Loading...
HomeMy WebLinkAboutTrans 2008-05-28 Item 3D - Agreement - Traffic Counts with Traffic Data Gathering for Concurrency Model UpdateTo: Mayor Haggerton From: Public Works Director Date: May 20, 2008 v Subject: Concurrence Model Update Project 08 -RWO5 Traffic Counts Agreement ISSUE Execute an agreement with Traffic Data Gathering to provide traffic counts for the annual update to the City's Concurrency Management Program. BACKGROUND Current traffic count data is necessary to the city's annual update to the Concurrency model. Traffic Data Gathering provided count data for the 2007 model update and currently holds the contract for the city's annual traffic count program. ANALYSIS Similar locations that were counted last year need to be revisited again. A few locations were removed due to anticipated extended road closures. Additionally, locations were added that haven't been counted in a few years. A total of 10 locations for 24 hour counts (tube counts) and p.m. peak hour turning movements will be counted at 58 intersections. The total contract amount is $13,480.00. RECOMMENDATION INFORMATION MEMO For information only as the contract is under $25,000.00. Attachment: Short Form Contract p: \projects \a rw rs projects \08rw05 concurrency modeling\information memo traffic counts model update 5- 20-08.doc Contractor/ Vendor Name: Address: Telephone: The City and the Contractor hereby agree as follows: 1. SCOPE OF WORK Traffic Data Gathering 11410 13 Street SE Lake Stevens, WA 98258 (425) 334 -3348 24 Hour Volume Counts Intersection Counts 3. CONTRACT SUM 4. PAYMENTS CITY OF TUKWILA Short Form Contract AGREEMENT Project No.: Budget Item: Project Name: Please initial all attachments, then sign and return two copies to: City of Tukwila, Public Works Department, 6300 Southcenter Boulevard, Tukwila, Washington 98188. This Agreement, made and entered into this day of 20 by and between the City of Tukwila, hereinafter called the City, and Traffic Data Gatherine, hereinafter called the Contractor. as shown on the Drawings and/or described in the Specifications and/or General Conditions attached and identified as: a. Attachment "A" Concurrency Modeling Update Traffic Count Locations) 2. TIME OF COMPLETION The work shall be commenced by June 17. 2008 and be completed no later than July 17. 2008. The City shall pay the Contractor for the performance of the work the sum of $13.480.00 that includes applicable Washington State sales tax. The City shall make payments on account of the contract as follows: Monthly. Of 000.13.532.200.41.02 Concurrence Modeling: Traffic Counts 5. ACCEPTANCE AND FINAL PAYMENT Final payment shall be due fifteen (15) days after completion of the work, provided the contract is fully performed and accepted. 6. GENERAL CONDITIONS The City and the Contractor agree upon the following general conditions which shall govern: A. Contract Documents The contract includes this Agreement, Scope of Work and Payment Exhibit. The intent of these documents is to include all labor, materials, appliances and services of every kind necessary for the proper execution of work, and the terms and conditions of payment therefore. The documents are to be considered as one, and whatever is called for by any one of the documents shall be as binding as if called for by all. The Contractor agrees to verify all measurements set forth in the above documents and to report all differences in measurements before commencing to perform any work hereunder. B. Materials, Appliances and Employees Except as otherwise noted, the Contractor shall provide and pay for all materials, labor, tools, water, power and other items necessary to complete the work. Unless otherwise specified, all material shall be new, and both workmanship and materials shall be of good quality. Contractor warrants that all workmen and subcontractors shall be skilled in their trades. C. Surveys, Permits and Regulations The City shall furnish all surveys unless otherwise specified. Permits and licenses necessary for the prosecution of the work shall be secured and paid for by the Contractor. Easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by the City unless otherwise specified. The Contractor shall comply with all laws and regulations bearing on the conduct of the work and shall notify the City in writing if the drawings and specifications are at variance therewith. D. Protection of Work, Property and Persons The Contractor shall adequately protect the work, adjacent property and the public and shall be responsible for any damage or injury due to his act or neglect. E. Access to Work The Contractor shall permit and facilitate observation of the work by the City and its agents and public authorities at all times. F. Changes in the Work The City may order changes in the work, the contract sum being adjusted accordingly. All such orders and adjustments shall be in writing. Claims by the Contractor for extra cost must be made in writing before executing the work involved. G. Correction of Work The Contractor shall re- execute any work that fails to conform to the requirements of the contract and that appears during the progress of the work, and shall remedy any defects due to faulty materials or workmanship which appear within a period of one year from date of completion of the contract and final acceptance of the work by the City unless the manufacturer of the equipment or materials has a warranty for a longer period of time, which warranties shall be assigned by Contractor to City. The provisions of this article apply to work done by subcontractors as well as to work done by direct employees of the Contractor. H. Owner's Right to Terminate Contract Should the Contractor neglect to prosecute the work properly, or fail to perform any provision of the contract, the City, after seven days' written notice to the contractor, and his surety, if any, may without prejudice to any other remedy the City may have, make good the deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contract or, at the City's option, may terminate the contract and take possession of all materials, tools, appliances and finish work by such means as the City sees fit, and if the unpaid balance of the contract price exceeds the expense of finishing the work, such excess shall be paid to the Contractor, but if such expense exceeds such unpaid balance, the Contractor shall pay the difference to the City. I. Payments Payments shall be made as provided in the Agreements. Payments otherwise due may be withheld on account of defective work not remedied, liens filed, damage by the Contractor to others not adjusted, or failure to make payments properly to the subcontractors. J. Contractor's Liability Insurance Contractor will carry public liability and property damage insurance with carriers satisfactory to the City, in the following amounts: $50,000 property damage 500,000 public liability (each person) $1,000,000 public liability (each occurrence) with endorsements naming the City as an additional insured and will provide the City with certificates of insurance prior to start of construction and with 30 days notice prior to cancellation. K. Performance Bond The Contractor shall furnish to the City prior to start of construction a performance bond in an amount of 100% of the contract in a form acceptable to the City. In lieu of bond for contracts less than $25,000, the City may, at the Contractor's option, hold 5% of the contract amount as retainage for a period of 30 days after final acceptance or until receipt of all necessary releases from the Department of Revenue and the Depaitment of Labor and Industries and settlement of any liens, whichever is later. L. Liens The final payment shall not be due until the Contractor has delivered to the City a complete release of all liens arising out of this contract or receipts in full covering all labor and materials for which a lien could be filed, or a bond satisfactory to the City indemnifying the City against any lien. M. Separate Contracts The City has the right to let other contracts in connection with the work and the Contractor shall properly cooperate with any such other contracts. N. Attorneys Fees and Costs In the event of legal action hereunder, the prevailing party shall be entitled to recover its reasonable attorney fees and costs. O. Cleaning Up The Contractor shall keep the premises free from accumulation of waste material and rubbish and at the completion of the work he shall remove from the premises all rubbish, implements and surplus materials and leave the building broom clean. P. Indemnification The Contractor shall indemnify, defend and hold harmless the City, its officers, agents and employees, from and against any and all claims, losses or liability, including attorney's fees, arising from injury or death to persons or damage to property occasioned by an act, omission or failure of the Contractor, its officers, agents and employees, in performing the work required by this Agreement. With respect to the performance of this Agreement and as to claims against the City, its officers, agents and employees, the Contractor expressly waives its immunity under Title 51 of the Revised Code of Washington, the Industrial Insurance Act, for injuries to its employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this paragraph extends to any claim brought by or on behalf of any employee of the contractor. This waiver is mutually negotiated by the parties. This paragraph shall not apply to any damage resulting from the sole negligence of the City, its agents and employees. To the extent any of the damages referenced by this paragraph were caused by or resulted from the concurrent negligence of the City, its agents or employees, this obligation to indemnify, defend and hold harmless is valid and enforceable only to the extent of the negligence of the Contractor, its officers, agents, and employees. Q. Prevailing Wages The Contractor shall pay all laborers, workmen and mechanics the prevailing wage and shall file the required "Statement of Intent to Pay Prevailing Wages" in conformance with RCW 39.12.040. R. Discrimination Prohibited The Contractor shall comply with all Equal Employment Opportunity regulations and shall not discriminate against any employee, applicant for employment, or any person seeking the services of the Contractor on the basis of race, color, religion, creed, sex, age, national origin, marital status or the presence of any sensory, mental or physical handicap. IN WITNESS WHEREOF, the parties hereto executed this Agreement the day and year first above written. CITY OF TUKWILA By: By: Signature Signature Printed Name: Printed Name: Title: Title: Date: Date: ATTEST /AUTHENTICATED: Christy O'Flaherty, City Clerk APPROVED AS TO FORM: Office of the City Attorney BY: Attachment A Concurrency Modeling Update Traffic Count Locations Tube Counts: Count Days: Tuesday through Thursday Bi- directional 24hr tube counts taken at the locations as follows: West Valley HWY s/o S. 180th Street Martin Luther King Way n/o Boeing Access Rd 42nd Ave S n/o 144th St S Macadam Rd n/o 144th St S Turning Movement Counts: Count Days: Weekday Counts: Tuesday, Wednesday, or Thursday 2 -hr turning movement vehicle counts (including pedestrians, and heavy vehicles (by approach)) taken during the weekday afternoon peak hour of 4pm to 6pm. Project Intersection Table Martin Luther King Jr at Boeing Access Rd E Marginal Way S at S 112th St 42nd Ave S at S 124th St S 130th St at E Marginal Way S 40th Ave S at E Marginal Way S SR 599 NB off ramps at Interurban Ave S SR 599 NB on ramps at Interurban Ave S S 133rd St at SR 599 off /on ramps /134th Place Gateway Drive/ 133rd St at Interurban Ave S 1 -5 NB on ramp at Interurban Ave S 1 -5 SB off ramp at Interurban Ave S 53rd Ave S /Macadam Rd at S 144th St 51st Ave S at S 144th St 42nd Ave S at S 144th St Tukwila International Blvd at S 144th St Southcenter Blvd at 65th Ave S Interurban Ave S at 1 -405 on ramp /Fort Dent Wy West Valley Hwy at 1 -405 off ramp E Marginal Way S at Boeing Access Rd W Valley Hwy at S 180th Street S 180th St at Andover Park E S 180th St at Andover Park W S 180th St at Southcenter Parkway Southcenter Parkway at Minkler Blvd Southcenter Parkway at S 168 St Southcenter Parkway at Strander Blvd Southcenter Parkway at Klickitat Dr Southcenter Parkway at Nordstrom Entrance Tukwila Parkway at 61 Ave Bridge S Total $13,480 International Blvd n/o S 154th St 42nd Ave S n/o S 154th St S 133rd St w/o S 43rd Ave S 144th St w/o 46th Ave S Fee 1 day volume count at 8 locations at $125 per location $1,000 58 Turning Movement Counts, requiring up to 96 people at $130 /person $12,480 Southcenter Blvd at 61 Ave S Southcenter Blvd at 66 Ave S Interurban Ave S at Southcenter Blvd Andover Park E at Tukwila Parkway Andover Park E at Baker Blvd Andover Park E at Strander Blvd Andover Park E at Minkler Blvd Andover Park W at Minkler Blvd. Andover Park W at Baker Blvd Andover Park W at Strander Blvd Strander Blvd at 61st Place/Target Drwy Strander Blvd at West Valley Hwy Tukwila Parkway at 1 -405 NB On Ramp Tukwila Parkway at Andover Park W 1 -5 SB off ramp at S 154th St (Southcenter Blvd) Tukwila International Blvd at S 112th St Tukwila International Blvd at S 152nd St Klickitat Drive at SR 518 EB off ramp 51st Ave S at SR 518 WB on ramp Klickitat Drive at 1 -5 SB On Ramp W Valley Hwy at Longacres Way Airport Way at Boeing Access Road Tukwila International Blvd at SR 599/SR 99 EB ramps Tukwila International Blvd at SR 599/SR 99 WB ramp /116th Tukwila International Blvd at SR 599/SR 99 WB slip ramp E Marginal Way S at S Norfolk Street E Marginal Way S at S 102nd Street Airport Way at S Norfolk Street Southcenter Blvd at 1 -405 SB Off Ramp