Loading...
HomeMy WebLinkAboutTrans 2011-08-15 Item 2A - Grant Applications - 2011 Funding Programs from WA State Transportation Improvement BoardCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: FROM: DATE: SUBJECT: Mayor Haggerton Transportation Committee Bob Giberson, Public Works Director. August 12, 2011 2011 Fundina Proarams Transportation Fundina Opportunities Washington State Transportation Improvement Board (TIB) ISSUE The Transportation Improvement Board has announced its 2011 Funding Programs and signed applications must be postmarked by August 31, 2011. BACKGROUND The grant funding programs which have called for project applications include: Program Urban Arterial Program (UAP) Urban Corridor Program (UCP) Sidewalk Program DISCUSSION Statewide Fundinq Puaet Sound Allocation 30 million 16.9 million 40 million 22.5 million 1 million 562,000.00 Per CIP policy, appropriate committees must approve applying for any grants. The following projects are recommended for 2011 TIB grant applications: Andover Park West Tukwila Pkwy to Strander Blvd (with Transit Cntr CIP pg. 19) Interurban Ave S S 143r St to Fort Dent Way (CIP pg. 30) Typical maximum project funding is $5.5 million from the UCP and $3.0 million from the UAP. TIB requires a minimum City match of 20 but the match depends on the project costs and the application submittal (higher match higher score). Discussions with TIB staff suggest that the projects identified above would be the most competitive projects for grant funding this year. Project selections for 2011 funding will be announced at the November 18, 2011 Board meeting. RECOMMENDATION The Committee is being asked to approve submittal of grant applications to the Transportation Improvement Board for the Andover Park W and Interurban Ave S projects. Attachment: CIP Pages 19 and 30 WAPW Eng10THER1Grant Applicabons1201111nfo Memo TIB 2012 Grant Apps TC 08 -12 -11 gl.docx CITY OF TUKWILA CAPITAL PROJECT SUMMARY Pro ,lect Location Gds 2011 2016 Capital Improvement Program 19 2 2011 to 2016 PROJECT: Andover Park West (Tukwila Pkwy Strander Blvd) Project No. 98810404 DESCRIPTION: Study and implement revised channelization. JUSTIFICATION: Revising left turn lanes will reduce accidents and lessen congestion. Major portion of Andover Park W at intersections are complete. Next phase is to revise turn lanes along STATUS: length of project. To be coordinated with the development of the Tukwila Urban Center Transit Center. MAINT.IMPACT: Negligible. Project is on impact fee list and goal is to begin project by 2011. Design report completed in 1991 updated COMMENT: in 2009. ACME Bowling mitigation of $111 k and Westfield Mall of $205k in 2007. FINANCIAL Through Estimated (in $000's) 2009 2010 2011 2012 2013 2014 2015 2016 BEYOND TOTAL EXPENSES Design 77 123 200 Land(R/W) 656 656 Const. Mgmt. 105 105 Construction 700 700 TOTAL EXPENSES 77 0 123 1,461 0 0 0 0 0 1,661 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 316 316 Impact Fees 981 981 City Oper. Revenue (239) 0 123 480 0 0 0 0 0 364 TOTAL SOURCES 77 0 123 1,461 0 0 0 0 0 1,661 Pro ,lect Location Gds 2011 2016 Capital Improvement Program 19 2 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2011 to 2016 PROJECT: Interurban Ave S (S 143 St Fort Dent Way) Project No. 90310402 DESCRIPTION: Design and construct sidewalks, pavement restoration, drainage and lighting Orolect Location 2011 2016 Capital Improvement Program 30 3 Pedestrian traffic is forced to walk in traveled way, lighting is substandard, drainage is poor and JUSTIFICATION: pavement failure is accelerating. Design to be completed in 2010. Federal STP construction grant submitted in 2009 was unsuccessful and State STATUS: TIB did not issue a call for projects in 2009. MAINT. IMPACT: Reduce annual pavement repairs and increase pedestrian safety. COMMENT: Federal Hwy STP Grant of $389,000 for design only. Proposed grants are Federal and State TIB. FINANCIAL Through Estimated (in $000's) 2009 2010 2011 2012 2013 2014 2015 2016 BEYOND TOTAL EXPENSES Design 424 39 250 713 Land (RM) 150 150 Const. Mgmt. 1,300 1,300 Construction 9,400 9,400 TOTAL EXPENSES 424 39 0 0 0 0 0 0 11,100 11,563 FUND SOURCES Awarded Grant 367 22 389 Proposed Grant 5,000 5,000 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 57 17 0 0 0 0 0 0 6,100 6,174 TOTAL SOURCES 424 39 0 0 0 0 0 0 11,100 11,563 Orolect Location 2011 2016 Capital Improvement Program 30 3