HomeMy WebLinkAboutTrans 2010-02-16 Item 3B - Report - 2009 4th Quarter Report: City Council / Public WorksCITY COUNCIL
City of Tukwila
BUDGET PROGRAM GOALS:
FOURTH QUARTER REPORT TO COUNCIL
October 1 December 31, 2009
Prepared for Transportation Committee
Jim Haggerton, Mayor
1. Seek out opportunities for Councilmembers to further their knowledge, experience and awareness of
the different cultures represented within the Tukwila community: Assigned to Community Affairs
Parks Committee for implementation and /or follow -up. No activity to report during fourth quarter.
2. Support proarams and services that provide a sense of stability. community and unity throuahout
Tukwila's residential neiahborhoods: Assigned to Community Affairs Parks Committee for
implementation and /or follow -up. Councilmembers continue to sponsor a monthly Coffee Chat in the
Tukwila community.
3. Work together in cooperation with nearby cities to address common problems in the Hiahwav 99
corridor and Military Road: Assigned to Finance Safety Committee for implementation and /or
follow -up. Mayors from Tukwila and SeaTac have been communicating regarding the possibility of a
joint meeting between the two city councils. Due to an increased workload, Tukwila City Council was
not able to commit to a specific meeting date during fourth quarter.
4. Provide leaislative support and encouraaement to Tukwila residents livina in rental communities
through programs that hold owners and /or property managers accountable for providina safe places
to live throuah the implementation of a rental licensina program: Assigned to Community Affairs
Parks Committee for implementation and /or follow -up. Tukwila Councilmembers actively opposed HB
1296/SB 5495 which provided for limitations on rental housing inspections. Relative legislation was
deferred this legislative session. Department of Community Development staff continues to move
forward with developing a rental housing licensing program for Tukwila.
5. Approve and implement standard operating procedures for the Council. Review and update
procedures on a reaular basis: Not currently assigned to a specific committee. Current workload
assignments prevented the Legislative Analyst from further research and preparation of draft
materials relative to Council standard operating procedures.
6. Support the implementation of City endorsed programs (i.e. Walk Roll Plan, Fire Master Plan, Parks
Recreation Open Space Plan) through policy related decisions not associated with direct program
fundina: Assigned to Community Affairs Parks Committee for implementation and /or follow -up. No
activity to report during fourth quarter.
7. Ensure a commitment to continued human services fundina in relation to the cost of livina through
consistent review of reaional. state and federal budgets affectina human services programs and
services: Assigned to Community Affairs Parks and Finance Safety Committees for
implementation and /or follow -up. This item will be scheduled for Committee review as budget reviews
deem appropriate.
8. Study the feasibility and implementation of televised City Council meetinas: Assigned to Utilities
Committee for implementation and /or follow -up. Information Technology staff has conducted
preliminary research on this topic, but discussion has been delayed due to staff workload, per City
Administrator.
2009 Fourth Quarter Report
Prepared for Transportation Committee
Page 2
9. Continue to foster relationships within local. reaional and state entities that encourage opportunities
for joint partnership and outreach: Assigned to Utilities Committee for implementation and /or follow
up. Councilmembers serve as representatives and alternates on local, regional and state boards,
committees and commissions including but not limited to: SCATBd, SKEDI, WRIA 9, AHAB,
Suburban Cities Association, Association of Washington Cities, Highline Forum and Cascade Water
Alliance.
10. Formulate an Adopt -a- Neighborhood program that will provide Councilmembers the opportunity to
become more familiar with the changing faces of communities and neighborhoods throuahout the
City: Assigned to Community Affairs Parks Committee for implementation and /or follow -up. This
item was not scheduled for Committee review during the fourth quarter.
11. Research the viability of sponsorina a City -wide Citizens' Academy: Assigned to Community Affairs
Parks and Finance Safety Committees implementation and /or follow -up. This item was not
scheduled for Committee review during the fourth quarter.
12. Establish a process to provide updates to Council on issues that are brought forward at Council
meetings during citizen comment opportunities: Assigned to Transportation Committee for
implementation and /or follow -up. This item was not scheduled for Committee review during the fourth
quarter.
PUBLIC WORKS DEPARTMENT
2009 YEAR END SUMMARY:
Public Works ended 2008 and started 2009 with a record snow and ice storm. From that storm, the US
Army Corps of Engineers announced that the Howard Hanson Dam would not store as much water and
that there could be an increased probability that the City would experience flooding along the Green
River. A massive planning effort and outreach program continued throughout the year for Public Works to
inform our business and residential communities. Council passed Resolution No. 1689 declaring a local
emergency and Resolution 1697 for emergency contracting procedures. A draft Flood Response Plan has
been completed by all City departments. As of December 31, 2009, no flooding was experienced in
Tukwila. Overall, the City is better prepared now for any potential future flooding or natural disaster.
4th QUARTER SIGNIFICANT ISSUES:
In support of the King County Flood Control District, advance protective measures HESCOs and Super
Sacks) were installed along the Green River. The log cabin on S 140 St was demolished and HESCO's
were installed at that location. An interfund utility tax on water, sewer and surface water was implemented
to help fund the Howard Hanson Dam Flood Response Plan.
Construction is 66% complete and within budget for Phase II Ill of Tukwila International Blvd
Improvement Project. Currently preparing to shift traffic from the west side of road to the east side of the
road in early 2010 to enable the contractor to start construction of the west side improvements.
Construction began on the Surface Water's Storm Lift Station No. 18 Upgrade and Gilliam Creek Basin
Stormwater Overflow; both projects are related to the Howard Hanson Dam Flood Response Plan.
2009 Fourth Quarter Report
Prepared for Transportation Committee
Page 3
BUDGET PROGRAM GOALS:
Public Works Administration
1. Prepare and present a comprehensive City Facilities Upgrade and Replacement Plan: Has been
placed on -hold until a financing plan is adopted.
2. Evaluate future grant funding options available and propose a course of action to fund transportation
proiects: Staff continued to seek funding opportunities.
3. Implement the Emergency Manaaement Community Disaster Education (CDE) Program:
Preparedness briefings are part of the Outreach Program for the Howard Hanson Dam
planning effort. CERT Program Trainer recruitment on hold due to budget restrictions.
4. Provide quarterly reports on emeraencv manaaement issues: Mayor and Council are being
regularly updated on all issues. Council approved Resolution 1697 declaring the existence of
an emergency requiring Public Works, without bid, to address the hazards from the Hanson
Hanson Dam Flood Response Plan.
5. Hold auarterly community informational meetinas: Ongoing. Emergency Management has held 9
public outreach briefings to date with several hundred people in attendance.
Business Services
1. Create a more effective, cost efficient department— proiecting and monitoring department costs:
seeking more cost effective purchasing agreements with vendors; preparing the department's
operation, maintenance and capital facilities budaet using a "needs- basis" approach: Ongoing.
2. Review the feasibility of using Council approved Local Improvement Districts (LIDs' as a means of
financing street improvement proiects for residential and commercial areas: Approved Resolution
No. 1690 and revised Resolution No. 1698 for the Intent to Form a LID and Ordinance No. 2260
was approved to Form LID #33 for the Tukwila Urban Center Access (Klickitat) Project.
3. Review "rate model" for establishina appropriate rates for water. sewer and surface water enterprise
funds. Investigate the feasibility of a consumption -based sewer rate: The rate model was
completed with the updated 2010 -2015 Capital Improvement Program. Minimum water charges
were increased in 2010 to compensate for stagnant revenue based on water consumption
levels decreasing due to conservation. Residential sewer rates will remain a flat rate as
opposed to consumption -based since overall water consumption is decreasing. An interfund
utility tax was implemented to help fund the Howard Hanson Dam Flood Response Plan.
Maintenance Administration
1. Identify operational reauirements (facility space. equipment. and personnel) for all maintenance
functions being performed: Material staging and storage have been prioritized for the Howard
Hanson Dam Flood Response Plan.
2. Implement recurrent technical trainina and operational safety programs to maintain employee
certification levels to meet current and updated regulations: Training was completed for confined
space and the City's confined space plan with the new regulations has been approved.
3. Initiate a program that will improve the energy efficiency of City maintenance operations: As part of
the City's Green Team, Public Works is reducing waste and evaluating energy conservation.
Engineering Administration
1. Assess standardized contractina procedures for construction and repair proiects: City attorney is
reviewing all contract templates.
2. Annual assessment and update of transportation impact fees system: On -hold pending budget
approval for traffic model and transportation element update. Traffic, Parks, and Fire Impact
fees were input into Finance's new Project Accounting software for tracking.
Development
General:
1. Maintain and improve the turn around time for permit review and approval: All performance goals
are being met.
2. Work with and support DCD to improve permit processes: Ongoing.
2009 Fourth Quarter Report
Prepared for Transportation Committee
Page 4
Performance:
1. Zero backlogs of permits waiting for more than 30 days to be reviewed: Goal met.
2. Permits for sinale familv residences issued within 30 days: Goal met.
Facility Maintenance
General:
1. Maintain a record keeping and trackina system for facility maintenance work order allocation: Goal
met. Facilities also assessed auxiliary power sources for emergency purposes (i.e. 6300
Building, etc.).
2. Implement the business plan for facility maintenance: Planning is now part of the Green Initiative.
Performance:
1. Advertise and award 90% of active Fund 303 Projects no later than June l On budgetary hold.
2. Reduce facility maintenance costs by 10% throuah efficiencies: Reviewing and implementing
lighting cooling efficiencies.
Street Maintenance /General Admin
General:
1. Participate in pavement manaaement for the multi -year street overlay program: Completed the
design review with engineering. The 2009/2010 Overlay and Repair Program was completed in
2009.
2. Assess the Traffic Operations Center (TOM effectiveness and flexibility with an emphasis on
expanding its use by other departments: Fiber expansion by City crews was completed from City
Hall to the Neighborhood Resource Center on Tukwila Intl Blvd.
Performance:
1. Repair City -owned streetliahts within 72 hours. For Seattle City Light/Puget Sound Enerav
streetlights, report within 24 hours: Repairs have been made on City -owned lights as needed.
2. Correct all traffic signal problems within 24 hours: Goal being met.
3. Perform quarterly preventative maintenance on all City -owned traffic sianals: Completed all LED
replacements in the traffic signal heads.
4. Evaluate reflectivity of all sians once a year: Completed.
5. City street cleanina: Goal met.
Residential 100 percent of the streets, twice a year.
Arterial residential and commercial /industrial roads six times a year..
Arterial commercial /industrial roads eiaht times a year.
6. Potholes shall be repaired within 48 hours of notification: Goal being met
7. Provide auarterlv reports on the effort to remove araffiti from public property: Year -end report being
prepared.
Residential Streets General Engineering
1. Prioritize. budget. and schedule list of residential street improvement projects. includina condition of
sidewalks. for inclusion into the City's Capital Improvement Proaram: On hold.
2. Annual update of pavement manaaement system: 2009/2010 Overlay Repair Program
construction was completed in 2009. Due to staff workload, the pavement management
system will need to be updated in 2010.
Bridges Streets General Engineering
1. Ongoing construction of Phase II Ill of Tukwila International Blvd. Improvement Project:
Construction is 66% complete and within budget. Contractor is on a winter construction
schedule. Preparing to shift traffic from west side of road to the east side in 2010 to enable
contractor to construct west side improvements.
2. Award construction contract for Tukwila Urban Access (Klickitatl Project: LID formation approved
by Council. ROW acquisition completed with ROW certification to follow. Advertisement date
postponed pending resolution of design criteria with WSDOT.
2009 Fourth Quarter Report
Prepared for Transportation Committee
Page 5
3. Award construction contract for Southcenter Parkway Project: Final design supplement with David
Evans approved by Council. Final plans submitted to WSDOT for review. Right -of -way
certification underway. Advertisement scheduled for February 25, 2010.
Water Utility /Maintenance Operations
General:
1. Track backflow prevention compliance for the annual Department of Health report usina the City's
cross connection data oroaram: Data updates completed and DOH reports have been submitted.
2. Continue the remainina phase of the automatic meter read program in the residential areas:
Remaining area, Allentown, nearing completion. More installs are scheduled for 2010.
3. Implement a program to test the accuracy of water meters 2- inches and laraer into standard
preventative maintenance procedures: Goal met.
4. Monitor Water Use Efficiency efforts and provide an annual report: Report sent to Washington
State Department of Health.
Performance:
1. Install new water meters within 48 hours of the hook -up request: Goal being met.
2. Respond to water aualitv concerns within 24 hours: Other than Lake Young's algal bloom issues,
there were no calls or complaints in the Tukwila system for 2009.
3. Test chlorine residual level bi-monthlv: Goal being met as scheduled.
4. Test coliform levels bi-monthlv: Goal being met.
5. Achieve 10 percent water savinas to meet Water Efficiency Goals established by the Municipal Water
Law: Completed 10% for 2008 and waiting for final 2009 consumption figures.
6. Reaular testina of fire hydrants: Completed for 2009.
General Engineering Services Water
1. Complete construction of Andover Park East Water main Replacement Proiect: Design is complete.
SEPA and shoreline permits have been submitted. Advertise in second quarter of 2010.
Sewer Maintenance Operations
General:
1. Evaluate system -wide conditions for possible replacement and /or uoarade: Assessment completed
with Infiltration Inflow work.
2. Review results of video loas to identify damaaed areas and locations of possible infiltration /inflow:
Repairs have been made as needed based on inspection logs.
3. Implement a system for remote monitorina of lift stations response and corrective action can be
achieved from a laotop computer: New software installed and further fine tuning is underway.
Performance:
1. TV inspect 20.000 LF of pipe annually: Approximately 75% complete. This goal was not met due
to the Howard Hanson Dam Flood Response Plan.
2. Clean 183.000 LF of pipe annually: Approximately 90% completed. This goal was not met due to
the Howard Hanson Dam Flood Response Plan.
3. Clean and maintain 730 manholes annually: Approximately 500 manholes completed. This goal
was not met due to the Howard Hanson Dam Flood Response Plan.
4. Weekly monitorina of 10 sewer lift stations for Dump hours, start counts, and aenerator operation:
Routine scheduled monitoring along with cleaning of wet wells.
General Engineering Services Sewer
1. Complete construction of the Interurban Ave S Gravity Sewer Project: Design is complete.
Easement is needed to construct overflow pipe. Advertise in third quarter of 2010. Interurban
roadway project is on hold.
Surface Water Maintenance
General:
1. Participate in development of a multi -year small drainage oroiect list: Design review completed.
2. Provide field support to Enaineerina for GIS inventory: Continuing with Area 6.
2009 Fourth Quarter Report
Prepared for Transportation Committee
Page 6
3. Investigate throuah usage of TV. GIS and flushing tasks to find unmapped systems: Efforts are
underway to begin TV work in areas that still need additional mapping.
Performance:
1. TV inspect 15.000 LF of pipe: This goal was not met due to the Howard Hanson Dam Flood
Response Plan.
2. Maintain /clean 3.500 LF of ditches and four large water quality ponds: 2,800 LF completed. This
goal was not met due to the Howard Hanson Dam Flood Response Plan.
3. Clean 1.400 catch basins, manholes and stormceotors: 1,000 catch basins cleaned. This goal was
not met due to the Howard Hanson Dam Flood Response Plan.
4. Maintain /clean 15.000 LF of storm lines: Completed inspection efforts.
5. Conduct weekly monitorina of five storm lift stations for oumD hours. start counts. and aenerator
operation: Routine scheduled monitoring.
Surface Water General Engineering Services
1. Complete small drainaae projects identified on the approved list for 2009 -2010: 2009 construction is
underway with closeout in 2010.
2. Continue adoption and repair of the private storm systems that have been identified: Consultant will
complete design of 5 other sites for future construction.
3. Continue development of the GIS as- builts of city infrastructure that complies with NPDES: Area 5
inventory complete. Area 6 contract was approved and is currently underway.
Equipment Rental
General:
1. Use the Fleet Manaaement Database to recommend a 10 percent reduction in the City's fleet costs:
Carpool and auction efforts have reduced under utilized vehicles.
2. Fully implement the Vehicle Replacement Guidelines Procedures: Goal being met.
Performance:
1. Return 100 percent of vehicles for preventive maintenance and checkup within the 30 -day timeframe:
Ongoing, goal being met.
2. Keep 90 percent of safety vehicles (Police and Fire) available for use: Completed repair of fire
trucks for full enablement of the Fire fleet.
3. Complete by April 30th. the "Condition of the City's Fleet" Report: Available upon request.
4. Complete 85 percent of the capital eauipment purchases by June 30 On budgetary hold.