HomeMy WebLinkAboutTrans 2009-05-18 Item 3C - Resolution - 2010-2015 Transportation Improvement ProgramTO:
City of Tukwila
INFORMATIONAL MEMORANDUM
Mayor Haggerton
TRANSPORTATION COMMITTEE
FROM: Public Works Director
DATE: May 6, 2009
SUBJECT: Six -Year Transportation Improvement Program (2010 -2015)
ISSUE
Jim Haggerton, Mayor
Annual update of the Six -Year Transportation Improvement Program for the years 2010 2015.
BACKGROUND
The Transportation Improvement Program (TIP) is updated annually as required by RCW. The TIP
is adopted by resolution after a public hearing at the local agency level and incorporated into the
regional and state TIPs. The TIP is primarily a financial planning document for projects competing
for grants. Any project submitted for federal grant funding must be included in the local, regional
and state adopted TIPs.
The TIP is a rolling plan showing various funding sources: grants, developer, and local funds.
Projects "roll" as funds or stages occur (design report, final design, and construction).
Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation- related
projects. The TIP lists only those transportation- related projects planned within the next six years
that are deemed regionally significant. The City's CIP lists transportation projects planned in the
next six years and beyond, as well as water, sewer, surface water, and capital facilities. The TIP is
required to be adopted by July 1 on an annual basis, while the CIP is prepared during summer /fall
in conjunction with the City's budget preparation. Differences between the two may be due to
priority changes, funding availability changes, or other factors that normally occur during the time
between adoption of each document.
ACTION TAKEN
The attached spreadsheet is the "Draft" 2010 2015 TIP and was created by modifying the 2009
2014 TIP to add or remove projects, adjust project costs, and reprioritize the list of projects.
Added: Project 11 Walk Roll Plan (Nonmotorized Transportation Plan)
Deleted: Tukwila Int'I Blvd (Phase II)
Deleted: Tukwila Int'I Blvd (Phase III)
RECOMMENDATION
The Council is being asked to approve and forward the resolution for the updated annual Six -Year
Transportation Improvement Program of 2010 2015 for consideration at the June 8, 2009
Committee of the Whole meeting to hold a Public Hearing and subsequent June 15, 2009 Regular
Meeting for Adoption.
Attachment: Resolution
2010 2015 "Draft" Transportation Improvement Program (TIP) Spreadsheet
Current Adopted 2009 2014 TIP
P: \PROJECTS \TIP \Current TIP \tip2010 memo gl.doc
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION
IMPROVEMENT PROGRAM (2010- 2015), AND DIRECTING THE SAME
TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION
AND THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a
Transportation Improvement Program and thereafter periodically modified said
Transportation Improvement Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2010- 2015); and
WHEREAS, on June 8, 2009, a public hearing was held regarding the City's Six
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A six -year Transportation Improvement Program
for the calendar years 2010 -2015 is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the
Secretary of Transportation and the Transportation Improvement Board of the State of
Washington.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular Meeting thereof this day of 2009.
ATTEST/ AUTHENTICATED:
Christy O'Flaherty, CMC, City Clerk
APPROVED AS TO FORM BY:
Office of the City Attorney
DRA
Exhibit: City of Tukwila' s Six -Year Transportation
Improvement Program from 2010 to 2015
W: \Word Processing \Resolutions \TIP 2010 -2015 Adoption.doc
RT:GL:kn 5/14/2009
Joan Hernandez, Council President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Page 1 of 1
2010 -2015
TIP
DRAFT 2010 -2015 TIP SUMMARY
PROJECT TITLE
1 Neighborhood Traffic Calming Program
2 Annual Bridge Inspections and Repairs
3 Boeing Access Rd Bridge Replacement
4 Tukwila Urban Center- Ped /Bike Bridge
5 Southcenter Parkway IS 180 St S 200 St)
6 Tukwila Urban Center Access (Klick[tat)
7 5 144 St (Phase 11)
8 Annual Overlay 8 Repair Program
9 Tukwila Urban Center Transit Center
10 !Andover Park West (Tuk Pkway Strander)
11 I Walk 8 Roll Plan (Nonmotorized Trans. Plan)
12 (Macadam Rd 8 S 144th St Intersection
13 ;Andover Pk E M nkler Blvd Intersection
14 1W Valley Hwy /S 156 St
15 ]Andover Park E Industry Dr. Signal
16 IS 133 St SR 599 Ramps Intersection
17 [East Marginal Way (BAR to S 112 St)
18 I Interurban Ave S (S 143 St Ft Dent Way)
19 ITUC/TOD Pedestnan Improvements
20 IMinkler Blvd (Southcenter Pkwy APW)
21 Tukwila Int'I Blvd (Phase IV)
22 (Traffic Signal Interconnect Program
23 ;SC Blvd Widening (1-5 61st Ave S Bridge) I
24 1Tukwita Intl Blvd S 116 Wy/ SR599
25 IS 168 St (010 Parkway to Andover Pk E) I
26 (West Valley Hwy (1-405 Strander Blvd.) 1
27 'Nelsen P ace (S 158 St S 156 SI)
28 S 1600)/ Andover Park W Intersection
29 S 144th St Bridge S'dwalks
30 !Greenbelt Mult purpose Trails
PROJECTS REVISED FROM 2009 -2014 TIP
4
8
9
10
14
15
19
20
22
23
24
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
43
44
47
56
Deleted ;Tukwi a Intl Blvd (Phase II)
Deleted ,Tukwila Intl Blvd (Phase 111)
New ;Walk 8 Roll Plan (Nonmotonzed Tran Plan) 24
2009 CIP
Page No.
(Project Costs n Thousands of Dollars
I I
I I 1
I I 1
2010 2011 1 2012 2013 2014
0
145
1,750
5,826
23,480
0
1,250
1,150
0
200
17
75
75
75!
0( 2
01 5
01
Oj
01
01
01
01
0'
0,
01
01
01
01
43 4
1
TOTAL 34,0861 31,32
i I
2010 2015 Draft
Transportation Improvement Program (TIP)
0
1451 20
1,7501 13,61
01 50
25,251
0
0
1,2501 1,25
1,150
1,46
20 20
40
20
13,61
10
1,25
20
6,42
4 4
1 16,21 21,84
270
0
1,400
0
0
1,250
200
0
0
0
4,275
0
0
0
0
0
1 0
1 0
0
01
May 12, 2009
FUNDING SOURCES
2015 TOTAL 1 Federal I State TIB, Developer Unsecured, City
01 0
2701 1,240
01 30,734
01 2,000
0 31,077
O 23,480
1,750 1,750
1,250 7,500
4,300 6,600
O 1461
O 1,000
610 627
602 677
1,032 1,107
575 650
630 6501
3,300 3,3501
O 11,100
1,100 1,100
4251 425
4,591i 4,591
3,000 3,000
20,000 20,000
4,675 4,675
23,244 23,244
630 630
200 200
2101 210
1001 100
01 172
I 1
1
24,588
400
3,550 15,000
3,000 5,250
452
1,600
6,307
12,139
940
1,000
17
751
751 440
751
201 460
1,0401 1,300
1 5,000
1 500
4251
216! 3,500
1
1
5,300,
5301
4,620
1,200
1,900
30 100'
I
I I
I I
1 0
1,240
1 6,146
0
6,220
3,091
750
7,500
1,528
521
1,000
610
602
592
575
17C
1,010
6,100
600
0
875
1,800
20,000
2,775
17,944
100
200
80
100
172
7,3951 72,494 183,350/ 31,538; 20,702! 28,7891 20,020! 82,301
I I I
Six Year Transportation Improvement Program
rove
From rove to 2014
Hearing Date: 6/9/2008 Adoption Date: 6116/2008
r Washington State Department of Transportation
Resolution No.: 166
Tukwila Amend Date:
ncy: Federally Funded
Co. Name: King Projects Only
No.: 17 Expenditure Schedule
MPOfRTPO: PSRC project Costs in Thousands of Dollars (Local A gency) R!W
y No.: 1320 Fund Source Information Required
4th n
P roject identification B Bridge No. °r Feder Funding To tal 3rd T6 h T vir. pate
AI u egUire
a Federal State Sta Local 1st 2nd
A. PIN/Federal Aid No. a y phase Federal Fund Funds Funds 20 21
r rn o Start Fund Cost by Code Funds E
1 f3 19
y 9 C. Project Title o d i Phase 16 17 I
E r m mldd/YyYYl Code 1 4 15
3 n o a D. S Describe Name er Number M P or Road p 12 13 j
Z inni MP or Road Ending 1 0 1
i. E. Beg
F. Describe Work to be Done 4 5 g 7 8
3 ALL 111/2009
1 2 12 S
19 1 Neighborhood Tragic Calming Program 43 43 86
Various City Streets 1 215 215 43
from: eeding Totals I
Program to address neighborhood traffic and education toserduce spg PEI 1(1 (ZD09
roadway Improvements, traffic calming,
and im prove safety. 32 P
00 2 43 43 43 86
Greenbelt Trails 215 215 140 y 140 I 615
to: 1015 1015 120 1
from: blic traits to promote Pedestrian and bicycle "Totals
Provide safe c onnections to W ALL 1 /112009
modes of transportation in lieu of motorized vehicles.
11 S
14 3 1015 120 140 140 615
Annual Bridge Inspections and Repairs
Various City Streets
1015 400 100
to. 50 0 500 1600 CE
from: Totals 1600 1600
perform load ratings and bi- annual Inspections as well as construct PE 111 /2010
necessary repairs and maintenance. C N 1/1/2012 12t31t12
32 p 1,000 Ft
08 lsoo
00 4 400 100
Tukwila Urban Center PedlBike Brdge 2100 2 10 0 11600 CE
to: West Valley Hvry 6931 14375 No
from: Baker Blvd. TOta15 9R 7444
Pedestrian bridge wer the Green River cpnneGmg the Ca0 and rail sta ion. ALL 1/1!2014
0800250 og P 1,000 Ft F
14 5 Boeing Access Rd Bridge Replacemen
14375
6931 14375 20827 CE 0
Boeing Access Road to f 5 7 444 31002 tD175 Yes
from: Airport Way 9476 TPP 50D0 16526 I
Totals
Reconstruct bridge. CN, 1/1/2009 \Discretionary\
01 S 7 400 Ft W 7/1/09
T
S
16 6 S 180 St S 20 S t p 10175 20827
South center Parkw G 500D 16526 31002 CE
Sou /50501er Parkway to: S 200 St 9,476 21209 29860 29860 Yes T from: S dew St tickets including curb Totals Tpp 525D
CN 11112009 Discretionary 3401
landscapi and utility undergrounding
Construct widening to 4 lanes with center tum
gutter, sidewalks, drainage, 12/31/09
05 P 1,500 Ft W
08 s
16 7 P 29860
from: Tukwila Urban Center Klickita 5250 21209 28660
Southcenter Parkway to: S 168 St G 3 401
from: I-5 d 0 Ramp Totals v. 5.7 Supersedes Previous editions
Design and construct safety and capacity improvements
Page 1
Washington State Department of Transportation
3ency: Tukwila
o. No.: 17
ity No.: 1320
14 8
14 9
17 10
Co. Name: King
MPO /RTPO: PSRC
Project Identification B Bridge No.
A. PIN /Federal Aid No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
1 2 3
Tukwila Intl Blvd (Phase 2)
Tukwila Intl Blvd to: S 132 St
from: S 116 St drainage,
Construct overlay, curb gutter, sidewalks, illumination,
landscaping, and utility undergrounding.
Tukwila inn Blvd (Phase 3)
Tukwila Intl Blvd to: S 138 St
from: S 132 St
Reconstruct
on, drainage and u ti li ty u oundingner, sidewalks,
S 144 St (Phase 2)
5 144 St
from: 42 Ave S to Tukwila Intl Blvd
Design and construct paving, curb gutter, sidewalks, drainage,
illumination, and utility undergrounding.
16 11
Annual Overlay and Repair Program
Various City Streets
t
um: to:
Repair, rehabilitate, and overlay City streets as needed in an annual
program.
16 12
Tukwila Urban Center Transit Center
Central Business District
to:
from:
Design and construct a transit center.
16 13
Andover Park West
Andover Park West to: Sf ander Blvd
from: Tukwila Parkway
Complete widening for center left tum lane.
0,
£y
d m T
$r
E
14 14
Interurban Ave S
Interurban Ave S
from: S 143 St to: Fort Dent Way
Reconstruct street including paving, curb gutter, drainage, illumination,
sidewalk, and landscaping
Project Costs in Thousands of Dollars
Fund Source Information
d N
s Federal Funding
0
3 a Phase Federal Federal
o S d S tarYY) t Fund Cost by
(mm/ddlyy Code Phase
a
10 11 _.12 I 13
4 5 6 7 8 9
CN 1/1/2009 I STP(U)
03 S 5,000 Ft G
0
P
S
03 S 2,100 Ft G
S
P
03 P
07 S
21 P
05 P
03 P
T
W
C
T
W
2000 C
G
P
S
7
W
4,500 Ft W
T
S
P
G
C
Totals
CN I 1/1/2009
Totals
ALLI 1/1/201
Totals
ALL 1/112009
C
G
0
P
S
T
W Totals
ALLI 1/1/2009
T
W
P
S
Totals
Totals
ALL 1/1/2009
Totals
CN 1/1/2014
STP(U)
Six Year Transportation improvement Program
From 2009 to 2014
Hearing Date: 6/9/2008 Resolution DD to 1663 6/2008
Amend Date:
Federally Funded
Projects Only
State State Local Total
code
Funds grinds Funds
14 15 16 17 18 19
1296 5011 5011
1715 TPPI 2000
1,715 2000 1296 5011
668 1 37721
3104 I
f I
3,104
I I
I I I
STP(U) I 8001
Page 2
I I
800
I I I
I I I
668 3772
1750
1461
7625 I
7625
1750 1
1 st
Expenditure Schedule
(Local Agency)
7625
5011
3772 I
3772
2nd
1750 1750
7500 I 7500 1250 1 1250 1 1250 1
7500 7500 1250 1250 1250
4600 I 5400 I 31001
4600 5400 3100
1461 1 1461 I 1461 I I I
1461 1461
7625 l
3rd
l 1
4th
Thru
6th
Y I
I I 1
1750
R/W
Required
Date
(MMNY)
Envir.
Type
20 21
3750
CE
CE
1750
3750
2300 CE
2300
7625
7625
CE
No
Yes
7/1/08
Yes
12131(14
Yes
1/1/12
v. 5.7 Supersedes previous editions
Six Year Transportation Improvement Program
From 2009 to 2014
Washington State Department of Transportation
Agency: Tukwila
Tukwila
Co. No.: 17 Co. Name: King
City No.: 1320 MPO /RTPO: PSRC
o y a
.QE
S o 0
tL
1 2
16 22
14 23
14 24
Tukwila Intl Blvd /S 116 St
Tukwila Intl Blvd
from: 1,000 Ft. on each leg to: 1,000 Ft. on each leg
Design and construct widening on Tukwila Int'I Blvd and intersection
improvements at T.I.B. /S 116 St.
16 25
14 26
17 27 03 P 600 Ft
Nelson Place
Nelson Place
from: S 156 St to: S 158 St
Design and construct paving, curb gutter, sidewalks, drainage, and
illumination
16 28
Project Identification
A. PIN /Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
Traffic Signal Interconnect Program
Various City Streets
from: to:
Design and install hard wire interconnect system between traffic signals and
the Traffic Operations Center.
SC Blvd. Widening
Southcenter Blvd
from: 1 -5 to: 61 Ave S
Widen Southcenter Blvd and the 61st Ave S Bridge to add a lane for future
traffic growth.
S168St
S 168 St
from: Southcenter Pkwy to: Andover Pk E
Construct new roadway including curb gutter, sidewalk, drainage,
illumination, and landscaping.
West Valley Highway
West Valley Hwy
from: 1 -405 to: Strander Blvd
Design and construct widening to 7 lanes including curb gutter, sidewalks,
illumination, and drainage.
S 180 St/ Andover Park W Intersection
from: 500 Ft. on each leg to: 500 Ft. on each leg
Widen for north south tum lanes.
r D
d 0 0
w
nF
1- 5
4 5 6 7
12 S W
T
G
C
P
S
04 P o. C
G
P
S
T
W
04 P 2000 P
01 P 4,000 Ft P
T
W
S
05 P 0.5 Mi W
T
S
P
G
12 P loon w
T
P
Project Costs in Thousands of Dollars Federally Funded
Fund Source Information Expenditure Schedule Projects Only
(Local Agency)
(5
Federal Funding RIVV
a. Required
Phase Federal Federal State State Local Total 4th Envir. Date
Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type
(mm/dd/yyyy) Code Phase Code 6th (M
a
8 9 10 11 12 13 14 15 16 17 18 19 20 21
ALL 1/1/2014 3000 3000 3000
Totals
ALL 1/1/2013
Totals
ALL 1/1/2014
Totals
ALL 1/1/2014
Totals
ALL 1/1/2014
Totals
ALL 1/1/2014
Totals
ALL 1/1/2014
Totals
Report Date: June 27, 2005 Page 4
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 6/9/2008 Adoption Date: 6/16/2008
Amend Date: Resolution No.: 1663
3000 3000 3000
1700
4675
1372
630
200
210
17001
4675 1
1372 1
630 1
200 1
210
1700
1700 1700 1700
4675
4675 4675 4675
1372
1372 1372 1372
630
630 630 630
200
200 200 200
210
210 210 210
v. 5.7 Supersedes previous editions
Agency: Tukwila
Co. No.: 17
City No.: 1320
1 2
17 29
16 30
16 31
Washington State Department of Transportation
Co. Name: King
MPO /RTPO: PSRC
Project Identification
A. PIN /Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
S 144 St Bridge Sidewalks
S 144 St
from: 51 Ave S to: 53 Ave S
Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd
Ave S.
Minkler Blvd
Minkler Blvd
from: Southcenter Pkwy to: Andover Park W
Consruct widening for 3 lanes inccuding curb gutter, sidewalk, drainage,
and landscaping.
East Margin! Way
East Marginal Way
from: Boeing Access Rd to: S 112 St
Design and construct widening to 3 lanes including curb gutter, sidewalks,
drainage, landscaping, and ubhty undergrounding.
04 P
03 P
N
o
0
U
6 7
0.25 C
G
P
S
T
W
2,000 Ft W
T
5
P
1,500 Ft P
s
T
W
Project Costs in Thousands of Dollars Federally Funded
Fund Source Information Expenditure Schedule Projects Only
Federal Funding (Local Agency) R/W
Phase Federal Federal State 4th Required
Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date
(mm /dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (Ammo
8 9 10 11 12 13 14 15 16 17 18 19 20 21
PE 1/1/2014 25 25 25
Totals
ALL 1/1/2012
Totals
ALL 1/1/2011
Totals
Grand Totals for Tukwila
STP(U)
Report Date: June 27, 2005 Page 5
700
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 6/9/2008 Adoption Date: 6/16/2008
Amend Date: Resolution No.: 1663
25 25 25
425
4251
425 425
1255
19551
35
425
700 1255 1955 35 1920
26,640 12,250 95,143 134,033 55,482 23641 4,061 50,849
425
1920 CE
No
v. 5.7 Supersedes previous editions