Loading...
HomeMy WebLinkAboutUtilities 2012-05-30 Item 2A - Final Acceptance - Interurban Avenue South Gravity Sewer wtih RL Alia ConstructionCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director Z O BY: Michael Ronda, Construction Project Manager DATE: May 25, 2012 SUBJECT: Interurban Avenue S. Gravitv Sewer Proiect Project No. 90440208, Contract No. 11 -099 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of retainage. BACKGROUND The Notice to Proceed for Contract No. 11 -099 with R.L. Alia Construction of Renton, Washington, was issued on August 19, 2011 for construction of the Interurban Avenue S. Gravity Sewer Project. This project was designed to replace a failing sewer lift station with a series of gravity feed lines on the west side of Interurban Avenue S. between Fort Dent Way and S 144 Street. DISCUSSION Construction was physically completed on May 10, 2012. Ten change orders were issued during construction for a total of $28,580.38. The change orders can generally be summarized as minor revisions that were offset by under -runs in quantities for various bid items. The largest change order in the group ($13,146) was due to an unexpected subgrade condition which caused problems with the trench when installing the new sewer main. The total budget for this contract, with an 11 contingency, was $828,256.25. A retainage bond was used, so no retainage amount was withheld. Contract Award Amount 681,440.00 Change Order Nos. 1 10 28,580.38 Cost Under -runs (103,260.91) Sales Tax 57.642.15 Total Amount 664.401.62 RECOMMENDATION The Council is being asked for formal acceptance and retainage bond release authorization, subject to standard claim and lien release procedures, for the contract with R.L. Alia Construction, in the amount of $664,401.62 and to consider this item on the Consent Agenda at the June 4, 2012 Regular Council Meeting. Attachments: Dept of Revenue Notice of Completion W:IPW Eng1PROJECTSW SW Projectsllnterurban Gravity Sewer (90440208)IConstrucbon.200 Correspondence1010 -To Others\IU Sewer -INFO MEMO Closeout 05 -25 -12 sb.doc %TATt x �if� 1Nr "9 i�ry NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Contractor's UBI Number: 600149378 Date: 05/23/12 Name Address of Public Agency Departme»t,Use "Only, City of Tukwila Assigned to: 6200 Southcenter Blvd. Tukwila WA 98188 Date Assigned: UBI Number: 179 000 -208 Notice is hereby given relative to the completion of contract or project described below Project Name Contract Number Job Order Contracting Interurban Avenue South Gravity Sewer 11 -099 Yes [9 No Description of Work Done /Include Jobsite Address(es) Install replacement gravity feed sewer system from approximately 14900 to 14400 block, reroute existing sewers to new system and remove the old pump station at approximately 14610 Interurban Avenue. Federally funded road transportation project? Yes Vf No Contractor's Name Telephone Number R L Alia Company 425- 226 -8100 Contractor Address 107 William Ave. Renton WA 98055 If Retainage is Bonded, List Surety's Name (or attach a copy) N/A Surety Agent's Address North American Specialty Insurance Company, Parker Smith and Feek Inc., 2233112th Ave NE, Bellevue WA 98004 Date Contract Awarded Date Work Commenced Date Work Completed Date Work Accepted 7/14/11 8/19/11 05/10/12 XX /XX /XX Contract Amount 681,440.00 Additions 28,580.38 Liquidated Damages 0.00 Reductions 103,260.91 Amount Disbursed 664,401.62 Sub -Total 606,759.47 Amount Retained 0.00 Amount of Sales Tax Paid at .095 (If various rates apply, please send a breakdown) 57.642.15 TOTAL 664,401.62 TOTAL 664,401.62 NOTE: These two totals must be equal Please List all Subcontractors Below: Subcontractor's Name: National Concrete Cutting Del -Mar Concrete Cutting Coring ASPI Surveying Krazan Testing Ground Up Road Construction Hot Mix Pavers Apply -a -Line NWCW LLC F215- 038 -000 08 -2011 REV 31 0020e (08/25/11) IUBI Number: lAffidavit ID (if known) 600 195 813 No Work Performed 602 260 574 372139 601 778199 350994 601 498 409 N/A 602 790 246 No Work Performed 600 310 693 373269 600 553 941 602 813 492 374648 Continued on page 2 2