Loading...
HomeMy WebLinkAboutUtilities 2012-10-09 Item 2A - Review - 2013-2018 Capital Improvement Program: Water, Sewer and Surface WaterCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM ISSUE Review Water, Sewer, and Surface Water projects in the Proposed 2013 2018 Capital Improvement Program. BACKGROUND The City annually approves the 6 -year Financial Planning Model and Capital Improvement Program. This year both the Proposed 2013 2014 Biennial Budget and Proposed 2013 2018 CIP will be presented to Council for adoption. Budget Workshops are being held October 9, 10, and 11, 2012 to review the two documents. Per Utilities Committee request, the Water, Sewer, and Surface Water CIP projects will also be reviewed in depth at the Committee level. DISCUSSION The Proposed 2013 2018 CIP includes some additions and deletions from last year. Some of the highlights that will be reviewed include: Water Added Water Reservoir, page 90 Added Pipeline Asset Management, page 91 Main Projects in next two years: Andover Park West (with TUC Transit Center) Andover Park East Water Main Replacement Surface Water Added 4 new projects, see page 137 Sewer Valley View West Hill Transfer Area, pg. 122 Sewer Repair at 14438 59 Ave S, pg. 134 Main Projects in next two years: CBD Sewer Rehabilitation Various smaller projects Main Projects in next two years: Storm Lift Station No, 15, Soils Reclamation Facility, and 42 Ave S Culvert RECOMMENDATION Information only, full Council will adopt the entire 2013 2018 CIP by Resolution. W.1PW Eng,OTHER'.Ga 1 Labanara %,Water Sewer Documents "%Info Memo Review 2013 -2018 Water, Sewer, SWM CIP projects gl.docx