Loading...
HomeMy WebLinkAboutTrans 2009-04-06 Item 3B - Final Acceptance - East Marginal Way South/92nd Place South Signal Pole Replacement with TransTech ElectricMayor Haggerton Transportation Committee FROM: Jim Morrow, Public Works Directo DATE: March 30, 2009 SUBJECT: E Marginal Wv S 92 PI S Signal Pole Luminaire Replacement Project No. 08 -RW04, Contract No. 08 -059 Project Completion and Acceptance TO: City of Tukwila INFORMATIONAL MEMORANDUM ISSUE Accept contract as complete and authorize for release of the retainage. BACKGROUND This project replaced a signal pole with luminaire that was damaged by an errant southbound pickup truck at the southwest corner of East Marginal Way South and South 92nd Place. The first Notice to Proceed for Contract No. 08 -059 with TransTech Electric, Inc. of Kent, Washington, was issued on August 5, 2008 for approval of the signal pole drawings and pole procurement. The second Notice to Proceed was issued on December 1, 2008 for the actual construction of the signal pole replacement. Construction was physically completed on February 23, 2009. No change orders were issued for the project construction. Jim Haggerton, Mayor ANALYSIS The finalized project cost is the same as the authorized construction award. The driver's insurance company will pay for the total construction contract amount, as well as utility potholing, design and construction management. Contract Award Amount Change Orders Total Amount Paid (including retainage) RECOMMENDATION The Council is being asked to formally accept and authorize the release of retainage, subject to standard claim and lien release procedures, for the contract with TransTech Electric, Inc. in the amount of $83,061.00 and to consider this item on the consent agenda of the April 20, 2009 Regular Meeting. Attachment: Dept of Revenue Notice of Completion $83,061.00 0.00 $83.061.00 P.\PROJECTS\A- RW RS Projects \08RW04 EMW_92nd P1. Signal Pole Replacement \Construction Phase \After ConstructionVnfo Memo Info Memo Closeout TransTech 3 -30 -09 bg gl doc State of Washington Department of Revenue PO Box 47474 REV Olympia WA 98504 -7474 City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Comments: REV 31 0020e (6 27 01) Contractor's Registration No. (UBI No.) 601 617 500 Date 1 -14 -2009 NOTICE !1T COMPLETION T�T9T T, TT�IAT OF PUBLIC WORKS VTT? A ('T r i r. L jr l lli it LL 11V1\ Vl' I v1� 1� "r �l�v e0 i .l�c� 1 From: Name Address of Public Agency Transtech Electric, Inc. Contractor's Address P.O. Box 1108, Kent, WA 98031 Reductions 0.00 Assigned To Date Assigned Signature Type or Print Name Diane Jaber Phone Number 206- 433 -1871 Department Use Only Notice is hereby given relative to the completion of contract or project described below Description of Contract Contract Number E. Marginal Way S. and S. 92nd Pl. Signal Pole Replacement 08 —RW04 08 -059 Contractor's Name Telephone Number 253- 872 -5343 Date Work Commenced Date Work Completed Date Work Accepted 8/5/08 1/6/09 Surety or Bonding Company American Contractors Indemnity Company Agent's Address 9841 Airport Boulevard, 9th Floor, Los Angeles, CA 90045 Contract Amount 83,061.00 Additions 0.00 Liquidated Damages 0.00 Sub -Total 83,061.00 Amount Disbursed 78,907.94 Amount of Sales Tax Paid at 0.0 0.00 Amount Retained 4,153.06 (If various rates apply, please send a breakdown.) TOTAL 83,061.00 TOTAL 83,061.00 1 Disbursing Officer The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 3217. Teletype (TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov.