Loading...
HomeMy WebLinkAboutUtilities 2012-05-30 Item 2B - Contract Supplement #2 - Water and Sewer Comprehensive Plans with Carollo EngineersCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director 10 BY: Mike Cusick, Senior Engineer DATE: May 25, 2012 SUBJECT: Water and Sewer Comprehensive Plans Project No. 91040101, Contract No. 10 -055 Supplement No. 2 ISSUE Approve Supplement No. 2 to Contract No. 10 -055 with Carollo Engineers for the Water /Sewer Comprehensive Plan. BACKGROUND The Departments of Health and Ecology require the City of Tukwila to update the Water and Sewer Comprehensive Plans every six years. In 2010, the City contracted with Carollo Engineers to update the Water and Sewer Comprehensive Plans. DISCUSSION Carollo Engineers completed the work draft of Chapter Two, "Demographic Analysis and Demand Projections," for the Comprehensive Plan in October 2010 using current population data. In November 2010, DCD requested that the Public Works department rerun the population study model with 4,800 new housing units and 15,500 net new jobs by the year 2031. In the 2005 water model, most areas of the City had more than adequate fire flows in excess of 4,500 gpm. In May 2011, the Tukwila Fire Marshal requested that the fire flows in the Commercial Business District (CBD) be increased from 6,000 gpm to 8,000 gpm. The increased fire flows resulted in most of the CBD not having adequate fire flows and would require costly upgrades to existing water lines. In April 2012, the Fire Marshal revised the required fire flows in all areas of the CBD except north of Strander Blvd to 6,000 gpm. The Consultants scope of work was to prepare a sewer system map book for the Public Works field crews to carry in their vehicles. The task went over budget due to City staff finding multiple discrepancies in the existing sewer pipe maps. FINANCIAL IMPACT Supplement No. 2 will increase the Consultant's scope of work for Task 300 Planning Considerations for $5,721.50, Task 700 Distribution System Analysis and Task 900 Capital Improvement Program for $10,000, and Task 060 Hydraulic Model and Mapping for $6,000, for a total Supplement of $21,721.50. Funding for the additional work will come from the Interurban Water Reuse Project, page 86, 2012 CIP. EXPENDITURES Fundina BudcLet Original contract $291,000.00 Water Comp Plan 160,000.00 Supplement No. 1 12,662.00 Sewer Comp Plan 143,000.00 Supplement No. 2 21,721.50 Interurban Water Reuse 25.000.00 Total $325,383.50 $328,000.00 RECOMMENDATION Council is being asked to approve Supplemental Agreement No. 2 to Contract No. 10 -055 with Carollo Engineers in the amount of $21,721.50 and consider this item at the June 11, 2012 Committee of the Whole meeting and subsequent June 18, 2012 Regular Council meeting. Attachment: Supplemental Agreement No. 2 W:\PW Eng \PROJECTSW- WT Projects \Water Comprehensive Plan -Water (91040101) \InfoMemo -Water Comp Plan Sup #2 052512- sb.doc SUPPLEMENTAL AGREEMENT NUMBER 2 to CONSULTANT AGREEMENT NUMBER 10 -055 THIS SUPPLEMENTAL AGREEMENT is entered into between the Citv of Tukwila. Washington, herein -after referred to as "the City and Carollo Engineers hereinafter referred to as "the Consultant in consideration of the mutual benefits, terms, and conditions hereinafter specified. The City desires to supplement the agreement entered into with the Consultant and executed on, May 19, 2010, and identified as Agreement No. 10 -055. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: 1. Scope of Services, for Supplemental Agreement 42 to the Comprehensive Sewer and Water Plans (Plans) for the City of Tukwila. The purpose of this supplement is to add: a. $5,721.50 for Task 300 Planning Considerations Section 304 Population. The Consultant to rerun population growth model using revised data from the PSRC for the year 2010. b. $10,000.00 for Task 700 Distribution System Analysis and Task 900 Capital Improvement Plan. The Consultant to reanalyze the water system in the CBD south of Strander Boulevard for a reduced fire flow of 6,000 gpm and required Capital Improvement Program. c. $6,000.00 for Task 060 Hydraulic Modeling and Mapping of the Sanitary Sewer System. The Consultant is to reconcile the existing pipe data with current piping inventory. 2. Deliverables a. Revised Chapter Two of the Comprehensive Plan with increased population numbers based on November 2010 PSRC data. b. Revised Chapter Six of the Comprehensive Plan "Distribution System Analysis" for the CBD south of Strander Boulevard. c. Revised Chapter Eight of the Comprehensive Plan "Capital Improvement Plan" for the CBD south of Strander Boulevard. d. Revise sanitary sewer map books. 3. Time for Performance, is amended to change the number of calendar days for completion of the work to read an additional 90 days for a total of 980 days. 4. Payment, shall be amended as follows: 4 Payment for the work provided by the Consultant as part of this supplement shall be made for an additional $21,721.50. The total amount for the Consultant for this contact shall not exceed $325,383.50 without express written modification of the Agreement sided by the City. DATED this day of 2012. CITY OF TUKWILA Jim Haggerton, Mayor CONSULTANT By: Printed Name: Title: 5