HomeMy WebLinkAboutTrans 2007-05-29 Item 3A - Resolution - 2008-2013 Transportation Improvement ProgramINFORMATION MEMO
To: Mayor Mullet
From: P ublic Works Directo
Date: May 23, 2007
Subject: Six -Year Transportation Improvement Program (2008 2013)
ISSUE
Attachment III.A.
Annual update of the Six -Year Transportation Improvement Program for the years 2008 2013.
BACKGROUND
The Transportation Improvement Program (TIP) is updated annually as required by RCW. The
TIP is adopted by resolution after a public hearing at the local agency level and incorporated into
the regional and state TIP's. The TIP is primarily a financial planning document for projects
competing for grants. Any project submitted for federal grant funding must be included in the
local, regional and state adopted TIP's.
The TIP is a rolling plan showing various funding sources: grants, developer, and local funds.
Projects "roll" as funds or stages (design report, final design, construction) occur.
Tukwila's TIP and CIP list many of the same transportation related projects. The TIP lists only
those transportation- related projects planned within the next six years that are deemed regionally
significant. The City's CIP lists transportation projects planned in the next six years and beyond,
as well as water, sewer, surface water, and capital facilities. The TIP is required to be adopted by
July 1 on an annual basis, while the CIP is prepared during summer /fall in conjunction with the
City's budget preparation. Differences between the two may be due to priority changes, funding
availability changes, or other factors that normally occur during the time between adoption of each
document.
ACTION TAKEN
The attached spreadsheet is the "Draft" 2008 2013 TIP and was created by modifying the 2007
2012 TIP to add projects, remove projects, adjust project costs, and reprioritize the list of projects.
Added: Project 31 Macadam Rd S 144 St Left Turn Pocket
RECOMMENDATION
Forward the resolution to the next Committee of the Whole meeting to hold a Public Hearing and
adopt the updated annual Six -Year Transportation Improvement Program of 2008 2013.
RT:ad
attachments: Resolution
Draft TIP Summary Spreadsheet
Current Adopted Six-Year TIP
(P:Projxn\TLPi05 -10 TTPltip2008 memo)
z
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION
IMPROVEMENT PROGRAM, AND DIRECTING THE SAME TO BE FILED
WITH THE STATE SECRETARY OF TRANSPORTATION AND THE
TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a Transportation
Improvement Program and thereafter periodically modified said Transportation Improvement
Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said program,
determined current and future City street and arterial needs, and based upon these findings has
prepared a Six -Year Transportation Improvement Program for the ensuing six (6) calendar
years (2008- 2013); and
WHEREAS, a public hearing was held on the said Six -Year Transportation Improvement
Program on June 11, 2007;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Filing of Program. The City Clerk is hereby authorized and directed to file a
copy of this resolution, together with the exhibit attached hereto, with the Secretary of
Transportation and the Transportation Improvement Board of the State of Washington.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of 2007.
ATTEST/AUTHENTICATED:
Jane E. Cantu, CMC, City Clerk
APPROVED AS TO FORM BY:
Office of the City Attorney
(P:PR0JEcTs \TIP\05 -10 TIFTIP RESOD rroN2008- 2013.Doc)
Verna Griffin, Council President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
(A)
TOTAL 36,879 38,196 7,145 4,901 4,220 59,885 151,226 27,873 14,200 37,072 16,688 55,393
DRAFT 2008 2013 TIP SUMMARY Project Costs in Thou of Dcllars 5/23/07
2007-2012 2008-2013 2007 CIP FU t DING SOUP CES
TIP TIP PROJECT TITLE Page No, 2008 2009 2010 2011 2012 2013 TOTAL Federal State TIB Developer Unsecured City
1 1 Neighborhood Traffic Calming Program 2 10 10 10 10 10 10 60 60
2 2 Greenbelt Trails 14 30 30 30
3 3 Annual Bridge Inspections and Repairs 31 100 100 120 120 180 180 800 800
4 4 Boeing Access Rd Bridge Replacement 32 50 14,375 14,425 7,444 6,981
5 5 Southcenter Parkway Extension 35 10,175 20,827 5,000 10,3071 6,219
6 6 Tukwila Urban Center Access (Klickitat) 36 16,604 16,604 3,436 5,000 7,865 303
7 7 Tukwila Intl Blvd (Phase II) 38 4,645 4,668 9,313 3,691 4,200 1,422
8 8 Tukwila Intl Blvd (Phase 111) 39 3,245 3,656 6,901 3,426 2,851 624
9 9 S 144 St (Phase 11) 41 235 1,138 1,373 753 620
10 10 Overlay Repair Program 42 1,250 1,250 1,250 1,250 1,250 1,250 7,500 7,500
11 11 Traffic Signal Interconnect Program 44 3,000 3,000 1200 1,800
12 12 Interurban Ave S 46 7,625 7,625 5,000 2,625
13 13 Tukwila Urban Center Transit Center 48 600 3,320 3,920 200 2,650 1,070
14 14 Andover Park West 49 1,461 1,461 345 1,116
15 15 S 144th St Bridge Sidwalks 68 25 25 25
16 16 Southcenter Blvd. 47 600 7,000 7,600 7 ,600 0
17 17 Andover Pk E Minkler Blvd 53 65 405 470 470
18 18 East Marginal Way (BAR to S 112 St) 51 35 625 660 570 90
19 19 W Valley Hwy S 156 St 54 41 725 766 300 3 166
20 20 S 133 St SR 599 Ramps Intersection 50 50 450 500 315 185
21 21 Minkler Blvd. 56 425 425 425 0
22 22 Andover Park E Industry Dr. Signal 55 41 316 357 169 188
23 23 S 180 St Andover Park W Intersection 65 210 210 30 100 80
24 24 S 168 St (S \C Parkway to Andover Pk E) 61 13 13,750 5,300 8,450
25 25 SC Blvd Widening (1-5 61st Ave S Bridge) 59 11,200 11,200 11,200
26 26 Tukwila Intl Blvd. S 116 St 60 4,675 4,675 1,350 1,900 1,425
27 27 Tukwila Intl Blvd. (Phase IV) 57 220 2,780 3,000 2,400 600
28 28 West Valley Hwy 62 630 630 530 100
29 29 Nelsen PI 64 200 200 200
30 30 Center -1 58 200 2,100 2,300 200 1,500 600
31 Macadam Rd S 144th St Left Turn Pocket 52 152 292 444 444
2007-2012 'IP PROJECTS REVISED:
31 Added Macadam Rd S 144th St Left Turn Pocket
2008 2013 DRAFT
Transportation Improvement Program (TIP)
wtrgton State Department of Transportation
Agency: Tukwila
Co. No.: 17
City No.: 1320
o
0_z
ILL
1 2
19 1
00 2
14 3
16 5
Co. Name:
MPOIRTPO:
Greenbelt Trails
Report Date: July 25, 2001
King Co.
PSRC
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number ding MP or road
E. Beginning MP or road
F. Describe Work to be Done
3
Neighborhood Traffic Calming Program
Various City Streets
from: to:
Program to address neighborhood tragic concerns using abiping, signage,
roadway Improvements, traffic calming, and education to reduce speeding
from: to:
Provide safe connections to public traits to promote pedestrian and bicycle
modes of transportation in lieu of motorized vehicles.
Bridge Program
Various City Streets
from:
to:
Perform load ratings and bMannual Inspections as well as construct
necessary repairs and maintenance.
14 4 Replacement
Boeing Access Rd Bridge P
Boeing Access Road
from: Airpod Way to: 1 -5
Reconstruct bridge.
Southcenter Parkway Extension
Southcenter Parkway to: 5 200 St
from: S 180 St Including curb
Construct widening to 4 lanes with center turn pockets
gutter, sidewalks, drainage, landscaping, and utility undergrounding.
16 6
KlickHat SC Pkwy 11-5 Access Revision
from: 1 -5 Off Ramp to: S 168 St
Design and construct safety and capacity improvements.
r
E
4 5
12 S
32 P
11 S
01
m
a.
o- Phase
i Start
(mm/ddyyyY)
6 7 8 9
ALL 11112007
Totals
PE 111/2012
Totals
ALL 1 1/1/2007 1
Totals
09 p 1 600 T ALLI 1/1/2007
P
0
1.4 W
T
S
P
G
05 P 1500 W
08
P
G
Totals
Project Costs in Thousands of Dollars
Fund Source Infonnafon
Federal Funding
Federal Federal State
Fund Cost by
Code Phase Code
10 1 11 12 1 13
BR
I
I
Totals
CN 1 1112007 1 Discretionary I
Page 1
Six Year Transportation Improvement P 12
From 2007 to
Hearing Date: 6/12/2006 Adoption Date: 6/19/2006
Amend Date: Resolution No.: 1606
Federally Funded
Projects Only
State
Funds
I
Local
Funds
Total
Funds
Expenditure Schedule
(Local Agency)
1 st 2nd 3rd
2150 2150 350 350 350
2150 2150 350
1 1 301 301
30 30
8601 86o1 300{ 1001 1001
I 1 1 144251 14425 501 1
14425 14425 50
Totals 35681 TPPI 110001 111291 256971 182151 74821
CN I 1/12007 I Discretionary I
3568 11000 11129 25697 18215 7482
1 1 1 124501 124501 124501
12450 12450 12450
4th
Thru
6th
Envir.
Type
20
14 15 16 17 18 19
1100 CE
RAN
Required
Date
(MMA11
21
No
350 350 1100
1 1 30 CE
No
0
360 CE
860 860 300 100 100 360
I 14375 CE
14375
1 CE
CE
No
No
Yes
1/1/06
Yes
1/1/09
Supersedes previous editions
Six Year
r
From a te; 611912006
Adoptio
611212 Resolution So:. 1606
Rearing Date: F unded'
r r Federally OnIY
„twn Amend Patel P
Department o{ Transportation
Schedule
State Depa Expenditure Sch
ton Dollars Agency)
Washington Local A9 Required
Wa to (housanda l
r T p fpiaGt Costs F ice Intormailo h E YPe (WPM
I,gency: Tukwila Na me: Ktn�' 1 1_ 1 �ota 1st 2nd 3rd 6ih_ 21
Co. No: MppiRTpo; ?SRC 1 1
1 d Federal F' Slate gtate to Fund 1 18 Z
MOW: 132 m 4 F ed erat Federat Fund 'Funds 16
Cos by Funds 16 G
Identificat B. Bridge N a phase Fund Code 14 1 N
4 0
Construct profectldentit g Starl Co de Phase 13 4645\ 4418
1 Ald No.
N m 12 9063
A, Fedora p E I 8 mmld 10 42001 11771
C Prajo Uft ftl� N Number or road 3686\ ?PP RM
gg o D. 5tree og ame�ad Endin9 5 6 T 7 STPN)
E� a E. Beginning MP a Done 4--).
1 1 1 GN U1120 t. u' 4 F• Describe Work to b 3 03 5000 O 46a5 36561 GE No
.---1-_—_ l P 4200 15751 6�1� 32A5I I
1 2 S 3 6 66
3426\ OVER
14 7 'Tukwila foil &Wd {Phase 2) T 5 PN)
to:s,1umS T. T 11112 1
JukwNa Intl BWd drainage. 3656
S 116 St sidewalks, 1 132 St gO 2100 C 32A5 CE No curb gutter,
tram overlay. ug °r9revndmg 'v 03 S S 2900 575 6 21 21 51 I I
landacAP1t0' and
3426 1 1 U I 2 20 20\ 11381
Phase 3) P 1 1 3851 1138.
14 8 }a Intl Blvd l d Tota AIPI 7531
1?ukwila Intl BWd 10:5138 St PE 11112
k�dudm4Px '69 d s 03 1000 W RW 11 7 235 1138 3750 GE No
from 513251 03 P Chi 11112 1373 1250\ 1250\ Reconstruct ion, drainage, and Witty Vnder V Totals
ounding 620 12501
753 7500
rnhe1 drainago• P I 750
G 1
17 9 5144 St tphaso 2) Totals
}la tot I Blvd t ALL 1,112007
51a4 2 St to.. g sidewalks. drainage. G 1250 3750
1250 1250 2400 GE NO
from: 42 Ave paving, curb n9. gutter, 07 S 1
7 7500 23721
cream and I IN unda9 Q g77G r
Rumination P I 35661
r S 120 1
16 1U Overlay and Repair Pro9r T Tot3 CMP
Streets to: anann CN U1120 C0
Various City laY City streets as needed in W GE
I trout: Repair, rehabilitate, and ove
12 S 1 4772 2372 24
I" 6192\ No
Program P 1206 1 1 6 921 6192 1
P rogram O 1
16 11 Signal Intarr on^e t
Traffic si9 Totals a1s 1,1120 1
Various Ct i n Streets ect between tragic signal an 1N 1
6192
interconnect ssyste be 4500
from: install bard 03 T 6192 6192
the Traffic Pemd�sCenter. S
P
1 4 12 INtban Ave S nt G Totals
l Interurban Ave S to: Fort oedramaga• I gur rdnadon, i t
S 143 St vitro, c urb gutter, r
from ybe etind�I n g Pa
gand'an�'
t Supersedes P revious editions
page 2
yjlastfn8t°n State DePartrnent of Transportation
Iwo Tukwila
Agency: Co. No.: 17 Co. Name: King Co.
MPOIRTPD: PSRC
City No.: 1320
Prolect Identification
B. Bridge No
A. Federal Aid No.
Title Prolect o E D. Stre tlRoad Name or Number ding MP or road
0 a y E Beginning MP or road
F. Describe Work to be one 3
1
16 13
Tukwila Urban Center Transit Center
Centred Business District to
tram: transit center.
Design and construct a
16 14 A Park West
Andover Park Wei to Strander Blvd
from: Tukwila Parkway
Complete widening for center lantern lane.
17 15
S 144 St Bridge Sidewalks
S 144 St lo; 53 Ave S 53 Ave
from; 51 Ave 5 over t -5 b Si Ave S and
widen existing sldewellrs on bridge
S.
16 16
Southcenter Blvd.
Southcenter Blvd. to: I -5
tram: International Blvd, rial with medians, tom lanes, curb
Improve roadway to a aton, and *renege. a
gutter, sidewalks, Itlurrn
16 17
Andover Park E 1 Minkter Blvd.
to: 500 Ft. each leg nta and
from: 500 Ft. each me and va gi signal lm,.-^
Design end construct Intersection
,Mdentng for lofttum lanes.
46 18
05 P
•••,.qc 2001
East Marginal Way
East Marginal Way to: S 112 St
Boeing Access Rd. Potter, sidewalks,
Deli tram: nlng to Vanes Including cu
dr
Design an landscapi 8 and utility undergrounding.
drainage
05 P 025
03 S
12 S 1 000
03
1500
Tota1S
PE 111120 1
CH 111120 I
Totals
PE 1 1/1120 1
2000 C
G
P
S
W
C
G
P
s
T
W Totals
PE 1/112007
1.1 C CN 1111208 1
O
1 Totals
ALL 1/11207
P
S
T
W
Six Year Transportation t1iilt.s""' to 2012
From 20Q7
Adoption Date: 611912006
Hearing Date: 611212006 Resolution No.: 1606
Amend Date: Federally Funded
Projects Only
Expenditure Schedule
(Local Agency) R1W
Required
mir. Data
3rd Type Date 1
State Fun ds E
Funds 1s1 2nd
Funds Funds 20 21
Funds 18
16 17
14 15
13 z10
2850 2850 2640
2850 2640 210
l
1 I
2650
1001
7001 1001 1
I
Prolect Costs in Thousands of Dollars
Fund Source Information
Federal Funding State
Federal S S tine
Cost by
Phase Code
11 12
m
g F
Phase F ederal
Fund
A tmm sdd Code
0
T 6 9 10
11112007 CMAO 1
TotalS
PE 1/1120
CH I 111/2012
Totals
Page 3
1 I I
800 B00 100
251 251 251
25
25 25
1
70001 7000 6001 1 70001
760 7609 600 7000
201 2001 2001
200 200 20 351
35
19201 1920 1
1955 1955
4th
Thru
6th
19
700
CE
35
700
CE
CE
1920
No
No
No
CE No
CE No
CE No
1920
SuperSedes previous editions
T Washington State Department of Transportation
Hearing Date: 6/1212006 Adoption Date: 6/1912006
Agency: Tukwila Resolution No.: 1606
C Name: King Co. Amend Date:
Co. No.: 17 Federally Funded
City No.: 1320 d APOIRTPO: PSRC
Project Costs in Thousan of D ollars expenditure Schedule Projects Only
Fund Source Information (Local Agency) RAN
Project Identification Required
A. Federal Aid No. B. Bridge No, w o L Federal Funding 4th Envlc Date
e H Pha Federal Federal State State Local Total Thru
G. Project Title ar Cost by Fund
E F Start Fund phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (M
E D. Street/Road ec be Work Name or Number mnr/dd/YY1!17 Code 18 t9 20 21 LI RAN a Z E. Beginning MP or roa Ending MP or road 11 12 13 14 15 16 17
F. Describe Work to be Done 4 5 6 T 8 9 10 725 CE
3 725 725 No
12 p 1500
T ALL 1/1!2009
P
14 19
West Valley Hwy 1 S 156 St
from: Southcenter Blvd. to: S 158 St
Construct additional northbound left turn lane at S 156 St for northbound
Totals
HOV to northbound 1465.
16 20 12 p 1000 C ALL 1 111/2009 1
G
S i33 St I SR 599 Ramps Intersection P
S
from: 500 Ft. on each leg to: 500 F1, on each leg
Design and construct intersection improvements Including a new fram S e T W Totals
signal. P 2 W ALL 1 1,112010 1
16 21
Minkler Blvd. T S
P
16 24
%.1
Mlnkler Blvd.
from: Southcenter Pkwy to: Andover Park W
Construct widening for 3-lanes including curb gutter, sidewalk, drainage,
and landscaping.
16 22
Andover Park E Industry Dr. Signal
from: 500 Ft. on each leg to: 500 Ft. on each leg
Design and construct a traffic signal and intersection improvements.
16 23
S 180 St Andover Park W Intersection
from: 500 Ft. on each leg to: 500 Ft. on each leg
Widen for north south tum lanes.
S 168 St
S 168 St
from: Southcenter Pkwy to: Andover Park W
Construct new roadway Including curb gum. sidewalk. drainage,
illumination, and landscaping.
Report Date: July 25, 2001
12 P 1000
Totals
w ALL 1 1/1/2010
T
S
P
G
Totals
12 P 1000 W ALL 1 1/1/2010 1
T
P
Totals
01 P 2000 P ALL1 1/1/2012 1
W
Totals
1
30 320
300 50 350
1 1 4251 4251 1 1 1 425 CE
Page 4
3001
Six Year Transportation Improvement Program
From 2007 to 2012
1 1 I
725 725
501 3501
425 425
2201 2201
210 210
1 137501 137501
13750 13750
I I
I I
775
301 3 GE
425
220 CE
220
220 220 1 210 CE
1 1 1 1 2101 2101
210
1 1 13750 CE
13750
No
No
No
No
No
Supersedes previous editions
a� n1ton State Departm of Transpo
Vi Tukwila
Agency: Co. Name: King Co.
Co. No.: 17 MPOIRTPO: !sRC
City No.: 1320
Project Identificatio D Bridge No.
A. Federal Aid No.
C. Project Title
D. StreetiRoad Name or Number ding MP or road
E. Beginning MP or road
Yliork to be Done 4
F. Describe
3 04 P
14 25 Widening
SC Blvd• 161 Ave 5 Bridge
from: to: 62 Ave
Widen to:
alvd" and the 81 A ve 5 brd9e to add a lane for future
traffic growth.
14 26
Tu Intl BWd. 1 S 116 St
Bridge to: SR 599 n
P SR 599 on widening on Tukwila Intl elvd" and intersec8o
improvements 1g,1 S 118 St
14 27 4
Tukwila Intl BWd. (Ph
Tukwila Intl Blvd. to: S 116 St sidewalk,
Boeing Access Rd. including paving, 511 curb &gutter, sidew
drain e, lu n a a undergmu
drainage. 9minatdr', landscaping and utility
14 28
17
29
ar
WeslValley Hwy
West Valley Hwy to: St r sidewalks, s,
from: 1.405 t 7•lanee including
Design and construct
illumination, and drainage"
Nelsen Place
Nelsen Place to: S 158 5i Inage, and
D err; S 156 ns aving, curb gutter, sidewalks, dra
Design and constnrct R
illuminatio
AS 30
Tukwila Urban Center PedtBike Bridge
to: West Valley ev and mg station,
Baker B e o over the Green River cermecting the
Pedestrian bridge
t 3 e
a m
ii o- Phase
ii Ii Start
r E (mmtdd 1'Y1
8 9
6
AL L 111120
0.5 C
G
P
s
T
W Totals
ALL 11112012
04 P 1000 P
05 P 0.5
03 P 600
32 1000
08
Totals
W ALL\ 1/112012
T
G
P
Six Year to 201
From 2007
Adoption Date: 611912006
Hearing Resolution No.
Amend D ate: 611212 1606 Date: Federally Funded
Projects Only
Expenditure Schedule ule
(Local Agency) R equited
Project Costs in Thousands o �Donnatlon 4th Envlr. Date
Fund 50
3rd Thru Type (MN
Federal Funding 8 th
Federal State Stale Local Fun 1st 2nd 19 20 21
Federal Cost by Fund Funds Funds 1 18
�d Phase Code
13 14 r 15 16 11200 CE No
10 11 12 y i 112001 11200
Totals
ALL 111120
Totals
Grand Totals for Tukwila
Page 5
Totals
111120
03 P 3500 P
PE
0
Totals
ALL\ 111/2007 51P(E) 500\
1268
11200 11200
1 46751 46751
4675 4675
1 30001 30001
3000 3000
5801 5801
I I
1
580 580
1 2001 2001
1
200 200
1 12001 17001 3001 14001
11200
4675
4675
220\ 2780 GE
220 2780
GE
CE
No
580
200 CE
200
CE
500
1200 1700 300 1400
110339 141878 46977 27039 67 58995
18853
No
No
No
No
Supersedes pfeYious editions