Loading...
HomeMy WebLinkAboutPermit M97-0036 - CSG OPENLINEq OW.0 City of Tukwila (. Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 MECHANICAL PERMIT Permit No: Type: Category: Address: 2811 S 102 ST Location: Parcel #: 042304 -9182 Contractor License No: UNITESI176RB TENANT OWNER CONTRACTOR CONTACT M97 -0036 B -MECH NRES Permit Description: UMC Edition: 1994 CSG OPENLINE Phone: 281 -8700 2811 S 102 ST, TUKWILA, WA 98168 BOEING UNITED SYSTEMS INC. Phone: 206 442 -9454 1021 SW KLICKITAT.WY.STE 104 SEATTLE, WA 98134 BILL BIEBSACK Phone: 206- 654 -3340 1021 SW KLICKITAT WAY, SUITE 104, SEATTLE,.. WA 98134 ****************** * * * * * * * * * * * * ** * * * * * * * * * * * * * * ** ADDITON AND ALTERATION TO HVAC SYSTEM. ******** .*** ***"* ** ******* **.******************* * * * * * * * * *.. * * *** ** * * * * * * * * * * * ** �./r' Lfl�SLLI.Xa o `� Permit Center Authorized Signature Date I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting;, of this permit does not presume to give authority t'o violate or cance provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this, balding p it. Signature: Print Name: 0 (Lt.* Valuation: Total Permit Fee: Date: Status: ISSUED Issued: 03/27/1997 Expires: 09/23/1997 9 (206) 431 -3670 9.300.00 91.69 Title: jC!GI. A5(5t,syc This permit shall become null and void If the work is not commenced within 180 days from the date of Issuance, .:or Af. the worksuspended or abandoned for a period of, from the last inspection. CITE OF TUKWILA, Address: Suite: Tenant: CSG OPENLINE Type: B-MECH Parcel .# : 04231)4. -9182 *' k*' ***** *It *' k' kk* k.* k* k• k**' k* lc* *' �M ` *•k'k* *** * *k* * ** ** * *kk ckAk•k'* * *. *A*•k•k*k * *k *•k ** .. Permit Conditions: 1. No changes will be made to the plan_ unless approved by the Architect or Engineer and the Tukwila B u i l d i n g Division. All Permits, inspection reco and: ap'pro plans shall be available at the job site= prior to thestart -:of any con- struction. These .documents ,are to be maintained and avail- able until :final inspection approval is Granted All construction to be done in'.conformance with approved plans and .requirements of the Uniform Bui idl g : Code ;(1994 Edition) as''amende'd, Uniform Mechani'cal Code `(1994 Edition), and Washingtori State Energy Code (1994 Edition) 4. Val idi,ty :of Pe'r?mit. •: The issuance of a permit or appr.oval•':.of plans,.`,•specifications, and ;'computations shall not be' con- strued. >'to.be a permit for,' or an approval of, any violation of any ; of the p r o v i s i o n s of the b u i l d i n g code or of any other or di trance' of the . jurisdiction. No permit presuming to y. -authorit to violate the provisions of this code�, : "'be,..va1 id. 5. MANUFACTURERS INSTRUCTIONS ..REQUIRED ON SITE FOR THE BUILDING INSPECTORS ':REVIEW:, Electrical : ;permits. - shall be ,obta ined through the Washington State Division of Labor and Indu ,tries- and' al l electrical work will ?be inspected , ' tha agency (248- 6630). Rea'dilyacc;essible` `access to roof : mounted equipment is r e q u,i yr e d _..Ff ..`. Status: ISSUED Applied: 03/12/19 Issued: 03/27/1997 Project Name/Tenant: Li it) • `' �, Value of Construction: 1 �, 00 Site Address: 0 th ' I v V (City State/�i • �;� ��'P� Tax Parcel Num �3 ��� - 9J Phone: .. Property Owner: Phone: Street Address: U( c (1 Co(✓ Aut. W, City State /Zip: Fax #: r� �•� 9C 5' oc Contact Person: Phone: Street Address: Oil I a( 0 , Citc Z' Fax #: ( a , r `I Contractor: U1/1 (U.& 561'0 Phone: k C y54/ Street Add ttl�( r wet, (UI J .lu . � C Ll��� , l Cit te/, O r l9J ��b15'1 Fax #: Architect: Phone: Street Address: City State /Zip: Fax #: Engineer: — Phone: Street Address: City State /Zip: Fax #: MISCELLANEOUS, PERMIT REVIEW AND APPROVALREQUESTED :'(TO BE FILLED OUT;BYAPPLICANT).' : ' Description of work to be done: AC ft (1 iO an ctV - e , ' ( ct - Horl 1 -0 DG.Q_ Cl i v G G. : la Will there be storage of flammable /combustible hazardous material in the building? El yes It no Attach list of materials and storage location on se•arate 8 1/2 X 11 •a•erindicatin •uantities & Material a /et Data Sheets ■ Above Ground Tanks ■ Antennas /Satellite Dishes ■ Bulkhead/Docks ■ Commercial Reroof El Demolition ❑ Fence Mechanical ❑ Manufactured Housing - Replacement only ❑ Parking Lots El Retaining Walls Temporary Pedestrian Protection /Exit Systems ❑ Temporary Facilities El Tree Cutting MONTHLY SERVICE BILLINGS TO: Name: Phone: Address: City /State /Zip: 0 Water 0 Sewer 0 Metro 0 Standby Miscellaneous Permit Application El Channelization/Striping El Curb cut/Access /Sidewalk El Fire Loop /Hydrant (main to vault) #: Size(s): ❑ Flood Control Zone El Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq. ft.grading /clearing El Landscape Irrigation ❑ Sanitary Side Sewer #: El Sewer Main Extension 0 Private 0 Public ❑ Storm Drainage ❑ Street Use El Water Main Extension 0 Private 0 Public ❑ Water Meter /Exempt # Size(s): 0 Deduct 0 Water Only El Water Meter /Permanent # Size(s): ❑ Water Meter Temp # Size(s): Est. quantity: gal Schedule: ❑ Miscellaneous ❑ Moving Oversized Load/Hauling WATER METER DEPOSIT /REFUND BILLING: Name: Address: Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Data application accepted: MISCPMT.DOC 7/11/96 CITY OF TUIKWILA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. APPLICANTtREQUEST.,FOR MISCELL•ANEOUSPUBLIC WORKS PERMITS. Date application expires: Phone: City /State /Zip: Application t: en by: (initials) BUILDING O u R AUT 0 RIZ: Y AGENT: PERMIT REVIEW Submit checklist No: M -9 Signature: 9 JW ` LQ 'J C C Submit checklist No: M -1 Date: • . re), , j Print name: l 1 (l (4 S O v " 3 ,., () Pho Fax #: _((,,f c(-/u& Address: /( �� 10 City /State /Zip: e , , ( ...d5 e ( , 13 ti O SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR Above Ground Tanks/Water Tanks - Supported directly upon grade exceeding 5,000 gallons and a ratio of height to diameter or width which exceeds 2:1 PERMIT REVIEW Submit checklist No: M -9 0 Antennas /Satellite Dishes Submit checklist No: M -1 El Awnings /Canopies - No signage Commercial Tenant Improvement Permit O Bulkhead /Dock Submit. checklist No: M -10 El Commercial:Reroot Submit checklist No: M -6 in Demolition Submit checklist No: M -3, M -3a El Fences - Over 6 feet in Height Submit checklist No: M -9 L Land Altering/Grading/Preloads Submit checklist No: M -2 O Loading Docks Commercial Tenant Improvement Permit.. Submit checklist No: H-17 Mechanical (Residential Commercial) Submit checklist No M -8, Residential only - H -6, H -16 0 Miscellaneous Public Works Permits Submit checklist No: H -9 Manufactured Housing (RED INSIGNIA ONLY) Submit checklist. No: M -5 C3 Moving Oversized Load /Hauling Submit checklist No: M -5 Parking Lots Submit checklist No: M -4 71 Residential Reroof - Exempt with following exception: If roof structure to be repaired or replaced Residential Building Permit Submit checklist No: M -6 Retaining Walls - Over 4 feet in height Submit checklist No: M -1 El Temporary Facilities Submit checklist No: M -7 EI Temporary Pedestrian Protection/Exit Systems Submit checklist No: M -4 71 Tree Cutting Submit checklist No: M -2 ALL MISCELLANEOUS P IT APPLICATIONS MUST BE SUB ED WITH THE FOLLOWING: A ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN ➢ BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED A ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT ➢ STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED STRUCTURAL ENGINEER ➢ CIVIUSITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER (P.E.) Copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT ! HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND l AM AUTHORIZED TO APPLY FOR THIS PERMIT. MISCPMT.DOC 7/11/96 WE INCLUDE: • Replace existing DPC control chips in existing VAV boxes serving space. • Relocate eight (8) i ,ting 6 inch perimeter VAV boxes to eight ((, ew small Conference. Rooms. ♦ One (1) new Trane perimeter VAV fan - powered electric heat box to serve new perimeter Conference Room. ♦ Two (2) new Trane cooling only VAV Boxes to serve the two (2) new Training Rooms. ♦ New hi- pressure ductwork from new and relocated VAV boxes to existing hi- pressure mains. ♦ Relocate one (1) VAV Box out of new Reception area and run new 26 gage duct from one (1) new combination fire /smoke damper to two (2) new liner slot diffusers ♦ One (1) new return air grille in the Reception Area and one (1) new combination fire /smoke damper in the new full height wall for return air. • Sixteen (16) new perimeter diffusers. ♦ One (1) new Broan #365 exhaust fan with discharge through roof to serve Kitchen. • Two (2) new Broan exhaust fans in the Training Rooms. ♦ One (1) new Broan #365 exhaust fan to serve UPS/Transformer Room. • One (1) new transfer air grille between Computer Room and UPS/Transformer Room. • Approximately thirty (30) diffuser relocates and sixteen (16) return air grille relocates., • Eleven (11) new aluminum eggcrate return air grilles. • Control work for new and relocated VAV boxes to match existing. • Sixteen (16) sensor relocates. • Air balance and report. • Start-up and test of new and existing VAV boxes. 1,1-4.t./ c,oR ♦ Operations & Maintenance Manual. ♦ Mechanical engineering, CAD drawing and permit. 4 3 NeAf 1GiR0sMvK -c.:, DM PP* ACTIVITY NUMBER PROJECT NAME DEPARTMENT: BUILDING DIVISION ewe ga,g7 PUBLIC WORKS 5M -1q7 APPROVED D APPROVED W/ CONDITIONS Q REVIEWERS INITIAL CORRECTION DETERMINATION: APPROVED I 1 APPROVED W/ CONDITIONS C:ROUTE -F L ?.ery,k cbor dina�ot C�j PLAN REVIEW / ROUTING SLR M97 -0036 CSG OPENLINE FIRE PREVENTION PLANNING DMSION El ALA- 3-i3- 7 IA 31311 STRUCTURAL [J PERMIT COORDINATOR 411111.1113111111111111io DETERMINATION OF COMPLETENESS: (T,Th) DUEDATE 3/13/97 COMPLETE NOT COMPLETE E NOT APPLICABLE 0 COMMENTS TUES /THURS ROUTING: PLEASE ROUTE F1 NO FURTHER REVIEW REQUIRED ROUTED BY STAFF El (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL DATE APPROVALS OR CORRECTIONS: (ten days) DUE DATE 3/27/97 DATE REVIEWERS INITIAL DATE DATE 3/12/97 NOT APPROVED (attach comments) 0 DUE DATE NOT APPROVED (attach comments) Q (Cerdficadoo of occupancy required. ) 1 1 k * * ** *** * *)' **** *****• A****************** * * ** *+l* * *3 < * ** * ** * *i1 * * * * * * ,.. :ITY 0 . TUKWILA. ItiA .. • *k * C lF * : TRANSMIT k *�* * ** * * *ii * *A* * *•1i ** �4 ,k **.."4 " ' `k"9e ** ** ***** ****• * ***•tir41•h *** '111ANSt4IT Number 897005'57 Amount: 91.69 03/27/97 13:58 Payment, Methad:\ CHECK( Notation: UNITED SYS(MMS iriit SLR Permit Not M97- •0036 Type: E; -MECH MECHANICAL PERMIT Parcel. No: 042304-9102 Site Address: 2811 S 102 ST Total..Feee: 91 This Payment 91.69 Total ' ALL Pmts., 91.69 Rai ance x , AO ** * * *.A * * *• * ** ** * **A * * *.A ** * ** * ** fir * ** *** *** * * *•k * * ** *;“1 * * ** • * * * ** ue.rcript.ion Amount PLAN :CHECK..,..- NONRE9 10,1'9 MECHANICAL �_ NONIIES 8 : 1.50 Account Code 000/34..830 000/322.100 CITY OF TUKWILA RECEIPT PW DCD 10.19 PW DCD 81.50 CHECK 91.69 03/28/97 19 16 :58 0097 8967 Project: C..% t�-u 1r1 rJc Type of inspection: I r.t . Address: 41 t . S I OL Date called: Special instructions: Date wanted: 3 1 rl � q7 a.m. P.m. Requester: Phone No.: INSPECTION RECORD Retain a copy with perk INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 7 Approved per applicable codes. Receipt No.: Date: m • oas(o . PERMIT NO. 1 1 l (206) 431 -3670 Corrections required prior to approval. Inspector: ` Date: _ f il p [ -] $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter • Blvd., Suite 100. Call to schedule reinspection. M V %IVI-I N TYpel?t, ,i ' (� - pocr ,am J s. C 10 y Date ... ecial instructions: Date wanted: S.. _ Co .i- _ p.m. � S . ��A� tT VV O, - 00 . Requester: -N -- .�,.11f Phone No.: „$ COMMENTS: Inspector: I I [eceiPt No.: Approved per applicable codes. INSPECTION RECOR Retain a copy with permit INSPECT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431 -3670 Corrections required prior to approval. PAT`r`9 3 (ahl Fi- 1 G 16t% N.tnl ACC); I1Lr , tS GacZAV fRa- - H; - I slci L4G (1.1...1 f tJ SP i'ra Date: s $42.00 REIN EIN'SPECTION FEE REQUIRED. Prior to Inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100, Call to schedule reinspection. Date: Project: QP- 2nlin� Ty •,� of i s ectio ` irirOi .j Date called: (I ,, � 45 Address Spec instructions: Date wanted: I I ' a .m. Requester: R Phone No,: t1s q Inspect Date: ,. INSPECT I • N NO, INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 �(� (206) 431 -3670 Approved per. applicable codes. COMMENTS; Receipt No.: M°11-0D3(0 PERMIT NO. Corrections required prior to apJiroy,g J _ / i A I �..—� $42.00 REINSPECTIO FEE R : IRED. Prior to;itlspection, fee must be paid at 6300 Southcenter Blvd„ Suite 100. Call to schedule reinspection. Date: Projegl�p , �i �,JC� G�4J tV ..,� Type of inspecti . �� ` •, r 6 10 � Date called: _ 1 G_ - Special instructions: Date wanted: q _ 1(a _ Cj� Requester: � 1 C t^ s t Phone No.: ( t g , g 32. COMMENTS: Receipt No.. � _ INSPECTION RECORC) Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Corrections required prior to approval. tai r fv- t- s+.4,, co. rac"w.J cF- Fig e}Vtrt'c' Mali - 003 PERMIT NO. (206) 431 -3670 1 $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Cfill schedule reinspection. ate: Poe t: �� 01761\1 Utz 5 T of inspection: �J AXi- Date called _ y \ — 91 d r(Ts: 102_ S pecial instructions: OA ) 1 6 e- T) Date wanted: ` _ 1 9-1 ""1 ` i ' pm Requester:A ice`' � i - r- CAIZ pA Phone No.: t 1 G , g o32 Li Approved per applicable codes. COMMENTS: Inspector: 1. 1 Receipt No,: ..,.....1. _» _.11.0.7. INSPECTION RECOR -�' Retain a copy with permit INSPECTIO NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Mql PERMIT NO. (206) 431 -3670 ( Corrections required prior to approval. iaze_ /›.-,re 07-7 / 00f 4' $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 1,00. Call to schedule reinspection, Date: t5 eet i : 01:76s A Type of inspectiop• ii Date called: LA 0 iv iiss: 10 451.► Special instructions: I L l �' " Date wanted: __ Requester: RD I A Phone No.: l i „ g' CO MENTS: < }. �.?, ... �.: ' INSPECTION RECORR Retain apy with permit INSPECTION NO, CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Inspector: I I Date: PA91-00so PERMIT NO. (206) 431\3670 Corrections required prior to approval. $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd.; Suite 100. Call to schedule reinspection, L Pt No.: Date: /.3E1: Operl 1-) e Type of insmilati 0 _ I N rtiss: 5 102- 51 ,.. Date called: Li _. j 1 1 - 97 `' Special instructions: Date wanted: a. Requester: F04 'M F v i s ��a i g. 6y ^ g 3 94 Approved per applicable codes. COMMENTS: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 • Inspector: Receipt No,: INSPECTION RECORR Retain a copy with permit I I Date: r ODVe PERMIT NO. (206) 431 -3670 Corrections required prior to approval. lL Date 1, $42.00 REINSPECTION FEE REQUIRED. Prior to inspec ion, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Project: ` . 4 Type of inspection: Address : g I ( el 0 . 7...... Date called: � (Z l C� Special instructions: •� (�� Sw�P; "Ut Date wanted: .3 �� g ,7 Requester: i Phone No,; &sit, — 3 340 pproved per applicable codes. INSPECTION RECORC Retain a copy with permit INSPECTION NO, CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 COMMENTS: 4_, A c,(.,4-z -( 7 r 41 c3 (, PERMIT NO. (206) 431 -3670 Corrections required prior, to approval. $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. f Receipt No.: Date: #+' '4n wt ti�tr ttTi3kil S that, Yiplz.xo >r.rn teuf ax minrn��ix. City of Tukwila Fire Department Project Name (�)Qq.r \ Address 7 ,, 5 t u7 � Retain current inspection schedule Needs shift inspection TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM Approved without correction notice X Approved with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre -Fire: Permits: 510 Authorized Signature FINALAPP.FRM T.F.D. Form F.P. 85 John W. Rants, Mayor Thomas P. Keefe, Fire Chief 1 an S q1 -1 CO o0 3 ( Permit No. D� l ` .20 Suite # c)aC 2, 1 19 7 i) Date Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575 4404 • Fax (206) 575.4139 ** QUICK COMMERCIAL H LOADS PROGRAM BY ELITE S 'TWARE DEVELOPMENT INC. ** UNITED SYSTEMS INC SEATTLE, WA 98134 --- ■`4 OPENLINE - OXBO 02/17/97 PAGE 4 * * * * * * * * * * * * * * * * * * * * * * ** TOTAL BUILDING LOAD SUMMARY * * * * * * * * * * * * * * * * * * * * * ** :io:,.i:' oft :ox�art,•.'.Ma����h-.saa..tu.+� . ,.,...•a..,. >.,.....,.rom.,wx.n BUILDING PEAKS IN JUNE AT 3 PM BLDG. LOAD AREA DESCRIPTIONS QUAN ROOF WALL GLASS SKIN LOADS LIGHTING EQUIPMENT PEOPLE PARTITION VENT 0 INFL 0 DRAW -THRU FAN BLOW -THRU FAN SUPPLY DUCT RETURN DUCT BUILDING TOTALS BUILDING SUMMARY LOAD DESCRIPTIONS VENTILATION INFILTRATION ZONE LOADS PLENUM LOADS FAN & DUCT LOADS BUILDING TOTALS 806 18,500 1 0 0 0 AC - -1 SEN. %TOT LOSS LOSS 672 1,391 100.00 0 0 0.00 0 0 0.00 672 1,391 100.00 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,391 100.00 200 SEN. %TOT LOSS LOSS 0 0.00 0 0.00 1,391 100.00 0 0.00 0 0.00 TOTAL HEATING WITH OUTSIDE AIR: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: 1,391 100.00 200 TOTAL BUILDING SUPPLY AIR (BASED ON A 16 TD): TOTAL BUILDING VENT AIR (0% OF SUPPLY): TOTAL CONDITIONED AIR SPACE: SUPPLY AIR CFM /SQ.FT. OF CONDITIONED SPACE: SQ.FT OF CONDITIONED AIR SPACE PER TON: TONNAGE PER SQ.FT OF CONDITIONED AIR SPACE: LAT. GAIN 0 0 0 0 200 LAT. GAIN 200 + SEN. GAIN 2, 147 0 0 2, 147 0 2,750 0 63,085 250 0 0 0 0 0 0 0 0 0 0 0 0 0 0 68, 232 + SEN. GAIN 0 0 0 0 68, 232 0 0 0 0 68, 232 3,933 CFM 0 CFM 672 SQ.FT 5.8527 CFM /SQ.FT 117.8396 SQ.FT /TON 0.0085 TONS /SQ.FT 1.39 MBH 5.70 TONS = TOTAL %TOT GAIN GAIN 2,147 3.14 0 0.00 0 0.00 2,147 3.14 2,750 4.02 63,085 92.19 450 0.66 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 68,432 100.00 = TOTAL %TOT GAIN GAIN 0 0.00 0 0.00 68,432 100.00 0 0.00 0 0.00 68,432 100.00 RECEIVED CITY OF TUKWILA MAR 1 2 1997 PERMIT CENTER ** UNITED SYSTEMS c14C ** 1021 SW KLICKITAT WAY # 104 ** SEATTLE, WA 98134 ** QUICK COMMERCIAL HVAC LOADS PROGRAM CLIMATE DATA: DESIGN MONTH AUGUST JUNE JULY SEPTEMBER JANUARY FEBRUARY WINTER OUTDOOR OUTDOOR DRY BULB WET BULB 83 83 83 80 54 59 24 GENERAL PROJECT INFORMATION: PROJECT FILE NAME: PROJECT LOCATION: BAROMETRIC PRESSURE: ALTITUDE: NORTH LATITUDE: MEAN DAILY TEMPERATURE RANGE: ATMOSPHERIC CLEARNESS FACTOR: GROUND REFLECTANCE: STARTING TIME FOR HVAC LOAD CALCULATIONS: ENDING TIME FOR HVAC LOAD CALCULATIONS: FLOOR HEAT LOSS COEFFICIENT: NUMBER OF UNIQUE ZONES IN THIS PROJECT: BUILDING DEFAULT VALUES: 68 66 69 65 48 50 0 CALCULATIONS PERFORMED: LIGHTING REQUIREMENTS: EQUIPMENT REQUIREMENTS: PEOPLE SENSIBLE LOAD MULTIPLIER: PEOPLE LATENT LOAD MULTIPLIER: ZONE SENSIBLE SAFETY FACTOR: ZONE LATENT SAFETY FACTOR: ZONE HEATING SAFETY FACTOR: PEOPLE DIVERSITY FACTOR: INDOOR REL.HUM 50% 50% 50% 50% 50% 50% 50% PROJEL2 CLIENT: R. DATE: DESIGNER: INDOOR DRY BULB 72 20.83 -9 72 10.55 -9 72 26.15 -9 72 10.40 -12 72 -18.52 -38 72 -19.36 -33 70 0.00 F:OPENLINE SEATTLE, WA 29.491 IN.HG. 400 FEET 47 DEGREES 26 DEG.F 1 20 PERCENT 6 AM 6 PM 0 BTUH /FT -F 9 OPENLINE - OXBO MILLER CONSTRUCTION 02/17/97 GRAINS IN /OUTDOOR DIFF. CORRECTION BOTH HEATING AND COOLING LOADS 1.20 WATTS PER SQUARE FOOT 3.00 WATTS PER SQUARE FOOT 250 BTU PER PERSON 200 BTU PER PERSON 0% 0 0% 0 0% 0 100% ALL DESIGN DATA TAKEN FROM THE 1989 ASHRAE HANDBOOK OF FUNDAMENTALS PETER CRELLEY *. *QUICK COMMERCIAL HV LOADS PROGRAM. BY ELITE SoVTWARE DEVELOPMENT. INC.:** UNITED SYSTEMS INC SEATTLE, WA 98134 OPENLINE - OXBO 02/17/97 PAGE 2 * * * * * * * * * * * * * * * *' * * * * * * * * ** .AIR HANDLER INPUT DATA * * * * * * * * * * * * * * * * * * * * * * * * . AIR HANDLER # 1 INPUT DATA: AIR HANDLER DESCRIPTION: TERMINAL TYPE: SUPPLY FAN TYPE: CALCULATIONS PERFORMED: NUMBER OF TIMES SYSTEM OCCURS: LEAVING COOLING COIL TEMP. (DEG.F): LEAVING HEATING COIL TEMP. (DEG.F) : COMBINED FAN,MOTOR EFFICIENCY ( %): STATIC PRESS. ACROSS FAN (IN W.G): SUMMER SUPPLY DUCT TEMP. RISE (DEG.F): SUMMER RETURN DUCT TEMP. RISE (DEG.F): WINTER SUPPLY DUCT TEMP. DROP (DEG.F): WINTER RETURN DUCT TEMP. DROP (DEG.F): CHILLED WATER TEMP.DIFFERENCE (DEG.F): HOT WATER TEMP.DIFFERENCE (DEG.F): COOLING VENTILATION METHOD: COOLING VENTILATION VALUE: COOLING INFILTRATION METHOD: COOLING INFILTRATION VALUE: HEATING VENTILATION METHOD: HEATING VENTILATION VALUE: HEATING INFILTRATION METHOD: HEATING INFILTRATION VALUE: VENTILATION IS 1001; OF SUPPLY AIR: VAV BOX WITH ELECTRIC HEAT CONSTANT VOLUME BUILT -IN PACKAGED UNIT BOTH HEATING AND COOLING LOADS 1 56 . 0 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0.000 0 0.000 0 0.000 0 0.000 NO } ** QUICK COMMERCIAL HVAC LOADS UNITED,SYSTEMS INC OPENLINE -:OXBO * * * * * * * * * *. * * * * * * * * * * * * * * * * * * ** ZONE # 9: EQUIPMENT ROOM.(672 AIR HANDLER NUMBER: ZONE LENGTH (FEET): LIGHTING WATTS: PER.SF NO. OF PEOPLE IN ZONE: DIRECT CEILING HEIGHT (FEET): SEN.SAFETY FACTOR ( %): SEN.HEAT PER PERSON (BTU) : CLG VENTILATION CFM: HTG VENTILATION CFM: CLG. SQFT EXPOSED TO PLENUM: LAT. BTUH EQUIP LOAD: ROOF ASHRAE # U- FACTOR 1. 0.045 ,3 PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC. ** SEATTLE, WA 98134 02/17/97 PAGE 3 ZONE INPUT DATA * * * * * * * * * * * * * * * * * * * * * * * * * * * ** SF) 1 24.0. 806 1 9.0 0 250 0 0 672 0 LENGTH 24.0 ZONE OCCURRENCES: ZONE WIDTH (FEET): EQUIPMENT WATTS: EXHAUST AIR CFM: HTG.SAFETY FACTOR (%): LAT.SAFETY FACTOR ( %): LAT.HEAT PER PERSON (BTU): CLG INFILTRATION CFM: HTG INFILTRATION CFM: EXPOSED FLOOR SLAB EDGE -FT: HTG. & CLG. LOADS CALCULATED 1 28.0 DIRECT .18500 0 0 0 200 0 0 0.0 WIDTH ROOF -AREA SUSP.CEIL COLOR 28.0 672.0 YES DARK • • • ' itP> C: i�.' 1`. �EbtSit; ^ rar/sr`.3a.'Sl+;+P.E+i �inr: w»• w..... w., ne... w. .o.ws�r.,aninhnY�.n.ar... :V ovoza oM' E . lenAtErarkeNT- eaug ZA ow /3°w C.ae•P. Fs/deg /ROOF TD? M1c44W /G44. Arkv/ lFvT APPIr/o/V Fo/P ehc/n SYSTWI15 ENGINEERS.NORTHWEST, INC. 6869 WOOOLAWN AVE. N.E. SEATTLE, WASHINGTON 98115 I 6A-corer .2 1 EXPIRES 11/12/ ' • tk *O . F•/-ia , 3i/ • , To 4,6 at?or✓ . 12oOF 1 'I •q,"- z;: F. Ei 5/ $T ACRo Gt.8 TYPo.A71.09 oie goor/I FMSA /# 4)0577, Zt "DC045 • &-lod %MMa✓ AvA /,c mat 7Russ A Q ‘ko a� "1 CITY OF TUKW ILA �' n� %.4k)') -LIAR 1 21997 n1NG � PERMIT CENTER • DWN: RA ENG' D N JO C 3 DATE: / SHEET RA/ammo/4r �'FcHN /C,� F.A.R1$ Eu02/ c� ZA oxea� corm 7 k �1 `� " • • r Y oo . . OWN: im p ENG' D: ROOF "MP Macf44N /GQL._. AW',A14t%/7" Apprr/oN PoR c &//r4`) SYSTEMS u •�! .. . . 7 +P4.,..40039 .v ion SS • NA G - FIRES 11/1;'x/ . JOB N0: °PGo93 - DATE / II �3 ENGINEERS NORTHWEST, INC. 6869 WOOOI.AWN AVE. N.E. SEATTLE, WASHINGTON 98115 SHEET • .0 4.h AVst • iril4.9, 3 +n.,.. W+`wM r w. ay.41k 1 .4 •N IZi 1 ... 3,...x..:....1.•.• ..r�...:t.... • :a.,...,.••••.••••••—••••••• .....• 12 ooF P'AM/NC P/ . J VQe /FY 4 LL D /MFA/$,ONS ' l(o "-1 to a z. /.cc, C&.IT a pP'61eAv /ry (c.G) yr 1 /61.,/ g Q(NPI1i! -IT o1/CC GC..B irrP, M r ** QUICK COMMERCIAL HVAC LOADS UNITED SYSTEMS INC _� OPENLINE - OXBO * * * * * * * * * * * * * * * * * * * * * * ** TOTAL BUILDING PEAKS IN JUNE AT 3 PM BLDG. LOAD AREA DESCRIPTIONS QUAN ROOF WALL GLASS SKIN LOADS LIGHTING EQUIPMENT PEOPLE PARTITION VENT 0 INFL 0 DRAW -THRU FAN BLOW -THRU FAN SUPPLY DUCT RETURN DUCT BUILDING TOTALS BUILDING SUMMARY LOAD DESCRIPTIONS VENTILATION INFILTRATION ZONE LOADS PLENUM LOADS FAN & DUCT LOADS BUILDING TOTALS 806 18,500 1 0 0 0 SEN. LOSS %TOT LOSS 672 1,391 100.00 0 0 0.00 0 0 0.00 672 A - 1 1,391 100.00 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,391 100.00 200 SEN. %TOT LOSS LOSS 0 0.00 0 0.00 1,391 100.00 0 0.00 0 0.00 TOTAL BUILDING SUPPLY AIR (BASED ON A 16 TD): TOTAL BUILDING VENT AIR (0% OF SUPPLY): TOTAL CONDITIONED AIR SPACE: SUPPLY AIR CFM /SQ.FT. OF CONDITIONED SPACE: SQ.FT OF CONDITIONED AIR SPACE PER TON: TONNAGE PER SQ.FT OF CONDITIONED AIR SPACE: TOTAL HEATING WITH OUTSIDE AIR: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC. ** SEATTLE, WA 98134 02/17/97 PAGE 4 BUILDING LOAD SUMMARY * * * * * * * * * * * * * * * * * * * * * ** LAT. GAIN 200 LAT. GAIN 200 1,391 100.00 200 + SEN. GAIN 0 2,147 0 0 0 0 0 2,147 2,147 3.14 0 2,750 0 63,085 250 0 0 0 0 0 0 0 0 0 0 0 0 0 0 68,232 + SEN. GAIN 0 0 0 0 68,232 0 0 0 0 68,232 3,933 CFM 0 CFM = TOTAL %TOT GAIN GAIN 672 SQ.FT 5.8527 CFM /SQ.FT 117.8396 SQ.FT /TON 0.0085 TONS /SQ.FT 2,147 3.14 0 0.00 0 0.00 2,750 4.02 63,085 92.19 450 0.66 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 68,432 100.00 TOTAL GAIN 1.39 MBH 5.70 TONS CITY RECEIVED MAR 1 21997 PERMIT CENTER %TOT GAIN 0 0.00 0 0.00 68,432 100.00 0 0.00 0 0.00 68,432 100.00 ** UNITED SYSTEMS NC ** 1021 SW KLICKITAT WAY # 104 ** SEATTLE, WA 98134 ** QUICK COMMERCIAL HVAC LOADS PROGRAM CLIMATE DATA: DESIGN MONTH AUGUST JUNE JULY SEPTEMBER JANUARY FEBRUARY WINTER OUTDOOR OUTDOOR DRY BULB WET BULB GENERAL PROJECT INFORMATION: PROJECT FILE NAME: PROJECT LOCATION: BAROMETRIC PRESSURE: ALTITUDE: NORTH LATITUDE: MEAN DAILY TEMPERATURE RANGE: ATMOSPHERIC CLEARNESS FACTOR: GROUND REFLECTANCE: STARTING TIME FOR HVAC LOAD CALCULATIONS: ENDING TIME FOR HVAC LOAD CALCULATIONS: FLOOR HEAT LOSS COEFFICIENT: NUMBER OF UNIQUE ZONES IN THIS PROJECT: BUILDING DEFAULT VALUES: CALCULATIONS PERFORMED: LIGHTING REQUIREMENTS: EQUIPMENT REQUIREMENTS: PEOPLE SENSIBLE LOAD MULTIPLIER: PEOPLE LATENT LOAD MULTIPLIER: ZONE SENSIBLE SAFETY FACTOR: ZONE LATENT SAFETY FACTOR: ZONE HEATING SAFETY FACTOR: PEOPLE DIVERSITY FACTOR: PROJLT : CLIENT: R. DATE: DESIGNER: INDOOR INDOOR REL.HUM DRY BULB 83 68 50% 72 20.83 -9 83 66 50% 72 10.55 -9 83 69 50% 72 26.15 -9 80 65 50% 72 10.40 -12 54 48 50% 72 -18.52 -38 59 50 50% 72 -19.36 -33 24 0 50% 70 0.00 F:OPENLINE SEATTLE, WA 29.491 IN.HG. 400 FEET 47 DEGREES 26 DEG.F 1 20 PERCENT 6 AM 6 PM 0 BTUH /FT -F 9 BOTH HEATING AND COOLING LOADS 1.20 WATTS PER SQUARE FOOT 3.00 WATTS PER SQUARE FOOT 250 BTU PER PERSON 200 BTU PER PERSON 0% 0 0% 0 0% 100% OPENLINE - OXBO MILLER CONSTRUCTION 02/17/97 ALL DESIGN DATA TAKEN FROM THE 1989 ASHRAE HANDBOOK OF FUNDAMENTALS PETER CRELLEY GRAINS IN /OUTDOOR DIFF. CORRECTION * *.QUICK COMMERCIAL }MAC LOADS PROGRAM.BY ELITE k4TWARE DEVELOPMENT INC.. ** UNITED 'SYSTEMS INC SEATTLE, WA 98.134. OPENLINE.- OXBO 02/17/97 * * * *. * * * * * * * * * * * * * * * * * * * * ** AIR HANDLER INPUT DATA * * * * * * * * * * * * * * * * * * * * * * * * ** AIR HANDLER # 1 INPUT DATA: AIR. HANDLER DESCRIPTION: TERMINAL TYPE: SUPPLY FAN TYPE: CALCULATIONS PERFORMED: NUMBER OF TIMES SYSTEM OCCURS: 1 LEAVING COOLING COIL TEMP. (DEG.F): 56 LEAVING HEATING COIL TEMP. ( DEG.F): 0 COMBINED FAN,MOTOR EFFICIENCY ( %): 0. STATIC PRESS. ACROSS FAN (IN W.G): 0.000 SUMMER SUPPLY DUCT TEMP. RISE (DEG.F): 0.000 SUMMER RETURN DUCT TEMP. RISE (DEG.F): 0.000 WINTER SUPPLY DUCT TEMP. DROP (DEG.F): 0.000, WINTER RETURN DUCT TEMP. DROP (DEG.F): 0.000 CHILLED WATER TEMP.DIFFERENCE ( DEG.F): 0.000 HOT WATER TEMP.DIFFERENCE (DEG.F): 0.000 COOLING VENTILATION METHOD: 0 COOLING VENTILATION VALUE: 0.000 COOLING INFILTRATION METHOD: COOLING INFILTRATION VALUE: HEATING VENTILATION METHOD: HEATING VENTILATION VALUE: HEATING INFILTRATION METHOD: HEATING INFILTRATION VALUE: VENTILATION IS 100% OF SUPPLY AIR: VAV BOX WITH ELECTRIC HEAT CONSTANT VOLUME BUILT- IN UNIT BOTH HEATING AND COOLING LOADS 0 0:000 0 0.000 0 0.000 NO PAGE 2 ** QUICKCOMMERCIAL IC LOADS UNITED SYSTEMS INC OPENLINE : - OXBO * ** * * * * * * * * * * * * * * * * * * * * * * * ** • 'ZONE # 9: EQUIPMENT ROOM (672 AIR HANDLER NUMBER: ZONE LENGTH. (FEET): LIGHTING WATTS: PER.SF NO. OF PEOPLE IN ZONE: DIRECT CEILING HEIGHT (FEET): SEN SAFETY FACTOR ( %): SEN.HEAT PER PERSON (BTU): CLG VENTILATION CFM: HTG VENTILATION CFM: CLG. SQFT EXPOSED TO PLENUM: LAT. BTUH EQUIP LOAD: 1. 1 0.045 PROGRAM BT E 02/17/97 ZONE INPUT DATA SF) ROOF ASHRAE # U- FACTOR LENGTH 24.0 LITE,SOFTWARE DEVELOPMENT INC: ** SEATTLE, WA 98134 PAGE 3 * * * * * * * * * * * * * * * * * * * * * * * * * * * *•* 1 ZONE OCCURRENCES: 24.0 ZONE WIDTH (FEET): 806 EQUIPMENT WATTS: 1 EXHAUST AIR CFM: 9.0 HTG.SAFETY FACTOR ( %): 0 LAT.SAFETY FACTOR (%): 250 LAT.HEAT PER PERSON (BTU): 0 CLG INFILTRATION CFM: 0 HTG INFILTRATION CFM: 672 EXPOSED FLOOR SLAB EDGE -FT: 0 HTG. & CLG. LOADS CALCULATED WIDTH ROOF -AREA SUSP.CEIL 28.0 672.0 1 28.0 DIRECT. 18500 0 0 0 200 0 0 0.0 COLOR YES DARK *;t;i".. March 17, 1997 i:.`f ?i'L 0,31 y5v..t c JA, 3 i,^' F leer 3 x' City of Tukwila Fire Department Fire Department Review Control # M97 -0036. Re: H.V.A.C. at CSG Openline, 2811 S 102 St Dear Sir: V ,ma rs FILE c o . ants Mayor Thomas P. Keefe, Fire Chief The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #1742) H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air - moving equipment upon detection of smoke in the main supply -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (UMC 608) 2. Duct smoke detectors shall be capable of being reset from the alarm panel. (City Ordinance #1742) Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #1742) 3. In areas that are not continuously occupied, automatic smoke detection shall be provided at each control unit(s) location to provide notification of fire at that location. (NFPA 1 -5.6) The installation of wiring and equipment shall be in ./, Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 5754404 • Fax (206) 5754439 City of f Tukwila Fire Department Page number 2 accordance with N.F.P.A. 70, Article 760, Fire Protective Signaling Systems. (NFPA 72- 1- 5.5.4) 4. When the control panel is located inside a room, the door to the room shall have a sign with one -inch letters which reads "Fire Alarm" or "Fire Alarm Control". (City Ordinance #1742) Dedicated fire alarm system circuit breaker(s) shall be equipped with a mechanical lockout device. (NFPA 72 (1- 5.2.8.2)) 5. All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #1742) (UFC 1001.3) Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (UFC 10.503) (City Ordinance #1742) Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. Yours truly, The Tukwila Fire Prevention Bureau cc: TFD file ncd John W. Rants, Mayor Thomas P. Keefe, Fire Chief Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575.4404 • Fax (206) 5754439 '.....i:t,': tic/MBR . ..E° 1 41 )6 ." 1 .00 .;:. ::.■ . (i/7 1 :`:ht l'f!r i?:;,k :;,:;■ r.i --,.-• :..ii ::.....: 1 ;: ; 1' ,.1,;.:;':', EtOtt Y.i xi i ..-...ii. T. -'.=.. 1 .2. %:0 E & DEPARTMENT OF LABOR AND INDUSTRIES THIS CERTIFIES THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED BY LAW AS A r DETACH TO DISPLAY CERTIFICATE I-. DETACH TO DISPLAY CERTIFICATE -I RECEIVED CITY OF TUKWILA MR 1 2 1991 PERMIT CENTER EQUIPMENT SCHEDULE TAG LOCATION MODEL # BTU CFM VOLTAGE PHASE NOTES AC -1 COMP. RM (INDOOR) LIEBERT #VE1100 8 —TON) 60,000 4650 460V/30 O1 CU -1 COMP. RM(OUTDOOR) LIEBERT - — 460V/30 PERIMETER EQUIPMENT SCHEDULE FOR TRANE PARALLEL INTERMITTENT FAN VAV BOXES AND INTERIOR COOLING ONLY VAV BOXES TAG PERIMETER/ INTERIOR LOCATION TRANE MODEL # INLET SIZE PRIM CFM MIN OSA VOLTAGE PHASE KW VAV # PERIMETER N. OFFICES VSEE- 0607 6" 570 80 277/1 3 VAV # PERIMETER N CONF. RM VSEE -0607 6 ° . 460 280 277/1 5 VAV # PERIMETER NORTH VSEE -1111 8" 760 120 277/1 4 VAV #4 PERIMETER EAST VSEE -1720 12" 1,860 420 277/1 10 VAV #5 PERIMETER EAST (MID) VSEE -1111 8" 805 160 277/1 5 VAV #6 PERIMETER SOUTHEAST VSEE -1715 10" 1,475 280 277/1 8 VAV # INTERIOR TRAINING #1 VCCE11 10" 1,005 340 277/1 0 VAV #8. INTERIOR CONFERENCE RN VCCE11 10" 1,020 340 277/1 0 EXHAUST FAN SCHEDULE TAG LOCATION PRODUCT TRANE MODEL # INLET SIZE PRIM CFM MIN OSA VOLTAGE PHASE REMARKS EF -1 KITCHEN BROAN 365 10" 400 — 115V/10 SPEED CONTROLLER EF -2 LIPS/TRANSFORMER BROAN 365 — 500 — 115V/10 — EF -3,4 TRAINING ROOM BROAN 365 — 500 — 115V/10 SPEED CONTROLLER 8"0 POC R N -6"0 DIFF FROM NEW 8"x8" , FSD 200 CFM --I NEW 24 "x24" RETURN AIR GRILLE FROM N M 14' x14" FSD N -8 "0, DIFF FROM NEW 8" x8" FSD 200 CFM N 003 HVAC CONSTRUCTION NOTES: OPEN LINE —T.I. SCOPE OF WORK: u. REMOVE VAV BOX AND STORE ON 1s`. FLOOR FOR SABEY. 10'0 EXHAUST DUCT UP THROUGH ROOF WITH CAP —1 • ONE (1) NEW LIEBERT 8 —TON COMPUTER ROOM AC UNIT. • NEW DUCTWORK AND FIVE (5) NEW DIFFUSERS FROM AC UNIT. • PIPING BETWEEN INDOOR AC UNIT AND OUTDOOR DRYCOOLER. • CRANE. • REPLACE EXISTING DDC CONTROL CHIPS IN EXISTING VAV BOXES SERVING SPACE. • RELOCATE EIGHT (8) EXISTING 6 INCH PERIMETER VAV BOXES TO EIGHT (8) NEW SMALL CONFERENCE ROOMS. • FIVE (5) NEW TRANE PERIMETER FAN - POWERED. VAV BOXES WITH ELECTRIC STRIP HEAT. • TWO (2) NEW COOLING ONLY VAV BOXES TO SERVE THE TWO (2) NEW TRAINING ROOMS. • RELOCATE TWO (2) EXISTING VAV BOXES. • NEW HI— PRESSURE DUCTWORK FROM NEW AND RELOCATED VAV BOXES TO EXISTING HI— PRESSURE MAINS. FIVE 5 • 'WI NEW COMBINATION FIRE SMOKE DAMPERS. • SIXTEEN (16) NEW PERIMETER DIFFUSERS. • ONE (1) NEW BROAN #365 EXHAUST FAN WITH DISCHARGE THROUGH ROOF TO SERVE KITCHEN. • TWO (2) NEW BROAN EXHAUST FANS IN THE TRAINING ROOMS. • ONE(1) NEW BROAN #365 EXHAUST FAN TO SERVE UPS / TRANSFORMER ROOM. • ONE (1) NEW TRANSFER AIR GRILLE BETWEEN COMPUTER ROOM AND UPS /TRANSFORMER ROOM. • APPROXIMATELY THIRTY (30) DIFFUSER RELOCATES AND SIXTEEN. (16) RETURN AIR GRILLE RELOCATES. • ELEVEN (11) NEW ALUMINUM EGGCRATE RETURN AIR GRILLES • CONTROL WORK FOR NEW AND RELOCATED VAV BOXES TO MATCH • SIXTEEN (15) SENSOR RELOCATES. • AIR BALANCES AND REPORT. • START —UP AND TEST NEW AND EXISTXI3 VAV BOXES. • OPERATIONS & MAINTENANCE MANUAL. NOTES 0 DUCT SMOKE DETECTOR POC. —12 "0 i -10`W 12 "0 EPARATE PERMIT REQUIRED FOR, . MECHANIC LEGTRIC 0 PLUMBIN GAs PIP:i`IG DUILDIN i CONSULTANTS SABEY CMl O KVI ammeneamison zs9 REGIS1ERm ARCHITECT JOHN W. LANG sak a rr.+•min 10 0, 350 CFM L 4 6 - 0 X° CAP _. TYP) co Witt P_� 11 10_ 'EF 1 P _ zpo kM 160 335 'CF EF NEW; R -10'0 -T12 TY0i p '�4 4x14. I:r X- X 4 . 253 OFA 6 10"0 230 CFM (2 TYP) DRAWING TRU: REVISIONS 02/14/97 ode. orol .011311.1 soft of Ms kb. Coop.. ond . i i Y. ay TOt M do S. a turd MM a a sol b" M to fay C.adYn. MINIMMINMENNE A Tenant Improve et F09, OPENLIME co Amin PROJECT DATA SHEET INDEX VICINITY MAP h11af '1. oovi)