Loading...
HomeMy WebLinkAboutTrans 2010-03-15 Item 3A - Contract Supplement #8 - Tukwila International Boulevard Phases II and III Construction Management with KPG IncTo: City of Tukwila Mayor Haggerton Transportation Committee From: Public Works Director h/ Date: March 9, 2010 INFORMATIONAL MEMORANDUM Subject: Tukwila International Boulevard Phases II III Improvements Project Nos. 95 -RWO3 95 -RW04, Contract 02 -108 and 02 -108b Construction Management Adjustment Supplement No. 8 ISSUE Approve Contract No. 02 -108 and 02 -108b, Supplement No. 8, with KPG Inc. for the Tukwila International Blvd. Phases 11 III Street Improvement Project construction management and material testing services. BACKGROUND The City contracted with KPG, Inc. to design the Tukwila International Blvd., Phase II Ill Project, from So. 116th St. to So. 139th St. The construction contract was awarded to Gary Merlino Construction on December 15, 2008. The construction management (CM) services for the project were originally split between Tukwila staff, KPG Inc. and Harris Associates, Inc. Initially, KPG was to provide design support and submittal reviews, materials testing and technical services through subcontract relationships with select members of their design team. Harris was to provide the bulk of the field inspection support, including specialty inspectors for some of our higher risk elements (primarily the soldier pile walls along both sides of TIB). Shortly after starting construction it became apparent that Harris had oversold their capacity for the field inspection role and that function had to be picked up by other project staff. An employee of Krazan Associates (a sub consultant to KPG) began filling dual roles as a transportation inspector and materials tester to support the hole created by the lack of Harris staff. This created a need to increase KPG's CM support contract budget. ANALYSIS A recent analysis of the proposed Harris CM support contract shows a significant projected underrun on the Harris contract (on the order of $500,000). This was caused by two primary factors. The first is that the project appears to be well ahead of schedule and the inspection support is not anticipated to run the original contract length. The second was due to Harris's inability to provide the support personnel on the schedule proposed in the CM support contract and thus their lower level of involvement under billed the project budget. We have been able to cover this shortfall in personnel with some additional support by City staff and by shifting responsibilities for work within the project team. This $181,903.40 Supplement No. 8 with KPG will be more than offset by the anticipated $500,000.00 +1- savings from the Harris contract. RECOMMENDATION The Council is being asked to approve Contract 02 -108 and 02 -108b Supplement No, 8 with KPG, Inc. for CM support for the Tukwila International Blvd Phase II III Project in the amount of $181,903.40 and consider this item at the March 22, 2010 C.O.W. meeting and subsequent April 5, 2010 Regular meeting. Attachment: Supplemental Agreement No. 8 KPG, Inc. W \PW Eng\PROJECTS \A- RW RS Projects \95RW03 TIB2 \TIB Ph2 &3 Info Memo KPG Consultant Agreement Supplement #8 doc Jim Haggerton, Mayor Tukwila International Blvd Phase II III Description Vendor Design KPG Const Mgmt KPG Const Mgmt Harris 1,275,049.00 Original Contract Paid through Amount 3/15/10 1,742,637.00 1,669,371.33 385,000.00 281,061.05 2,127,637.00 1,950,432.38 479,694.62 Construction Gary Merlino I 12,262,288.20 9,079,676.03 of Amount Spent 96% 73% Remaining KPG Total Balance Supp #8 Contract 73,265.67 103,938.95 38% I 795,354.38 74% I 3,182,612.17 $181,903 40 2, 309, 540.40 Washington State WI Department of Transportation Supplemental Agreement Number 8 Original Agreement Number LA -5329 Project Number STPF 0099(007) Organization and Address KPG, Inc. P.S. KPG, Inc. P.S. 753 9th Avenue North Seattle, WA 98109 Phone: 206.286.1640 Project Title Tukwila International Boulevard Phase 2 3 Description of Work South 139th Street to South 116th Street Construction Engineering and Materials Testing and Observation Services The Local Agency of City of Tukwila desires to supplement the agreement entered into with and executed on 11/18/2002 By: DOT Form 140 -063 EF Revised 9/2005 Nelson Davis, KPG F 1 J E Consultant Signature Execution Date Completion Date 11/18/2002 12/31/2010 New Maximum Amount Payable 2,309,540.40 KPG, Inc. P.S. and identified as Agreement No. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: 11 LA -5329 Section 1, SCOPE OF WORK, is hereby changed to read: The Serape of Work and estimated level of effort for this supplement is detailed in Exhibit `B -8' attached hereto, and by this reference made a part of the agreement Section IV, TiME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: No Revi.einrnc 111 Section V, PAYMENT, shall be amended as follows: Additional services for this supplement No. 8 are estimated at $181 9O1 4 based on the level of effort indicated on the attached Rxhihit'T) If you concur with this supplement and.agree.to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: City of Tukwila Approving Authority Signature Date A. BACKGROUND Exhibit B -8 City of Tukwila Tukwila International Boulevard, Phases 2 3 South 139 Street to South 116 Street Scope of Work Supplemental Agreement No. 8 Construction Engineering and Support KPG, Inc March 8, 2010 The scope of work is provided to include additional support throughout the construction phase of the Tukwila International Boulevard Project. This work includes additional inspection, field reviews, and design support based on actual construction progress and scheduling as described herein. B. SCOPE OF WORK TASK 1— MANAGEMENT COORDINATION ADMINISTRATION 1.1 The Consultant shall prepare supplemental agreements for the work associated with this supplement and provide continuous management and administration of all subcontractors included in this scope of work. Task 1 Deliverables: Monthly progress reports TASK 2 CONSTRUCTION PHASE SERVICES 2.1 Provide ongoing on -call construction support for the project duration with subconsultant support as needed. This work includes estimated level of effort based on project needs to date and extending through project completion. Additional support than anticipated in the original contract authorization is required for the following items of work: Provide civil design, structural design (KPFF) and assist with change order preparation for an added stairwell between TIB and the dead end of 37` Avenue South. The purpose of the stair way is to provide pedestrian access from the neighborhood east of TIB. Prepare an alternative driveway and slope layout and provide right of way support (Abeyta) as requested to allow deletion of soldier pile wall 6 from the contract. Construction of the slope is anticipated to provide significant project savings compared to wall 6 construction. Provide assistance with additional WSDOT permit requirements including partial overlay of TIB within the limited access area. This permit condition by WSDOT was added following contract award. General Construction support: The Consultant shall continue to provide engineering support as required for the duration of construction. The Contractor has maintained an aggressive schedule, requiring additional meetings, site reviews, and follow up than anticipated in the original budget estimates. These services have included on -call field inspection for storm drainage, assistance with recycled material compaction testing, and assistance with wall anchor testing. Budget allowances for ongoing support needs based on progress to date is shown on the attached hour estimate. Subconsultant Construction Support: This supplement includes and estimate of additional subconsultant services as follows: Page 1 of 2 o Additional geotechnical (Landau Associates) services were required associated with soldier pile wall obstructions, wall anchor testing, and resolution of compaction issues with recycled trench backfill material. o Additional structural Engineering (KPFF) services associated with soldier pile wall obstructions, wall anchor testing, and structural design of the 37`" Avenue S stairway. o Additional construction observation and/or material testing services (Krazan and Associates) is necessary to cover daily field coverage and reporting. KPG is serving as a contracting agent for these services with day to day coordination for observation and material testing services by the City. o Additional right of way services (Abeyta) are required for assistance with valuation, negotiation, and recording of easements associated with the wall 6 deletion. o Additional services for arborist review and recommendations on hazard trees following site clearing by Sound Tree Services is included as requested by the City. Task.2 Deliverables: Documentation as requested in support of on -call construction support TASK.3 UTILITY COORDINATION ALLOWANCES 3.1 No change to this task; however, funds may be used for general construction phase services if necessary. TASK.4 CONSTRUCTION SURVEYING AND STAKING 4.1 No change to this task; however, funds may be used for general construction phase services if necessary. TASK 5 RECORD DRAWINGS 5.1 No change to this task. C. FUTURE SUPPLEMENTAL AGREEMENT The City of Tukwila may require other services of the Consultant these services could include other work tasks not included in the scope of work. These services may include, but are not necessarily limited to, additional construction support, engineering or independent peer review of contractor, City, or utility proposed plan changes, assistance with property issues, or other services deemed necessary by the City. At the time these services are required, the Consultant shall provide the City with a detailed scope of work and an estimate of costs. The Consultant shall not proceed with the work until the City has authorized the work and issued a Notice to Proceed. Tukwila International Boulevard, Phase 2 3 Supplement No. 7 Page 2 of 2 March 8, 2010 EXHIBIT D -8 Archite Civil 'Landscape ril eering HO UR AND FEE ESTIMATE j Total Fee City of Tu4cwila Boulevard, Pha 2 3 Services Project: tal EnyinQerin9 Labor Hour Estimate ,mate =Admen proj du i ila l ent N 8 Su pplemen r •Survey Fee *Technicia 64.2 Supplement No. 8 l *Pro *Project ,Bngineer $Crew 9 8 r� 68 Engineer 139.2 Manager 99.9 5,826 4 178.51 j$ 123`58] 24 Description 24 Task 24 0 0 0 0 t Administration 4,140.60 24_____i--0 12 0 7 ,822. r anaeme t Coordination 0 4 7 0 99_58 ?ask 1 Task Totals 24 j 16 0 A. SubCOntractor� rdinat+on j 0 0 8 28,27 4 40 0 1 0 14,125. on Phase Services 4 12 40 0 40 3 574.55 Construct venue South 8 8 200 Task 2 m ess at 37th P re ents support 0 104,544 00 Stairway Access for Wall i right of way 16 *See Estimate Attached* A SDOT requireme ate Attached' 7,000.00 .41 1. Alternative eote *See Estimate B. with additional W 1,500 00 See Estimate Attached C Assistance 076:9 D Additional construction suppod See Estimate Attached 76 4-4 on call allowance Landau Geotechn_.!�a� Allowance Estimated E Structural Allowanc g03,40 F OFF Allowanc 32 20 1 181, Krazan insoection assistance lenient No 8 G. ssociates ricrht of way orist suppor 4 Total Suppleme H. Abe�vta A ices on cell arb Sound Tree Services 'Totals 22.50 Costs 62.50' 43.2 34.9 48.77 I 30.00 160.6 Direct Salary 25% Overhead Rate Fixed Fee March 8, 2010 HOUR AND FEE ESTIMATE EXHIBIT D -8 K. rchitrt. l Project City of Tukwila Landscape Architecture Tukwila International Boulevard, Phase 2 3 Ci Engineering Supplement No. 8 Supplemental Engineering Services Total Fee Labor Hour Estimate *Project "Project *Survey Description Manager Engineer *Engineer Crew *Technician *Admin Fee Task 1 178.51 I 123.58 99.93 139.29 85.68 1 64.26 j Estimated Allowance for Krazan Associates Purpose: To provide on -call inspection at the direction of the City. Original scope only included testing. Estimate 160 hours I month for 9 months =1440 hours 28,512.00 80% Regu4ar time of $66 /hour 1 76,032.00 20% Overtime rate of $99 /hour Note: For estimating purposes only, actual hours may not be entirely available due to administrative costs and misc. expenses. Total Estimated Allowance 104,544.00 Estimated Allowance for Landau Associates Purpose: To provide on -call geotechnical support for compaction and structural walls. Original estimate assumed CM would provide wall expertise. 24.69 On call support for wall construction and compaction issues in 2009 construction season 1,05$ (10,000.00) Estimate 20 hours of geotechnical support for 2010 construction season 10% for admin and expenses 3,070.66 9 Less original authorization 14,125.35 Total Estimated Allowance Estimated Allowance for KPFF Purpose: Structural design for stairway structure and 2010 on -call support. Engineering support for wall submittals, RFI's, support in 2009 Construction season. Structural design of 37th Avenue S stairway structure Estimate 20 hours of structural support for 2010 10% for admin and expenses Less original authorization Total Estimated Allowance Estimated Allowance for Abeyta Associates Purpose: Assistance with negotiation of easement in lieu of wall 6 Order Title Report Prepare AOS Negotiations Right of way certification closing Total Estimated Allowance u rhR 2010 23,700.00 3 ,500.00 3,174.56 (26,800.06) 1 3,574.56 500.00 1,500.00 4,000.00 1,000.00 7,000.00