Loading...
HomeMy WebLinkAboutTrans 2009-06-01 Item 3B - Turnover Acceptance - Water Main and Fire Hydrant from Tukwila 6 LLCANALYSIS TO: Mayor Haggerton Transportation Committee FROM: Public Works Director DATE: May 27, 2009 RECOMMENDATION City of Tukwila INFORMATIONAL MEMORANDUM SUBJECT: Tukwila 6. LLC 4 Lot Short Plat Site address 14659 62 Ave South Turnover of Water main and Fire Hydrant ISSUE Accept turnover of water main and one fire hydrant from Tukwila 6, LLC. BACKGROUND Jim Haggerton, Mayor The Tukwila 6, LLC project is now complete. As a condition of the Public Works permit, Tukwila 6, LLC installed 398 feet of 8 -inch ductile iron water main and one fire hydrant. The proposed public water main and fire hydrant were constructed to City standards and inspected by Public Works staff and are now ready for turnover. The value of the transferred improvements from Tukwila 6, LLC to the City is $36,860.00. The Council is being asked to accept Conveyance of Public Improvements from Tukwila 6, LLC for consideration at the June 8, 2009 Committee of the Whole meeting and subsequent June 15, 2009 Regular Meeting. Attachments: Vicinity Map Exhibit 'A' Water Main and Fire Hydrant Depiction Map Exhibit 'B' *NOTE: All documents are available at Public Works. W: \PW Eng \OTHER \Dave McPherson \Tukwila 6 LLC Turnover \Info Memo Tukwila 6 LLC Turnover.doc EXHIBIT A TUKWILA 6, LLC 4 LOT SHORT PLAT 14659 62 Ave. South LNFRASTRUCTURE TURNOVER WATERMAIN FIRE HYDRANT PW07 -072 L06 -057 VICINITY MAP SCALE: 1' MILE SOUTHCENTER SITE EXHIBIT B TUKWILA 6, LLC 4 LOT SHORT PLAT 14659 62nd avenue South INFRASTRUCTURE TURNOVER WATERMAIN FIRE HYDRANT PW07 -072 L06 -057