Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M97-0019 - BOEING #9-99
'9-7? oolci City of Tukwila (206) 4313670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 MECHANICAL PERMIT Permit No: M97 -0019 Type: B -MECH Category: NRES Address: 9725 EAST MARGINAL WY S Location: Parcel #: 000340 -0018 Contractor License No: Permit Description: INSTALL ; TWO' A/C UNITS. UMC Edition 1994 Signature Print Name: ._SSaJ aid! Center Authorize. Signature ;Date Date: Title: Valuation: `Total Permit Fee Status: ISSUED Issued: 03/06/1997 Expires: 09/02/1997 TENANT BOEING #9 -99 9725 EAST MARGINAL WY S, SEATTLE, WA 98124 OWNER BOEING PO BOX 3707 - M/S 1F- 09 .. SEATTLE WA 98124 CONTACT GARY TALLER Phone: 206 544 -2975 P.O. BOX 3707 M/S 46 -87, SEATTLE, WA 98124 r********************************** *. ** * * * ** ** * * * * * * * * * * ** 8,000.00 58.13 ******** * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** I hereby certify that I have read an'd.examined this permit. and know the same to b:e true and correct. All provisions of law and ordinances', governing thiswork will be comp.l'ied with, whether specified herein or not. The granting of permit does not presume to give authority to violate or cancel,th'e provisions of any other'state or local laws regulating construc.ti'on'or . the,performance of work. I am authorized to. sign for and obtain this building perm t , 4AF t .. ar 44e r This permit shall become null and void if work is,not commenced within 180 days from the date of issuance,,. If the ,work is suspended or abandoned for a period,of.180 days.from'the last inspection. . Address. :; 972$ EAST MARGINAL WY Suite Tenant':. BOEING, #9 -99 ;. Status :. ISSUED," Type : B. -MECH : ,.Appl,ied:. 02/04/.1997 Parcel.'#R: '000340 - 0018 ; Issued: ..03 /06/1997'• * k' kk**• k*' R*****" k k* 41* k• k*******.*****' kleA**• kk• k******" k***: k• k• A *•k*k•k*•i'lck * *•k•k Per`mit.Conditionsc 1. No changes wil l be made to the plans :unless approved by the Architect or Engineer and th w:i e Tuk la:.,Bui lding Division. 2. All ,perm ts., i nspect i orr retards; and app °roved p 1 ans sha 1 1 be'. available: at the gob s.i to : prior to the start o.f any con - struction.' These. documents are to be maintained, and avai T- able until final `lnspect;ion 'appro,v"a'l is granted. 3 All construction to be `done `in confor.mance•'wi,th approved plans and ,.•r euuirements. of the Uniform Building Code (1994 Edition) 'as 'amende'`d,`' Uniform Mechanical Code. 1'199.4 Ed t on), and Washington State Energy Code, (1994 Edition)'. 4 . Val i d i,ty 'of Permit .. The .issuance .of a permit ors . approva,l, of spe.cifi Cat tans , and c'omputat.ions shall not be, cnn strue;d to, b,e a permit for`,` or an . approval of, any violation of any of '`t"he provisions of the . bu i i d i n g code or'.of any other r'ord`inance of th'e':.,juri d'iction.. No permit presuming ao , give',aut"h ~.it to violate" or :cancel 'the provisions of this ' code shall be val id. 5. MANUFACTURERS INSTALLATION INSTRUCTIONS REOUIRED ON SITE FOR ;THE BUILDING INSPECTORS', 6, E 1 e ctr i cal; y. permits ,. sha•l l'...be` `obtained , through the Washington State Division of Labor; an'd...Industri'es and all electrical : work: wi T 1'' be nsp'ected " :"by tha`"t ' agency (2.48- 6630).. 7. P1 bing ;permi.ts sha' l:�be through: the Seattle-Kin County Department of Public Hea'l`th. Plumbing will. be inspected b`y that agency, including . 'all gas piping (296 - 4;722) Protect Name/Tenant: BOEING DEFENSE is SPACE GROUP q_R Value of Constructio g aoo Site Address: q7A� E Ar / l' y lea S , City State /Zip: Tax Parcel Number: 00 034/0 -- ©O /e Property Owner: THE BOEING COMPANY Address: Phone: Street Address: P.O.BOX .707 M/S 46 -87 SEATTLE WA City State /Zip: 98124 Fax #: 0 Sewer Contact Person: GARY TALLER 0 Standby Phone: 206 - 544 -2975 Street Address: P.O. BOX 3707 M/S 46 -87 SEATTLE WA City State /Zip: '8124 Fax #: 206 — 44 -2854 Contractor: Phone: Street Address: City State/Zip: Fax #: Architect: Phone: Street Address: City State /Zip: Fax #: Engineer: Phone: , Street Address: 1 City State /Zip: Fax #: ., ::' ;•' igatti 'its , Limit t iti~i 011 01,41 ii , iU 0V '40 0 ii r;g O OW , p 'iaAi 11:' `` Description of work to be done: NW- CL TWJ 4)1c. L-(N i7 . Will there be storage of flammable /combustible hazardous material in the building? ❑ yes ® no Attach list of materials andstora•o location on so.arate 8 1/2 X 11 •a•orindicatin• •uantitles & Material Safet Data Sheets ■ Above Ground Tanks ■ Antennas /Satellite Dishes ■ Bulkhead/Docks ■ Commercial Reroof ❑ Demolition ❑ Fence U Mechanical ❑ Manufactured Housing - Replacement only ❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection /Exit Systems ❑ Temporary Facilities ❑ Tree Cutting 1. 2 i ,q t n :! �• a y i . MU, N, �' H' L9Y.,+ SEf. �V( G� ;BiL4'INd5xrG7;,�A {ii.;i' 1.;.x. �.: �..., i� '�' ��xi��s,�';_;':.',..,. ,'.? ...... , , :, ' 3 1 .. P . • . r , x, . ;.',� ,:1�'�t:i,;� : �.',Y 1, . ..` t�• ;i;t'.:.. Name: Phone: Address: City /State /Zip: 0 Water 0 Sewer 0 Metro 0 Standby Miscellaneous Permit Application ❑ Channelizatlon /Striping ❑ Flood Control Zone ❑ Landscape Irrigation in Storm Drainage ❑ Water Meter /Exempt # ❑ Water Meter /Permanent It ❑ Water Meter Temp If ❑ Miscellaneous CITY OF TI "(WILA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 J 17 -- p7 (206) 431 -3670 a"U ; Paso LI Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mall or facsimile. ., /u •.s .,5' Y' i vA PI'h 5 1 G' 1 1�1 : ., Yfjr 11 .. �,:,;';i,t�c +ilkl'.":.c ?c.'.v4 F?P,' 131CAf�1 't1EgUEST,tF 51p t3, LIC�WC1l�KS ;t ?Ei�Ml;1'$`�rl�rr;'�''A .;t,;,r;ki,;:, WATER ME'EFI'bEVOSl,TMEF.UNaBILIJI,V Sr>i.,t%.NS; Name: ❑ Curb cut/Access /Sidewalk Cl Fire Loop /Hydrant (main to vault) #: Size(s): ❑ Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq. ft.grading /clearing ❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public ❑ Street Use ❑ Water Main Extension 0 Private 0 Public 0 Deduct 0 Water Only Address: Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Date application accepted: MISCPMT.DOC 7/11/96 Size(s): Size(s): Size(s : Est. quantity: Moving Oversized Load /Hauling Date application expires: City /State /Zip: cr gal Schedule: Phone: :.1, Ir.. •��li K` Application ta, erypy: (initials) j 'BUILDING`OWNER'•RAUTHO' +'• 'ENT :; f : '',.,' -' ,• , < y':' r 'r,;. Signature: 1:131 <M � , Date: 3 rte Print name: GARY TA B LER Phone: 544_2975 Fax M544_2854 Addressr.O. BOX 3707 M/S 46 -87 SEATTLE, WA City /State /Zip: 98124 ALL MISCELLANEOUS P ' IT APPLICATIONS MUST BE SUB' TED WITH THE FOLLOWING: t > ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN • BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED • ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT > STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED STRUCTURAL ENGINEER > CIVIL/SITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER (P.E.) SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR PERMIT REVIEW "boXeiGround=Ta" �C� ate } aj� s -` of . �cc 'udirjf.00o >IlQnstaflilratio; old 1 - ` �► nt; �' t�i�a�lsaf�.11lte.�p'I��e "s�tj, s,;.: .(.d'•r4ls,,; tt:, �?; F.::i:f;: FS �ii`6 i ;3a "?. :Y'y 'r`. tto'b`e re•aitedtar.re lace 'i , M�RI xst 1T<'t51!1, '/,f0.01411 .g ., n S • '..r �7 � !i %��.�,i L. ' s. .. 01166101014 1:..,. ti; !! .. �•!�'. s. ? 1..1,:f . i6. ;: ti'� ''�a2 'N'•�y •' A.:.+wiw, 1� � � 4 �M Y ,,,.{,t , � r,,�'`it , mm .6 4r 000 i ii ?R . 9±, 11 } g �� ., , .ilr, f .. ,. +�1. .. tIS',,. °l. 'i'. • s 'tfl<;t'.�. =Y, '.R osidtin t ia l 'nl R 6i �j � t ,�d!l� —MOM It?7 :4; 3,1 ?17�EP �` 4[gLJL ft ed3r � t f l fmr' ♦ . �A F I'SW r' ru'..h' t y ' � i .N a , . 4 11{'1� a1N ail 11 ri''+ tM5%;* e5 5 ll,�.rf.'}•'. 4 :1,'14.. ai`,a�l. <! ' ?'Subiriliteled 1Nt r1Na: MR•x�, i, - ;`, >','. i cr y M]i� U 4'�ich.^t rt +' 1r �•S; Y ta f 0 t5 4p rt3.? w I l:tf fl: +:f 1. '• .'1 +� � •, r; e.; i9 ! 1GYt5lrF'n. r,'. �'!:• i.:ti.. i N! •! s f . 1 ' �, it.0 ,� 19 r 1 . ' f (1911 `' '` rt ' "1 . ':.(. ,r:'. :,c•r`.: •,i ,i; , r:,�lmrn �.� «. t; �{Y ] , � �r GG • 'i«'! ` 1 J' i i' ; r.l i''S. �`a :'s•�� �T i 7+ i .1 t,.• r, Y;.sf4a'.f l l 1 1 . ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit In Lieu of Contractor Registration ". Butldln ,Ow a /Autho (zed e t f ho �1., , n r � _ Ag {� r `I t appliaantls oth�r;��i�ij�tlie'o�nof,; registered �rctllte q �t/ �{ t, �ln��{ �', pr,Ggrltr�GtQr;�j��1,�a. by the.Slate of Washington,, a notarized le�terfroln'the properfy,ownerauthorizin the'ogeht'IQ subgilt this'pemilt'application and obtalmtho permit will be required as part of this submittal .. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. MISCPMT.DOC 7111/96 *** * *k irk. A.* ****!4* **** *krC•kkhsk*k*** ******k *kkkk * * * ******** ***A * **4* ' CITY OF TUKWXLA WA TRANSMIT �kr, ** ****** ** * **k* 14 i **k'* 4 ' **M *''Jlr *'Jlr * * lds Fhk•l *i4 *A ***A **** * * **k** * * * *k TRANSMIT Number: R9700.540 Amount: 58.13 03/06/97 O9:34 Payment Method: CASH Notation: BOEING Init: SLH Permit Not M97- -0019 Type: B-MECH ?MECHANICAL PERMIT Parcel No: 000340 -0018 Site Address: 9725 EAST MARGINAL NY 8 Total Fees: 58.13 This Payment ;8.13 Total ALL Pmts: 58.13 Balance: .00 Lek * * * ** **k **** **** *k *k ***k*kkkk ** alt* * *k*k* ** *,4k * ** * * * *k ***kk* * *k•A Account Code Description Amount 000/34; »830 PLAN CHECK •- NONRES 11.63 000/322.10 MECHANICAL - NONRES 46,50 Project: i t r�, q ci —t _ Type of inspectio • � \)_. Address:q� y�,� t t 1 I na�L Date called: 9 1 .... Special instructions: r //�� rr '' ``� (� r�U W�� fl r- e Date wanted: 5 _ flee p m Requester: Q 0Y ti Phone No:: 5t 1 . �•� "l Approved per applicable codes. CO ' MENTS: Inspector: 11 Receipt No.: INSPECTION RECORD Retain a copy with permit INSPECT CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 �i (206) 431 -3670 Corrections required prior to approval. Date 20 . - 460/ .. $42.0 '' = EINSPECTION FEE REQUIRED, Prior to inspection, fee must ' be paid at 6300 Southcenter Suite 100. Call to schedule reinspection, Date: REVIEWERS INITIAL t REVIEWERS INITIAL Pe-stirs'rk- C.�q'd no&or Copi PLAN REVIEW / ROUTING SLIP ACTIVITY NUMBER PROJECT NAME DEPARTMENT: BUILDING DIVISION ❑ M97 -0019 BOEING #9 -99 TUES /THURS ROUTING: PLEASE ROUTE ❑ APPROVALS OR CORRECTIONS: (ten days) APPROVED ❑ APPROVED W/ CONDITIONS ❑ DATE 2/04/97 FIRE PREVENTION ❑ PLANNING DIVISION ❑ PUBLIC WORKS ❑ STRUCTURAL ❑ PERMIT COORDINATOR II DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE ❑ NOT COMPLETE ►.1 NOT APPLICABLE • ROUTED BY STAFF ❑ (If routed by staff, make copy to master file & enter Sierra.) DATE DUE DATE 2/06/97 NO FURTHER REVIEW REQUIRED G DATE DUE DATE 2/20/97 NOT APPROVED (attach comments) ❑ CORRECTION DETERMINATION: DUE DATE APPROVED D APPROVED W/ CONDITIONS ❑ REVIEWERS INITIAL C:ROUTE -F DATE NOT APPROVED (attach comments) ❑ (Certification of occupancy required. ) DATE: 17k7 4 CITY OF TUKWILA Department of Community Development Building Division - Permit Center 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 REVISION SUBMITTAL PROJECT NAME: ,13-0-e- 'n 0 - q9 PROJECT ADDRESS: 91 a marci f ► ra I V V PHONE: Sti -',2 CONTACT PERSON: 6 a,V{ r" REVISION SUMMARY: krnh (A ► c.T cti rcr SHEET NUMBER(S) "Cloud" or highlight all areas of revisions and date revisions. SUBMITTED TO: CITY USE ONLY e.0 ;" C a ri•rd :5 ` Por- - RECEIVED CITY OF TUKWILA FEB 1 8 1997 PERMIT CENTER PLAN CHECK/PERMIT NUMBER: Inc/7 ` 3/19/96 City of Tukwila February 13, 1997 Mr. Gary Taller The Boeing Company P.O. Box 3707 M/S 46 -87 Seattle, Washington 98124 Dear Mr. Taller: .144r,„ „47.+T PhrVC 4 NW3 L+sM:.r Department of Community Development Steve Lancaster, Director SUBJECT: Development Permit Application Number M97 -0019 NOTICE OF INCOMPLETE APPLICATION Boeing #9 -99 9725 East Marginal Wy S Building Division: FILE COPY John W. Rants, Mayor This letter is to inform you that your permit application received at the City of Tukwila Permit Center on February 4, 1997 was determined to be incomplete. Before your permit application can begin the plan review process the following requirements from the Building Division must be met. Contact Bob Benedicto, Sr. Plans Examiner, at 431 -3676 if you have any questions regarding the following comments. 1'. Provide manufacturer's specificatoins for the proposed equipment. The City requires that four (4) complete sets of revised plans be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a Revision Sheet must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. hgnn .cnnthrantar Rnulavar, .Caita Ii mn • Tukwila Wa.chinntnn ORJRR • 12nh) el? 1. ?h70 • Far_. 120h) 4I1. ?hhM If you have any questions please contact me at the City of Tukwila Permit Center at (206) 431- 3672. Kelcie J. Peterson Permit Coordinator Enclosure File: M97 -0019 7'40 ',IV V 4 ACTIVITY NUMBER PROJECT NAME DEPARTMENT: BU ING DIVISION [21 Om' '0J(\( 'Nor_ DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE 14 NOT COMPLETE El COMMENTS TUES/THURS ROUTING: PLEASE ROUTE T1 NO FURTHER REVIEW REQUIRED El ROUTED BY STAFF El (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL Coora`m&tot CoR PLAN REVIEW / ROUTING SLPr M97-0019 BOEING #9-99 DATE IL .V.V 7 MINIMMVONVIIIMIPMV . FIRE PREVENTION E PLANN DIVISION ' NA : STRUCTURAL PERMIT COORDINATOR m APPROVALS OR CORRECTIONS: (ten days) DUE DATE 3/06/97 APPROVED REVIEWERS INITIAL CORRECTION DETERMINATION: APPROVED Fi REVIEWERS INITIAL C:ROUTE-F APPROVED WI CONDITIONS ....1•0•P■111 DATE APPROVED W/ CONDITIONS p NOT APPROVED (attach comments) DATE DATE 2/18/97 DUE DATE 2/2o/97 NOT APPLICABLE fl NOT APPROVED (attach comments) 0 DUE DATE (Certiftcadon of occupancy required. I.R.A PIPING BIZ 1,050.850 900.730 34-1/4 PC3OEK PC30EK 1,050.850 900-730 9.6 50.43 1 60.7/16 28.13/18 10.1/8 93 34.1/4 49.9/18 :W .M MiarA.- .LA.... PC36EK PC38EK 1,270.990 1,100-860 11.1 5244 1 62-1/4 26.13/18 10-1/8 115 38-3/16 13.81/18 49.9116 PC42EK PC42EK:. 1,270.990 1,100-860 12.6 52.44 1 62-1/4 26-13/18 10-1/8 115 13.6/18 49.9/16 PC 24EK 24,000 27,000(33,500) 16,400(24,900) 2.46 2.42(4.32) 2.1(4.0) 8.4(1,9) PCH3OEK 30,000 33,000(41,500) 18,000(26,500) PCH3OEK 10.8(2.5) 7.0 50-43 1 50.7/16 26.13/18 1011 97 920.740 830.670 9.1 50-43 1 50.7118 26.13/18 920-740 830.870 10-1/8 35,400 38,000(47,600) 3.53 3.4(8.2) 2.7(5.5) 4.3r 4.3(7;1) 3.2(8.1) 19,600(29,200) 12(2.8) 1,270.890 1,100-880 51.45 62.1/4 26.13/16 10.1/8 NH47NAD 38.3/18 13.9/18 49.9/16 42,000 43,000(52,600) 1,270.990 1,100.860 M•. -1 R.L.A 7.2 50-43 1 50.7/16 25.13/16 10-1/8 16 0.66+0.65 NH33N8D 11.5 Munsell SY 7/1 55 55 66 66 ' 65 55 55 53 230, 1,60 30 30 40 20 30 30 40 20 22 27 16 20 22 27 0.66+0.65 0.7S+0.75 0.8+0.8 0.6640.85 0.76+0.75 0.75+0.75 0,8+0.6 NH41NAD 14 NH47NAD 17,5 NH33NBD 11.6 PUHSOEK 51-45 1 82 -1/4 26.13/18 NH589NXA .17 39) 13 -9/18 49 -9/18 ;antral Volta ,crankcase Hooter lefrlgorant Control =Oil f;'1 00' 1g '1 eat 1g '2 (by built. In Irons F.L,A, .17(39) .17 39 With Indoor Unil ` - +11f rn '.''` kxioor unit- remote contract: DC 12V, Indoor unit- outdoor unit: DC 12V Ca f lEt Tube 34.1/4 NH41NAD 14 17 3') 38.31 13-9/16 49.9/ 8 245 Rovorse Cyclo 1/2, 3/4 11111111( DEL Coo ng •1 BTU /h Capacity Hee r2L, RTU/h Hee n r '2 BTU /h Coo ifl'1kW :r 11 kW Hee i' '2 kW EER '1 SEER HSPF COP Power Consumption External Finish Power Supply ' Lie ;o, Hz Max. Fuze Size (time inlay MIr1. Ampecity NOWMPOW Fan Motor F.L.A. Auk Hoator A kW A irflow HI -Lo W r. . turo Removal F nts/h Sound Pressure Levoi li Lo dB(Ai Cond. Drain Conned. n Ot. in. W Dlmenuionls D H Wel ht tir External Finish Sound Pressure Level dB(A) Power Su ply V, a Hz Max. Fuze Size (time delay' A Mln. Ampeciry Fan Motor Comprossor )otrost method )Imonsions $ 206451 93� 82� THERMAL SUPPLY II X:1.8 LL . ..' 1/2, 3/4 Igures in parentheses Include auxiliary heat. For 208 volt applications rater to technical and service manual for ratings. 02/17/4? 14:03 P.02 EIVED F TUKWItA 8 1397 PERMI(OENTER A NSTALL COOLING IN THE COATING AREA 4757566 -07 6 11-0D1 9 KGP N RWS/EJC(I 1 /08/97 PUH -240( CCHBN0 MI WHITED TO DE PROCESS ROOM CU? PDH -2401 EVAPORATIVE UNIT. RATED TO 24.000 BTU /F& 0109 430 OEM MOUNTED WITHIN 1 - 1/2' OF THE CEILING 3 FLOOR PLAN SCALE 1/8 = 1 ° -0' ®OE /AfG FACILITIES DEPARTMENT ACCEPIABUY vs NWOR MOWN= IS RM. AfAiDED MMMW K. PENROD naw Bat 1 -9 -97 MECHANICAL MASTER PIPING PLAN LEGEND: BLDG. 9 -99.2 GENERAL NOTES: CONSTRUCTION NOTES: TIE INTO THE MITSUBISHI MODEL $PUH -24EK CONDENSING UNIT ON THE CONTROL ROOM CAP WITH THE 5 /B' AND 3 /B" REFRIGERANT TUBING PROVIDED. ROUTE THE TUBING FROM THE MANUFACTURER SUPPLIED CONNECTING POINTS ALONG THE CAP. SUPPORT THE TUBING OFF OF FRAMING CHANNEL MOUNTED TO THE CAP. SUPPORT THE TUBING AT 4' INTERVALS. 'ROUTE THE TUBING THROUGH THE CAP AND THE PIPING CONNECTION KNOCK OUT PANEL IN THE A/C UNIT IN THE CONTROL ROOM. MAKE THE FINAL CONNECTION TO THE MITSUBISHI MODEL #PCH -24EK A/C UNIT AS PER THE MANUFACTURER DIRECTION. INSTALL THE PUMP KIT SUPPLIED WITH THE A/C UNIT AND ROUTE THE 3/4 CONDENSATE DRAIN LINE TO THE SINK IN THE PROCESS ROOM. TERMINATE THE CONDENSATE DRAIN LINE BELOW THE RIM OF THE SINK. ROUTE THE CONDENSATE LINE ALONG THE CAP SUPPORTING THE TUBING AT B' INTERVALS. COL. E -C / 1 -4 D.C. R cE K cir oP Tuwiu E. B 0 41997 PERMIT CENTER rarsnx 2M62 757566 -07 9 -99 -2M62 "A" 1/09/9 A NSTALL COOLING IN COATING AREA 1 757566-07 iPCN- 6EK EVA'r.^ -FIVE NMIIT. RATED 15.100 MTOfAN IYIFN OFM 1/OIANTE6 W1TM N 12 OF 1HE CEILI , PUH -USSR CO1¢EN9MG UNIT MOWN3E6 :0 RN PROCESS ROOM CAP KGP or rnaii-o019 APRILVIED RNS /EJC 1/09/97 FLOOR PLAN SCALE: 1/8 = 1 — BOE/AW FACILITIES DEPARTMENT 111.11 MOM 51£17.13111 VS50. ARIDED KPEENROD S ROSSE 1/D9/97 SLUTLE PIPING PLAN LEGEND: GENERAL NOTES: CONSTRUCTION NOTES: TIE INTO THE MITSUBISHI MODEL #PUH -36EK CONDENSING UNIT ON THE PROCESS ROOM CAP WITH THE 3/4" AND 1/2" REFRIGERANT TUBING PROVIDED. -ROUTE THE TUBING FROM THE MANUFACTURER SUPPLIED CONNECTING POINTS ALONG THE CAP. SUPPORT THE TUBING OFF OF FRAMING CHANNEL MOUNTED TO THE CAP SUPPORT THE TUBING AT 4' INTERVALS. 1:::>—ROUTE THE TUBING THROUGH THE CAP AND THE PIPING CONNECTION KNOCK OUT PANEL IN THE A/C UNIT IN THE PROCESS ROOM. MAKE THE FINAL CONNECTION TO THE MITSUBISHI MODEL #PCH -36EK A/C UNIT AS PER THE MANUFACTURER DIRECTION. INSTALL THE PUMP KIT SUPPLIED WITH THE A/C UNIT AND ROUTE THE 3/4' CONDENSATE DRAIN LINE TO THE SINK IN THE PROCESS ROOM. TERMINATE THE CONDENSATE DRAIN LINE BELOW THE RIM OF THE SINK. ROUTE THE CONDENSATE LINE ON THE WALL AND SUPPORT AT 6' INTERVALS BLDG. 9 -99.1 SEPARATE FERMIS REQUIRED FOR: O MEC HANICAL N aELECSR ICPL in PLUMS H ° - -I �`- , Ptao 1l F do approvals teat, inn >1 eU o r 1 ` ��_ u � • � ■ sacknowle d r , By t e pert, No RECEIVED CRY OF TUMWILA FEB 7 1997 A m 1 ITC is LAsr 1M62 I 757566 -07 /0 9