Loading...
HomeMy WebLinkAboutTrans 2009-04-06 Item 3C - Final Acceptance - Green River Pedestrian-Utility Bridge Re-Bid Painting with Purcell Painting and CoatingTO: ISSUE BACKGROUND City of Tukwila INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Jim Morrow, Public Works Directoy DATE: March 30, 2009 CJ SUBJECT: Green River Pedestrian and Utility Bridge Rebid Painting Project No. 07 -RW02, Contract No. 08 -074 Project Completion and Acceptance Accept contract as complete and authorize for release of the retainage. Jim Haggerton, Mayor The Notice to Proceed for Contract No. 08 -074 with Purcell Painting Coating, LLC of Tukwila, Washington, was issued on September 8, 2008 for the Green River Pedestrian and Utility Bridge Rebid Painting Project. This project provided cleaning and painting of an arched wood pedestrian bridge across the Green River. Construction was physically completed on October 22, 2008. One Change Order was issued during construction to allow the contractor to close the bridge during blasting and repainting at no cost to the City. ANALYSIS The finalized project cost is under the authorized construction budget. Minor unit price under -runs were due to force account items not entirely used during construction: Contract Amount (Sales Tax included) Change Order No. 1 (no cost): Unit Price Under -runs Total Amount Paid (including retainage) RECOMMENDATION $134,000.00 0.00 ($7,390.42) $126.609.58 The Council is being asked to formally accept and authorize the release of retainage, subject to standard claim and lien release procedures, for the contract with Purcell Painting Coating, LLC in the amount of $126,609.58 and to consider this item on the consent agenda of the April 20, 2009 Regular Meeting. Attachment: Dept of Revenue Notice of Completion P:\PROJECTS\A- RW RS Projects \07RW02 Gr Riv Ped Br\2008 Sealing Re- Bid \Construction Phase\After Construction\Info Memo Closeout Purcell Painting 3 -30 -09 bg gl.doc From: State of Washington Department of Revenue //4 PO Box 47474 REVEN Olympia WA 98504 -7474 Contractor's Registration No. (UBI No.) 602 440 422 Date 1/14/09 City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 N(lTTCT' nF U(1MPT ..F.TTON ()F PTTRT .TU WORKS rnNTR A CT Name Address of. Publiie'Agency Notice is hereby given relative to the completion of contract or project described below Description of Contract Contract Number Green River Pedestrian and Utility Bridge Painting 07 —RW02 08 -074 Contractor's Name Telephone Number Purcell Painting Coatings, LLC 206 835 -6878 Contractor's Address 6456 South 144 Street, Tukwila WA 98168 Date Work Commenced Date Work Completed Date Work Accepted 9/8/08 10/22/08 Surety or Bonding Company Western Surety Company Agent's Address 999 3 Avenue, Suite 2500, Seattle, WA 98104 Contract Amount 122,935.78 Additions 0.00 Reductions 6,780.20 Sub -Total 116,155.58 Amount of Sales Tax Paid at 9.0 10,454.00 (If various rates apply, please send a breakdown.) TOTAL 126,609.58 Comments: 0 Department Use Only Assigned To Date Assigned Amount Disbursed Amount Retained Signature Type or Print Name Diane Jaber Phone Number 206 433 -1871 Liquidated Damages 0.00 arsng.. 120,801.79 5,807.79 TOTAL 126,609.58 ffiice! The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Depat.tnient's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype (TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov. REV 31 0020e (6- 27 -01)