Loading...
HomeMy WebLinkAboutTrans 2007-10-08 Item 3B - Final Acceptance - Tukwila Urban Center Signal Interconnect and ITS with Valley Electric CompanyContract Award Amount Net Change Orders Unit Price Bid Item Overruns Sales Tax (N /A Rule 171) Total Amount Paid (incl. retainage) RECOMMENDATION INFORMATION MEMO To: Mayor Mullet From: Public Works Director to Date: October 2, 2007 Subject: Tukwila Urban Center Signal Interconnect and ITS Project Project No. 88 -RWO2 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of retainage. BACKGROUND The Notice to Proceed for Contract No. 06 -090 with Valley Electric Company of Mount Vernon, Inc. was issued January 8, 2007 for this project. This contract was completed on August 20, 2007. Two change orders were issued during construction. Change Order 1 was a credit of $5,783.95 for not installing future transit priority hardware (Metro Transit technology is changing and could not commit to participate at this time). Change Order 2 was for miscellaneous extra work in the amount of $20,000, primarily replacing conduits and junction boxes that proved to be unusable due to damage or lack of excess capacity for running cables and/or fiber optics. The unit price bid item overruns listed below were primarily due to significantly more traffic control labor than estimated (estimated 800 hours and used over 2,300 hours) and additional concrete restoration due to increases in junction boxes and conduits. $693,081.00 14,216.05 123,838.97 0.00 831.136.02 It is recommended that this contract be forwarded to the Tukwila City Council on the Consent Agenda for formal acceptance and authorization to release the retainage, subject to the standard claim and lien release procedures. attachments: Notice of Completion of Public Works Contract P:\PROJECTSIA- RW RS Projects \88rvA2 Traf Sig Intrcnt\JNFO MEMO Acceptance Valley Electric NC ITS.doc 11 From: State of Washingt on Department of Revenue PO Box 47474 RE VENUE Olympia WA 985047474 Contractors Registration No. (UBI No.) 911 275 610 Date 9/7/07 City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Description of Contract NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT N ame& Address=ofPublic Agency Notice is hereby given relative to the completion of contract or project described below Tukwila Urban Ctr Signal Interconnect ITS Project #88RW02 06 -090 Contractor's Name Telephone Number Valley Electric Company of Mt. Vernon, Inc. Contractor's Address 1100 Merrill Creek Parkway, Everett, WA 98203 Date Work Commenced Date Work Completed 1/8/07 8/20/07 Surety or Bonding Company Fidelity and Deposit Company of Maryland Agent's Address HUB International Northwest, PO BOx 3018, Bothell, WA 98041 Sub -Total Amount of Sales Tax Paid at 0.0 0.00 (Ifvarious rates apply, please send a breakdown.) TOTAL 831,136.02 Comments: Retainage Bond in place; Sales Tax not paid pursuant o "Rule 171". Finance Approval: U Contract Amount 693,081.00 Additions 138,055.02 Liquidated Damages 0.00 Reductions 0.00 Signature Type or Print Name Diane Jaber Phone Number 206 433 -1871 Department Use O n ly Assigned To Date Assigned Contract Number 425 407 0832 Date Work Accepted Amount Disbursed 831,136.02 Amount Retained 0.00 TOTAL 831,136.02 Disbursing Officer The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype (TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov. REV 31 0020e (6- 27-01) 12