Loading...
HomeMy WebLinkAboutTrans 2010-09-20 Item 2C - Grant Acceptance - Tukwila Urban Center Access (Klickitat)TO FROM DATE: SUBJECT: City of Tukwila Grant Federal Sec. 117, FFY 2005 Approp Act Federal High Priority Projects (HPP 474) Federal High Priority Projects (HPP 475) Federal STP Regional Federal Intersection and Corridor Safety State Transportation Improvement Board Attachment: CIP Page INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee Public Works Director September 15, 2010 Tukwila Urban Center Access Proiect (Kiickitatl Project No. 98410419 Acceptance of Grants ISSUE Formal City acceptance of six grants which have been awarded to the TUC Access Project. BACKGROUND Since 2003, staff has been working on the Tukwila Urban Center Access Project to improve traffic conditions at and around the Klickitat Drive /Southcenter Parkway intersection. Funding for the design and construction of this major project comes from many sources including six grants, impact/mitigation fees, City funds, and Local Improvement District #33 According to CIP Policy #12, staff must get approval from the full Council before accepting grants. This policy has been met in the past with the annual adoption of the CIP and budget showing both the proposed and accepted grants. DISCUSSION Six grants have been awarded to this project. The first three grants have been fully expended in the design phase and the remaining three grants will be utilized for construction Year of Award 2005 2006 2006 2006 2006 2006 W: \PW Eng \Old P drive \Cyndy \Klickitat \INFORMATION MEMO Grants Acceptance 9 -15 -10 doc Phase Design Design Design Construction Construction Construction Total Minimum Match 0% 0% 0% 13.5% 0% 20% $1,405,000 Jim Haggerton, Mayor Amount $983,928 719,921 1,574,824 3,000,000 250,000 5,000,000 $11,528,673 The minimum match listed above would be represented by the LID #33 and City funds. Attached is the proposed 2011 CIP page for the TUC Access Project. Recent approvals from WSDOT have been given on the updated Hydraulics Report as well as the Channelization Plans. Staff is working with WSDOT and the Transportation Improvement Board to formally "obligate" the remaining construction funds Pending those obligations and final approval by both agencies, staff expects to advertise this project before the end of September. RECOMMENDATION Council is being asked to formally accept the six grants for the Tukwila Urban Center Access Project and consider this item at the September 27, 2010 Committee of the Whole and the subsequent October 4, 2010 Regular Meeting. PROJECT: Tukwila Urban Center Access (Klickitat-S1C Pkwy) Project No 98410419 DESCRIPTION: Improve traffic flow on Southcenter Parkway, Klickitat Drive and Strander Boulevard by constructing an underpass for the southbound lane on Southcenter Pkwy Coordinate with WSDOT on 1 -5 on- ramps. JUSTIFICATION: Provide needed future traffic capacity, safety improvements and reduce accidents STATUS: Design Report completed in 2005, design in 2006 2007, and LID formation in 2009 Proposed Southcenter Pkwy/Klickitat road closure for duration of construction will save a significant amount of costs. MAINT. IMPACT: Overlay on a 10 -20 year cycle Project is on Impact Fee List under Zone 1 Federal design funds for $3.25m. Westfield Mall mitigation $579k COMMENT: cash and $846k ROW, Boeing (Longacres) mitigation is $65k, ACME Bowling $112k. Construction grants, State TIB $5m, Federal STP $3m and $250k. Local Improvement District (LID) is a range from $6.5 to $10 5 million FINANCIAL Through Estimated (in $000's) 2009 2010 2011 2012 2013 2014 2015 2016 BEYOND TOTAL EXPENSES Design 3,341 670 4,011 LID Expenses 197 10 500 707 Land (R/W) 2,408 7 2,415 Const. Mgmt. 2,513 2,513 Construction 16,750 16,750 TOTAL EXPENSES 5,946 687 19,763 0 0 0 0 0 0 26,396 FUND SOURCES Awarded Fed Grant 974 3,250 4,224 Earmark future) 1,840 435 2,275 Awarded State Grant 5,000 5,000 LID 11,545 11,545 ROW Donation 846 846 Mitigation Actual 759 759 impact Pees 336 471 807 City Oper Revenue 1,191 (219) (32) 0 0 0 0 0 0 940 TOTAL SOURCES 5,946 687 19,763 0 0 0 0 0 0 26,396 Project Location 2n11 2n16 Capital Improvement Program CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2011 to 2016 15