE 111/2012 Totals ALL 1 1/1/2007 1 Totals 09 p 1 600 T ALLI 1/1/2007 P 0 1.4 W T S P G 05 P 1500 W 08 P G Totals Project Costs in Thousands of Dollars Fund Source Infonnafon Federal Funding Federal Federal State Fund Cost by Code Phase Code 10 1 11 12 1 13 BR I I Totals CN 1 1112007 1 Discretionary I Page 1 Six Year Transportation Improvement P 12 From 2007 to Hearing Date: 6/12/2006 Adoption Date: 6/19/2006 Amend Date: Resolution No.: 1606 Federally Funded Projects Only State Funds I Local Funds Total Funds Expenditure Schedule (Local Agency) 1 st 2nd 3rd 2150 2150 350 350 350 2150 2150 350 1 1 301 301 30 30 8601 86o1 300{ 1001 1001 I 1 1 144251 14425 501 1 14425 14425 50 Totals 35681 TPPI 110001 111291 256971 182151 74821 CN I 1/12007 I Discretionary I 3568 11000 11129 25697 18215 7482 1 1 1 124501 124501 124501 12450 12450 12450 4th Thru 6th Envir. Type 20 14 15 16 17 18 19 1100 CE RAN Required Date (MMA11 21 No 350 350 1100 1 1 30 CE No 0 360 CE 860 860 300 100 100 360 I 14375 CE 14375 1 CE CE No No Yes 1/1/06 Yes 1/1/09 Supersedes previous editions Six Year r From a te; 611912006 Adoptio 611212 Resolution So:. 1606 Rearing Date: F unded' r r Federally OnIY „twn Amend Patel P Department o{ Transportation Schedule State Depa Expenditure Sch ton Dollars Agency) Washington Local A9 Required Wa to (housanda l r T p fpiaGt Costs F ice Intormailo h E YPe (WPM I,gency: Tukwila Na me: Ktn�' 1 1_ 1 �ota 1st 2nd 3rd 6ih_ 21 Co. No: MppiRTpo; ?SRC 1 1 1 d Federal F' Slate gtate to Fund 1 18 Z MOW: 132 m 4 F ed erat Federat Fund 'Funds 16 Cos by Funds 16 G Identificat B. Bridge N a phase Fund Code 14 1 N 4 0 Construct profectldentit g Starl Co de Phase 13 4645\ 4418 1 Ald No. N m 12 9063 A, Fedora p E I 8 mmld 10 42001 11771 C Prajo Uft ftl� N Number or road 3686\ ?PP RM gg o D. 5tree og ame�ad Endin9 5 6 T 7 STPN) E� a E. Beginning MP a Done 4--). 1 1 1 GN U1120 t. u' 4 F• Describe Work to b 3 03 5000 O 46a5 36561 GE No .---1-_—_ l P 4200 15751 6�1� 32A5I I 1 2 S 3 6 66 3426\ OVER 14 7 'Tukwila foil &Wd {Phase 2) T 5 PN) to:s,1umS T. T 11112 1 JukwNa Intl BWd drainage. 3656 S 116 St sidewalks, 1 132 St gO 2100 C 32A5 CE No curb gutter, tram overlay. ug °r9revndmg 'v 03 S S 2900 575 6 21 21 51 I I landacAP1t0' and 3426 1 1 U I 2 20 20\ 11381 Phase 3) P 1 1 3851 1138. 14 8 }a Intl Blvd l d Tota AIPI 7531 1?ukwila Intl BWd 10:5138 St PE 11112 k�dudm4Px '69 d s 03 1000 W RW 11 7 235 1138 3750 GE No from 513251 03 P Chi 11112 1373 1250\ 1250\ Reconstruct ion, drainage, and Witty Vnder V Totals ounding 620 12501 753 7500 rnhe1 drainago• P I 750 G 1 17 9 5144 St tphaso 2) Totals }la tot I Blvd t ALL 1,112007 51a4 2 St to.. g sidewalks. drainage. G 1250 3750 1250 1250 2400 GE NO from: 42 Ave paving, curb n9. gutter, 07 S 1 7 7500 23721 cream and I IN unda9 Q g77G r Rumination P I 35661 r S 120 1 16 1U Overlay and Repair Pro9r T Tot3 CMP Streets to: anann CN U1120 C0 Various City laY City streets as needed in W GE I trout: Repair, rehabilitate, and ove 12 S 1 4772 2372 24 I" 6192\ No Program P 1206 1 1 6 921 6192 1 P rogram O 1 16 11 Signal Intarr on^e t Traffic si9 Totals a1s 1,1120 1 Various Ct i n Streets ect between tragic signal an 1N 1 6192 interconnect ssyste be 4500 from: install bard 03 T 6192 6192 the Traffic Pemd�sCenter. S P 1 4 12 INtban Ave S nt G Totals l Interurban Ave S to: Fort oedramaga• I gur rdnadon, i t S 143 St vitro, c urb gutter, r from ybe etind�I n g Pa gand'an�' t Supersedes P revious editions page 2 yjlastfn8t°n State DePartrnent of Transportation Iwo Tukwila Agency: Co. No.: 17 Co. Name: King Co. MPOIRTPD: PSRC City No.: 1320 Prolect Identification B. Bridge No A. Federal Aid No. Title Prolect o E D. Stre tlRoad Name or Number ding MP or road 0 a y E Beginning MP or road F. Describe Work to be one 3 1 16 13 Tukwila Urban Center Transit Center Centred Business District to tram: transit center. Design and construct a 16 14 A Park West Andover Park Wei to Strander Blvd from: Tukwila Parkway Complete widening for center lantern lane. 17 15 S 144 St Bridge Sidewalks S 144 St lo; 53 Ave S 53 Ave from; 51 Ave 5 over t -5 b Si Ave S and widen existing sldewellrs on bridge S. 16 16 Southcenter Blvd. Southcenter Blvd. to: I -5 tram: International Blvd, rial with medians, tom lanes, curb Improve roadway to a aton, and *renege. a gutter, sidewalks, Itlurrn 16 17 Andover Park E 1 Minkter Blvd. to: 500 Ft. each leg nta and from: 500 Ft. each me and va gi signal lm,.-^ Design end construct Intersection ,Mdentng for lofttum lanes. 46 18 05 P •••,.qc 2001 East Marginal Way East Marginal Way to: S 112 St Boeing Access Rd. Potter, sidewalks, Deli tram: nlng to Vanes Including cu dr Design an landscapi 8 and utility undergrounding. drainage 05 P 025 03 S 12 S 1 000 03 1500 Tota1S PE 111120 1 CH 111120 I Totals PE 1 1/1120 1 2000 C G P S W C G P s T W Totals PE 1/112007 1.1 C CN 1111208 1 O 1 Totals ALL 1/11207 P S T W Six Year Transportation t1iilt.s""' to 2012 From 20Q7 Adoption Date: 611912006 Hearing Date: 611212006 Resolution No.: 1606 Amend Date: Federally Funded Projects Only Expenditure Schedule (Local Agency) R1W Required mir. Data 3rd Type Date 1 State Fun ds E Funds 1s1 2nd Funds Funds 20 21 Funds 18 16 17 14 15 13 z10 2850 2850 2640 2850 2640 210 l 1 I 2650 1001 7001 1001 1 I Prolect Costs in Thousands of Dollars Fund Source Information Federal Funding State Federal S S tine Cost by Phase Code 11 12 m g F Phase F ederal Fund A tmm sdd Code 0 T 6 9 10 11112007 CMAO 1 TotalS PE 1/1120 CH I 111/2012 Totals Page 3 1 I I 800 B00 100 251 251 251 25 25 25 1 70001 7000 6001 1 70001 760 7609 600 7000 201 2001 2001 200 200 20 351 35 19201 1920 1 1955 1955 4th Thru 6th 19 700 CE 35 700 CE CE 1920 No No No CE No CE No CE No 1920 SuperSedes previous editions T Washington State Department of Transportation Hearing Date: 6/1212006 Adoption Date: 6/1912006 Agency: Tukwila Resolution No.: 1606 C Name: King Co. Amend Date: Co. No.: 17 Federally Funded City No.: 1320 d APOIRTPO: PSRC Project Costs in Thousan of D ollars expenditure Schedule Projects Only Fund Source Information (Local Agency) RAN Project Identification Required A. Federal Aid No. B. Bridge No, w o L Federal Funding 4th Envlc Date e H Pha Federal Federal State State Local Total Thru G. Project Title ar Cost by Fund E F Start Fund phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (M E D. Street/Road ec be Work Name or Number mnr/dd/YY1!17 Code 18 t9 20 21 LI RAN a Z E. Beginning MP or roa Ending MP or road 11 12 13 14 15 16 17 F. Describe Work to be Done 4 5 6 T 8 9 10 725 CE 3 725 725 No 12 p 1500 T ALL 1/1!2009 P 14 19 West Valley Hwy 1 S 156 St from: Southcenter Blvd. to: S 158 St Construct additional northbound left turn lane at S 156 St for northbound Totals HOV to northbound 1465. 16 20 12 p 1000 C ALL 1 111/2009 1 G S i33 St I SR 599 Ramps Intersection P S from: 500 Ft. on each leg to: 500 F1, on each leg Design and construct intersection improvements Including a new fram S e T W Totals signal. P 2 W ALL 1 1,112010 1 16 21 Minkler Blvd. T S P 16 24 %.1 Mlnkler Blvd. from: Southcenter Pkwy to: Andover Park W Construct widening for 3-lanes including curb gutter, sidewalk, drainage, and landscaping. 16 22 Andover Park E Industry Dr. Signal from: 500 Ft. on each leg to: 500 Ft. on each leg Design and construct a traffic signal and intersection improvements. 16 23 S 180 St Andover Park W Intersection from: 500 Ft. on each leg to: 500 Ft. on each leg Widen for north south tum lanes. S 168 St S 168 St from: Southcenter Pkwy to: Andover Park W Construct new roadway Including curb gum. sidewalk. drainage, illumination, and landscaping. Report Date: July 25, 2001 12 P 1000 Totals w ALL 1 1/1/2010 T S P G Totals 12 P 1000 W ALL 1 1/1/2010 1 T P Totals 01 P 2000 P ALL1 1/1/2012 1 W Totals 1 30 320 300 50 350 1 1 4251 4251 1 1 1 425 CE Page 4 3001 Six Year Transportation Improvement Program From 2007 to 2012 1 1 I 725 725 501 3501 425 425 2201 2201 210 210 1 137501 137501 13750 13750 I I I I 775 301 3 GE 425 220 CE 220 220 220 1 210 CE 1 1 1 1 2101 2101 210 1 1 13750 CE 13750 No No No No No Supersedes previous editions a� n1ton State Departm of Transpo Vi Tukwila Agency: Co. Name: King Co. Co. No.: 17 MPOIRTPO: !sRC City No.: 1320 Project Identificatio D Bridge No. A. Federal Aid No. C. Project Title D. StreetiRoad Name or Number ding MP or road E. Beginning MP or road Yliork to be Done 4 F. Describe 3 04 P 14 25 Widening SC Blvd• 161 Ave 5 Bridge from: to: 62 Ave Widen to: alvd" and the 81 A ve 5 brd9e to add a lane for future traffic growth. 14 26 Tu Intl BWd. 1 S 116 St Bridge to: SR 599 n P SR 599 on widening on Tukwila Intl elvd" and intersec8o improvements 1g,1 S 118 St 14 27 4 Tukwila Intl BWd. (Ph Tukwila Intl Blvd. to: S 116 St sidewalk, Boeing Access Rd. including paving, 511 curb &gutter, sidew drain e, lu n a a undergmu drainage. 9minatdr', landscaping and utility 14 28 17 29 ar WeslValley Hwy West Valley Hwy to: St r sidewalks, s, from: 1.405 t 7•lanee including Design and construct illumination, and drainage" Nelsen Place Nelsen Place to: S 158 5i Inage, and D err; S 156 ns aving, curb gutter, sidewalks, dra Design and constnrct R illuminatio AS 30 Tukwila Urban Center PedtBike Bridge to: West Valley ev and mg station, Baker B e o over the Green River cermecting the Pedestrian bridge t 3 e a m ii o- Phase ii Ii Start r E (mmtdd 1'Y1 8 9 6 AL L 111120 0.5 C G P s T W Totals ALL 11112012 04 P 1000 P 05 P 0.5 03 P 600 32 1000 08 Totals W ALL\ 1/112012 T G P Six Year to 201 From 2007 Adoption Date: 611912006 Hearing Resolution No. Amend D ate: 611212 1606 Date: Federally Funded Projects Only Expenditure Schedule ule (Local Agency) R equited Project Costs in Thousands o �Donnatlon 4th Envlr. Date Fund 50 3rd Thru Type (MN Federal Funding 8 th Federal State Stale Local Fun 1st 2nd 19 20 21 Federal Cost by Fund Funds Funds 1 18 �d Phase Code 13 14 r 15 16 11200 CE No 10 11 12 y i 112001 11200 Totals ALL 111120 Totals Grand Totals for Tukwila Page 5 Totals 111120 03 P 3500 P PE 0 Totals ALL\ 111/2007 51P(E) 500\ 1268 11200 11200 1 46751 46751 4675 4675 1 30001 30001 3000 3000 5801 5801 I I 1 580 580 1 2001 2001 1 200 200 1 12001 17001 3001 14001 11200 4675 4675 220\ 2780 GE 220 2780 GE CE No 580 200 CE 200 CE 500 1200 1700 300 1400 110339 141878 46977 27039 67 58995 18853 No No No No Supersedes pfeYious editions