Loading...
HomeMy WebLinkAboutTrans 2010-03-01 Item 3B - Contract Supplement #9 - Southcenter Parkway Extension with David Evans and AssociatesCity of Tukwila TO: Transportation Committee Mayor Haggerton FROM: Lisa Verner, Mayor's Office DATE: March 1, 2010 INFORMATIONAL MEMORANDUM SUBJECT: Tukwila South Southcenter Parkway Extension Design Contract Amendment 04- 025(1) ISSUE Jim Haggerton, Mayor Authorize the Mayor to sign an amendment to Contract 04 -025 (I) (Supplement #9) with David Evans Associates (DEA) to complete the remaining design work for Southcenter Parkway Extension BACKGROUND DEA has been under contract to the City for design of Southcenter Parkway Extension, the relocated road piece of the Tukwila South Project, since 2004. The contract has been amended several times over the years to add additional funds and to adjust the scope of work. DEA completed "90% drawings" and these were used by others (Segale Properties, PSE, Highline Water District and others) to do their own design work. Attached is a summary of the contract amendments already approved. Southcenter Parkway Extension runs from S 180 Street to S 200 Street. The full right -of -way is within the city limits. A Possession Use Agreement for the new right -of -way and construction area was signed by Segale Properties and recorded. Section 4.3.1 of the Tukwila South Development Agreement states, in part: The City shall, using grant funds secured for this Project, promptly complete the final design of the extension and relocation of Southcenter Parkway from S. 180th Street to S. 200 Street "Southcenter Parkway Project" or "SCP Project'), including necessary sewer, water, stormwater, natural gas, power and telecommunications utility system improvements associated with this roadway improvement project (the "Final Design Plans'), as documented in the 90% drawings completed by David Evans and Associates dated September 2005 (the "90% drawings") and on file with the City. The City may use up to $300, 000 of the grant funds identified in Section 4.3.7 below for the purpose of completing the Final Design Plans; any costs to complete the Final Design Plans in excess of $300, 000 shall be borne by the City. INFORMATIONAL MEMO Page 2 DISCUSSION The scope of work for the contract amendment includes items needed to complete the last pieces of the design work. It also includes changes to the drawings, including access for Mitchell Moving Storage, fire hydrant relocations, sewer lift station relocations, and updated technical information. The cost for this scope of work is $221,033. When the Development Agreement was reviewed and adopted, the estimated cost to complete the design work was $300,000 and this figure was included in Section 4.3.1. Since then costs have increased as the necessary scope of work has changed. In October, 2009, Council approved Supplement #8 (contract amendment H) for $378,680. Segale Properties agreed that the City could use grant funds for the $78,680 above the amount specified in the Development Agreement. For the current contract amendment, the entire $221,033 will also come from the City's grant funds and Segale Properties has agreed. RECOMMENDATION Authorize the Mayor to sign an amendment to Contract 04 -025 (I) with David Evans Associates (DEA) to complete the remaining design work for Southcenter Parkway Extension at Council's March 8, 2010 Committee of the Whole meeting and forward to March 15, 2010 Regular Meeting ATTACHMENTS 1. History of DEA Contract for Design of Southcenter Parkway dated 2/17/2010 2. WSDOT cover page for contract amendment 04- 025(1) for DEA and Scope of work for contract amendment, labeled Exhibit B -2 (to the cover page) 3. Southcenter Parkway 2010 timeline (FYI) C:IDOCUME- 11susan\ LOCALS- 11Temp\XPGrpWise \InfoMemo SCP contract amend 3- 1- 1O_1.doc DEA Contract for Design of Southcenter Parkway History 02/24/2010 Original Contract Supplement #1 Supplement #2 Supplement #3 Supplement #4 Supplement #5 Supplement #6 Supplement #7 Supplement #8 Supplement #9 Supplement #10 TOTAL Amount 350,577.00 79,615.00 472,297.00 68,648.00 Original Fed/TIB design funds City General Fund State grants Approval Date 04/05/2004 11/29/2004 03/29/2005 08/15/2005 n/a 01/06/2006 n/a 01/23/2008 n/a 12/16/2008 n/a 06/09/2009 378,680.00 10/09/2009 221,033.00 1,570,850.0 Reason for Supplement Road design to (old) City Limits; sanitary sewer design (Minkler to S 200th St) Realignment of S 178th St; signal at S 178th St; sewer in S 178th St; Water Mink ler to S 180th St; design (old) City Limits to S 200th St Water from S 180th St to S 200th St Time change only Time change only Time change only Time change only Revisions to 90% drawings; 100% drawings, updated geotech; updated hyraulic; electronic bid docs; lift station relocation, Mitchell access detour Approval scheduled for March, 2010; revisions; utility coordination; time change approval April? Construction support, if needed WI Washington State Department of Transportation Supplemental Agreement Number 9 Original Agreement Number 04 -025 Project Number 84-RW 37 Project Title Southcenter Parkway Extension Project Description of Work Additional work required for the preparation of construction documents inicluding plans, specifications, and estimates (P.S. &E.) for the Southcenter Parkway Extension Project. Work includes the design of additional features as identified in Exhibit B -2 and project bid, add and award. The Local Agency of City of Tukwila desires to supplement the agreement entered into with David Evans and Associates, Inc. and executed on 4/5/2004 and identified as Agreement No. 04 -025 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: Additional work as described in Exhibit IH 2. Organization and Address David Evans and Associates, Inc. 415 118th Avenue SE Bellevue, WA 98005 Attn: Scott Soiseth Phone: 425 -519 -6590 Execution Date Completion Date 4/5/2004 5/31/2010 New Maximum Amount Payable 1,570,850.00 11 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: 5/11 /2010 111 Section V, PAYMENT, shall be amended as follows: Additional payement in the amount of $221,Q11 shall be added to the contract (See Exhibit R 2) as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: DOT Form 140 -063 EF Revised 9/2005 Scott R. Soiseth, Associate By: City of TukwiIa Consultant Signature Approving Authority Signature Date Basic Agreement Supplement #1 Supplement #2 Supplement #3 I Supplement #4-7 (Time Change Only) Supplement #8 Supplement #9 Total Direct Salary Cost $108,162.00 $26,088.00 $150,432.00 $22,383.00 n/a $115,785.00 $70,380.00 9493,230.00 overhead $183,833.00 $44,340.00 $260,188.00 $38,714.00 n/a $202,275.00 $122,954.00 $852,304.00 (including Payroll AddOves) Direct Non Salary Cost $26,133.00 $1,360.00 $16,547.00 $836.00 n/a $25,885.00 66,585.00 677,346.00 Fixed Fee $32,449.00 $7,827.00 $45,130.00 $6,715.00 n/a $34,735.00 $21,114.00 9147,970.00 Total $350,577.00 $79,615.00 6472,297.00 968,648.00 n/a 9378,680.00 9221,033.00 91,570,850.00 DOT Form 140-063 EF Revised 1097 Exhibit "A" Summary of Payments EXHIBIT B -2 CITY OF TUKWILA ENGINEERING DESIGN SERVICES SOUTHCENTER PARKWAY EXTENSION PROJECT 1.01 PROJECT DESCRIPTION SCOPE OF SERVICES SUPPLEMENT NO. 9 SECTION 1.00 PROJECT DESCRIPTION AND DELIVERABLES The objective of Supplement No. 9 is to document scope of work changes and to complete construction documents including plans, specifications, and estimates (PS &E) for the Southcenter Parkway Extension Project not included in the original contract or Supplements 1 through 8. The following task revisions are included in Supplement No. 9: Establish S 180 Street and S 200 Street right -of -way centerline. Establish horizontal and vertical control and additional topographic survey. Redesign the King County Metro bus pullouts based on updated design standards. Develop access location for new PSE substation. Relocate /redesign illumination system to back of curb to eliminate conflict with joint utility trench. Relocate /redesign signal system to eliminate conflict with joint utility trench. Develop temporary access to Seattle Tractor. Develop and evaluate three additional sites for the sewer lift station. Redesign sanitary sewer lift station at new selected site. Redesign sanitary sewer trunkline to tie into new sanitary sewer lift station design. Additional coordination with Highline Water and LaPianta to develop new waterline design. Redesign entire Highline water system. Develop temporary construction easement drawing and control sheet for plan set. Provide Bid Review and Award Recommendation. Develop alternate access drawings for the Gaco /Mitchell Access. Prepare overlay design for Southcenter Parkway from S 180 Street to Minkler Boulevard. Prepare overlay design for S 200 Street from the proposed Southcenter Parkway to the western limits of the waterline design. Prepare miscellaneous City exhibits. Prepare Temporary Construction Easement Display. Develop detour plan. Develop building demolition plan and specification 1.02 PROJECT DELIVERABLES FURNISHED BY THE CONSULTANT Section 1.02 of Supplement No. 8 is revised to the following: The Consultant shall maintain a project file for pertinent work items. These files will be delivered to the City at the conclusion of the project. In addition to the project files, the Consultant shall deliver the following documents and products to the City as part of this agreement: Meeting Minutes. p t\ tuka00000001\ 0000con \0030contract \0031add -ons \supplement no 9 \southcenter supplemental services #9 10_0223 doc DAVID EVANS AND ASSOCIATES, INC. 1 Scope of Services Pre -100% PS &E Progress Set to be submitted to WSDOT Local Programs. 100% Proof PS &E Contract Plans incorporating the revisions listed above. 100% Proof Cost Estimate. 100% Proof Special Provisions. 100% PS &E Contract Plans. 100% Cost Estimate. 100% Special Provisions. Engineer's Cost Estimate back -up data. Updated Hydraulic Report. Updated Geotechnical Report. Electronic Bid Documents provided to the Builders Exchange. Addenda. SECTION 2.00 PROJECT MANAGEMENT AND QUALITY CONTROL SECTION 3.00 BASEMAPPING 3.01 BASEMAPPING Section 3.01 of Supplement No. 8 is supplemented with the following: S 180th Street and S 200th Street R/W Verification The Consultant shall provide the necessary professional surveying services to perform the field and office survey necessary to prepare a centerline alignment plan of the new Southcenter Parkway Extension and ties at S 180th Street and S 200th Street. This phase will include the research of county road plans and records, record of surveys, and plats; section and road monument field survey ties; plat and Record of Survey calculations; road alignment computations and resolution; and preparation of a survey map exhibit to depict the centerline alignment and ties to section lines. Establish Horizontal Vertical Control and additional Topographic Survey The Consultant shall provide the necessary professional surveying services to perform the field and office survey necessary to develop horizontal and vertical control for the project, develop a horizontal and vertical control basemap, and perform additional topographic survey at the tie -in to the existing Southcenter Parkway at Segale Drive C, B -Line Alignment, and C -Line Alignment. Completed Work Deliverables: Updated basemap and survey control sheet SECTION 4.00 DESIGN 4.01 REVISE SOUTHCENTER PARKWAY EXTENSION LAYOUT Section 4.01 of Supplement No. 8 is supplemented with the following: At the direction of the City, the Consultant shall revise the design of Southcenter Parkway based on the following: Redesign the King County Metro bus pullouts based on updated design standards. Develop access location for new PSE substation. Relocate /redesign illumination system to back of curb to eliminate conflict with joint utility trench. p t\ tuka00000001\ 0000con \0030contract \0031add -ons \supplement no 9 \southcenter- supplemental services #910_0223 doc DAVID EVANS AND ASSOCIATES, INC. 2 Scope of Services Relocate /redesign signal system to eliminate conflict with joint utility trench. Develop temporary access to Seattle Tractor. Develop and evaluate three additional sites for the sewer lift station. Redesign sanitary sewer lift station at new selected site. Redesign sanitary sewer trunkline to tie into new sanitary sewer lift station design. Redesign entire Highline water system. Develop temporary construction easement drawing and control sheet for plan set. In addition, the following plan elements required additional staff hours to complete than what was identified in Supplement No. 8. These items include: Roadway Plan and Profiles at Segale Park Drive C, B -Line, and C -Line due to updated topographic survey information. Channelization Plans. TESC plan preparation based on information provided by LaPianta. Storm Drainage Plan and Profiles. Landscaping and Irrigation Plans. Stream E mitigation Plans. Electrical design for sanitary sewer lift station. Deliverables: 100% Proof Plans (10 copies, half -size 11" x 17 100% Proof Contract Special Provisions (10 hard copies) 100% Proof Engineer's Estimate (3 hard copies) 4.03 ASSISTANCE DURING BID PERIOD Section 4.03 of Supplement No. 8 is revised to the following: The Consultant shall provide assistance during the ad period for construction bids consisting of attending a pre- construction meeting, assisting the City in responding to bidder questions, and preparing addenda. It is assumed that 112 hours total will be required to prepare the addenda. 4.04 BID REVIEW (NEW SECTION) The Consultant shall review the proposal of the apparent low bidder and check references to assist the City in awarding the Contract. The Consultant shall attend the bid opening, prepare a bid tabulation, review the unit bid costs in the proposal, compare them with unit costs of other bidders, and note whether any major discrepancies are present. The Consultant shall call the references listed on the apparent low bidder's "Responsible Bidder Determination Form The Consultant shall prepare a list of questions to ask the references and shall document their responses. The responses shall be sent to the City for their review. The Consultant shall prepare an award letter of recommendation to award a contract to the lowest responsible bidder. Deliverables: Bid Tabulation Reference Check Forms Letter of recommendation to award bid p:\ t\ tuka00000001\ 0000con \0030contract \0031add -ons \supplement no 9 \southcenter supplemental services #9 10_0223.doc DAVID EVANS AND ASSOCIATES, INC. 3 Scope of Services SECTION 9.00 MISCELLANEOUS DESIGN SERVICES The CONSULTANT shall provide miscellaneous work to support other design elements of the project. The following miscellaneous design work included in Supplement No. 9 includes: A. Develop alternate access drawings for the Gaco /Mitchell Access. B. Prepare overlay design for Southcenter Parkway from S 180 Street to Minkler Boulevard. Prepare overlay design for S 200 Street from the proposed Southcenter Parkway to the western limits of the waterline design. C. Prepare miscellaneous City exhibits (32 hours maximum). D. Prepare Temporary Construction Easement Display. E. Develop detour plan. F. Develop Building Demolition Plan and Specification. p:\ t\ tuka00000001\ 0000con \0030contract \0031add -ons \supplement no. 9 \southcenter supplemental services #9 10_0223 don DAVID EVANS AND ASSOCIATES, INC. 4 Scope of Services Supplement No. 9 Southcenter Parkway Extension Project Summary Classification Hrs. x Rate Cost 1 Quality Assurance /Quality Control 22 $57.75 $1,270.50 2 Project Manager 67 $57.75 $3,869.25 3 Senior Professional Engineer 325 $58.80 $19,110.00 4 Professional Engineer 160 $43.05 $6,888.00 5 Design Engineer 316 $31.50 $9,954.00 6 CADD Manager 320 $40.43 $12,936.00 7 Sr. Traffic Engineer 54 $58.80 $3,175.20 8 Traffic Engineer 32 $43.05 $1,377.60 9 Sr. Landscape Architect 25 $40.90 $1,022.44 10 Sr. Landscape Designer 36 $32.24 $1,160.46 11 Senior Prof. Land Surveyor 32 $50.40 $1,612.80 12 Survey Tech. 70 $31.50 $2,205.00 13 Survey Crew 64 $49.35 $3,158.40 14 Administrative Assistance 94 $28.09 $2,640.23 Total Hrs. 1617 $70,380 Direct Salary Cost $70,380 Subtotal $70,380 Overhead Cost Net Fee Subtotal 174.70% of Direct Labor 30.00% of Direct Labor Direct Non -Salary Cost a) Deliveries/ Mail 5 Each $15.00 /Each $75.00 b) Reproduction: Half Size Plans Sets 15 Each $110.00 /Each $1,650.00 Full Size Plan Set 1 Each $600.00 /Each $600 Reports 15 Each $50.00 /Each $750 c) Hydraulic Modeling Lump Sum $1,000 d) Travel (Personal Miles) 200 Miles $0.550 /Mile $110.00 e) Utility Tone Marking (APS) $0.00 Subtotal $4,185 Subconsultant R &W $2,400 DEA Total to Complete Project J $221,033 Page 1 P:\ t\ TUKA00000001\ 000000N \0030Contract \0031Add -Ons \Supplement No. 9\Southcenter- Supplemental Services #9 10_0223_revised3.xls $122,954 $21,114 $214,448 Printed 2/24/2010 3.00 3.01 A B C D 4.00 IDesign 4.01 A B C Final PS &E Preparation Basemapping Basemapping S. 180th to Minkler Field Walk On -call surveying S 180th Street and S 200th Street R/W Centerline I Establish Horz -Vert Control Additional Topo `Task "3.Q Total Revise Southcenter Parkway Extension Layout Bike Lane Elimination September 2009 90% Comment Resolution 100% Proof Plans Preparation Roadway plans /profiles Segale Drive C HorizontalNertical Realignment Station 118 +50 intersection realignment Channelizatlon and signing plans TESC Plans /Details Miscellaneous details Storm drainage plans and details Stream E Conveyance PIaNProfile Retaining Wall Water /Sewer plans Sanitary Lift Station PRV plans Intersection plans Signal design Steam E Enhancement plans Right -of -way plan Illumination design Landscape plans and details Irrigation plans and details Dry utilities Engineer's estimate quantities Specifications Design submittal production SUPPLEMENT NO. 9 Southcenter Parkway Extension Project Estimated Person -hours Summary 1 2 3 4 5 1 6 7 8 9 1 10 11 12 13 14 1 O C U w d T U j W N N N 2 m c N O o 5 W W !1 O Q O c C `w C Q A m W d rn I 'al O dl J C N C N m L 3 N O C W V C NN O y N N a n. .2 w w N v 6: 1' 0 c c 1 o c o rn p J J Z Z E D EA R &W O a co a o U rn t- in rn to 1n co Total DEA Total Electrical Total Vat. Total. Total Totat, Total Total. Total Total _.Total Totat'Total Total Total Total Total Total Total Total .'_'firs r t i t s hrs' t s .hrs hrs' -..hrs hrs hrs hrs hrs hrs hrs hrs hrs .1$ I I I I I I I I I I I 2 1 1 1 2 8 1 2 1 2 l I 10. 4 14 8 7 80 1 I I 4 6 40 1 50 14 80 120 2 88 100 20 I I A 1 32 I 12 40 1 20 80 12 54 1 24 1 PV\ TUKA000WW1` 000000N0030Contract10031AddOns \Supplement No. 915o0fcenter- Supplemental Services #910 0223 reviced3 XIS Page 2 10 1 16 32 1 1 10 10 5 10 10 1 18 12 22 1 44 52 32 62 64 6 2 4 30 47 134 181 $6.125 $17,881 $24,006 119 1 $15,690 22 $2,771 90 $11,966 258 $33.945 270 $35,570 20 51,920 66 511.153 26 52.818 70 $9.617 20 $2,228 15 51.605 58 $6,464 62,400 $6.125 517,881 $24,006 515,690 $2.771 511,966 $33.945 $35.570 $4,320 $11,153 52.818 59,617 $2,228 51.605 56,464 2/24/2010 4.03 Assistance During Bid Period A Pre-construction meeting B Responding to bidders questions C Addenda 4.04 Bid Review I A Bid Review and Award Recommendation I T Miscellaneous Design Services A Gaco/Mitchell Driveway Alternatives SSP/200th and 180th Overlay C Prepare Miscellaneous City Exhibits D Prepare Temporary Construction Easement Display E Prepare Detour Plan Sheet 1 Sheet) F Prepare Building Demolition Plan and Specification SUPPLEMENT NO. 9 Southcenter Parkway Extension Project Estimated Person-hours Summary 2 3 4 5 6 7 8 9 10 1 11 PATUKA000C0001.90000NZ030Cor6'act6'031Add-Ons \Supplement No. 9 \Southcenter Supplemental Services 89 10_0223_revised3.xls Page 3 12 13 14 1 fa. g 1 1 To cn LLI ID W C 0 i W 1,3 't 'I' 8 3 g i fg T g Lt .'t 13 f; t 1 2 o 0 .2 1 5 g g ,f, a_ 1- 0 2-g, t .1. 1 .K. 2 r= t 3 2 .g. 4 4 i DEA (53 (I) (I) Total DEA Total Total. Total tOtSt 'TOW Total Total Total Total Total Total- Total Total Total Total •Total hrS'.. hrs "hrs hrs Airs' hrs hrs hrs hrs hrs hrs 1 1 1 1 1 4 4 1 1 I 1 1 1 8 $1.421 4 8 1 4 1 I 1 1 I 16 52.662 8 16 1 16 16 1 40 1 16 112 1 $14,205 4 8 1 40 1 1 40 92 1 $12.701 86 1262 6166,736 4 4 8112 4 8116 1 16 8 1 16 100. 312 280 54 '32 25 36 8 24 16 8 I 4 4 212 1 81 1 1 2 1 1 .,:i 7. Tisk_9.01 :4 :10 :26- 60 4 60 8 2 174 523,706 523,706 I Expenses1 1 I 1 1 1 1 1 1 1 1 54,185 1 1 54.185 i alOiE0TTQTA1:6 425 -...i50:;. .320, .54 32 25 f 36 32 70 64 94 1617 5218,633 -52,400 $221,033 32 56 32 32 8 14 $4.697 $7,896 54,070 $4.300 $877 $1,867 R8W Electrical Total Total -Total 52,400 $1,421 $2,662 $14,205 $12.701 $169136 $4.697 $7,896 $4.070 $4.300 5877 $1,867 2/24/2010 Southcenter Parkway 2010 timeline 2 -25 -10 Activity 1. DEA delivers 100% Plans, Specs, Eng Est to City 2. CM review, shortlist, interview, references 3. CM interviews (up to 4 firms) 4. Advertise Contractor bid 5. CM select 6. Negotiate contract with CM 7. Contractor bid due, bids opened 8. TIB March Board Meeting (Wenatchee) 9. Contractor bid review, background, interview 10. CC Transportation Committee 11. Corps of Engineers issues "404" permit 12. City Council COW Meeting discuss Contractor bid award CM award TIB contract CERB contract State Capital Projects contract Highline Water District ILA 13. City Council Regular Meeting award /authorize Contractor bid award CM award TIB contract CERB contract State Capital Projects contract Highline Water District ILA 14. Mayor signs contracts with CM and Contractor, City issues Notice to Proceed 15. Construction starts Start Date February 10 February 24 March 8 March 25 March 18 End/Due Date January 13 March 5 February 25 February 25 March 5 March 12 March 18 March 26 April 1 April 5 April 5 April 12 April 19 April 20 May 3