Loading...
HomeMy WebLinkAboutTrans 2010-09-20 Item 2A - Bid Award - Signal Electric for East Marginal Way South/South 86th Place Traffic Signal Pole ReplacementAttachments: Bid Tabulations Vicinity Map City of Tukwila INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Public Works Director DATE: September 9, 2010 Subject: East Marginal Wav S S 86th PI. Traffic Signal Pole Replacement Project No. 11001605 BID AWARD ISSUE Award the East Marginal Way S S 86 PI. Traffic Signal Pole Replacement. Jim Haggerton, Mayor BACKGROUND On February 20, 2010, an errant vehicle struck a traffic signal pole on East Marginal Way S at S 86 Place. The signal pole sustained enough damage to necessitate its replacement. The traffic signal was temporarily repaired and put back into service until permanent repairs can be constructed. One signal pole will have to be completely replaced. The driver's insurance company will be billed for all reimbursement costs. ACTION TAKEN Bids were advertised on August 19th and 26th and opened on September 2, 2010. Two (2) bids were received and Signal Electric, Inc. submitted the lowest bid at $35,054.00. The engineer's estimate was $50,000.00. Signal Electric, Inc. has worked for the City on past projects and has performed good work. BUDGET AND BID SUMMARY Bid Results Engineer's Estimate Budg Bid Amount $35,054.00 $50,000.00 Insurance Contingency (10 3,505.40 5,000.00 Total 38.559.40 55.000.00 N/A RECOMMENDATION Council is being asked to award the construction contract for the East Marginal Way S S 86 PI. Traffic Signal Pole Replacement contract to Signal Electric, Inc. in the amount of $35,054.00 and consider this item at the September 27, 2010 Committee of the Whole meeting and subsequent October 4, 2010 Regular Meeting. W' \PW Eng \PROJECTS\A- RW RS Projects \11001605 EMW 86th PI Signal Pole \Into Memo Bid Award EMW_86th.doc CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS Signal Pole Replacement E Marginal Way S S 86th PI Project No. 11001605 Item No. !ROADWAY 1 I Mobilization 1 2 1Project Temporary Traffic Control I 3 'Shoring or Extra Excavation, Class A TRAFFIC CONTROL DEVICES Item 1 4 (Traffic Signal Modifications Engineer's Estimate (Base Bid) Qty Unit Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost u 1 1 LS 1 $5,000 1 5,000 11 $3,000.00 1 1 LS 1 $5,000 1 5,000 11 $10,000 00 1 I LS $5,000 I 5,000 II $3,312.00 1 1 LS 1 $35,000 1 35,000 11 $18,742.00 I $18,742 0011 $21,000.00 I TOTAL (SCHEDULE A BASE BID) 50,000.00 $35,054.00 KPG Prepared by: \O I Iry r Date: Z B 6 Signal Electric, Inc. Transportation Systems, Inc. $3,000 0011 $4,000.00 I $10,000.0011 $3,800.00 1 $3,312.00II $14,000 00 $4,000.00 $3,800 00 $14,000.00 $21,000 001 $42,800.00 44, V ►C►NIT‘f N1Ap AL WAY S $6T pL EAST �ARG►N EVENT SIGNA POLE REPLAC N I, r 1