Loading...
HomeMy WebLinkAboutTrans 2009-06-01 Item 3A - Turnover Acceptance - Infrastructure and Dedication of Right-of-Way from Westfield Southcenter MallTO: FROM: DATE: SUBJECT: ISSUE BACKGROUND ANALYSIS RECOMMENDATION City of Tukwila INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee Public Works Director May 27, 2009 Westfield Southcenter Mall Turnover of Infrastructure and Dedication of Right -of -Way Jim Haggerton, Mayor Accept turnover of traffic signal and street improvements, water main and water meters, sanitary sewer and dedication of right -of -way from WEA Southcenter, LLC. The WEA Southcenter, LLC project is now complete. As conditions of the Public Works permits and the Development Agreement, WEA Southcenter, LLC has constructed required improvements and is dedicating right -of -way (see list on the following page). The proposed public improvements have been constructed to City standards and inspected by Public Works staff and is now ready for turnover. The value of the transferred improvements from WEA Southcenter, LLC to the City is $365,039.98. Dedication of right -of -way is pursuant to the Development Agreement between the City, Prudential Financial Inc., and WEA Southcenter LLC and is necessary for the future Klickitat Project. Per the development agreement, Westfield has received a credit in the amount of $846,240.00 against the Traffic Impact fees for dedication of right -of -way necessary for the Klickitat project. The Council is being asked to accept Conveyance of Public Improvements, Right of Way Dedication and Real Estate Excise Tax Affidavit from WEA Southcenter, LLC for consideration at the June 8, 2009 Committee of the Whole meeting and subsequent June 15, 2009 Regular Meeting. Attachments: Vicinity and Improvement Area Map Exhibit 'A' Traffic Signal and Channelization Depiction Map Exhibit 'B' Dedication of Right -of -Way Depiction Map Exhibit 'C' *NOTE: All documents are available at Public Works, W:\PW Erg \OTHER \Dave McPnersen\WEA Southcenter LLC Tumoverlhfo Memo WEA Southcenter LLC Turnover don INFORMATIONAL MEMO Page 2 1111Q Li u�tiiic i�cc Ellilil Jitj I CUM 01 133 LF of 8" pipe (3) 48" Type II sanitary sewer manholes (2) 10" gate valves 5' of 2" water service line (1) 2" water meter box 10' of 2" water service line (2) 1.5" water meter boxes (3) water tap services (3) 8" saddles (1) 2" corp. stop (2) 1.5" corp. stops 745 LF of curb and gutter (12) ADA ramps 10,044 SF of concrete sidewalks 834 SF of asphalt ped path. (1) controller cabinet (4) Type III signal poles (3) Type PS ped poles (10) traffic signals (8) ped pushbuttons (8) ped signals (4) video detection RPM paint striping Value $365,039.98 Right- of- -vvay (see Exhibit L) Value $846,240.00 WITW Eng ;OTHER IDave McPherson\WEA Southcenter LLC TumoveAlnfo Memo 1 P/EA Southcenter LLC Turnover.doc Dedication of Right -of -Way per Development Agreement requirements IMPROVEMENT AREA WATER EXIBIT A IMPROVEMENT AREA STREET SIGNAL SIDEWALK CHANNELIZATION WATER SANITARY SEWER SOUTH IMPROVEMENT AREA STREET SIDEWALK CHANNELIZATION 'TUKWILA IMPROVEMENT AREA SIDEWALK IMPROVEMENT AREA WATER STRANDER BoulevarD I WESTFIELD SOUTHCENTER MALL INFRASTRUCTURE TURNOVER STREET SIGNAL CHANNELIZATION SIDEWALK WATER SANITARY FACILITIES PW05-125 PW06-067 PW06-072 PW08-116 PW08-117 BAKER STREET CHEESECAKE FACTORY '10EO ZONE 61 VOEO ZONE 62 SEE' TS -7.2 FOR MAST- EXIBIT `B' ACCESS STA. 10+ TRAFFIC SIGNAL WESTFIELD SOUTHCENTER MALL INFRASTRUCTURE TURNOVER TRAFFIC SIGNAL CHANNELIZATION PW05 -125 PW06 -067 PW06 -072 PW08 -116 PW08 -117 1 Veto ZONE 82 1 strander BLVD STA, 06 +26.63 1 RANDEA BOULEgARb° SEE SHEET MA-1 FOR LIGHT STANDARD REMOVAL HP 12 GAS I RESERVE AREA FOR EXISTING SIGN f EXISSINO POWER EA5EMENT EXISTING C007 DETECTOR EASEAMENT DEDICATION OF RIGHT -OF -WAY 1 EXISTING ELECTRICAL EASEMENT BAHAMA BREEZE SESTFIELO CORPORATION MONUMENT STRANDER BLVD. WESTFIELD SOUTHCENTER MALL DEDICATION OF RIGHT -OF -WAY RESERVE AREA FOR EXISTING SIGN EXIBIT C