Loading...
HomeMy WebLinkAboutPermit M96-0015 - CITY OF TUKWILA - TUKWILA COMMUNITY CENTERUrnmuki Ce1.1-re_P‘ City of Tukwila Permit No: M96 -0015 Type: B- MECHAN Category: NRES Address: 12424 42 AV S Location: Parcel #: 017900 -3239 Contractor License No: SCOTTI *225DZ Signature:'. Print Name:_ MECHANICAL PERMIT (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 TENANT TUKWILA COMMUNITY CENTER 12424 42 AV 5, TUKWILA, WA OWNER CITY OF TUKWILA 6200 SOUTHCENTER BLVD, ..TUKWILA WA 98188 CONTACT RANDY BERG Phone: 206 433 -0179 6300 SOUTHCENTER BLVD #100, TUKWILA;.' 98188 CONTRACTOR SCOTT & FROM COMPANY INC Phone: 206 878 -7824 3820 SOUTH JUNETTE STREET, :;'TACOMA,: WA 98409 ******************• k*** * * * * * * * * * * * * * *** * * *k *ifr** * * *** * * ****k* * * * * * * * * * ** ** ** Permit Descripeion:.. INSTALL,HVAC' EQUIPMENT. UMC Edition: 1994 Valuation..`. 275.06 Status: ISSUED Issued: 02/26/1996 Expires: 08/24/1996 Total Permit Fee *******.** * ***•k* * *** * * * * *•k. * **•k * * * **** Q Permit Center Authorized Signature Date I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not The granting of this permit does not presume to give authority to violate or cancel the p r o v i s i o n s of any other state or local l aws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. This permit shall become null and void if the work :is commenced within 180 days from the date of, issuance, or if the work' is suspended or abandoned for a period of 180 days f;ro.m.:the last inspection. Date: - -- .V T i t l e : f,z0,,) 7:41e2Y/f Address: 12424 42 AV S Suite: Tenant: TUKWILA COMMUNITY CENTER - --Type: B-MECHAN Parcel #: 017900-3239 CITY OF TUKWILA Permit No: M96-0015 Status: ISSUED Applied: 02/02/1996 Issued: 02/26/1996 k*4*********4***4*******************k********A**************VklekkVW Permit Conditions: 1. No changes wiil be made,4hlan:s by the Architect or Engineeranethe All permits, inspe6,46ti'record$7, anttapproved0jans shall be available at the job to he start.,oranyoon- struction. :Thee document e to be maintt4ned able untilIAn'il tpsp approval ts gnted 3. All construction to be dohe oved plans an,d>:4quirements,of the■j.in)form Building CCOO. ()994 Edition: ainded,,Uniform'MeChical Code . (1994 Edition) and WaWnaton State EnergACOde (104 Edition) f 7 4. Validtt r ,Pemib' r of per or'apOroUal planstl coMputations shall not be .-1 6?m=' st to be a permit or;/an approval of, any vAolatiOn of anY!of the provisiOnS-of_Oe building code or of 'any other' or of the*IlirisdlOtionNormit pv eurnln to oiv 'orcahoe:Lihe)proOsions of this _ code shall he :valid 5. MAN:00CTUREOSINSTALIATIONjINSTRUCTIONS-REQUIRED ON FOR THE BUILDING'INSUCTORS 6. No will be made k.o'thellOa'nSun.less'approved Aroh,feot ov Engineerandthe TukwBuild.trig Diviston' 7. PluOt shall be obtainOdthrough Couri'Wpi of Public Health will be inspettedj4 that agency, including 'ail, gas plOing: , 4 (2.96-4722 • , ; . 8. Electr.141 permits: be obtainedhrOugh the4',Washingt77 State 610sionof Labor and ical work will be inspected h that agency (248-6630) 9. All permttinSpection records, and approved plans .ha 1.1 be available at the job site pricir:tothe Start of any con struction. Ties documents are to bemaintained andavail- able until firinspectionappiou'al.,JS granted.,./ 10. Readily accessibleacoess torOof..mOtinted equipmens required. • • 11. Any exposed insulatiOnS4alg:':materia1;:shall have a Flame Spread Rating of 25 or lessanli:2MaterAal shall bear identi- fication showing the fire performance rating thereof. 12. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1994 Edition) as amended, Uniform Mechanical Code (1994 Edition), and Washington State Energy Code (1994 Edition). 13. Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be con- strued to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to give authority to:Nicilate or cancel the provisions of this code shall be valid, DEPARTMENT DAT IN . DATE A PPROVED.: REQUIREMENTS / COMMENTS BUILDING - ;nitial review Pi-FIRE �°� -�� , } � Is- � �'`� OUTED CONSULTANT: Date Sent - Date Approved - 3 - a to 1 ZI (�' 1 b i acs ) q 0 FIRE PROTECTION: U Sprinklers `] Detectors U N/A FIRE DEPT. LETTER DATED: c2 )OJG1 to INSPECTOR: 5)o INIT: 5 i n Eii PLANNING BY: (init.) ZONING: IBAR/LANDUSECONDITIONS? (J Yes (JN o SCREENING REQUIRED? Q Yes Q No INIT: REFERENCE FILE NOS.: 0 OTHER - INIT _ it ;:3UILDINC; - final review Z ZZ 4 6 UMC EDITION (year): ( C i INIT 3U1Li ING ;')FF=ICIAL ?( 27r I ` INH: AMOUN "I 4@i5 -OW CON 'ACTED • 1 • 0 • 0 I M LATE: NOTIFIED Q-' , 3 - a to _ ( t.) � 2rnd NOTIFICATION BY: BY: (Init.) 3RD NOTIFICATION BY: (init.) PROJECT NAME .�-, I I a�— aL CQ ni er SITE ADDRESS __ ____ `J SUITE NO. PLAN CHECK NUMBER fl cn REVIEW COMPLETED CITY OF TUKWL Department of Community Development — Permit Center 6300 Southcenter Boulevard - #100, Tukwila, WA 98188 (206) 431 -3670 Mechanical Permit Application Tracking INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that the status of the project may be ascertained at any time. • Plan corrections shall be completed and approved prior to sending to the next department. • Any conditions or requirements for the permit shall be noted in the Sierra system or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ", date and initial. DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. 01/07/V3 SITE ADDRESS SUITE # 12414 42 N.D Ave' - 5 • , VALUE OF CONSTRUCTION - $ f, 1 4 $'l , _ PROJJEE T NAME/TENANT 1) 1 4 1/44,A - G c'11yt1 -4l9 M i�� (H --ri - ASSESSOR ACCOUNT It 6 2. 3Zt3 TYPE OF WORK: R 'New /Addition ❑ Modifications ❑ Repair ❑ Other: DESCRIBE WORK TO BE DONE: 1 C 'ku U NI 1 < ( - } .:.; TYPE. : : : :. <: :RATING /SIZE :. : : :: :..;: . NUMBEROF::UNITS Lk? t 2 /14 afrr - 1 (eve- CA /. /HX HANDL /4 47 (N ! T5 . . /" a . (� 905 LL.2 t/1 GlM c� o` 5' FN D 5 v 7-7 0/ Y Jmi (ykR.l o v 5 1 b G., a._ AMMA j '. ^ . , r " 1 . . 27 0 4pe it BUI DIN USE (office, warehouse, - c rki 131 I C/ H. 0 14 15 1.-1 °f--- NATURE OF BUSIN S S: H U I� I GI PA o■/ N`I N' WILL THERE BE A CHANGE IN USE? 0'■ O Yes IF YES, EXPLAIN: WILL3HERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? No ❑ Yes IF YES, EXPLAIN: PROPERTY OWNER c4.-r• o +l VIA`ILA-- PHONE 433 _ 9j7 IB r`�S - � ZIP ADDRESS 0 200 � 'TG L\/2. iw- _ 5 It) KN 1 L-- -ZIP1 PHONE ,65.6 DATE CONTRACTOR pyM O / y L � ADDRESS ' WA. ST. CONTRACTOR'S LICENSE it r7...6no I_* 10 10 H 7EXP. DESCRIPTION AMOUNT RCPT It DATE BASIC PERMIT FEE UNIT(S) FEE PLAN CHECK FEE . OTHER:. . TOTAL - CITY OF TUKWILA -or-- Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK NUMBER Mci co APPLICATION MUST BE FILLED OUT COMPLETELY MECHAN ;AL PERMIT APPLICATION FEES (for staff use only) I HEREBY CERTIFYTHAT I HAVE READ;AND..EXAMINED THIS APPLICATION AND KNOW THE BE TRUE;:: AND CORRECT,:AND I AM AUTHORIZED TO APPLY FOR THIS:.PERMIT. DATE PHONE CITY/ZIP BUILDING OWNER SIGNATU�F lz� OR PRINT NA AUTHORIZED AGENT ADDRESS CONTACT PERSON ANIL / -4/ PHONE APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Application and plans must be complete in order to be accepted for plan review. BUILDING OWNER /AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days uponlwritten request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 431 -3670. DATE APPLICATION ACCEPTED Qt. VI DATE APPLICATION EXPIRES 03114/94 H MECHANICAL Completed mechanical permit application (one for each structure or tenant) Two (2) sets of mechanical plans, which include: • Floor plan • System layout • Elevations (for roof mounted equipment) • Heat Loss Calculations Note: Hood and duct systems require a building permit for the duct shaft. I i Structural calculations stamped by a Washington State licensed engineer may, be required if structural work is to be done (2 sets) Water heaters and vents are included in the UMC — please include any water heaters or vents being installed or replaced. UITTA L CHECKLT *AAAkt.**A**A**A CITY or TUKWILA WA 1RNSM3T hA*Ak*A****A*11AA****A*A4A Witith4AA kh*A) 1RAN6MIT Number: 96003707 Amount: 275.06 02/26/A&S Pavment Method: TRANS Notation: CITY OF TUKWILA In"fti Permit No M96-0015 Type: B-MliCHAN MECHANICAL PERMIT Purcell No 017900-3209 Site Address: 12424 42 AV 9 • Total Fecs: 275.06 This Payment 275.06 Total ALL Pmts: 275.06 Balance: .00 fi*I4h**t4A*Akk.AMA***4111kAh***A11*.A****Alith+.A*0**A0*A*4*AAA***AAAA Account Code Description 006/345.930 PLAN CHECK - NOHRES 000/322.100 MECHANICAL - NONUES 30a 00 Sqg 13D tDJ @cl - 16Kw\lo,_ Corn mu ni Amount 55.01 220.05 4a15.00> GENERA 55.01 GENERA 220.05 VOID GENERA -275.06 CASH 0.00 3040A000 15:32 Project--- Type of inspectlonI frt.. Address: Date called: Special instructions: Date wanted: ( � 2 j� a.m. ' � �[ —P Re Phone No.: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Inspector: INSPECTION RECORD -Retain a copy with permit Approved per applicable codes. ( Corrections required prior to approval. Date: (1120 PERMIT NO. 31 -3670 $42.00 REINSPECTION. FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: • Mgr 'COMMENTS: C Type of inspa Gin VC Qom,- (A o MG cmt( VV + r Addre1s;� 4 4 ,,f ` � ih/ , 5 , Date called: .s ' � 19I IV-kb t vy■LiO ScA' "IAJS 01) C".1 4 Date wanted: of- - 6,61t...1 P- cyl4\, Requester: ' Phone No. 't' A.c,� 1 R. wilt.. `rw.: 1 rr i Projq�tN. r....4.4 I fr...... C Type of inspa Addre1s;� 4 4 ,,f ` � ih/ , 5 , Date called: .s ' � 19I instructions: �y� / ' eA r 1 7 yvx Date wanted: Oft Special Requester: a Q � ' v 9S Phone No. 't' Nitfn".t]u m�ewwrnw... Approved per applicable codes, Inspector: Receipt No.: 3 INSPECTION RECORD Retain a copy with permit INSPECTION NO CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Date:5 PERMIT NO. Corrections required prior to approval. (206) 431 -3670 $42.00 REINSPECTION FEE REQUIRED. Prior to Inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection, Date: COMMENTS: Foil ns ect n/ag. V L 1, J 1 ) L'j 72._ Vii 1A S s+41 - tvAa rlS77 c;& w' r1 / >J S tkm-Tw Al A-, A0 rr r 7 r S /01 l Date called: -2) - 97 Special instructions: Iti 042.e T b IN1be -.. Toiziaki E. T O F - 6 4 M M . 5t- -I r.IG /t-lw 1.4 T r5brrt r\ tor* GwLe> 1 / S r st i ,a-c.t - virs9 - OPsT►d IT t..)P A 6 A -+r.J 3 4 1 Requester: -DREW Mr G>'Lv R t4 Sear d 71 \/ ' GTfl -c.- r-c as r4.1,J C, mil 6. u 3e9 Ti S' *' -- t 7 - 04 ,g- , Q P . r ' 7 4 i r J C „ , . r F L r g- -- lD , ,Bwr 1 wv- vJ r LL. v4,A trr 7-0 Sly r»( id S1 D' • imILA coitim. Oft Foil ns ect n/ag. d 64 42 A V 5 Date called: -2) - 97 Special instructions: Iti 042.e T b IN1be -.. Toiziaki E. T O F - 6 4 M M . ate wait ed: ' l MOM LA `2 1 ,.�- cB.II� p.m. Requester: -DREW Pho o.: r r INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 0015 PERMIT NO. Approved per applicable codes. > required prior to approval. f Inspector; Loate: �, l q z g r $42.00 REINSPECTION FEE REQUIRED, Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100..-Call to schedule reinspection. I Receipt No.: {Receipt 431 -3670 Date: A COMMENTS: t) ` -D. hAectA • kw:It - p‘ pi NIG. - - ;) 1 N 31 ;-4.._ Ft 1-F/ s-wo .L ►,pd c c" 13.••4 Ai L c Mc' `j L► Mc 17 (3 / y o,it9 Lt r /k 1 7. 5 ( 3 3) ` � F /s . f. t�r1._. SN 'It i1.AcAt,�1�,Aa-- J c...0,11...7 (4L /-i A-s f-5 ./2g xes fit. -Vt---s) . ...0 t'.7C" ' cox- ttF o 1-171 vY.r' C 1od iL.. St P P GILA L,.k 04 ri�=�J r. t.,bc - -0_ 4) EIS" .!£(w .)0v+ .13e56.&-- sm9S ,31--1W-7 1 ct x,St t1G . Arta oL. ,j),'"1" t...S Nke0 D Cat ME. it+Ttvk ,, t CJE . ((3G'c"`P Cf -esS'9 V W t L - '•PA f R- Project :'\'^k (' Type of inspectfoh; Address: Date called: /�/ q, c s: Special instructions: t o ca '. f- �. . , Date wanted: a.m. p.m. Requester: Phone No.: ziC:.t 1131 c�rono, Inspector: .»wu.0,11i1 rwmroMwuau ottos+ INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 Approved per applicable codes. [ Corrections required prior to approval. Date: Receipt No.: Date: t lki -00\5 PERMIT NO. (206) 431 -3V $42.00 REM §PECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. COMMENTS: A_ I " UNfC' W6►.11 p'-u 12.E_1uR -4.) P - rl TU Iv, a - iGF e "NA P P % 4G $(.lart.eiZ._ .. tit) S h^OK.4: 1 45' AThathrrisi Mr U 7..- Svr. Iw.. 1 i i'IrSs . Awe3— ,, MAK 4 — Srwtt( r i te4ona..Q atcr 114Z sowed F-aA All)r� S1 r .661.3 . 7C 'N- wR$ ...00■- 11 114 I( �, I. w " O vAl d-C 3 - r �ro n'A - i ., . fl Atnrvr,.I ' L.. , y ym t,p tqrAr Fv r Crt d S) CA -‘"`'1 6 /09 104004 - ■ Special instructions: , lY C,.. 1C"•('t.C�1S Pa- 1 6 � AAA. toNxT S WILL. hSA tr ('(W 61k`M\ c.,a t i -""D, (1-41 A 14 v.. l -- Lc s Ii, U pm s.V. ei ZR.— 1v. -i Nt4S 6v, IS S+1LL- fri Mc-A.:1) UF 0.. tACa - f . -IYMI....co...t.fki l 1UN' l Gf Type P I i t.... -. I1 r s: Date call Special instructions: , lY C,.. 1C"•('t.C�1S Pa- 1 6 � Date wan a.m. Reg ter Phort•1 0 (4% -/. 3 o ` ZA.,Varun..,...n . w.........„.,c.ur re.rehrottIZAWrnreuva^.atituft •naves:rimaroca_+e� las.W :ZeWrizttabr C I @' 22VMSTAMMT INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Inspector: $42.00 REIN FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: INSPECTION RECORD Retain a copy with permit Date: /0 7 Ifik -Oa c PERMIT NO. (206) 431 -3670 Corrections required prior to approval. Date: COMMENTS: TteMtion: C s a 04 4 ..„ 4trsp5 Date called: ) 1 ,./ p-, r r A 4 <-- c.7 1-2--) t,,, ,....d.fe, .0 ---. 0 Requestet S c,if ,ft ef Azze , ie.,. ee ci.--/e .5 N S-1‘ as 1 -, _.■ Aka Ca r„. it!" . ; e • . 0 , - 7 461/4..1-- --,' _.., 40 Ar , . ,e—or ■•••_ / 1 <1.° e--e C 96-N — , OW _h d f, __ A -fiat ti4 6 6044 C . 4 .4.." TteMtion: C s a 04 4 ..„ 4trsp5 Date called: ) 1 ,./ p-, r r Special instructions: Date wantell: 2_I 51 1111D Requestet S Phone INSPECTI N NO, CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. EJ Corrections. required prior to approval. [ Inspector: /It AIR $42.00 REINSPECTIO 4E REQUIRED. Prior to inspection, iee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. I Receipt No.: .1.1110.1“ansAM.111...• TWA" INSPECTION RECORD Retain a copy with permit Date: Date: (206) 431-3670 , c,OMMENTS: Vv\ 1.g- C.Qt,14N11 V . ed5 r i'1 vtr 1A-- I.SS t\ PcA*v WOO 1- I S jLZ - - g-CTctl C;rte .At C L M' C " QF I 1 ' Al ' G,.M4a t ct.trSsAPF W%‘.... 64 / 1Ar`vi* eat_ M.Prt4 4•..n:114.- Fait —. Ac .mot► cc . .taucZt tt.0 —i t a.44 Al l if -- D-uca ^rr y '-- jLA.4mt A CG,v.fi. -i 14A- rf-3 er4G tL . C'* L . J ML. NITI - STM -- V R q est r: cur , ,� 1 P one Ne, / _ t r IdNu _'_ Q , _ 2 C C_ I n T T • : •f i : pection: ddress D Date c II d: Special instructions: D Date la i : / a.m. p .m. R q est r: cur , ,� 1 P one Ne, / _ t i=thnetYKEESITZMIAWX NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Inspector: I Receipt No.:. Retain a copy with permit `76 INSPECTION RECORD PERMIT NO Date: ) 2 -'' (206) 431 - 3670 Corrections required prior to approval. Nipir U $42.00 REINSPECTION FEE REQUIRED. F nor to in pect on, fee must be paid at 6300 Southcentor Blvd., Suite 100. Call to schedule reinspection. Date: COMMENTS: L -D / — P - 42 c, i/ i•et pe o irgr evoiLeg Niito • 4, ts___c_..e. L Ch,-, 4 . , Iv cd_ito ex/ /-7 „ Iyie e4_, e A Z 62_1.es, ,5 L/fr. --f--. 4," e ll Phone a.: 11 _i_2-,__ AlICAL. Ar ., re'4— A I r Q °vim . t o re.12_ pe o irgr evoiLeg Niito ti Liz Au S Date called: _ t _1 : — % cfP nAgg /S OM Special instructions: axo-r v\1)146.1 Date wants Requeye Phone a.: 11 ,M.ZaltAtid.V.W.I.K.wo*ornauenveamerimay.o.rsonaxwvOtAX44.1. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Inspect° INSPECTION RECORD Retain a copy with permit Date: (206) 431-3670 Approved per applicable codes. LJ Corrections required prior to approval. $42.00 REINSPECTION FEE REQUIRED, Prior to Inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: COMMENTS: w V.htac-3 i A0.fl f i ?a FF R.� (.. � OAvt• vwt_ AT NbM oc- c 6/ • , t lL. t.43/5631 f4 - O__ r,,al.t u a r wikt.S W 1 1 os ti. r .... — I..... lU c 1 . 114ANV. iWesus' PAC` a6 - NC' ltATETV _/01 Date wanted: /Hi - 9cs , 1,rocV : t.eTS of- 1„1c ed.W9 4.Tad f ‘aG 1 a ilk r „z-L.2„• . c.1 S . 114 t3 nrkNa{?S II) 6Z- G, v �1(L:"`e). Del a n — 1 f-1 •n1 "' 1 tine- ..ti.. .. ,. vl• Phone No.: Project: „4.• Cam,. Type of inspection: (TR -10 Address: 41- �� � L Date called: /0 / 1 Special instructions: Date wanted: /Hi - 9cs , f3. . Requester: �_ u^'� a �' Phone No.: �s. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with permit PERMIT NO. (206) 431 -3670 Approved per applicable codes. (_Corrections required prior to approval. Date: /0 9(p Li $42,00 REINSPECTION FEE REQUIRED. Prior to inspection . fee must be paid at 6300 Southcenter Blvd., Suite 100, Call to schedule reinspection. Receipt No.: Date: I I _ ' aftsur Fir4Ta Frirrfsi er Am OuCitace_ A- It AL 1 • , I 1 1 i 6 ogioftrott. il r 4. 614 i — — I I — . " Pi km eft* ......_..... ' Dr 117-APOPTIoN 'rem 'ticr„, mm 1 I MOO 6 c‘ I fr.1 ht2.2 CONTINUATION M2.5 NM . II I 36.0 ''' GNI 0 C‘I GNI Co To • g I-. To U 04 30x30 fict=1. 1620 24x12 22x2 24x12 Sci=2 SG-2 880 840 TYP M2.5 OYER . 8x8 WI I 560 W I L. 12-0 22x16 EG-1 RACQUET5ALI- V r 7F1 1 f A - RACQUETBALL TME 14 2 69gy a f - PParlDC 6teriff PAP Trane Air Conditioning Economics By: ABACUS CONSULTANTS ** * * ** ** ********************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ****** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** T R A C E by TUKWILA COMMUNITY CENTER TUKWILA WA ARC ARCHITECTS GK LCCA Weather File Code: Location: Latitude: Longitude: Time Zone: Elevation: Barometric Pressure: Summer Clearness Number: Winter Clearness Number: Summer Design Dry Bulb: Summer Design Wet Bulb: Winter Design Dry Bulb: Summer Ground Relectance: Winter Ground Relectance: Air Density: Air Specific Heat: Density- Specific Heat Prod: Latent Heat Factor: Enthalpy Factor: 6 0 0 A N A L Y S I S ** SEATTLE. 47.0 (deg) 122.0 (deg) 8 386 (ft) 29.5 (in. Hg) 0.95 0.95 83 (F) 67 (F) 20 (F) 0.20 0.20 0.0749 0.2444 1.0988 4,836.9 4.4953 (Lbm/cuft) (Btu /lbm/F) (Btu- min. /hr /tuft /F) (Btu- min. /hr /tuft) (Lb- min. /hr /tuft) Design Simulation Period: June To November System Simulation Period: January To December Cooling Load Methodology: CLTD /CLF (Transfer Function Method) Time /Date Program was Run: 14:46:21 5/ 3/95 Dataset Name: TUKWCC .TM ** RECEIVED FEB 21996 TUKWILA PUBLIC WORKS FILE COPY undt•:r:51cnd t heit the Plan Cheek oporlvol3 err, .::: 10 C'rrt►rc RECEIVED CITY OF TUKWILA FEB 0 21996 PERMIT CENTER V 60 PAGE 1 it Trane Air Conditioning Economics By: ABACUS CONSULTANTS AIRFLOW - ALTERNATIVE 1 Outside System System Airflow Number, Type (Cfm) 1 FPVAV 2 FPVAV 3 SZ 4 FPVAV 5 SZ 6 UN Totals CAPACITY - ALTERNATIVE 1 VAV W Cooling Heating Return Exhaust Supply Exhaust Airflow Airflow Airflow Airflow Airflow Airflow (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) 15,311 22,609 7,751 23,273 15,975 0 1,314 1,042 5,069 1,970 5,285 1,258 0 0 4,500 8,661 8,661 9,327 5,167 0 0 2,616 5,157 4,798 5,439 2,897 0 4,320 850 1,222 1,222 1,244 872 0 0 0 0 135 0 31 0 0 24,319 42,718 24,537 44,568 26,200 0 5,634 Cooling Main Sys. Aux. Sys. Opt. Vent m System Capacity Capacity Capacity Nuwoer Type (Tons) (Tons) (Tons) SYSTEM SUMMARY (Design Airflow Quantities) Main Auxil. Room S Y S T E M S U M M A R Y (Design Capacity Quantities) Cooling Main Sys. Aux. Sys. Totals Capacity Capacity (Tons) (Btuh) (Btuh) 1 FPVAV 63.0 0.0 0.0 .63.0 - 199,398 2 FPVAV 11.6 0.0 0.0 11.6 - 54,814 3 SZ 27.3 0.0 0.0 27.3 - 509,867 4 FPVAV 16.7 0.0 0.0 16.7 - 103,620 5 SZ 3.9 0.0 0.0 3.9 - 72,045 6 UH 0.0 0.0 0.0 0.0 -6,652 Totals 122.5 0.0 0.0 122.5 - 946,396 Preheat Capacity (Btuh) 0 - 588,842 0 - 41,233 0 - 81,631 0 - 100,591 0 - 25,048 0 0 0 - 837,345 The building peaked at hour 14 month 7 with a capacity of 122.1 tons V 600 PAGE 2 Heating Reheat Humidif. Opt. Vent Heating Capacity Capacity Capacity Totals (Stub) (Btuh) (Btuh) (Btuh) 0 0 0 - 788,24C 0 0 0 - 96,04E 0 0 0 - 509,867 0 0 0 - 204,211 0 0 0 -72,045 0 0 0 -6,652 0 0 0 - 1,677,062 Trans Air Conditioning Economics By: ABACUS CONSULTANTS ENGINEERING CHECKS - ALTERNATIVE 1 ENGINEERING CHECKS Percent Cooling - -- ..Heating ---- System Main/ System Outside . Cfm/ Cfm/ Sq Ft Btuh / Cfm/ Btuh/ Floor Area Number Auxiliary Type Air Sq Ft Ton /Ton Sq Ft Sq Fti Sq Ft Sq Ft 1 Main FPVAV 67.72 1.17 359.0 305.8 39.24 0.40 -40.93 19,258 2 Main FPVAV 20.56 1.24 438.2 352.4 34.05 0.48 -23.56 4,077 3 Main SZ 51.96 0.73 316.7 435.4 27.56 0.73 -42.83 11,905 4 Main FPVAV 50.71 0.68 309.1 452.5 26.52 0.64 -27.05 7,549 5 Main SZ 69.56 1.44 311.7 216.8 55.36 1.44 -84.76 850 6 Main UH 0.00 0.00 0.0 0.0 0.00 0.05 -2.64 2,523 V 600 PAGE Trane Air Conditioning Economics By: ABACUS CONSULTANTS System 1 Block FPVAV - FAN POWERED VAV COOLING COIL PEAK Peaked at Time =_> Outside Air =_> OADB /WB /HR: 82/ 68/ 80.5 Envelope Loads Skylite Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Totat==> Internal Loads Lights People Misc Sub Total = => Ceiling Load Outside Air Sup. Fan Heat f Fan Heat Dui.c Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Space Sens. +Lat. (Btuh) (Btuh) 29,277 0 1,186 0 19,498 2,432 71,461 0 4,391 0 18,157 76 7,797 0 8,078 159,845 2,508 60,496 5,232 427,820 35,838 0 524,154 5,232 4,835 -4,835 0 0 0 Grand Total = => 688,834 - 119,401 (Tons) (Mbh) (Mbh) Main Clg 63.0 755.7 465.9 Aux Clg 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 Totals 63.0 755.7 COOLING COIL SELECTION HEATING COIL SELECTION Capacity Coil Airfl Ent Lvg Type (Mbh) (cfm) Deg F Deg F Vent Main Htg -199.4 7,751 74.9 98.3 Infil Aux Htg 0.0 0 0.0 0.0 Supply Preheat -588.8 15,311 20.0 55.0 Mincfm Reheat -0.0 0 0.0 0.0 Return Humidif 0.0 0 0.0 0.0 Exhaust Opt Vent 0.0 0 0.0 0.0 Rm Exh Tr -788.2 Auxil Mo /Hr: 7/14 * * Ret. Air Ret. Air Net Percnt * Sensible Latent Total Of Tot * (Btuh) (Btuh) (X) * 29,277 3.87 * 1,186 0.16 * 21,930 2.90 * 71,461 9.46 * 4,391 0.58 * 18,232 2.41 * 7,797 1.03 * 0 0.00 * 8,078 1.07 * 162,353 21.48 * * 65,728 8.70 * 427,820 56.61 * 0 35,838 4.74 * 0 529,385 70.05 * 0 0.00 * 0 186,294 24.65 * 0 0.00 * 0 0 0.00 * 0 0 0.00 * 0 0.00 * - 122,305 0 - 122,305 -16.18 * 0 0 0 -0.00 * * 0 755,727 100.00 * CLG SPACE PEAK Mo /Hr: 7/17 OADB: 81 Total Capacity Sens Cap. Coil Airfl Entering DB /WB /HR Leaving DB /WB /HR (cfm) Deg F Deg F Grains Deg F Deg F Grains 20,938 82.5 67.6 78.9 55.0 54.2 62.5 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 AIRFLOWS (cfm) Cooling 15,311 664 22,609 0 21,959 14,661 1,314 0 HEATING COIL PEAK Mo /Hr: 13/ 1 OADB: 20 V 600 PAGE 4 Space Percnt * Space Peak Coil Peak Percnt Sensible Of Tot * Space Sens Tot Sens Of Tot (Btuh) (X) * (Btuh) (Btuh) (X) 32,626 6.57 * 0 0 0.0C 1,160 0.23 * - 13,803 - 13,803 6.91 26,682 5.37 * -26,019 - 29,730 14.8E 98,565 19.84 * 0 0 0.00 4,387 0.88 * -51,691 -51,691 25.8E 21,137 4.25 * - 34,962 - 35,355 17.70 8,808 1.77 * -9,684 -9,684 4.85 0 0.00 * 0 0 0.0C 4,472 0.90 * - 40,124 - 40,124 20.0S 197,837 39.82 * -176,283 - 180,386 90.3C * 60,496 12.18 * 0 0 0.00 201,785 40.61 * 0 0 0.00 35,838 7.21 * 0 0 0.00 298,119 60.00 * 0 0 0.00 901 0.18 * -2,848 0 0.0C 0 0.00 * 0 0 0.0C 0.00 * 0 0.0C 0.00 * 0 0.0C 0.00 * 0 0.0C 0 0.00 * - 19,368 - 19,368 9.7C 0.00 * 0 0.0C 0.00 * 0 0.00 * 496,856 100.00 * - 198,499 - 199,754 100.00 Heating 0 664 7,751 0 0 0 0 0 -- ENGINEERING CHECKS- - Clg X OA 67.7 Clg Cfm/Sqft 1.17 Clg Cfm/Ton 359.00 Clg Sqft/Ton 305.79 Clg Btuh /Sqft 39.24 No. People 766 Htg % OA 0.0 Htg Cfm/SqFt 0.40 Htg Btuh /SqFt -40.93 AREAS Gross Total Glass (sf) (X) Floor 19,258 Part 4,752 ExFlr 0 Roof 17,269 763 4 Wall 8,852 2,859 32 - -TEMPERATURES (F) --• Type Clg Htg SADB 55.0 98.2 Plenum 82.5 71.S Return 82.6 75.0 Ret /OA 82.5 20.0 Runarnd 82.5 74.1 Fn MtrTD 0.0 O.1 Fn BIdTD 0.0 0.( Fn Frict 0.0 0.1 Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Outside Air Sup. Fan Heat ' Fan Heat Du..c Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total ==> Main Clg Aux Clg Opt Vent Totals Main Htg Aux Htg Preheat Reheat Humidif Opt Vent T' Trane Air Conditioning Economics By: ABACUS CONSULTANTS * * * * * * * * * * * * * * * * * * * * ** COOLING COIL PEAK * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** CLG SPACE PEAK * * * * * * * * * * ** HEATING COIL PEAK * * * * ** Space Sens. +Lat. Envelope Loads (Btuh) Ret. Air Ret. Air Sensible Latent (Stub) (Btuh) Net Total (Btuh) COOLING COIL SELECTION * Percnt * Of Tot (X) * * * * * * * * * * * * * * * * * * * * * * * * * HEATING COIL SELECTION AIRFLOWS (cfm) Capacity Coil Airfl Ent Lvg Type Cooling Heating (Mbh) (cfm) Deg F Deg F Vent Infil Supply Mincfm Return Exhaust Rm Exh Auxil Space Sensible (Btuh) * Percnt * Of Tot * (X) * Total Capacity Sens Cap. Coil Airfl Entering DB /WB /HR Leaving DB /WB /HR (Tons) (Mbh) (Mbh) (cfm) Deg F Deg F Grains Deg F Deg F Grains --ENGINEERING CHECKS- - Clg % OA Clg Cfm/Sgft Gig Cfm/Ton Clg Sqft/Ton Clg Btuh /Sqft No. People Htg % OA Htg Cfm/SgFt Htg Btuh /SqFt Space Peak Space Sens (Btuh) Gross Total Floor Part ExFlr Roof Wall Coil Peak Tot Sens (Stub) V 600 PAGE Pere Of T AREAS Glass (sf) (% -- TEMPERATURES (F)- Type Clg Ht SADB Plenum Return Ret /OA Runarnd Fn MtrTD Fn BIdTD Fn Frict Trane Air Conditioning Economics By: ABACUS CONSULTANTS System 2 Block FPVAV - FAN POWERED VAV * Peaked at Time =_> Outside Air =_> Envelope Loads Skylite Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Outside Air Sup. Fan Heat I Fan Heat DL..c Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total = => Total (Tons) Main Clg 11.6 Aux Clg 0.0 Opt Vent 0.0 Totals 11.6 Main Htg Aux Iltg Preheat Reheat Humidif Opt Vent Ti HEATING COIL SELECTION COOLING COIL PEAK Mo /Hr: 7/14 OADB /WB /HR: 82/ 68/ 80.5 Space Ret. Air Sens. +Lat. Sensible (Btuh) (Btuh) 26,085 0 562 0 5,170 1,465 29,183 0 1,358 0 6,758 0 422 0 4,248 73,786 1,465 Ret. Air Latent (Btuh) Net Percnt Total Of Tot (Btuh) (X) 26,085 18.79 562 0.40 6,635 4.78 29,183 21.02 1,358 0.98 6,758 4.87 422 0.30 0 0.00 4,248 3.06 75,251 54.20 12,434 1,481 13,915 10.02 26,580 26,580 19.15 * 8,046 0 0 8,046 5.80 * 47,059 1,481 0 48,541 34.96 * 1,198 -1,198 0 0.00 * 0 0 0 20,523 14.78 * 0 0.00 * 0 0 0.00 * 0 0 0.00 * 0 0 0.00 * -5,487 0 -5,487 -3.95 * 0 0 0 -0.00 * * 122,043 -3,738 0 138,827 100.00 * COOLING COIL SELECTION Capacity Sens Cap. Coil Airfl Entering DB /WB /HR (Mbh) (Mbh) (cfm) Deg F Deg F Grains 138.8 111.1 5,090 80.3 64.6 67.2 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 138.8 Capacity Coil Airfl Ent (Mbh) (cfm) Deg F -54.8 1,970 74.7 0.0 0 0.0 -41.2 1,042 20.0 -0.0 0 0.0 0.0 0 0.0 0.0 0 0.0 -96.0 Lvg Type Deg F Vent 100.0 Infil 0.0 Supply 56.0 Mincfm 0.0 Return 0.0 Exhaust 0.0 Rm Exh Auxil AIRFLOWS (cfm) Cooling Heating 1,042 0 216 216 5,069 1,970 0 0 5,090 0 1,042 0 0 0 0 0 CLG SPACE PEAK Mo /Hr: 7/13 OADB: 81 Space Sensible (Btuh) 26,186 398 4,163 31,196 960 7,062 398 0 1,409 71,772 12,434 11.75 * 0 0 0.1 13,290 12.56 * 0 0 0.1 8,046 7.60 * 0 0 0.1 33,769 31.91 * 0 0 0.1 296 0.28 * -1,453 0 0.1 0 0.00 * 0 0 0.1 0.00 * 0 0.1 0.00 * 0 0.1 0.00 * 0 0.1 0 0.00 * 0 0 0.1 0.00 * 0 0.1 0.00 * 0 0.1 * 105,838 100.00 * - 54,127 - 55,839 100.1 Leaving DB /WB /HR Deg F Deg F Grains 56.0 55.3 65.2 0.0 0.0 0.0 0.0 0.0 0.0 Percnt * Space Peak Coil Peak Of Tot * Space Sens Tot Sens ( %) * (Btuh) (Btuh) 24.74 * 0 0 0.38 * -6,611 -8,163 3.93 * -5,598 -7,211 29.48 * 0 0 0.91 * - 15,983 - 15,983 6.67 * - 10,962 - 10,962 0.38 * -480 -480 0.00 * 0 0 1.33 * - 13,041 - 13,041 67.81 * - 52,674 - 55,839 * - -ENGINEERING CHECKS- - Clg % OA 20.6 Clg Cfm/Sqft 1.24 Clg Cfm/Ton 438.19 Clg Sqft/Ton 352.41 Clg Btuh /Sqft 34.05 No. People 52 Htg % OA 0.0 Htg Cfm/SgFt 0.48 Htg Btuh /SqFt -23.56 HEATING COIL PEAK Mo /Hr: 13/ 1 OADB: 20 V 600 PAGE Perci Of T 0.1 14.E 12. 0.1 28.1 19.E 0.1 0.1 23.: 100.1 AREAS Gross Total Glass (sf) (X Floor 4,077 Part 150 Exflr Roof Wall 0 4,573 2,877 Type Clg SADB 56.0 Plenum 79.8 Return 79.8 Ret /OA 80.3 Runarnd 79.8 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 466 884 - -TEMPERATURES (F)- Ht! 100 68 75 20 74 0 0 0 Trane Air Conditioning Economics By: ABACUS CONSULTANTS ' * * * * * * * * * * * * * * * * * * ** COOLING COIL PEAK * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** CLG SPACE PEAK * * * * * * * * * * ** HEATING COIL PEAK * * * * * * ** Space Sens. +Let. Envelope Loads (Btuh) Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Totel==> Ceiling Load Outside Air Sup. Fan Heat f Fan Heat D4.. ‘ Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total==> Main Clg Aux Clg Opt Vent Totals Main Htg Aux Htg Preheat Reheat Humidif Opt Vent T( (Tons) (Mbh) Ret. Air Ret. Air Sensible Latent (Btuh) (Btuh) COOLING COIL SELECTION HEATING COIL SELECTION Capacity Coil Airfl Ent Lvg (Mbh) (cfm) Deg F Deg F Type Vent Infil Supply Mincfm Return Exhaust Rm Exh Auxil Net Total (Btuh) * Percnt * Of Tot ( %) * * * * * * * * * * * * * * * * * * * * * * Space Sensible (Btuh) * Percnt * Of Tot * ( %) * * * * * * * * * * * * * * * * e * * * * * Total Capacity Sens Cap. Coil Airfl Entering DB /WB /HR Leaving DB /WB /HR (Mbh) (cfm) Deg F Deg F Grains Deg F Deg F Grains AIRFLOWS (cfm) Space Peak Space Sens (Btuh) Gross Total Floor Part ExFlr Roof Wall -- ENGINEERING CHECKS- - Cooling Heating Clg % OA Clg Cfm/Sgft Clg Cfm/Ton Clg Sqft/Ton Clg Btuh /Sqft No. People Htg X OA Htg Cfm/SgFt Htg Btuh /SqFt Coil Peak .Tot Sens (Btuh) V 600 PAGE 7 Percnt Of Tot ( %) AREAS Glass (af) (X) --TEMPERATURES (F) --- Type Clg Htg SADB Plenum Return Ret /OA Runarnd Fn HtrTD Fn BIdTD Fn Frict Trane Air Conditioning Economics By: ABACUS CONSULTANTS System 3 f Peaked at Time =_> Outside Air =_> Envelope Loads Skylite Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Totat==> Ceiling Load Outside Air Sup. Fan Heat I Fan Heat Du..t Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total = => Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Tr Peak SZ Space Ret. Air Sens.+Lat. Sensible (Btuh) (Btuh) 0 0 0 0 18,270 0 9,516 0 1,124 0 32,833 0 0 0 7,512 69,256 0 46,275 1,821 148,500 1,524 0 196,299 1,821 0 0 0 0 3,219 COOLING COIL PEAK Mo /Hr: 7/14 OADB /WB /HR: 82/ 68/ 80.5 0 0 0 0 268,774 1,821 Total Capacity Sens Cap. (Tons) (Mbh) (Mbh) Main Clg 27.3 328.1 227.7 Aux Clg 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 Totals 27.3 328.1 HEATING COIL SELECTION Capacity Coil Airfl Ent (Mbh) (cfm) Deg F -509.9 8,661 46.4 0.0 0 0.0 -81.6 8,661 46.4 0.0 0 0.0 0.0 0 0.0 0.0 0 0.0 -509.9 - SINGLE ZONE Ret. Air Latent (Btuh) 0 328,120 COOLING COIL SELECTION 48,096 14.66 * 148,500 45.26 * 0 1,524 0.46 * 0 198,120 60.38 * 0 0.00 * 0 57,525 17.53 * 0 0.00 * 0 0.00 * 0 0.00 3,219 0.98 * 0 0 0.00 * 0 0 0.00 * * Coil Airfl Entering DB /WB /HR (cfm) Deg F Deg F Grains 8,661 79.1 66.2 77.3 0 0.0 0.0 0.0 0 0.0 0.0 0.0 Lvg Type Deg F Vent 100.0 Infil 0.0 Supply 55.0 Mincfm 0.0 Return 0.0 Exhaust 0.0 Rm Exh Auxil * Net Percnt Total Of Tot * (Btuh) ( %) * 0 0.00 * 0 0.00 * 18,270 5.57 * 9,516 2.90 * 1,124 0.34 32,833 10.01 0 0.00 * 0 0.00 * 7,512 2.29 * 69,256 21.11 * 100.00 * * AIRFLOWS (cfm) Cooling Heating 4,500 4,500 667 667 8,661 8,661 0 0 8,661 8,661 4,500 4,500 0 0 0 0 CLG SPACE PEAK Mo /Hr: 7/16 OADB: 82 --ENGINEERING CHECKS- - Clg X OA 52.0 Clg Cfm/Sqft 0.73 Clg Cfm/Ton 316.73 Clg Sqft/Ton 435.39 Clg Btuh /Sqft 27.56 No. People 225 Htg % OA 52.0 Htg Cfm/SqFt 0.73 Htg Btuh /SqFt -42.83 HEATING COIL PEAK Mo /Hr: 13/ 1 OADB: 20 V 600 PAGE 8 Space Percnt * Space Peak Coil Peak Percn Sensible Of Tot * Space Sens Tot Sens Of To (Btuh) (X) * (Btuh) (Btuh) (X 0 0.00 * 0 0 0.0 0 0.00 * 0 0 0.0 21,407 11.25 * - 23,225 -23,225 4.5 9,516 5.00 * 0 0 0.0 0.69 * - 13,235 - 13,235 2.6 1,312 30,739 16.15 * - 47,927 - 47,927 9.4 0 0.00 * 0 0 0.0 0 0.00 * 0 0 0.0 5,460 2.87 * - 40,286 - 40,286 7.9 68,434 35.96 * - 124,672 -124,672 24.4 * 46, 275 24.31. * 0 0 0.0 70,875 37.24 * 0 0 0.0 1,524 0.80 * 0 0 0.0 118,674 62.35 * 0 0 0.0 0 0.00 * 0 0 0.0 0 0.00 * 0 - 271,958 53.3 0.00 * 0 0.0 0.00 * 0 0.0 0.00 * 0 0.0 3,219 1.69 * - 113,236 - 113,236 22.2 0.00 * 0 0.0 0.00 * 0 0.0 * 190,327 100.00 * - 237,909 - 509,867 100.0 AREAS Leaving DB /WB /HR Gross Total Glass (sf) (X) Deg F Deg F Grains Floor 11,905 55.0 53.8 60.9 Part 0 0.0 0.0 0.0 ExFlr 0 0.0 0.0 0.0 Roof 12,796 0 Wall 8,888 732 -- TEMPERATURES (F)-- Type Clg Htg SADB 55.0 100. Plenum 75.0 75. Return 75.2 75. Ret /OA 79.1 46. Runarnd 75.0 75. Fn MtrTD 0.0 0. Fn B(dTD 0.0 0. Fn Frict 0.0 0. Trane Air Conditioning Economics By: ABACUS CONSULTANTS ' * * * * * * * * * * * * * * * * * * ** COOLING COIL PEAK * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** CLG SPACE PEAK * * * * * * * * * * ** HEATING COIL PEAK Space Sens. +Lat. Envelope Loads (Btuh) Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total= => Internal Loads Lights People Misc Sub Total = => Ceiling Load Outside Air Sup. Fan Heat f Fan Heat Du6c Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total= => Main Clg Aux Clg Opt Vent Totals Main Htg Aux Htg Preheat Reheat Hunidif Opt Vent Tc Total Capacity (Tons) (Mbh) Ret. Air Ret. Air Sensible Latent (Btuh) (Btuh) COOLING COIL SELECTION Net Percnt Total Of Tot (Btuh) (%) Space Sensible (Btuh) * Percnt Of Tot * (%) * Sens Cap. Coil Airfl Entering DB /WB /HR Leaving DB /WB /HR (Mbh) (cfm) Deg F Deg F Grains Deg F Deg F Grains HEATING COIL SELECTION AIRFLOWS (cfm) Capacity Coil Airfl Ent Lvg Type Cooling Heating (Mbh) (cfm) Deg F Deg F Vent Infil Supply Mincfm Return Exhaust Rm Exh Auxil Space Peak Space Sens (Btuh) Gross Total Floor Part ExFlr Roof Wall - -ENGINEERING CHECKS- - Clg % OA Clg CfnvSgft Clg Cfm/Ton Clg Sqft/Ton Clg Btuh /Sqft No. People Htg % OA Htg Cfm/SgFt Htp Btuh /SqFt Coil Peak Tot Sens (Btuh) V 600 PAGE 9 Percn Of To (X AREAS Glass (sf) (X) -- TEMPERATURES (F)-- Type Clg Htg SADB Plenum Return Ret /OA Runarnd Fn MtrTD Fn BIdTD Fn Frict Trane Air Conditioning Economics By: ABACUS CONSULTANTS System 4 ' * * * * * * * * * * * * * * * * * * ** COOLING COIL PEAK Peaked at Time =_> Mo /Hr: 7/14 Outside Air = => OADB /WB /HR: 82/ 68/ 80.5 Envelope Loads Skylite Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total ==) Ceiling Load Outside Air Sup. Fan Heat F Fan Heat 0� (teat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total = => Main Clg Aux Clg Opt Vent Totals Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Tc (Tons) 16.7 0.0 0.0 16.7 Space Ret. Air Sens. +Lat. Sensible (Btuh) (Btuh) 0 0 0 0 6,170 2,738 4,386 0 396 0 7,317 442 3,402 0 2,606 24,277 3,180 24,250 2,607 109,817 11,850 0 145,917 2,607 1,822 -1,822 0 0 Total Capacity Sens Cap. (Mbh) (Mbh) 200.2 129.0 0.0 0.0 0.0 0.0 200.2 Capacity (Mbh) -103.6 0.0 -100.6 -0.0 0.0 0.0 -204.2 Block FPVAV 0 HEATING COIL SELECTION 0 0 0 0 172,015 3,966 Coil Airfl Ent (cfm) Deg F 4,798 73.6 0 0.0 2,616 20.0 0 0.0 0 0.0 0 0.0 - FAN POWERED VAV Ret. Air Latent (Btuh) Net Total (Btuh) 0 0 8,908 4,386 396 7,759 3,402 0 2,606 27,458 26,857 109,817 0 11,850 0 148,524 0 0 24,234 0 0 0 0 0 0 0 0 COOLING COIL SELECTION Percnt Of Tot (X) 0.00 0.00 4.45 2.19 0.20 3.88 1.70 0.00 1.30 13.71 13.41 54.85 5.92 74.18 0.00 12.10 0.00 0.00 0.00 0.00 0.00 -0.00 0 200,216 100.00 Lvg Deg F Vent 93.2 Infil 0.0 Supply 55.0 Mincfm 0.0 Return 0.0 Exhaust 0.0 Rm Exh Auxil * Space * Sensible * (Btuh) * 0 * 0 * 8,663 * 7,356 281 9,941 3,780 0 1,259 31,280 24,250 41,748 11,850 77,848 4,214 * 0 Coil Airfl Entering DB /WB /HR (cfm) Deg F Deg F Grains 4,716 81.9 67.5 79.8 0 0.0 0.0 0.0 0 0.0 0.0 0.0 CLG SPACE PEAK Mo /Hr: 7/18 OADB: 79 V 600 HEATING COIL PEAK * * * * * * ** Mo /Hr: 13/ 1 OADB: 20 Percnt * Space Peak Coil Peak Percnt Of Tot * Space Sens Tot Sens Of Tot ( %) * (Btuh) (Btuh) (X) 0.00 * 0 0 0.0C 0.00 * 0 0 0.0C 7.64 * -8,325 - 12,219 12.23 6.49 * 0 0 0.0C 0.25 * -4,665 -4,665 4.67 8.77 * - 19,749 - 21,127 21.14 3.34 * -4,200 - 4,200 4.20 0.00 * 0 0 0.00 1.11 * -16,998 - 16,998 17.01 27.60 * - 53,936 - 59,209 59.25 * 21.40 * 0 0 0.00 36.83 * 0 0 0.00 10.46 * 0 0 0.00 68.68 * 0 0 0.00 3.72 * -1,544 0 0.00 0.00 * 0 0 0.00 0.00 * 0 0.00 0.00 * 0 0.00 0.00 * 0 0.00 0 0.00 * - 40,727 - 40,727 40.75 0.00 * 0 0.00 0.00 * 0 0.00 * 113,342 100.00 * - 96,208 - 99,936 100.00 AREAS PAGE 10 Leaving DB /WB /HR Gross Total Glass (sf) (X) Deg F Deg F Grains Floor 7,549 55.0 53.9 61.4 Part 2,100 0.0 0.0 0.0 ExFlr 0.0 0.0 0.0 Roof Wall AIRFLOWS (cfm) -- ENGINEERING CHECKS -- Type Cooling Heating Clg X OA 50.7 2,616 0 Clg Cfm/Sqft 0.68 281 281 Clg Cfm/Ton 309.11 5,157 4,798 Clg Sqft/Ton 452.45 0 0 Clg Btuh/Sqft 26.52 1,119 0 No. People 131 0 0 Htg X OA 0.0 4,320 0 Ntg Cfm/SqFt 0.64 0 0 Htg Btuh /SqFt -27.05 0 6,818 0 0 3,750 258 7 --TEMPERATURES (F) - -- Type Clg Htg SADB 55.0 93.2 Plenum Return Ret /OA Runarnd Fn MtrTD Fn BtdTD Fn Frict 77.7 81.2 81.9 77.7 0.0 0.0 0.0 72.9 75.0 20.0 73.6 0.0 0.0 0.0 l Trane Air Conditioning Economics By: ABACUS CONSULTANTS s * * * * * * * * * * * * * * * * * * ** COOLING COIL PEAK * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** CLG SPACE PEAK * * * * * * * * * * ** HEATING COIL PEAK * * * * * * ** Space Sens. +Let. Envelope Loads (Btuh) Skylite Coral Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Outside Air Sup. Fan Heat r Fan Heat Du..% Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total = => Main Clg Aux Clg Opt Vent Totals Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Tc Total Capacity (Tons) (Mbh) Ret. Air Ret. Air Sensible Latent (Stub) (Btuh) COOLING COIL SELECTION Net Percnt Total Of Tot (Btuh) (X) * * * * HEATING COIL SELECTION AIRFLOWS (cfm) Capacity Coil Airfl Ent Lvg Type Cooling Heating (gbh) (cfm) Deg F Deg F Vent Infil Supply Mincfm Return Exhaust Rm Exh Auxil Space Sensible (etch) * Percnt * Of Tot * (%) * Sens Cap. Coil Airfl Entering DB /WB /HR Leaving DB /WB /HR (Mbh) (cfm) Deg F Deg F Grains Deg F Deg F Grains Space Peak Space Sens (Btuh) Gross Total Floor Part ExFlr Roof Wall -- ENGINEERING CHECKS- - Clg % OA Clg Cfm/Sgft Clg Cfm/Ton Clg Sqft/Ton Clg Btuh /Sgft No. People Htg % OA Ntg Cfm/SqFt Ntg Btuh /SqFt Coil Peak Tot Sens (Btuh) V 600 PAGE 11 Percnt Of Tot (X) AREAS Glass (sf) (5) - -TEMPERATURES (F)- -- Type Clg Htg SADB Plenum Return Ret /OA Runernd Fn MtrTD Fn BIdTD Fn Frict Trane Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 12 System 5 Peak SZ Peaked at Time =_> Outside Air =_> Envelope Loads Skytite Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Outside Air Sup. Fan Heat r Fan Heat Du._. Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total = => Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Tc Space Ret. Air Sens. +Lat. Sensible (Stub) (Btuh) 0 0 0 0 0 1,239 2,610 0 138 0 497 471 0 0 265 3,510 1,710 1,305 1,596 21,675 9,009 0 31,990 1,596 552 -552 0 0 0 36,053 838 Total Capacity Sens Cap. (Tons) (Mbh) (Mbh) Main Clg 3.9 47.1 31.5 Aux Clg 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 Totals 3.9 47.1 HEATING COIL SELECTION Capacity (Mbh) -72.0 0.0 -25.0 0.0 0.0 0.0 -72.0 COOLING COIL PEAK Mo /Hr: 7/14 OADB /WB /HR: 82/ 68/ 80.5 0 0 -1,915 0 Coil Airfl Ent (cfm) Deg F 1,222 36.3 0 0.0 1,222 36.3 0 0.0 0 0.0 0 0.0 - SINGLE ZONE Ret. Air Latent (Btuh) 0 47,052 COOLING COIL SELECTION * * * Net Percnt * Total Of Tot * (etch) (%) 0 0.00 * 0 0.00 * 1,239 2.63 * 2,610 5.55 138 0.29 968 2.06 0 0.00 0 0.00 265 0.56 * 5,220 11.10 * * 2,901 6.17 * 21,675 46.07 * 0 9,009 19.15 0 33,586 71.38 * 0 0.00 * 0 10,161 21.60 * 0 0.00 0 0.00 0 0.00 * 0 0.00 * 0 -1,915 -4.07 * 0 0 0.00 * * * 100.00 Coil Airfl Entering DB /WB /HR (cfm) Deg F Deg F Grains 1,222 80.8 67.0 78.8 0 0.0 0.0 0.0 0 0.0 0.0 0.0 Lvg Type Deg F Vent 90.0 lnfil 0.0 Supply 55.0 Mincfm 0.0 Return 0.0 Exhaust 0.0 Rm Exh Auxil AIRFLOWS Cooling 850 22 1,222 0 1,222 850 0 0 (cfm) Heating 850 22 1,222 0 1,222 850 0 0 CLG SPACE PEAK Mo /Hr: 9/16 OADB: 78 HEATING COIL PEAK Mo /Hr: 13/ 1 OADB: 20 Space Percnt * Space Peak Coil Peak Percnt Sensible Of Tot * Space Sens Tot Sens Of Tot (Btuh) (%) * (Btuh) (Btuh) (%) 0 0.00 * 0 0 0.00 0 0.00 * 0 0 0.00 0 0.00 * 0 -1,556 2.16 5,850 21.78 * 0 0 0.00 32 0.12 * -1,627 -1,627 2.26 606 2.26 * -568 -1,118 1.55 0 0.00 * 0 0 0.00 0 0.00 * 0 0 0.00 68 0.25 * -1,340 -1,340 1.86 6,555 24.41 * -3,536 -5,641 7.83 * 1,305 4.86 * 0 0 0.00 10,837 40.35 * 0 0 0.00 7,581 28.23 * 0 0 0.00 19,724 73.45 * 0 0 0.00 576 2.14 * -352 0 0.00 0 0.00 * 0 - 51,370 71.30 0.00 * 0 0.00 0.00 * 0 0.00 0.00 * 0 0.00 0 0.00 * - 16,254 - 16,254 22.56 0.00 * 1,220 -1.69 0.00 * 0 0.00 * 26,856 100.00 * - 20,142 - 72,045 100.00 Leaving DB /WB /HR Gross Total Deg F Deg F Grains Floor 850 55.0 54.2 62.5 Part 0 0.0 0.0 0.0 ExFlr 0 0.0 0.0 0.0 Roof 878 Wall 296 --ENGINEERING CHECKS- - Clg % OA 69.6 Clg Cfm/Sqft 1.44 Clg Cfm/Ton 311.66 Clg Sqft/Ton 216.78 Clg Btuh /Sqft 55.36 No. People 43 Htg % OA 69.6 Htg Cfm/SqFt 1.44 Htg Btuh /SqFt -84.76 AREAS Glass (sf) ( %) 0 0 90 30 --TEMPERATURES (F) --- Type Clg Htg SADB 55.0 90.0 Plenum 77.1 73.7 Return 77.1 73.7 Ret /OA 80.8 36.3 Runarnd 75.0 75.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 4 Trane Air Conditioning Economics By: ABACUS CONSULTANTS Space Sens. +Lat. Envelope Loads (Btuh) Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Outside Air Sup. Fan Heat F Fan Heat Du., Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total = => Main Clg Aux Clg Opt Vent Totals Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Tc * * * * * * * * * * * * * * * * * * * ** COOLING COIL PEAK * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** CLG SPACE PEAK Ret. Air Ret. Air Sensible Latent (Stuh) (Btuh) HEATING COIL SELECTION Capacity Coil Airfl Ent Lvg (Mbh) (cfm) Deg F Deg F COOLING COIL SELECTION Net Percnt Total Of Tot (Btuh) (X) * * * * AIRFLOWS (cfm) Type Cooling Heating Vent Infil Supply Mincfm Return Exhaust Rm Exh Auxil Space Sensible (Btuh) * Percnt * Of Tot * (%) Total Capacity Sens Cap. Coil Airfl Entering DB /WB /HR Leaving DB /WB /HR (Tons) (Mbh) (Mbh) (cfm) Deg F Deg F Grains Deg F Deg F Grains Space Peak Space Sens (Btuh) Gross Total Floor Part ExFIr Roof Wall -- ENGINEERING CHECKS- - Clg % OA Gig Cfm/Sgft Clg Cfm/Ton Clg Sqft/Ton Clg Btuh /Sqft No. People Htg X OA Htg CfaVSgFt Htg Btuh /SqFt HEATING COIL PEAK Coil Peak Tot Sena (Btuh) V600 PAGE 13 Percnt Of Tot (X) AREAS Glass (sf) (X) -- TEMPERATURES (F)--- Type . Clg Htg SADB Plenum Return Ret /OA Runarnd Fn MtrTD Fn BIdTD Fn Frict : L L t �Niro�„ xyww�va.,. sf. arinwnrit. e� o40,1w,na w r: mam. alv... n....,..,,. w,,,.....,._......._ ._�w_...._.. «..,...�u...ww.wwr! i Trane Air Conditioning Economics By: ABACUS CONSULTANTS System 6 Block UH Peaked at Time = => Outside Air = => Envelope Loads Skylite Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Outside Air Sup. Fan Heat Fan Heat D.... Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total = => Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Tr Space Sens. +Let. (Btuh) 0 0 0 0 0 0 0 0 0 0 Mo /Hr: 0/ 0 OADB /WB /HR: 0/ 0/ 0.0 0 0 0 0 0 0 0 0 HEATING COIL SELECTION COOLING COIL PEAK Ret. Air Sensible (Btuh) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Capacity Sens Cap. Coil Airfl Entering DB /WB /HR (Tons) (Mbh) (Mbh) (cfm) Deg F Deg F Grains Main Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Totals 0.0 0.0 Capacity Coil Airfl Ent (Mbh) (cfm) Deg F -6.7 135 55.0 0.0 0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 0 0.0 -6.7 - UNIT HEATERS Ret. Air Latent (Btuh) 0 0 0 0 0 0 COOLING COIL SELECTION Lvg Type Deg F Vent 100.0 Infil 0.0 Supply 0.0 Mincfm 0.0 Return 0.0 Exhaust 0.0 Rm Exh Auxil Net Total (Btuh) 0 0 0 0 0 0 0 0 0 0 Percnt Of Tot ( %) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 * 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 AIRFLOWS (cfm) Cooling 0 0 0 0 0 0 0 0 * * * * Space * Sensible * (Btuh) 0 0 0 0 0 0 0 0 0 0 Heating 0 31 135 0 135 0 0 0 CLG SPACE PEAK Mo /Hr: 0/ 0 OADB: 0 HEATING COIL PEAK Mo /Hr: 13/ 1 OADB: 20 V 600 PAGE 14 Percnt * Space Peak Coil Peak Percnt Of Tot * Space Sens Tot Sens Of Tot (%) * (etch) (Stuh) (%) 0.00 * 0 0 0.00 0.00 * 0 0 0.00 0.00 * -2,944 -2,944 44.26 0.00 * 0 0 0.00 0.00 * -1,498 -1,498 22.51 0.00 * -1,006 -1,006 15.12 0.00 * 0 0 0.00 0.00 * 0 0 0.00 0.00 * -1,204 -1,204 18.10 0.00 * -6,652 -6,652 100.00 * 0 0.00 * 0 0 0.00 0 0.00 * 0 0 0.00 0 0.00 * 0 0 0.00 0 0.00 * 0 0 0.00 0 0.00 * 0 0 0.00 0 0.00 * 0 0 0.00 0.00 * 0 0.00 0.00 * 0 0.00 0.00 * 0 0.00 0 0.00 * 0 0 0.00 0.00 * 0 0.00 0.00 * 0 0.00 * 0 0.00 * -6,652 -6,652 100.00 Leaving DB /WB /HR Deg F Deg F Grains 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -- ENGINEERING CHECKS- - Clg % OA 0.0 Clg Cfm/Sqft 0.00 Clg Cfm/Ton 0.00 Clg Sqft/Ton 0.00 Clg Btuh /Sqft 0.00 No. People 0 Htg % OA 0.0 Htg Cfm/SqFt 0.05 Htg Btuh /SqFt -2.64 AREAS Gross Total Glass (sf) (%) Floor 2,523 Part 0 ExFlr 0 Roof 2,549 0 0 Wall 417 130 31 -- TEMPERATURES (F)- -- Type Clg Htg SADB 0.0 100.0 Plenum 0.0 55.0 Return 0.0 55.0 Ret /OA 0.0 55.0 Runarnd 0.0 55.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Trane Air Conditioning Economics By: ABACUS CONSULTANTS h * * * * * * * * * * * * * * * * * * ** COOLING COIL PEAK Space Sens. +Lat. Envelope Loads (Btuh) Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Outside Air Sup. Fan Heat r Fan Heat L - Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total = => Main Clg Aux Clg Opt Vent Totals Ret. Air Ret. Air Sensible Latent (Btuh) (Btuh) COOLING COIL SELECTION Net Percnt Total Of Tot (Btuh) ( %) CLG SPACE PEAK Space Sensible (Btuh) * Percnt * Of Tot * (%) * Total Capacity Sens Cap. Coil Airfl Entering DB /WB /HR Leaving DB /WB /HR (Tons) (Mbh) (Mbh) (cfm) Deg F Deg F Grains Deg F Deg F Grains Space Peak Space Sens (Btuh) Gross Total Floor Part ExFlr Roof Wall HEATING COIL SELECTION AIRFLOWS (cfm) -- ENGINEERING CHECKS- - Capacity Coil Airfl Ent Lvg Type Cooling Heating Clg % OA (Mbh) (cfm) Deg F Deg F Vent Clg Cfm/Sqft Main Htg Infil Clg Cfm/Ton Aux Htg Supply Clg Sqft/Ton Preheat Mincfm Clg Btuh /Sqft Reheat Return No. People Humidif Exhaust Htg % OA Opt Vent Rm Exh Htg Cfm/SqFt Tr Auxit Htg Btuh /SqFt HEATING COIL PEAK Coil Peak Tot Sens (Btuh) V 600 PAGE 15 Percnt Of Tot (X) AREAS Glass (sf) (%) -- TEMPERATURES (F)- -- Type Clg Htg SADB Plenum Return Ret /OA Runarnd Fn MtrTD Fn BIdTD Fn Frict MAIN SYSTEM COOLING - ALTERNATIVE 1 1 W Trane Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 16 PEAK COOLING LOADS (Main System) Space Coil Peak OA Rm Supp. Space Space Space Peak OA Rm Supp. Coil Coil Coil Time Cond. Dry Dry Air Sens. Let. Time Cond. Dry Dry Air Sens. Let. Room Mo /Hr DB /WB Blb Bulb Flow Load Load Mo /Hr DB /WB Blb Bulb Flow Load Load Number Description (F) (F) (F) (Cfm) (Btuh) (Btuh) (F) (F) (F) (Cfm) (Btuh) (Btuh) 1 HUMAN SERVICES 7/18 79 64 75 55.0 398 8,745 845 7/16 82 66 75 55.0 363 8,642 894 2 CONFERENCE 7/17 81 64 75 55.0 100 2,198 1,275 7/14 82 68 75 55.0 92 2,773 1,642 3 SENIOR ADULT 7/18 79 64 75 55.0 451 9,917 1,127 7/16 82 66 75 55.0 402 9,654 1,130 Zone 1 Total /Ave. 79 64 75 55.0 949 20,860 3,247 82 68 75 55.0 858 21,068 3,666 Zone 1 Block 7/18 79 64 75 55.0 949 20,857 3,247 7/14 82 68 75 55.0 752 18,823 4,877 4 FIRESIDE 7/18 79 64 75 55.0 776 17,046 6,190 7/14 82 68 75 55.0 612 17,546 8,480 Zone 2 Total /Ave. 79 64 75 55.0 776 17,046 6,190 82 68 75 55.0 612 17,546 8,480 Zone 2 Block 7/18 79 64 75 55.0 776 17,046 6,190 7/14 82 68 75 55.0 612 17,546 8,480 5 MULTI _P 7/18 79 64 75 55.0 1,830 40,222 17,935 7/14 82 68 75 55.0 1,477 44,226 24,359 6 DINING 9/16 78 63 75 55.0 1,555 34,178 18,103 7/14 82 68 75 55.0 1,372 41,354 23,983 Zone 3 Total /Ave. 79 65 75 55.0 3,385 74,399 36,038 82 68 75 55.0 2,848 85,580 48,341 Zone 3 Block 8/17 79 65 75 55.0 3,304 72,604 36,570 7/14 82 68 75 55.0 2,848 85,881 48,488 7 MISC_STOR 7/17 81 64 75 55.0 176 3,876 0 7/17 81 64 75 55.0 176 3,876 0 Zone 4 Total /Ave. 81 64 75 55.0 176 3,876 0 81 64 75 55.0 176 3,876 0 Zone 4 Block 7/17 81 64 75 55.0 176 3,876 0 7/17 81 64 75 55.0 176 3,876 0 8 BANG 9/16 78 63 75 55.0 5,317 116,855 52,815 7/14 82 68 75 55.0 4,314 129,139 70,737 i. . 5 Total /Ave. 78 63 75 55.0 5,317 116,855 52,815 82 68 75 55.0 4,314 129,139 70,737 Zone 5 Block 9/16 78 63 75 55.0 5,317 116,855 52,815 7/14 82 68 75 55.0 4,314 129,139 70,737 9 CLASS TRAIN 9/16 78 63 75 55.0 1,071 23,539 12,644 7/14 82 68 75 55.0 930 28,051 16,525 Zone 6 Total /Ave. 78 63 75 55.0 1,071 23,539 12,644 82 68 75 55.0 930 28,051 16,525 Zone 6 Block 9/16 78 63 75 55.0 1,071 23,539 12,644 7/14 82 68 75 55.0 930 28,051 16,525 10 YOUTH 9/16 78 63 75 55.0 1,249 27,457 15,299 7/14 82 68 75 55.0 1,141 34,387 20,254 Zone 7 Total /Ave. 78 63 75 55.0 1,249 27,457 15,299 82 68 75 55.0 1,141 34,387 20,254 Zone 7 Block 9/16 78 63 75 55.0 1,249 27,457 15,299 7/14 82 68 75 55.0 1,141 34,387 20,254 11 GAMES 7/16 82 66 75 55.0 924 20,298 8,594 7/14 82 68 75 55.0 915 24,196 10,726 Zone 8 Total /Ave. 82 66 75 55.0 924 20,298 8,594 82 68 75 55.0 915 24,196 10,726 Zone 8 Block 7/16 82 66 75 55.0 924 20,298 8,594 7/14 82 68 75 55.0 915 24,196 10,726 12 DANCE 7/16 82 66 75 55.0 1,248 27,417 43,729 7/14 82 68 75 55.0 1,235 35,324 47,813 Zone 9 Total /Ave. 82 66 75 55.0 1,248 27,417 43,729 82 68 75 55.0 1,235 35,324 47,813 Zone 9 Block 7/16 82 66 75 55.0 1,248 27,417 43,729 7/14 82 68 75 55.0 1,235 35,324 47,813 13 POTTERY 7/16 82 66 75 55.0 991 21,771 7,614 7/14 82 68 75 55.0 978 26,408 10,167 Zone 10 Total /Ave. 82 66 75 55.0 991 21,771 7,614 82 68 75 55.0 978 26,408 10,167 Zone 10 Block 7/16 82 66 75 55.0 991 21,771 7,614 7/14 82 68 75 55.0 978 26,408 10,167 14 ARTS 7/16 82 66 75 55.0 951 20,909 7,614 7/14 82 68 75 55.0 936 25,482 10,167 Zone 11 Total /Ave. 82 66 75 55.0 951 20,909 7,614 82 68 75 55.0 936 25,482 10,167 Zone 11 Block 7/16 82 66 75 55.0 951 20,909 7,614 7/14 82 68 75 55.0 936 25,482 10,167 15 PRESCHOOL 7/16 82 66 75 55.0 1,098 24,135 11,303 7/14 82 68 75 55.0 1,083 32,638 15,775 Zone 12 Total /Ave. 82 66 75 55.0 1,098 24,135 11,303 82 68 75 55.0 1,083 32,638 15,775 Zone 12 Block 7/16 82 66 75 55.0 1,098 24,135 11,303 7/14 82 68 75 55.0 1,083 32,638 15,775 16 WAIT 7/16 82 66 75 55.0 321 7,054 1,512 7/14 82 68 75 55.0 311 7,822 2,069 7 13 Total /Ave. 82 66 75 55.0 321 7,054 1,512 82 68 75 55.0 311 7,822 2,069 2 13 Block 7/16 82 66 75 55.0 321 7,054 1,512 7/14 82 68 75 55.0 311 7,822 2,069 17 CARDS 8/11 75 64 75 55.0 660 14,515 7,630 7/14 82 68 75 55.0 639 19,029 10,087 Zone 14 Total /Ave. 75 64 75 55.0 660 14,515 7,630 82 68 75 55.0 639 19,029 10,087 MAIN SYSTEM COOLING - ALTERNATIVE 1 w Trane Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 17 P E A K C O O L I N G L O A D S (Main System) Space Coil Peak OA Rm Supp. Space Space Space Peak OA Rm Supp. Coil Coil Coil Time Cond. Dry Dry Air Sens. Lat. Time Cond. Dry Dry Air Sens. Let. Room Mo /Hr DB /WB Blb Bulb Flow Load Load Mo /Hr DB /WB Blb Bulb Flow Load Load Number Description (F) (F) (F) (Cfm) (Btuh) (Btuh) (F) (F) (F) (Cfm) (Btuh) (Btuh) Zone 14 Block 8/11 75 64 75 55.0 660 14,515 7,630 7/14 82 68 75 55.0 639 19,029 10,087 18 STOR_ELEC 7/12 79 65 75 55.0 188 4,132 -35 7/14 82 68 75 55.0 186 4,095 86 Zone 15 Total /Ave. 79 65 75 55.0 188 4,132 -35 82 68 75 55.0 186 4,095 86 Zone 15 Block 7/12 79 65 75 55.0 188 4,132 -35 7/14 82 68 75 55.0 186 4,095 86 19 EXT_RR 7/16 82 66 75 55.0 860 18,900 2,536 7/14 82 68 75 55.0 239 6,997 3,395 Zone 16 Total /Ave. 82 66 75 55.0 860 18,900 2,536 82 68 75 55.0 239 6,997 3,395 Zone 16 Block 7/16 82 66 75 55.0 860 18,900 2,536 7/14 82 68 75 55.0 239 6,997 3,395 20 INT RR 7/17 81 64 75 55.0 454 9,977 1,530 7/14 82 68 75 55.0 122 3,659 2,009 Zone 17 Total /Ave. 81 64 75 55.0 454 9,977 1,530 82 68 75 55.0 122 3,659 2,009 Zone 17 Block 7/17 81 64 75 55.0 454 9,977 1,530 7/14 82 68 75 55.0 122 3,659 2,009 22 CORR 7/17 81 64 75 55.0 163 3,587 699 7/16 82 66 75 55.0 268 8,077 633 23 CORK OPEN 8/16 81 66 75 55.0 739 16,236 261 8/15 81 67 75 55.0 731 16,198 338 Zone 18 Total /Ave. 81 66 75 55.0 902 19,823 960 81 67 75 55.0 999 24,275 971 Zone 18 Block 8/16 81 66 75 55.0 902 19,823 960 8/15 81 67 75 55.0 999 23,229 1,243 24 SNACK 7/17 81 64 75 55.0 2,094 46,019 1,866 7/16 82 66 75 55.0 2,067 47,039 2,160 15 ROT WAIT 6/18 74 60 75 55.0 1,139 25,042 1,228 7/16 82 66 75 55.0 994 22,970 1,550 . . 20 Total /Ave. 81 64 75 55.0 3,233 71,060 3,093 82 66 75 55.0 3,061 70,009 3,710 Zone 20 Block 7/17 81 64 75 55.0 3,159 69,415 3,352 7/16 82 66 75 55.0 3,061 70,009 3,710 System 1 Total /Ave. 81 64 75 55.0 24,755 544,025 222,313 82 68 75 55.0 21,585 599,580 284,979 System 1 Block 7/17 81 64 75 55.0 22,609 496,856 221,698 7/14 82 68 75 55.0 20,938 465,901 289,826 30 MAIN_RECEPT 7/13 81 66 75 56.0 3,082 64,351 5,461 7/14 82 68 75 56.0 3,003 65,644 10,358 Zone 30 Total /Ave. 81 66 75 56.0 3,082 64,351 5,461 82 68 75 56.0 3,003 65,644 10,358 Zone 30 Block 7/13 81 66 75 56.0 3,082 64,351 5,461 7/14 82 68 75 56.0 3,003 65,644 10,358 31 ADMIN_OPEN 7/16 82 66 75 56.0 637 13,297 2,657 7/14 82 68 75 56.0 602 14,193 5,047 Zone 31 Total /Ave. 82 66 75 56.0 637 13,297 2,657 82 68 75 56.0 602 14,193 5,047 Zone 31 Block 7/16 82 66 75 56.0 637 13,297 2,657 7/14 82 68 75 56.0 602 14,193 5,047 32 REC_SUP 9/14 78 65 75 56.0 216 4,511 603 8/15 81 67 75 56.0 199 4,426 1,147 Zone 32 Total /Ave. 78 65 75 56.0 216 4,511 603 81 67 75 56.0 199 4,426 1,147 Zone 32 Block 9/14 78 65 75 56.0 216 4,511 603 8/15 81 67 75 56.0 199 4,426 1,147 33 YOUTH AD 10/13 64 55 75 56.0 506 10,557 762 9/14 78 65 75 56.0 501 10,698 1,612 Zone 33 Total /Ave. 64 55 75 56.0 506 10,557 762 78 65 75 56.0 501 10,698 1,612 Zone 33 Block 10/13 64 55 75 56.0 506 10,557 762 9/14 78 65 75 56.0 501 10,698 1,612 34 TEEN 9/14 78 65 75 56.0 173 3,622 552 8/14 81 67 75 56.0 157 3,520 1,046 Zone 34 Total /Ave. 78 65 75 56.0 173 3,622 552 81 67 75 56.0 157 3,520 1,046 Zone 34 Block 9/14 78 65 75 56.0 173 3,622 552 8/14 81 67 75 56.0 157 3,520 1,046 35 STAFF 10/13 64 55 75 56.0 409 8,535 2,460 7/14 82 68 75 56.0 338 8,697 4,954 Zone 35 Total /Ave. 64 55 75 56.0 409 8,535 2,460 82 68 75 56.0 338 8,697 4,954 Zone 35 Block 10/13 64 55 75 56.0 409 8,535 2,460 7/14 82 68 75 56.0 338 8,697 4,954 36 REST_STOR 7/17 81 64 75 56.0 39 812 255 7/14 82 68 75 56.0 55 1,534 485 Zone 36 Total /Ave. 81 64 75 56.0 39 812 255 82 68 75 56.0 55 1,534 485 7 36 Block 7/17 81 64 75 56.0 39 812 255 7/14 82 68 75 56.0 55 1,534 485 7 AD_CORR 9/14 78 65 75 56.0 208 4,348 285 8/14 81 67 75 56.0 221 5,606 537 Zone 37 Total /Ave. 78 65 75 56.0 208 4,348 285 81 67 75 56.0 221 5,606 537 Zone 37 Block 9/14 78 65 75 56.0 208 4,348 285 8/14 81 67 75 56.0 221 5,606 537 Trane Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 1f MAIN SYSTEM COOLING - ALTERNATIVE 1 V PEAK COOLING LOADS (Main System) Space Coil Peak OA Rm Supp. Space Space Space Peak OA Rm Supp. Coil Coil Coil Time Cond. Dry Dry Air Sens. Lat. Time Cond. Dry Dry Air Sens. Lat. Room Mo /Hr DB /WB Blb Bulb Flow Load Load Mo /Hr DB /WB Blb Bulb Flow Load Load Number Description (F) (F) (F) (Cfm) (Btuh) (Btuh) (F) (F) (F) (Cfm) (Btuh) (Btuh) 38 INT OFFS 7/17 81 64 75 56.0 206 4,309 1,020 7/14 82 68 75 56.0 198 4,789 1,941 Zone 38 Total /Ave. 81 64 75 56.0 206 4,309 1,020 82 68 75 56.0 198 4,789 1,941 Zone 38 Block 7/17 81 64 75 56.0 206 4,309 1,020 7/14 82 68 75 56.0 198 4,789 1,941 System 2 Total /Ave. 81 66 75 56.0 5,477 114,343 14,055 82 68 75 56.0 5,274 119,109 27,129 System 2 Block 7/13 81 66 75 56.0 5,069 105,838 14,623 7/14 82 68 75 56.0 5,090 111,050 27,777 42 GYM 7/15 83 67 75 55.0 7,644 167,994 77,352 7/14 82 68 75 55.1 7,644 203,744 100,542 43 STOR 7/17 81 64 75 55.0 1,016 22,333 -1,151 7/16 82 66 75 55.2 1,016 23,946 -112 Zone 40 Total /Ave. 82 66 75 55.0 8,661 190,327 76,201 82 68 75 55.1 8,661 227,690 100,430 Zone 40 Block 7/16 82 66 75 55.1 8,661 189,046 77,240 7/14 82 68 75 55.6 8,661 222,507 101,439 System 3 Total /Ave. 82 66 75 55.0 8,661 190,327 76,201 82 68 75 55.1 8,661 227,690 100,430 System 3 Block 7/16 82 66 75 55.1 8,661 189,046 77,240 7/14 82 68 75 55.6 8,661 222,507 101,439 48 LOCK_SHOWER 7/18 79 64 75 55.0 2,880 63,292 16,789 7/14 82 68 75 55.0 1,632 48,166 18,886 49 FAMILY 7/17 81 64 75 55.0 360 7,912 1,020 7/14 82 68 75 55.0 138 3,678 1,107 Zone 48 Total /Ave. 79 64 75 55.0 3,240 71,204 17,809 82 68 75 55.0 1,770 51,844 19,993 Zone 48 Block 7/18 79 64 75 55.0 3,240 71,200 17,809 7/14 82 68 75 55.0 1,770 51,841 19,993 10 FITNESS 7/18 79 64 75 55.0 2,157 47,413 41,348 7/14 82 68 75 55.0 1,938 50,427 43,121 i... 50 Total /Ave. 79 64 75 55.0 2,157 47,413 41,348 82 68 75 55.0 1,938 50,427 43,121 Zone 50 Block 7/18 79 64 75 55.0 2,157 47,413 41,348 7/14 82 68 75 55.0 1,938 50,427 43,121 53 RAO WEST 7/18 79 64 75 55.0 411 9,029 3,063 7/14 82 68 75 55.0 356 8,478 3,636 54 RAQ_EAST 7/17 81 64 75 55.0 440 9,663 2,608 7/14 82 68 75 55.0 421 9,905 3,690 Zone 51 Total /Ave. 81 64 75 55.0 851 18,692 5,671 82 68 75 55.0 777 18,382 7,327 Zone 51 Block 7/17 81 64 75 55.0 850 18,669 5,684 7/14 82 68 75 55.0 777 18,382 7,327 55 GYM_CORR 7/ 9 70 60 75 55.0 252 5,538 521 7/14 82 68 75 55.0 234 7,593 789 Zone 52 Total /Ave. 70 60 75 55.0 252 5,538 521 82 68 75 55.0 234 7,593 789 Zone 52 Block 7/ 9 70 60 75 55.0 252 5,538 521 7/14 82 68 75 55.0 234 7,593 789 System 4 Total /Ave. 79 64 75 55.0 6,500 142,846 65,349 82 68 75 55.0 4,718 128,247 71,229 System 4 Block 7/18 79 64 75 55.0 5,157 113,342 65,334 7/14 82 68 75 55.0 4,716 128,986 71,229 60 KITCHEN 9/16 78 63 75 55.0 1,222 26,856 12,104 7/14 82 68 75 57.3 1,222 31,490 15,562 Zone 60 Total /Ave. 78 63 75 55.0 1,222 26,856 12,104 82 68 75 57.3 1,222 31,490 15,562 Zone 60 Block 9/16 78 63 75 55.0 1,222 26,856 12,104 7/14 82 68 75 57.3 1,222 31,490 15,562 System 5 Total /Ave. 78 63 75 55.0 1,222 26,856 12,104 82 68 75 57.3 1,222 31,490 15,562 System 5 Block 9/16 78 63 75 55.0 1,222 26,856 12,104 7/14 82 68 75 57.3 1,222 31,490 15,562 Irene Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 19 MAIN SYSTEM HEATING - ALTERNATIVE 1 PEAK HEATING LOADS (Main System) Space Coil Peak OA Rm Supp. Space Space Peak OA Rm Supp. Coil Coil Floor Time Cond. Dry Dry Air Sens. Time, Cond. Dry Dry Air Sens. Room Area Ho /Hr DB /WB Blb Bulb Flow Load Mo /Hr DB /WB Blb Bulb Flow Loac Number Description (Sq Ft) (F) (F) (F) (Cfm) (Btuh) (F) (F) (F) (Cfm) (Btuh) 1 HUMAN SERVICES 405 13/ 1 20 18 75 100.0 189 -5,185 13/ 1 20 18 75 100.0 189 -5,185 2 CONFERENCE 135 13/ 1 20 18 75 100.0 10 -270 13/ 1 20 18 75 100.0 10 -27C 3 SENIOR ADULT 510 13/ 1 20 18 75 100.0 163 -4,488 13/ 1 20 18 75 100.0 163 -4,488 Zone 1 Total /Ave. 1,050 20 18 75 100.0 362 -9,943 20 18 75 100.0 362 -9,943 Zone 1 Block 1,050 13/ 1 20 18 75 100.0 362 -9,943 13/ 1 20 18 75 100.0 362 -9,943 4 FIRESIDE 586 13/ 1 20 18 75 100.0 248 -6,826 13/ 1 20 18 75 100.0 248 -6,826 Zone 2 Total /Ave. 586 20 18 75 100.0 248 -6,826 20 18 75 100.0 248 -6,826 Zone 2 Block 586 13/ 1 20 18 75 100.0 248 -6,826 13/ 1 20 18 75 100.0 248 -6,826 5 MULTI _P 1,065 13/ 1 20 18 75 100.0 515 - 14,161 13/ 1 20 18 75 100.0 515 -14,161 6 DINING 1,143 13/ 1 20 18 75 100.0 325 -8,928 13/ 1 20 18 75 100.0 325 -8,928 Zone 3 Total /Ave. 2,208 20 18 75 100.0 840 - 23,089 20 18 75 100.0 840 - 23,089 Zone 3 Block 2,208 13/ 1 20 18 75 100.0 840 - 23,089 13/ 1 20 18 75 100.0 840 - 23,089 7 MISC_STOR 745 13/ 1 20 18 75 100.0 37 -1,024 13/ 1 20 18 75 100.0 37 -1,024 Zone 4 Total /Ave. 745 20 18 75 100.0 37 -1,024 20 18 75 100.0 37 -1,024 Zone 4 Block 745 13/ 1 20 18 75 100.0 37 -1,024 13/ 1 20 18 75 100.0 37 -1,024 8 BANG 3,092 13/ 1 20 18 75 100.0 1,091 - 29,962 13/ 1 20 18 75 100.0 1,091 -29,962 2....a 5 Total /Ave. 3,092 20 18 75 100.0 1,091 - 29,962 20 18 75 100.0 1,091 - 29,962 Zone 5 Block 3,092 13/ 1 20 18 75 100.0 1,091 - 29,962 13/ 1 20 18 75 100.0 1,091 - 29,962 9 CLASS TRAIN 756 13/ 1 20 18 75 100.0 174 -4,774 13/ 1 20 18 75 100.0 174 -4,774 Zone 6 Total /Ave. 756 20 18 75 100.0 174 -4,774 20 18 75 100.0 174 -4,774 Zone 6 Block 756 13/ 1 20 18 75 100.0 174 -4,774 13/ 1 20 18 75 100.0 174 -4,774 10 YOUTH 915 13/ 1 20 18 75 100.0 283 -7,768 13/ 1 20 18 75 100.0 283 -7,768 Zone 7 Total /Ave. 915 20 18 75 100.0 283 -7,768 20 18 75 100.0 283 -7,768 Zone 7 Block 915 13/ 1 20 18 75 100.0 283 -7,768 13/ 1 20 18 75 100.0 283 -7,768 11 GAMES 850 13/ 1 20 18 75 100.0 199 -5,475 13/ 1 20 18 75 100.0 199 -5,475 Zone 8 Total /Ave. 850 20 18 75 100.0 199 -5,475 20 18 75 100.0 199 -5,475 Zone 8 Block 850 13/ 1 20 18 75 100.0 199 -5,475 13/ 1 20 18 75 100.0 199 -5,475 12 DANCE 920 13/ 1 20 18 75 100.0 182 -5,008 13/ 1 20 18 75 100.0 182 -5,008 Zone 9 Total /Ave. 920 20 18 75 100.0 182 -5,008 20 18 75 100.0 182 -5,008 Zone 9 Block 920 13/ 1 20 18 75 100.0 182 -5,008 13/ 1 20 18 75 100.0 182 -5,00E 13 POTTERY 778 13/ 1 20 18 75 100.0 244 -6,700 13/ 1 20 18 75 100.0 244 -6,700 Zone 10 Total /Ave. 778 20 18 75 100.0 244 -6,700 20 18 75 100.0 244 -6,700 Zone 10 Block 778 13/ 1 20 18 75 100.0 244 -6,700 13/ 1 20 18 75 100.0 244 -6,700 14 ARTS 996 13/ 1 20 18 75 100.0 262 -7,188 13/ 1 20 18 75 100.0 262 -7,188 Zone 11 Total /Ave. 996 20 18 75 100.0 262 -7,188 20 18 75 100.0 262 -7,188 Zone 11 Block 996 13/ 1 20 18 75 100.0 262 -7,188 13/ 1 20 18 75 100.0 262 -7,188 15 PRESCHOOL 1,080 13/ 1 20 18 75 100.0 282 -7,752 13/ 1 20 18 75 100.0 282 -7,752 Zone 12 Total /Ave. 1,080 20 18 75 100.0 282 -7,752 20 18 75 100.0 282 -7,752 Zone 12 Block 1,080 13/ 1 20 18 75 100.0 282 -7,752 13/ 1 20 18 75 100.0 282 -7,752 16 WAIT 528 13/ 1 20 18 75 100.0 186 -5,104 13/ 1 20 18 75 100.0 186 -5,104 13 Total /Ave. 528 20 18 75 100.0 186 -5,104 20 18 75 100.0 186 -5,104 2. . 13 Block 528 13/ 1 20 18 75 100.0 186 -5,104 13/ 1 20 18 75 100.0 186 -5,104 17 CARDS 760 13/ 1 20 18 75 100.0 126 -3,451 13/ 1 20 18 75 100.0 126 -3,451 Zone 14 Total /Ave. 760 20 18 75 100.0 126 -3,451 20 18 75 100.0 126 -3,451 MAIN SYSTEM HEATING - ALTERNATIVE 1 '' I ��...xiw� iii .r /F,.tWN.?N.t•tfV..GV✓.+�n�xa �.nw.....- .,...,- ..-.. w.. «�+-. Trane Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 20 PEAK HEATING LOADS (Main System) Space Coil Peak OA Rm Supp. Space Space Peak OA Rm Supp. Coil Coil Floor Time Cond. Dry Dry Air Sens. Time Cond. Dry Dry Air Sens. Room Area Mo /Hr DB /WB Blb Bulb Flow Load Mo /Hr DB /WB Blb Bulb Flow Loac Number Description (Sq Ft) (F) (F) (F) (Cfm) (Btuh) (F) (F) (F) (Cfm) (Btuh) Zone 14 Block 760 13/ 1 20 18 75 100.0 126 -3,451 13/ 1 20 18 75 100.0 126 -3,451 18 STOR_ELEC 280 13/ 1 20 18 75 100.0 114 -3,141 13/ 1 20 18 75 100.0 114 -3,141 Zone 15 Total /Ave. 280 20 18 75 100.0 114 -3,141 20 18 75 100.0 114 -3,141 Zone 15 Block 280 13/ 1 20 18 75 100.0 114 -3,141 13/ 1 20 18 75 100.0 114 -3,141 19 EXT_RR 430 13/ 1 20 18 75 90.0 860 - 14,175 13/ 1 20 18 75 89.5 860 - 14,755 Zone 16 Total /Ave. 430 20 18 75 90.0 860 - 14,175 20 18 75 89.5 860 - 14,755 Zone 16 Block 430 13/ 1 20 18 75 90.0 860 - 14,175 13/ 1 20 18 75 89.5 860 - 14,755 20 INT_RR 227 13/ 1 20 18 75 90.0 454 -7,483 13/ 1 20 18 75 89.5 454 -7,585 Zone 17 Total /Ave. 227 20 18 75 90.0 454 -7,483 20 18 75 89.5 454 -7,585 Zone 17 Block 227 13/ 1 20 18 75 90.0 454 -7,483 13/ 1 20 18 75 89.5 454 -7,585 22 CORR 1,370 13/ 1 20 18 75 100.0 70 -1,925 13/ 1 20 18 75 98.6 70 -2,142 23 CORR OPEN 512 13/ 1 20 18 75 100.0 403 - 11,074 13/ 1 20 18 75 100.0 403 - 11,074 Zone 18 Total /Ave. 1,882 20 18 75 100.0 473 - 12,999 20 18 75 99.8 473 -13,216 Zone 18 Block 1,882 13/ 1 20 18 75 100.0 473 - 12,999 13/ 1 20 18 75 99.8 473 -15,073 24 SNACK 690 13/ 1 20 18 75 100.0 851 - 23,375 13/ 1 20 18 75 100.0 851 - 23,375 15 ROT_WAIT 485 13/ 1 20 18 75 100.0 483 - 13,264 13/ 1 20 18 75 100.0 483 -13,264 ki...G: 20 Total /Ave. 1,175 20 18 75 100.0 1,334 - 36,639 20 18 75 100.0 1,334 - 36,639 Zone 20 Block 1,175 13/ 1 20 18 75 100.0 1,334 - 36,639 13/ 1 20 18 75 100.0 1,334 - 36,639 System 1 Total /Ave. 19,258 20 18 75 98.3 7,751 -198,499 20 18 75 98.2 7,751 - 199,398 System 1 Block 19,258 13/ 1 20 18 75 98.3 7,751 - 198,469 13/ 1 20 18 75 98.2 7,751 -224,454 30 MAIN_RECEPT 1,193 13/ 1 20 18 75 100.0 1,299 - 35,692 13/ 1 20 18 75 100.0 1,299 - 35,692 Zone 30 Total /Ave. 1,193 20 18 75 100.0 1,299 - 35,692 20 18 75 100.0 1,299 -35,692 Zone 30 Block 1,193 13/ 1 20 18 75 100.0 1,299 - 35,692 13/ 1 20 18 75 100.0 1,299 - 35,692 31 ADMIN_OPEN 989 13/ 1 20 18 75 100.0 149 -4,105 13/ 1 20 18 75 100.0 149 -4,105 Zone 31 Total /Ave. 989 20 18 75 100.0 149 -4,105 20 18 75 100.0 149 -4,105 Zone 31 Block 989 13/ 1 20 18 75 100.0 149 -4,105 13/ 1 20 18 75 100.0 149 -4,105 32 REC SUP 160 13/ 1 20 18 75 100.0 104 -2,846 13/ 1 20 18 75 100.0 104 -2,846 Zone 32 Total /Ave. 160 20 18 75 100.0 104 -2,846 20 18 75 100.0 104 -2,846 Zone 32 Block 160 13/ 1 20 18 75 100.0 104 -2,846 13/ 1 20 18 75 100.0 104 -2,846 33 YOUTH AD 200 13/ 1 20 18 75 100.0 194 -5,330 13/ 1 20 18 75 100.0 194 -5,330 Zone 33 Total /Ave. 200 20 18 75 100.0 194 -5,330 20 18 75 100.0 194 -5,330 Zone 33 Block 200 13/ 1 20 18 75 100.0 194 -5,330 13/ 1 20 18 75 100.0 194 -5,330 34 TEEN 132 13/ 1 20 18 75 100.0 58 -1,589 13/ 1 20 18 75 100.0 58 -1,589 Zone 34 Total /Ave. 132 20 18 75 100.0 58 -1,589 20 18 75 100.0 58 -1,589 Zone 34 Block 132 13/ 1 20 18 75 100.0 58 -1,589 13/ 1 20 18 75 100.0 58 -1,589 35 STAFF 266 13/ 1 20 18 75 100.0 90 -2,460 13/ 1 20 18 75 100.0 90 -2,460 Zone 35 Total /Ave. 266 20 18 75 100.0 90 -2,460 20 18 75 100.0 90 -2,460 Zone 35 Block 266 13/ 1 20 18 75 100.0 90 -2,460 13/ 1 20 18 75 100.0 90 -2,460 36 REST_STOR 230 13/ 1 20 18 75 100.0 15 -424 13/ 1 20 18 75 92.3 15 -360 Zone 36 Total /Ave. 230 20 18 75 100.0 15 -424 20 18 75 92.3 15 -360 - 36 Block 230 13/ 1 20 18 75 100.0 15 -424 13/ 1 20 18 75 92.3 15 -360 ;7 AD CORK 5:::9 13/ 1 20 18 75 100.0 37 -1,030 13/ 1 20 18 75 110.1 37 -1,780 Zone 37 Total /Ave. 559 20 18 75 100.0 37 -1,030 20 18 75 110.1 37 -1,780 Zone 37 Block 559 13/ 1 20 18 75 100.0 37 -1,030 13/ 1 20 18 75 110.1 37 -1,780 f.k�....i �.ul ...�..,. r.w �..�. .w.�L r1:.1 -•.. a. .n ..rllt+ .5::Ji N.t_ +iF.l .� Trane Air Conditioning Economics By: ABACUS CONSULTANTS MAIN SYSTEM HEATING - ALTERNATIVE 1 .rrwwr•,,flJ ...,.......... ........... «..ro -+-r PEAK HEATING LOADS (Main System) V 600 PAGE 21 Space Coil Peak OA Rm Supp. Space Space Peak OA Rm Supp. Coil Coil Floor Time Cond. Dry Dry Air Sens. Time Cond. Dry Dry Air Sens. Room Area Mo /Hr DB /WB Blb Bulb Flow Load Mo /Hr DB /WB Blb Bulb Flow Load Number Description (Sq Ft) (F) (F) (F) (Cfm) (Btuh) (F) (F) (F) (Cfm) (Btuh) 38 INT_OFFS 348 13/ 1 20 18 75 100.0 24 -652 13/ 1 20 18 75 100.0 24 -652 Zone 38 Total /Ave. 348 20 18 75 100.0 24 -652 20 18 75 100.0 24 -652 Zone 38 Block 348 13/ 1 20 18 75 100.0 24 -652 13/ 1 20 18 75 100.0 24 -652 System 2 Total /Ave. 4,077 20 18 75 100.0 1,970 - 54,127 20 18 75 100.1 1,970 - 54,814 System 2 Block 4,077 13/ 1 20 18 75 100.0 1,970 - 54,127 13/ 1 20 18 75 100.1 1,970 - 69,449 42 GYM 10,935 13/ 1 20 18 75 100.0 7,644 - 209,993 13/ 1 20 18 75 100.0 7,644 - 481,951 43 STOR 970 13/ 1 20 18 75 100.0 1,016 - 27,916 13/ 1 20 18 75 100.0 1,016 - 27,916 Zone 40 Total /Ave. 11,905 20 18 75 100.0 8,661 - 237,909 20 18 75 100.0 8,661 - 509,867 Zone 40 Block 11,905 13/ 1 20 18 75 100.0 8,661 - 237,909 13/ 1 20 18 75 100.0 8,661 -509,867 System 3 Total /Ave. 11,905 20 18 75 100.0 8,661 - 237,909 20 18 75 100.0 8,661 - 509,867 System 3 Block 11,905 13/ 1 20 18 75 100.0 8,661 - 237,909 13/ 1 20 18 75 100.0 8,661 -509,867 48 LOCK SHOWER 1,920 13/ 1 20 18 75 90.0 2,880 - 47,469 13/ 1 20 18 75 90.0 2,880 - 54,610 49 FAMILY 240 13/ 1 20 18 75 90.0 360 -5,934 13/ 1 20 18 75 89.7 360 -6,204 Zone 48 Total /Ave. 2,160 20 18 75 90.0 3,240 - 53,403 20 18 75 90.0 3,240 - 60,815 Zone 48 Block 2,160 13/ 1 20 18 75 90.0 3,240 - 53,403 13/ 1 20 18 75 90.0 3,240 -60,815 I0 FITNESS 2,400 13/ 1 20 18 75 100.0 580 - 15,930 13/ 1 20 18 75 100.0 580 - 15,930 Zenie 50 Total /Ave. 2,400 20 18 75 100.0 580 - 15,930 20 18 75 100.0 580 - 15,930 Zone 50 Block 2,400 13/ 1 20 18 75 100.0 580 - 15,930 13/ 1 20 18 75 100.0 580 - 15,930 53 RAC WEST 800 13/ 1 20 18 75 100.0 272 -7,472 13/ 1 20 18 75 100.0 272 -7,472 54 RAC EAST 800 13/ 1 20 18 75 100.0 513 - 14,093 13/ 1 20 18 75 100.0 513 - 14,093 Zone 51 Total /Ave. 1,600 20 18 75 100.0 785 - 21,565 20 18 75 100.0 785 - 21,565 Zone 51 Block 1,600 13/ 1 20 18 75 100.0 785 - 21,565 13/ 1 20 18 75 100.0 785 - 21,565 55 GYM_CORR 1,389 13/ 1 20 18 75 100.0 193 -5,310 13/ 1 20 18 75 100.0 193 -5,310 Zone 52 Total /Ave. 1,389 20 18 75 100.0 193 -5,310 20 18 75 100.0 193 -5,310 Zone 52 Block 1,389 13/ 1 20 18 75 100.0 193 -5,310 13/ 1 20 18 75 100.0 193 -5,310 System 4 Total /Ave. 7,549 20 18 75 93.2 4,798 - 96,208 20 18 75 93.2 4,798 -103,620 System 4 Block 7,549 13/ 1 20 18 75 93.2 4,798 - 96,059 13/ 1 20 18 75 93.2 4,798 107,084 60 KITCHEN 850 13/ 1 20 18 75 90.0 1,222 - 20,142 13/ 1 20 18 75 90.0 1,222 -72,045 Zone 60 Total /Ave. 850 20 18 75 90.0 1,222 - 20,142 20 18 75 90.0 1,222 - 72,045 Zone 60 Block 850 13/ 1 20 18 75 90.0 1,222 - 20,142 13/ 1 20 18 75 90.0 1,222 - 72,045 System 5 Total /Ave. 850 20 18 75 90.0 1,222 - 20,142 20 18 75 90.0 1,222 - 72,045 System 5 Block 850 13/ 1 20 18 75 90.0 1,222 - 20,142 13/ 1 20 18 75 90.0 1,222 - 72,045 71 MEZZ_C 115 13/ 1 20 18 55 100.0 39 -1,936 13/ 1 20 18 55 100.0 39 -1,936 Zone 71 Total /Ave. 115 20 18 55 100.0 39 -1,936 20 18 55 100.0 39 -1,936 Zone 71 Block 115 13/ 1 20 18 55 100.0 39 -1,936 13/ 1 20 18 55 100.0 39 -1,936 72 MECH_PENT_W 1,288 13/ 1 20 18 55 100.0 68 -3,379 13/ 1 20 18 55 100.0 68 -3,375 Zone 72 Total /Ave. 1,288 20 18 55 100.0 68 -3,379 20 18 55 100.0 68 -3,375 Zone 72 Block 1,288 13/ 1 20 18 55 100.0 68 -3,379 13/ 1 20 18 55 100.0 68 -3,375 73 MECH_PENT E 1,120 13/ 1 20 18 55 100.0 27 -1,336 13/ 1 20 18 55 100.0 27 -1,336 Zone 73 Total /Ave. 1,120 20 18 55 100.0 27 -1,336 20 18 55 100.0 27 -1,336 73 Block 1,120 13/ 1 20 18 55 100.0 27 -1,336 13/ 1 20 18 55 100.0 27 -1,336 b). .em 6 Total /Ave. 2,523 20 18 55 100.0 135 -6,652 20 18 55 100.0 135 - 6,652 System 6 Block 2,523 13/ 1 20 18 55 100.0 135 -6,652 13/ 1 20 18 55 100.0 135 -6,652 COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 Room Number Description it til'�: Trane Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 22 I N T E R N A L C O O L I N G L O A D S (At time of Space Peak) 1.1 Y.n, naux R AMIC'trrosnn�AS ✓�anrr+r^i Lights Lights Misc. Misc. Misc. Room Ret. Air Lites People People Peopl Space Space Ret. Air Misc. Sensible Sensible CLF Sensible Latent CLF Sensible Latent Sensible CLF Total (Btuh) (Btuh) (Btuh) (etch) (Btuh) (Btuh) (Btuh) (Btuh) 1 HUMAN SERVICES 1,382 0 1.000 1,020 1,020 1.000 1,555 0 0 1.000 4,977 2 CONFERENCE 461 0 1.000 1,275 1,275 1.000 69 0 0 1.000 3,080 3 SENIOR ADULT 1,741 0 1.000 1,275 1,275 1.000 1,958 0 0 1.000 6,249 Zone 1 Total /Ave. 3,584 0 1.000 3,570 3,570 1.000 3,582 0 0 1.000 14,306 Zone 1 Block 3,584 0 1.000 3,570 3,570 1.000 3,582 0 0 1.000 14,306 4 FIRESIDE 2,000 0 1.000 6,375 6,375 1.000 300 0 0 1.000 15,050 Zone 2 Total /Ave. 2,000 0 1.000 6,375 6,375 1.000 300 0 0 1.000 15,050 Zone 2 Block 2,000 0 1.000 6,375 6,375 1.000 300 0 0 1.000 15,050 5 MULTI _P 3,635 0 1.000 18,360 18,360 1.000 545 0 0 1.000 40,900 6 DINING 3,901 0 1.000 18,360 18,360 1.000 585 0 0 1.000 41,206 Zone 3 Total /Ave. 7,536 0 1.000 36,720 36,720 1.000 1,130 0 0 1.000 82,106 Zone 3 Block . 7,536 0 1.000 36,720 36,720 1.000 1,130 0 0 1.000 82,106 7 MISC_STOR 2,543 0 1.000 0 0 0.000 95 0 0 1.000 2,638 Zone 4 Total /Ave. 2,543 0 1.000 0 0 0.000 95 0 0 1.000 2,638 Zone 4 Block 2,543 0 1.000 0 0 0.000 95 0 0 1.000 2,638 8 BANQ 10,553 0 1.000 53,550 53,550 1.000 1,583 0 0 1.000 119,236 k..,..e 5 Total /Ave. 10,553 0 1.000 53,550 53,550 1.000 1,583 0 0 1.000 119,236 Zone 5 Block 10,553 0 1.000 53,550 53,550 1.000 1,583 0 0 1.000 119,236 9 CLASS TRAIN 2,580 0 1.000 12,750 12,750 1.000 387 0 0 1.000 28,467 Zone 6 Total /Ave. 2,580 0 1.000 12,750 12,750 1.000 387 0 0 1.000 28,467 Zone 6 Block 2,580 0 1.000 12,750 12,750 1.000 387 0 0 1.000 28,467 10 YOUTH 3,123 0 1.000 15,555 15,555 1.000 468 0 0 1.000 34,701 Zone 7 Total /Ave. 3,123 0 1.000 15,555 15,555 1.000 468 0 0 1.000 34,701 Zone 7 Block 3,123 0 1.000 15,555 15,555 1.000 468 0 0 1.000 34,701 11 GAMES 2,901 0 1.000 7,875 8,625 1.000 6,527 0 0 1.000 25,928 Zone 8 Total /Ave. 2,901 0 1.000 7,875 8,625 1.000 6,527 0 0 1.000 25,928 Zone 8 Block 2,901 0 1.000 7,875 8,625 1.000 6,527 0 0 1.000 25,928 12 DANCE 3,140 0 1.000 20,250 43,750 1.000 471 0 0 1.000 67,611 Zone 9 Total /Ave. 3,140 0 1.000 20,250 43,750 1.000 471 0 0 1.000 67,611 Zone 9 Block 3,140 0 1.000 20,250 43,750 1.000 471 0 0 1.000 67,611 13 POTTERY 2,655 0 1.000 7,650 7,650 1.000 7,156 0 0 1.000 25,111 Zone 10 Total /Ave. 2,655 0 1.000 7,650 7,650 1.000 7,156 0 0 1.000 25,111 Zone 10 Block 2,655 0 1.000 7,650 7,650 1.000 7,156 0 0 1.000 25,111 14 ARTS 3,399 0 1.000 7,650 7,650 1.000 5,099 0 0 1.000 23,798 Zone 11 Total /Ave. 3,399 0 1.000 7,650 7,650 1.000 5,099 0 0 1.000 23,798 Zone 11 Block 3,399 0 1.000 7,650 7,650 1.000 5,099 0 0 1.000 23,798 15 PRESCHOOL 3,686 0 1.000 11,340 11,340 1.000 4,147 0 0 1.000 30,513 Zone 12 Total /Ave. 3,686 0 1.000 11,340 11,340 1.000 4,147 0 0 1.000 30,513 Zone 12 Block 3,686 0 1.000 11,340 11,340 1.000 4,147 0 0 1.000 30,513 16 WAIT 1,802 0 1.000 1,530 1,530 1.000 68 0 0 1.000 4,930 13 Total /Ave. 1,802 0 1.000 1,530 1,530 1.000 68 0 0 1.000 4,930 13 Block 1,802 0 1.000 1,530 1,530 1.000 68 0 0 1.000 4,930 17 CARDS 1,167 1,427 1.000 7,650 7,650 1.000 1,945 0 0 1.000 19,839 Zone 14 Total /Ave. 1,167 1,427 1.000 7,650 7,650 1.000 1,945 0 0 1.000 19,839 Room Number Description COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 �mrw nn!a+ cmk xt nt Trane Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 23 I N T E R N A L C O O L I N G L O A D S (At time of Space Peak) Lights Lights Misc. Misc. Misc. Room Ret. Air Lites People People Peopl Space Space Ret. Air Misc. Sensible Sensible CLF Sensible Latent CLF Sensible Latent Sensible CLF Total (Btuh) (Btuh) (Btuh) (Btuh) (Btuh) (Ruh) (Btuh) (Btuh) Zone 14 Block 1,167 1,427 1.000 7,650 7,650 1.000 1,945 0 0 1.000 19,835 18 STOR_ELEC 956 0 1.000 0 0 0.000 2,150 0 0 1.000 3,106 Zone 15 Total /Ave. 956 0 1.000 0 0 0.000 2,150 0 0 1.000 3,106 Zone 15 Block 956 0 1.000 0 0 0.000 2,150 0 0 1.000 3,106 19 EXT_RR 660 807 1.000 2,550 2,550 1.000 220 0 0 1.000 6,78E Zone 16 Total /Ave. 660 807 1.000 2,550 2,550 1.000 220 0 0 1.000 6,78E Zone 16 Block 660 807 1.000 2,550 2,550 1.000 220 0 0 1.000 6,78E 20 INT_RR 349 426 1.000 1,530 1,530 1.000 116 0 0 1.000 3,951 Zone 17 Total /Ave. 349 426 1.000 1,530 1,530 1.000 116 0 0 1.000 3,951 Zone 17 Block 349 426 1.000 1,530 1,530 1.000 116 0 0 1.000 3,951 22 CORR 2,104 2,572 1.000 699 699 1.000 175 0 0 1.000 6,249 23 CORR OPEN 1,747 0 1.000 261 261 1.000 66 0 0 1.000 2,335 Zone 18 Total /Ave. 3,852 2,572 1.000 960 960 1.000 241 0 0 1.000 8,584 Zone 18 Block 3,852 2,572 1.000 960 960 1.000 241 0 0 1.000 8,584 24 SNACK 2,355 0 1.000 2,514 2,514 1.000 88 0 0 1.000 7,470 15 ROT_WAIT 1,655 0 1.000 1,767 1,767 1.000 62 0 0 1.000 5,251 Zwe 20 Total /Ave. 4,010 0 1.000 4,280 4,280 1.000 150 0 0 1.000 12,721 Zone 20 Block 4,010 0 1.000 4,280 4,280 1.000 150 0 0 1.000 12,721 System 1 Total /Ave. 60,496 5,232 1.000 201,785 226,035 1.000 35,838 0 0 1.000 529,385 System 1 Block 60,496 5,232 1.000 201,785 226,035 1.000 35,838 0 0 1.000 529,385 30 MAIN_RECEPT 4,072 0 1.000 4,590 4,590 1.000 153 0 0 1.000 13,404 Zone 30 Total /Ave. 4,072 0 1.000 4,590 4,590 1.000 153 0 0 1.000 13,404 Zone 30 Block 4,072 0 1.000 4,590 4,590 1.000 153 0 0 1.000 13,404 31 ADMIN_OPEN 3,375 0 1.000 2,550 2,550 1.000 3,797 0 0 1.000 12,273 Zone 31 Total /Ave. 3,375 0 1.000 2,550 2,550 1.000 3,797 0 0 1.000 12,273 Zone 31 Block 3,375 0 1.000 2,550 2,550 1.000 3,797 0 0 1.000 12,273 32 REC_SUP 546 0 1.000 510 510 1.000 614 0 0 1.000 2,180 Zone 32 Total /Ave. 546 0 1.000 510 510 1.000 614 0 0 1.000 2,180 Zone 32 Block 546 0 1.000 510 510 1.000 614 0 0 1.000 2,180 33 YOUTH_AD 683 0 1.000 1,020 1,020 1.000 768 0 0 1.000 3,491 Zone 33 Total /Ave. 683 0 1.000 1,020 1,020 1.000 768 0 0 1.000 3,491 Zone 33 Block 683 0 1.000 1,020 1,020 1.000 768 0 0 1.000 3,491 34 TEEN 451 0 1.000 510 510 1.000 507 0 0 1.000 1,977 Zone 34 Total /Ave. 451 0 1.000 510 510 1.000 507 0 0 1.000 1,977 Zone 34 Block 451 0 1.000 510 510 1.000 507 0 0 1.000 1,977 35 STAFF 908 0 1.000 2,550 2,550 1.000 681 0 0 1.000 6,689 Zone 35 Total /Ave. 908 0 1.000 2,550 2,550 1.000 681 0 0 1.000 6,689 Zone 35 Block 908 0 1.000 2,550 2,550 1.000 681 0 0 1.000 6,689 36 REST STOR 353 432 1.000 255 255 1.000 118 0 0 1.000 1,413 Zone 36 Total /Ave. 353 432 1.000 255 255 1.000 118 0 0 1.000 1,413 36 Block 353 432 1.000 255 255 1.000 118 0 0 1.000 1,413 37 AD_CORR 859 1,049 1.000 285 285 1.000 72 0 0 1.000 2,550 Zone 37 Total /Ave. 859 1,049 1.000 285 285 1.000 72 0 0 1.000 2,550 Zone 37 Block 859 1,049 1.000 285 285 1.000 72 0 0 1.000 2,550 l4:YTnllnw. �tu0..u�rx'n/.YA!!: Ct4Mt•4:! CxwrvnnNZ�nw.n+u+w.un�.wrw +w.w....r.�.r..r+..r.rw COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 I Room Number Description t. �i lMpYY.(/4ttr{lKSpJ�WilMOyu+WMwr Trane Air Conditioning Economics V 600 By ABACUS CONSULTANTS PAGE 24 INTERNAL COOLING LOADS (At time of Space Peak) Lights Lights Misc. Misc. Misc. Room Rot. Air Lites People People Peopl Space Space Ret. Air Misc. Sensible Sensible CLF Sensible Latent CLF Sensible Latent Sensible CLF Total (Btuh) (Btuh) (Btuh) (Btuh) (Btuh) (Btuh) (Btuh) (Btuh) 38 INT_OFFS 1,188 0 1.000 1,020 1,020 1.000 1,336 0 0 1.000 4,564 Zone 38 Total /Ave. 1,188 0 1.000 1,020 1,020 1.000 1,336 0 0 1.000 4,564 Zone 38 Block 1,188 0 1.000 1,020 1,020 1.000 1,336 0 0 1.000 4,564 System 2 Total /Ave. 12,434 1,481 1.000 13,290 13,290 1.000 8,046 0 0 1.000 48,541 System 2 Block 12,434 1,481 1.000 13,290 13,290 1.000 8,046 0 0 1.000 48,541 42 GYM 44,785 0 1.000 70,875 77,625 1.000 1,400 0 0 1.000 194,685 43 STOR 1,490 1,821 1.000 0 0 0.000 124 0 0 1.000 3,435 Zone 40 Total /Ave. 46,275 1,821 1.000 70,875 77,625 1.000 1,524 0 0 1.000 198,120 Zone 40 Block 46,275 1,821 1.000 70,875 77,625 1.000 1,524 0 0 1.000 198,120 System 3 Total /Ave. 46,275 1,821 1.000 70,875 77,625 1.000 1,524 0 0 1.000 198,120 System 3 Block 46,275 1,821 1.000 70,875 77,625 1.000 1,524 0 0 1.000 198,120 48 LOCK SHOWER 6,553 0 1.000 17,340 17,340 1.000 4,915 0 0 1.000 46,148 49 FAMILY 819 0 1.000 1,020 1,020 1.000 614 0 0 1.000 3,473 Zone 48 Total /Ave. 7,372 0 1.000 18,360 18,360 1.000 5,529 0 0 1.000 49,621 Zone 48 Block 7,372 0 1.000 18,360 18,360 1.000 5,529 0 0 1.000 49,621 10 FITNESS 8,191 0 1.000 19,440 42,000 1.000 6,143 0 0 1.000 75,775 1.- - 50 Total /Ave. 8,191 0 1.000 19,440 42,000 1.000 6,143 0 0 1.000 75,775 Zone 50 Block 8,191 0 1.000 19,440 42,000 1.000 6,143 0 0 1.000 75,775 53 RAC WEST 3,276 0 1.000 1,620 3,500 1.000 0 0 0 0.000 8,396 54 RAO EAST 3,276 0 1.000 1,620 3,500 1.000 0 0 0 0.000 8,396 Zone 51 Total /Ave. 6,553 0 1.000 3,240 7,000 1.000 0 0 0 0.000 16,793 Zone 51 Block 6,553 0 1.000 3,240 7,000 1.000 0 0 0 0.000 16,793 55 GYM_CORR 2,133 2,607 1.000 708 708 1.000 178 0 0 1.000 6,335 Zone 52 Total /Ave. 2,133 2,607 1.000 708 708 1.000 178 0 0 1.000 6,335 Zone 52 Block 2,133 2,607 1.000 708 708 1.000 178 0 0 1.000 6,335 System 4 Total /Ave. 24,250 2,607 1.000 41,748 68,068 1.000 11,850 0 0 1.000 148,524 System 4 Block 24,250 2,607 1.000 41,748 68,068 1.000 11,850 0 0 1.000 148,524 60 KITCHEN 1,305 1,596 1.000 10,837 10,837 1.000 7,581 1,428 0 1.000 33,586 Zone 60 Total /Ave. 1,305 1,596 1.000 10,837 10,837 1.000 7,581 1,428 0 1.000 33,586 Zone 60 Block 1,305 1,596 1.000 10,837 10,837 1.000 7,581 1,428 0 1.000 33,586 System 5 Total /Ave. 1,305 1,596 1.000 10,837 10,837 1.000 7,581 1,428 0 1.000 33,586 System 5 Block 1,305 1,596 1.000 10,837 10,837 1.000 7,581 1,428 0 1.000 33,586 Trane Air Conditioning Economics By: ABACUS CONSULTANTS COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 t• '4 K .M1]cv.'+?411:eYASe.lwn.m. V 600 PAGE 2`. B U I L D I N G E N V E L O P E C O O L I N G L O A D S (Roof - Skylight) (At time of Space Peak) Roof Roof Skylight Skylight Return Air Roof Space Roof Skylight Skylight Skylt Return Air Skylt Space Skyl Sensible R.A. Sensible Space Return Air Space Solar Conduction R.A. Conduction Spa: Room Load CLTD Load CLTD Soler Solar CLF Load CLTD Load CL1 Number Description (Btuh) (F) (Btuh) (F) (Btuh) (Btuh) (Btuh) (F) (Btuh) (I 1 HUMAN SERVICES 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0, 2 CONFERENCE 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0, 3 SENIOR ADULT 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0, Zone 1 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0, Zone 1 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0, 4 FIRESIDE 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0, Zone 2 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0, Zone 2 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0, 5 MULTI _P 0 0.0 2,255 58.9 0 0 0.000 0 0.0 0 0. 6 DINING 0 0.0 1,834 43.7 0 0 0.000 0 0.0 0 0. Zone 3 Total /Ave. 0 0.0 4,089 51.0 0 0 0.000 0 0.0 0 0, Zone 3 Block 0 0.0 4,085 50.9 0 0 0.000 0 0.0 0 0. 7 MISC_STOR 0 0.0 1,238 66.5 0 0 0.000 0 0.0 0 0, Zone 4 Total /Ave. 0 0.0 1,238 66.5 0 0 0.000 0 0.0 0 0, Zone 4 Block 0 0.0 1,238 66.5 0 0 0.000 0 0.0 0 0, 8 BANG 0 0.0 3,363 43.0 0 0 0.000 0 0.0 0 0, 2,...,2 5 Total /Ave. 0 0.0 3,363 43.0 0 0 0.000 0 0.0 0 0, Zone 5 Block 0 0.0 3,363 43.0 0 0 0.000 0 0.0 0 0. 9 CLASS TRAIN 0 0.0 1,050 46.1 0 0 0.000 0 0.0 0 0. Zone 6 Total /Ave. 0 0.0 1,050 46.1 0 0 0.000 0 0.0 0 0, Zone 6 Block 0 0.0 1,050 46.1 0 0 0.000 0 0.0 0 0. 10 YOUTH 0 0.0 1,118 46.1 0 0 0.000 0 0.0 0 0, Zone 7 Total /Ave. 0 0.0 1,118 46.1 0 0 0.000 0 0.0 0 0. Zone 7 Block 0 0.0 1,118 46.1 0 0 0.000 0 0.0 0 0. 11 GAMES 0 0.0 1,109 52.9 0 0 0.000 0 0.0 0 0. Zone 8 Total /Ave. 0 0.0 1,109 52.9 0 0 0.000 0 0.0 0 0. Zone 8 Block 0 0.0 1,109 52.9 0 0 0.000 0 0.0 0 0. 12 DANCE 0 0.0 1,409 52.9 0 0 0.000 0 0.0 0 0. Zone 9 Total /Ave. 0 0.0 1,409 52.9 0 0 0.000 0 0.0 0 0, Zone 9 Block 0 0.0 1,409 52.9 0 0 0.000 0 0.0 0 0. 13 POTTERY 0 0.0 1,236 50.9 0 0 0.000 0 0.0 0 0. Zone 10 Total /Ave. 0 0.0 1,236 50.9 0 0 0.000 0 0.0 0 0, Zone 10 Block 0 0.0 1,236 50.9 0 0 0.000 0 0.0 0 0. 14 ARTS 0 0.0 1,460 51.2 0 0 0.000 0 0.0 0 0. Zone 11 Total /Ave. 0 0.0 1,460 51.2 0 0 0.000 0 0.0 0 0. Zone 11 Block 0 0.0 1,460 51.2 0 0 0.000 0 0.0 0 0. 15 PRESCHOOL 0 0.0 1,460 51.2 0 0 0.000 0 0.0 0 0. Zone 12 Total /Ave. 0 0.0 1,460 51.2 0 0 0.000 0 0.0 0 0. Zone 12 Block 0 0.0 1,460 51.2 0 0 0.000 0 0.0 0 0, 16 WAIT 0 0.0 1,001 47.3 0 0 0.000 0 0.0 0 0. 13 Total /Ave. 0 0.0 1,001 47.3 0 0 0.000 0 0.0 0 0, 13 Block 0 0.0 1,001 47.3 0 0 0.000 0 0.0 0 0, 17 CARDS 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0, Zone 14 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0. Trane Air Conditioning Economics By: ABACUS CONSULTANTS COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 v •1 V 600 PAGE 2 BUILD I N G ENVELOPE COOLING LOADS (Roof - Skylight) (At time of Space Peak) Roof Roof Skylight Skylight Return Air Roof Space Roof Skylight Skylight Skylt Return Air Skylt Space Sky Sensible R.A. Sensible Space Return Air Space Solar Conduction R.A. Conduction Spa Room Load CLTD Load CLTD Solar Solar CLF Load CLTD Load CL • Number Description (Btuh) (F) (Btuh) (F) (Btuh) (Btuh) (Btuh) (F) (Btuh) Zone 14 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0 18 STOR_ELEC 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0 Zone 15 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0 Zone 15 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0 19 EXT_RR 756 51.5 0 52.9 0 0 0.000 0 0.0 0 0 Zone 16 Total /Ave. 756 51.5 0 52.9 0 0 0.000 0 0.0 0 0 Zone 16 Block 756 51.5 0 52.9 0 0 0.000 0 0.0 0 0 20 INT_RR 409 52.7 0 54.1 0 0 0.000 0 0.0 0 0 Zone 17 Total /Ave. 409 52.7 0 54.1 0 0 0.000 0 0.0 0 0 Zone 17 Block 409 52.7 0 54.1 0 0 0.000 0 0.0 0 0 22 CORR 2,862 58.2 0 59.6 0 0 0.000 0 0.0 0 0 23 CORR_OPEN 0 0.0 2,773 40.3 0 10,886 0.520 0 0.0 503 3 Zone 18 Total /Ave. 2,862 58.2 2,773 48.3 0 10,886 0.520 0 0.0 503 3 Zone 18 Block 2,118 43.1 2,773 44.5 0 10,886 0.520 0 2.5 503 3 24 SNACK 0 0.0 1,048 59.2 0 14,183 0.630 0 0.0 325 4 '5 ROT_WAIT 0 0.0 653 52.6 0 8,766 0.640 0 0.0 -81 -1 2...... 20 Total /Ave. 0 0.0 1,701 56.5 0 22,949 0.634 0 0.0 244 2 Zone 20 Block 0 0.0 1,695 56.3 0 22,949 0.641 0 0.0 553 4 System 1 Total /Ave. 4,026 56.2 23,005 49.8 0 33,835 0.592 0 0.0 748 3 System 1 Block 3,952 55.2 26,682 56.6 0 32,626 0.565 0 3.3 1,160 4 30 MAIN_RECEPT 0 0.0 1,379 45.1 0 23,766 0.620 0 0.0 398 3 Zone 30 Total /Ave. 0 0.0 1,379 45.1 0 23,766 0.620 0 0.0 398 3 Zone 30 Block 0 0.0 1,379 45.1 0 23,766 0.620 0 0.0 398 3 31 ADMIN OPEN 0 0.0 2,126 63.3 0 0 0.000 0 0.0 0 0 Zone 31 Total /Ave. 0 0.0 2,126 63.3 0 0 0.000 0 0.0 0 0 Zone 31 Block 0 0.0 2,126 63.3 0 0 0.000 0 0.0 0 0 32 REC_SUP 0 0.0 192 35.2 0 0 0.000 0 0.0 0 0 Zone 32 Total /Ave. 0 0.0 192 35.2 0 0 0.000 0 0.0 0 0 Zone 32 Block 0 0.0 192 35.2 0 0 0.000 0 0.0 0 0 33 YOUTH_AD 0 0.0 52 7.6 0 0 0.000 0 0.0 0 0 Zone 33 Total /Ave. 0 0.0 52 7.6 0 0 0.000 0 0.0 0 0 Zone 33 Block 0 0.0 52 7.6 0 0 0.000 0 0.0 0 0 34 TEEN 0 0.0 158 35.1 0 0 0.000 0 0.0 0 0 Zone 34 Total /Ave. 0 0.0 158 35.1 0 0 0.000 0 0.0 0 0 Zone 34 Block 0 0.0 158 35.1 0 0 0.000 0 0.0 0 0, 35 STAFF 0 0.0 67 7.4 0 0 0.000 0 0.0 0 0, Zone 35 Total /Ave. 0 0.0 67 7.4 0 0 0.000 0 0.0 0 0, Zone 35 Block 0 0.0 67 7.4 0 0 0.000 0 0.0 0 0, 36 REST_STOR 492 63.4 0 64.6 0 0 0.000 0 0.0 0 0. Zone 36 Total /Ave. 492 63.4 0 64.6 0 0 0.000 0 0.0 0 0. 7 36 Block 492 63.4 0 64.6 0 0 0.000 0 0.0 0 0. i7 AD CORR 528 20.3 0 21.5 0 2,923 0.550 -22 -0.7 0 0. Zone 37 Total /Ave. 528 20.3 0 21.5 0 2,923 0.550 -22 -0.7 0 0. Zone 37 Block 528 20.3 0 21.5 0 2,923 0.550 -22 -0.7 0 0. 'f bra' rr'- n.. wn .. ...... . .........a.....<.....�..wetuta. arx •n.ptltu'.'MnCr %1 "•u.. tl!: Cif✓ �lln: zv., �lw�v. Ir +�Nn.••.'rNJ't�Mtltlllifltf14 Trane Air Conditioning Economics By: ABACUS CONSULTANTS COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 •1 Room 3r Description 1 HUMAN SERVICES 2 CONFERENCE CNts,WF.tita. BUILDING ENVELOPE COOL I N G LOADS (Wall - Window) (At time of Space Peak) 'r1FYW� �hv. Wl q3 N . YVkYb1 /px{.,4giSY.WC.NMYn*�J/1')bLq/ V 600 PAGE 27 BUILDING ENVELOPE COOLING LOADS (Roof - Skylight) (At time of Space Peak) Roof Roof Skylight Skylight Return Air Roof Space Roof Skylight Skylight Skylt Return Air Skylt Space Skylt Sensible R.A. Sensible Space Return Air Space Solar Conduction R.A. Conduction Space Room Load CLTD Load CLTD Solar Solar CLF Load CLTD Load CLTD Number Description (Btuh) (F) (Btuh) (F) (Btuh) (Btuh) (Btuh) (F) (Btuh) (F) 38 INT_OFFS 0 0.0 765 64.6 0 0 0.000 0 0.0 0 0.0 Zone 38 Total /Ave. 0 0.0 765 64.6 0 0 0.000 0 0.0 0 0.0 Zone 38 Block 0 0.0 765 64.6 0 0 0.000 0 0.0 0 0.0 System 2 Total /Ave. 1,020 30.2 4,738 42.8 0 26,690 0.611 -22 -0.7 398 2.8 System 2 Block 1,266 37.5 4,163 38.7 0 26,186 0.599 71 2.2 398 3.4 42 GYM 0 0.0 19,433 50.1 0 0 0.000 0 0.0 0 0.0 43 STOR 0 0.0 1,974 57.4 0 0 0.000 0 0.0 0 0.0 Zone 40 Total /Ave. 0 0.0 21,407 50.7 0 0 0.000 0 0.0 0 0.0 Zone 40 Block 0 0.0 23,390 55.4 0 0 0.000 0 0.0 0 0.0 System 3 Total /Ave. 0 0.0 21,407 50.7 0 0 0.000 0 0.0 0 0.0 System 3 Block 0 0.0 23,390 55.4 0 0 0.000 0 0.0 0 0.0 48 LOCK SHOWER 3,209 49.0 0 55.2 0 0 0.000 0 0.0 0 0.0 49 FAMILY 398 48.6 0 54.8 0 0 0.000 0 0.0 0 0.0 Zone 48 Total /Ave. 3,607 49.0 0 55.2 0 0 0.000 0 0.0 0 0.0 Zone 48 Block 3,611 49.0 0 55.2 0 0 0.000 0 0.0 0 0.0 10 FITNESS 0 0.0 4,524 55.3 0 0 0.000 0 0.0 0 0.0 2./..0 50 Total /Ave. 0 0.0 4,524 55.3 0 0 0.000 0 0.0 0 0.0 Zone 50 Block 0 0.0 4,524 55.3 0 0 0.000 0 0.0 0 0.0 53 RAO WEST 0 0.0 1,579 59.8 0 0 0.000 0 0.0 0 0.0 54 RAG_EAST 0 0.0 1,610 61.0 0 0 0.000 0 0.0 0 0.0 Zone 51 Total /Ave. 0 0.0 3,189 60.4 0 0 0.000 0 0.0 0 0.0 Zone 51 Block 0 0.0 3,221 61.0 0 0 0.000 0 0.0 0 0.0 55 GYM_CORR 0 0.0 -96 -5.7 0 0 0.000 0 0.0 0 0.0 Zone 52 Total /Ave. 0 0.0 -96 -5.7 0 0 0.000 0 0.0 0 0.0 Zone 52 Block 0 0.0 -96 -5.7 0 0 0.000 0 0.0 0 0.0 System 4 Total /Ave. 3,607 49.0 7,617 51.9 0 0 0.000 0 0.0 0 0.0 System 4 Block 3,711 50.4 8,663 56.6 0 0 0.000 0 0.0 0 0.0 60 KITCHEN 1,274 44.0 0 46.1 0 0 0.000 0 0.0 0 0.0 Zone 60 Total /Ave. 1,274 44.0 0 46.1 0 0 0.000 0 0.0 0 0.0 Zone 60 Block 1,274 44.0 0 46.1 0 0 0.000 0 0.0 0 0.0 System 5 Total /Ave. 1,274 44.0 0 46.1 0 0 0.000 0 0.0 0 0.0 System 5 Block 1,2741 1 44.0 0 46.1 0 0 0.000 0 0.0 0 0.0 Wall Wall Wall Wall Glass Glass Glass Glass Glass Glass Glass Plenum Ple►m Space Space Space Return Air Solar Space Space Return Air R.A. Load CLTD Load CLTD Solar Solar CLF Conduction CLTD Conduction CLTD (Btuh) (F) (Btuh) (F) (Btuh) (Btuh) (Btuh) (F) (Btuh) (F) 0 0.0 862 32.3 3,000 0 0.450 82 3.4 0 0.0 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Trane Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 28 COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 '• Room Number Description r r..,. r. cr> avnr.. h•+ ex�:: s�..i wx. n.+ urr' Hen�v- e. u�w. �uCrM:'/ n11tD 'ft'ct�1YrP.+Jt'rkWMF.avACS.�rx a. yvr +vh.'.�- •...,.rn+..r. -..... . .._,..................no-nw..rw. wrens.. w.- rNwn'^ xwc ...e.wa.....rww.n.tiwwa�.�vr..� B U I L D I N G E N V E L O P E C O O L I N G L O A D S (Wall - Window) (At time of Space Peak) Wall Wall Wall Wall Glass ' Glass Glass Glass Glass Glass Glass Plenum Plenm Space Space Space Return Air Solar Space Space Return Air R.A. Load CLTD Load CLTD Solar Solar CLF Conduction CLTD Conduction CLTD (Btuh) (F) (Btuh) (F) (Btuh) (Btuh) (Btuh) (F) (Btuh) (F) 3 SENIOR ADULT 0 0.0 1,404 57.5 2,475 0 0.510 49 3.4 0 0.0 Zone 1 Total /Ave. 0 0.0 2,267 44.3 5,475 0 0.475 131 3.4 0 0.0 Zone 1 Block 0 0.0 2,267 44.3 5,475 0 0.475 131 3.4 0 0.0 4 FIRESIDE 0 0.0 1,019 35.3 6,030 0 0.490 146 3.4 0 0.0 Zone 2 Total /Ave. 0 0.0 1,019 35.3 6,030 0 0.490 146 3.4 0 0.0 Zone 2 Block 0 0.0 1,019 35.3 6,030 0 0.490 146 3.4 0 0.0 5 MULTI_P 0 0.0 3,065 48.9 11,792 0 0.520 292 3.4 0 0.0 6 DINING 0 0.0 1,532 40.1 7,808 0 0.600 45 1.1 0 0.0 Zone 3 Total /Ave. 0 0.0 4,597 45.6 19,600 0 0.549 337 2.7 0 0.0 Zone 3 Block 0 0.0 4,413 43.7 17,820 0 0.536 418 3.3 0 0.0 7 MISC_STOR 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 4 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 4 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 8 BANG 0 0.0 3,789 51.0 42,405 0 0.550 271 1.1 0 0.0 Zone 5 Total /Ave. 0 0.0 3,789 51.0 42,405 0 0.550 271 1.1 0 0.0 5 Block 0 0.0 3,789 51.0 42,405 0 0.550 271 1.1 0 0.0 9 CLASS TRAIN 0 0.0 643 58.5 5,760 0 0.600 32 1.1 0 0.0 Zone 6 Total /Ave. 0 0.0 643 58.5 5,760 0 0.600 32 1.1 0 0.0 Zone 6 Block 0 0.0 643 58.5 5,760 0 0.600 32 1.1 0 0.0 10 YOUTH 0 0.0 949 24.1 5,760 0 0.600 32 1.1 0 0.0 Zone 7 Total /Ave. 0 0.0 949 24.1 5,760 0 0.600 32 1.1 0 0.0 Zone 7 Block 0 0.0 949 24.1 5,760 0 0.600 32 1.1 0 0.0 11 GAMES 0 0.0 621 19.5 600 0 0.350 53 5.5 0 0.0 Zone 8 Total /Ave. 0 0.0 621 19.5 600 0 0.350 53 5.5 0 0.0 Zone 8 Block 0 0.0 621 19.5 600 0 0.350 53 5.5 0 0.0 12 DANCE 0 0.0 300 17.3 1,200 0 0.350 106 5.5 0 0.0 Zone 9 Total /Ave. 0 0.0 300 17.3 1,200 0 0.350 106 5.5 0 0.0 Zone 9 Block 0 0.0 300 17.3 1,200 0 0.350 106 5.5 0 0.0 13 POTTERY 0 0.0 697 22.3 1,800 0 0.350 158 5.5 0 0.0 Zone 10 Total /Ave. 0 0.0 697 22.3 1,800 0 0.350 158 5.5 0 0.0 Zone 10 Block 0 0.0 697 22.3 1,800 0 0.350 158 5.5 0 0.0 14 ARTS 0 0.0 697 22.3 1,800 0 0.350 158 5.5 0 0.0 Zone 11 Total /Ave. 0 0.0 697 22.3 1,800 0 0.350 158 5.5 0 0.0 Zone 11 Block 0 0.0 697 22.3 1,800 0 0.350 158 5.5 0 0.0 15 PRESCHOOL 0 0.0 852 21.1 1,840 0 0.350 162 5.5 0 0.0 Zone 12 Total /Ave. 0 0.0 852 21.1 1,840 0 0.350 162 5.5 0 0.0 Zone 12 Block 0 0.0 852 21.1 1,840 0 0.350 162 5.5 0 0.0 16 WAIT 0 0.0 262 17.0 2,057 0 0.720 213 5.5 0 0.0 Zone 13 Total /Ave. 0 0.0 262 17.0 2,057 0 0.720 213 5.5 0 0.0 Zone 13 Block 0 0.0 262 17.0 2,057 0 0.720 213 5.5 0 0.0 1 7 CARDS 0 0.0 478 52.5 2,385 0 0.480 -22 -1.5 0 0.0 L. . 14 Total /Ave. 0 0.0 478 52.5 2,385 0 0.480 -22 -1.5 0 0.0 Zone 14 Block 0 0.0 478 52.5 2,385 0 0.480 -22 -1.5 0 0.0 18 STOR_ELEC 0 0.0 772 26.8 0 0 0.000 0 0.0 0 0.0 Trane Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 29 COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 Room Number Description B U I L D I N G E N V E L O P E C O O L I N G L O A D S (Walt - Window) (At time of Space Peak) Wall Wall Wall Wall Glass Glass Glass Glass Glass Glass Glass Plenum Plerm Space Space Space Return Air Solar Space Space Return Air R.A. Load CLTD Load CLTD Solar ,Solar CLF Conduction CLTD Conduction CLTD (Btuh) (F) (Btuh) (F) (Btuh) (Btuii) (Btuh) (F) (Btuh) (F) Zone 15 Total /Ave. 0 0.0 772 26.8 0 0 0.000 0 0.0 0 0.0 Zone 15 Block 0 0.0 772 26.8 0 0 0.000 0 0.0 0 0.0 19 EXT_RR 116 15.9 116 17.3 336 0 0.350 28 5.5 0 0.0 Zone 16 Total /Ave. 116 15.9 116 17.3 336 0 0.350 28 5.5 0 0.0 Zone 16 Block 116 15.9 116 17.3 336 0 0.350 28 5.5 0 0.0 20 INT_RR 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 17 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 17 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 22 CORR 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 23 CORR OPEN 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 18 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 18 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 24 SNACK 0 0.0 3,934 43.7 20,256 0 0.480 648 4.8 0 0.0 25 ROT_WAIT 0 0.0 998 35.6 11,096 0 0.510 -159 -1.7 0 0.0 Zone 20 Total /Ave. 0 0.0 4,932 41.8 31,352 0 0.490 489 2.1 0 0.0 20 Block 0 0.0 4,859 41.2 28,432 0 0.464 1,097 4.8 0 0.0 System 1 Total /Ave. 116 15.9 22,990 36.2 128,400 0 0.515 2,294 2.5 0 0.0 System 1 Block 111 14.2 21,137 33.3 98,565 0 0.475 4,387 4.8 0 0.0 30 MAIN_RECEPT 0 0.0 4,260 34.4 23,717 0 0.440 697 3.4 0 0.0 Zone 30 Total /Ave. 0 0.0 4,260 34.4 23,717 0 0.440 697 3.4 0 0.0 Zone 30 Block 0 0.0 4,260 34.4 23,717 0 0.440 697 3.4 0 0.0 31 ADMIN_OPEN 0 0.0 1,309 58.2 0 0 0.000 0 0.0 0 0.0 Zone 31 Total /Ave. 0 0.0 1,309 58.2 0 0 0.000 0 0.0 0 0.0 Zone 31 Block 0 0.0 1,309 58.2 0 0 0.000 0 0.0 0 0.0 32 REC_SUP 0 0.0 1,028 53.3 1,566 0 0.550 4 0.5 0 0.0 Zone 32 Total /Ave. 0 0.0 1,028 53.3 1,566 0 0.550 4 0.5 0 0.0 Zone 32 Block 0 0.0 1,028 53.3 1,566 0 0.550 4 0.5 0 0.0 33 YOUTH_AD 0 0.0 626 29.8 8,190 0 0.550 -488 -12.1 0 0.0 Zone 33 Total /Ave. 0 0.0 626 29.8 8,190 0 0.550 -488 -12.1 0 0.0 Zone 33 Block 0 0.0 626 29.8 8,190 0 0.550 -488 -12.1 0 0.0 34 TEEN 0 0.0 376 51.6 1,593 0 0.550 4 0.5 0 0.0 Zone 34 Total /Ave. 0 0.0 376 51.6 1,593 0 0.550 4 0.5 0 0.0 Zone 34 Block 0 0.0 376 51.6 1,593 0 0.550 4 0.5 0 0.0 35 STAFF 0 0.0 265 49.5 4,410 0 0.560 -244 -12.1 0 0.0 Zone 35 Total /Ave. 0 0.0 265 49.5 4,410 0 0.560 -244 -12.1 0 0.0 Zone 35 Block 0 0.0 265 49.5 4,410 0 0.560 - 244 - 12.1 0 0.0 36 REST_STOR 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 36 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 36 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 37 AD_CORR 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 37 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 i,,,,- 37 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 38 INT_OFFS 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 38 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Trane Air Conditioning Economics By: ABACUS CONSULTANTS COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 Wall Wall Wall Walt Glass Glass Glass Glass Glass Glass Glass Plenum Plenm Space Space Space Return Air Solar Space Space Return Air R.A. Room Load CLTD Load CLTD Solar Solar CLF Conduction CLTD Conduction CLTD Number Description (Btuh) (F) (Btuh) (F) (Btuh) (Btuh) (Btuh) (F) (Btuh) (F) Zone 38 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 System 2 Total /Ave. 0 0.0 7,866 39.5 39,476 0 0.479 -26 -0.1 0 0.0 System 2 Block 0 0.0 7,062 35.4 31,196 0 0.453 960 3.4 0 0.0 42 GYM 0 0.0 16,524 27.0 9,516 0 0.650 1,312 5.6 0 0.0 43 STOR 0 0.0 14,215 54.8 0 0 0.000 0 0.0 0 0.0 Zone 40 Total /Ave. 0 0.0 30,739 35.3 9,516 0 0.650 1,312 5.6 0 0.0 Zone 40 Block 0 0.0 27,509 31.6 9,516 0 0.630 1,288 5.5 0 0.0 System 3 Total /Ave. 0 0.0 30,739 35.3 9,516 0 0.650 1,312 5.6 0 0.0 System 3 Block 0 0.0 27,509 31.6 9,516 0 0.630 1,288 5.5 0 0.0 48 LOCK SHOWER 660 25.2 1,353 31.4 1,701 0 0.500 69 3.4 0 0.0 49 FAMILY 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 48 Total /Ave. 660 25.2 1,353 31.4 1,701 0 0.500 69 3.4 0 0.0 Zone 48 Block 660 25.2 1,353 31.4 1,701 0 0.500 69 3.4 0 0.0 50 FITNESS 0 0.0 2,946 42.1 5,655 0 0.500 212 3.4 0 0.0 Zone 50 Total /Ave. 0 0.0 2,946 42.1 5,655 0 0.500 212 3.4 0 0.0 50 Block 0 0.0 2,946 42.1 5,655 0 0.500 212 3.4 0 0.0 53 RAQ_WEST 0 0.0 2,352 39.2 0 0 0.000 0 0.0 0 0.0 54 RAC EAST 0 0.0 2,520 20.0 0 0 0.000 0 0.0 0 0.0 Zone 51 Total /Ave. 0 0.0 4,872 26.2 0 0 0.000 0 0.0 0 0.0 Zone 51 Block 0 0.0 4,716 25.4 0 0 0.000 0 0.0 0 0.0 55 GYM_CORR 0 0.0 2,718 45.3 0 0 0.000 0 0.0 0 0.0 Zone 52 Total /Ave. 0 0.0 2,718 45.3 0 0 0.000 0 0.0 0 0.0 Zone 52 Block 0 0.0 2,718 45.3 0 0 0.000 0 0.0 0 0.0 System 4 Total /Ave. 660 25.2 11,889 33.1 7,356 0 0.500 281 3.4 0 0.0 System 4 Block 728 25.2 9,941 27.9 7,356 0 0.500 281 3.4 0 0.0 60 KITCHEN 578 56.5 606 58.6 5,850 0 0.600 32 1.1 0 0.0 Zone 60 Total /Ave. 578 56.5 606 58.6 5,850 0 0.600 32 1.1 0 0.0 Zone 60 Block 578 56.5 606 58.6 5,850 0 0.600 32 1.1 0 0.0 System 5 Total /Ave. 578 56.5 606 58.6 5 ,850 0 0.600 32 1.1 0 0.0 System 5 Block 1578 56.5 606 58.6 \5 0 0.600 32 1.1 0 0.0 Room Number Description m`...mn.wnsn W1.1:hGlf+{t34MI7nV:C0.4nit M}XAbRVN yh'!xi(KSY B U I L D I N G U I L D I N G E N V E L O P E C O O L I N G L O A D S (Wall - Window) (At time of Space Peak) B U I L D I N G E N V E L O P E C O O L I N G L O A D S (Exposed Floor - Partitions - Infiltration) (At time of Space Peak) V 600 PAGE 3 Exposed Expsd Plenm Ceiling Floor Floor Partition Part. Infilt. Infilt. Infilt. Dry B Sensible Envelope Sensible CLTD Sensible CLTD Airflow Sensible Latent Temp. Load Total ((Ruh) (F) (Btuh) (F) (Cfm) (Btuh) (Btuh) (F) (Btuh) (Btuh) 1 HUMAN SERVICES 0 0.0 729 9.0 26 115 - 175 75.0 0 4,613 2 CONFERENCE 0 0.0 246 9.1 0 0 0 75.0 0 246 3 SENIOR ADULT 0 0.0 918 9.0 22 97 - 148 75.0 0 4,796 Zone 1 Total /Ave. 0 0.0 1,893 9.0 47 212 - 323 75.0 0 9,654 Room Number Description Trane Air Conditioning Economics By: ABACUS CONSULTANTS COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 V I B U I L D I N G E N V E L O P E C O O L I N G L O A D S (Exposed Floor - Partitions - Infiltration) (At time of Space Peak) V 600 PAGE 31 Exposed Expsd Plerm Ceiling Floor Floor Partition Part. Infilt. Infilt. Infilt. Dry B Sensible Envelope Sensible CLTD Sensible CLTD Airflow Sensible Latent Temp. Load Total (Btuh) (F) (Btuh) (F) (Cfm) (Btuh) (Btuh) (F) (Btuh) (Btuh) Zone 1 Block 0 0.0 1,890 9.0 47 212 - 323 75.0 0 9,651 4 FIRESIDE 0 0.0 1,055 9.0 27 122 - 185 75.0 0 8,186 Zone 2 Total /Ave. 0 0.0 1,055 9.0 27 122 - 185 75.0 0 8,186 Zone 2 Block 0 0.0 1,055 9.0 27 122 - 185 75.0 0 8,186 5 MULTI _P 0 0.0 0 0.0 62 279 - 425 75.0 0 17,257 6 DINING 0 0.0 0 0.0 36 112 - 257 75.0 0 11,074 Zone 3 Total /Ave. 0 0.0 0 0.0 99 390 - 682 75.0 0 28,331 Zone 3 Block 0 0.0 0 0.0 99 480 - 150 75.0 0 27,068 7 MISC_STOR 0 0.0 0 0.0 0 0 0 75.0 0 1,238 Zone 4 Total /Ave. 0 0.0 0 0.0 0 0 0 75.0 0 1,238 Zone 4 Block 0 0.0 0 0.0 0 0 0 75.0 0 1,238 8 BANQ 0 0.0 1,021 7.6 104 319 - 735 75.0 0 50,434 Zone 5 Total /Ave. 0 0.0 1,021 7.6 104 319 - 735 75.0 0 50,434 Zone 5 Block 0 0.0 1,021 7.6 104 319 - 735 75.0 0 50,434 9 CLASS TRAIN 0 0.0 292 7.6 15 46 - 106 75.0 0 7,716 6 Total /Ave. 0 0.0 292 7.6 15 46 - 106 75.0 0 7,716 2..,,.. 6 Block 0 0.0 292 7.6 15 46 -106 75.0 0 7,716 10 YOUTH 0 0.0 340 7.6 36 111 - 256 75.0 0 8,054 Zone 7 Total /Ave. 0 0.0 340 7.6 36 111 - 256 75.0 0 8,054 Zone 7 Block 0 0.0 340 7.6 36 111 - 256 75.0 0 8,054 11 GAMES 0 0.0 399 8.9 26 214 -31 75.0 0 2,964 Zone 8 Total /Ave. 0 0.0 399 8.9 26 214 -31 75.0 0 2,964 Zone 8 Block 0 0.0 399 8.9 26 214 -31 75.0 0 2,964 12 DANCE 0 0.0 399 8.9 17 143 -21 75.0 0 3,535 Zone 9 Total /Ave. 0 0.0 399 8.9 17 143 -21 75.0 0 3,535 Zone 9 Block 0 0.0 399 8.9 17 143 -21 75.0 0 3,535 13 POTTERY 0 0.0 171 8.9 30 247 -36 75.0 0 4,274 Zone 10 Total /Ave. 0 0.0 171 8.9 30 247 -36 75.0 0 4,274 Zone 10 Block 0 0.0 171 8.9 30 247 -36 75.0 0 4,274 14 ARTS 0 0.0 399 8.9 30 247 -36 75.0 0 4,725 Zone 11 Total /Ave. 0 0.0 399 8.9 30 247 -36 75.0 0 4,725 Zone 11 Block 0 0.0 399 8.9 30 247 -36 75.0 0 4,725 15 PRESCHOOL 0 0.0 399 8.9 31 251 -37 75.0 0 4,926 Zone 12 Total /Ave. 0 0.0 399 8.9 31 251 -37 75.0 0 4,926 Zone 12 Block 0 0.0 399 8.9 31 251 -37 75.0 0 4,926 16 WAIT 0 0.0 0 0.0 15 123 -18 75.0 0 3,637 Zone 13 Total /Ave. 0 0.0 0 0.0 15 123 -18 75.0 0 3,637 Zone 13 Block 0 0.0 0 0.0 15 123 -18 75.0 0 3,637 17 CARDS 0 0.0 912 6.0 10 -1 -20 75.0 0 3,732 Zone 14 Total /Ave. 0 0.0 912 6.0 10 -1 -20 75.0 0 3,732 ' 14 Block 0 0.0 912 6.0 10 -1 -20 75.0 0 3,732 18 STOR_ELEC 0 0.0 166 6.6 22 88 -35 75.0 0 991 Zone 15 Total /Ave. 0 0.0 166 6.6 22 88 - 35 75.0 0 991 Zone 15 Block 0 0.0 166 6.6 22 88 -35 75.0 0 991 ��C i'fi':�•.'ci+Yri + '1. A.i.e u A COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 +• Y Room Number Description IY.Y.I.iWKF mm t•• +...new,.u.nw.......w...v++ «..- n«-.......« ww.>i rn nrwH: sewunnw0,,,wnsueaa..«•rtw..• -.. Trane Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 32 B U I L D I N G E N V E L O P E C O O L I N G L O A D S (Exposed Floor - Partitions - Infiltration) (At time of Space Peak) Exposed Expsd Plenm Ceiling Floor Floor Partition Part. Infilt. Infilt. Infilt. Dry B Sensible Envelope Sensible CLTD Sensible CLTD Airflow Sensible Latent Temp. Load Total (Btuh) (F) (Btuh) (F) (Cfm) (Btuh) (Btuh) (F) (Btuh) (8tuh) 19 EXT_RR 0 0.0 0 0.0 12 96 -14 76.4 191 1,625 Zone 16 Total /Ave. 0 0.0 0 0.0 12 96 -14 76.4 191 1,625 Zone 16 Block' 0 0.0 0 0.0 12 96 -14 76.4 191 1,625 20 1NT_RR 0 0.0 0 0.0 0 0 0 76.4 101 510 Zone 17 Total /Ave. 0 0.0 0 0.0 0 0 0 76.4 101 510 Zone 17 Block 0 0.0 0 0.0 0 0 0 76.4 101 510 22 CORR 0 0.0 0 0.0 0 0 0 76.4 609 3,471 23 CORR OPEN 0 0.0 0 0.0 0 0 0 75.0 0 14,162 Zone 18 Total /Ave. 0 0.0 0 0.0 0 0 0 76.4 609 17,633 Zone 18 Block 0 0.0 0 0.0 0 0 0 76.4 609 16,889 24 SNACK 0 0.0 0 0.0 99 668 - 648 75.0 0 40,414 25 ROT_WAIT 0 0.0 336 7.0 43 -52 - 539 75.0 0 21,018 Zone 20 Total /Ave. 0 0.0 336 7.0 142 616 - 1,187 75.0 0 61,433 Zone 20 Block 0 0.0 432 9.0 142 957 - 928 75.0 0 60,046 System 1 Total /Ave. 0 0.0 7,781 8.0 664 3,222 -3,722 76.4 901 223,596 ' :m 1 Block 0 0.0 8,808 9.1 664 4,472 -4,337 76.4 901 198,464 30 MAIN_RECEPT 0 0.0 398 8.3 141 921 871 75.0 0 56,407 Zone 30 Total /Ave. 0 0.0 398 8.3 141 921 871 75.0 0 56,407 Zone 30 Block 0 0.0 398 8.3 141 921 871 75.0 0 56,407 31 ADMIN_OPEN 0 0.0 0 0.0 17 138 107 75.0 0 3,681 Zone 31 Total /Ave. 0 0.0 0 0.0 17 138 107 75.0 0 3,681 Zone 31 Block 0 0.0 0 0.0 17 138 107 75.0 0 3,681 32 REC_SUP 0 0.0 0 0.0 16 51 93 75.0 0 2,934 Zone 32 Total /Ave. 0 0.0 0 0.0 16 51 93 75.0 0 2,934 Zone 32 Block 0 0.0 0 0.0 16 51 93 75.0 0 2,934 33 YOUTH AD 0 0.0 0 0.0 25 -294 - 258 75.0 0 7,828 Zone 33 Total /Ave. 0 0.0 0 0.0 25 -294 - 258 75.0 0 7,828 Zone 33 Block 0 0.0 0 0.0 25 -294 - 258 75.0 0 7,828 34 TEEN 0 0.0 0 0.0 7 23 42 75.0 0 2,196 Zone 34 Total /Ave. 0 0.0 0 0.0 7 23 42 75.0 0 2,196 Zone 34 Block 0 0.0 0 0.0 7 23 42 75.0 0 2,196 35 STAFF 0 0.0 0 0.0 9 -102 -90 75.0 0 4,307 Zone 35 Total /Ave. 0 0.0 0 0.0 9 -102 -90 75.0 0 4,307 Zone 35 Block 0 0.0 0 0.0 9 -102 -90 75.0 0 4,307 36 REST_STOR 0 0.0 0 0.0 0 0 0 76.2 86 578 Zone 36 Total /Ave. 0 0.0 0 0.0 0 0 0 76.2 86 578 Zone 36 Block 0 0.0 0 0.0 0 0 0 76.2 86 578 37 AD_CORR 0 0.0 0 0.0 0 0 0 76.2 210 3,639 Zone 37 Total /Ave. 0 0.0 0 0.0 0 0 0 76.2 210 3,639 Zone 37 Block 0 0.0 0 0.0 0 0 0 76.2 210 3,639 38 INT OFFS 0 0.0 0 0.0 0 0 0 75.0 0 765 38 Total /Ave. 0 0.0 0 0.0 0 0 0 75.0 0 765 Zone 38 Block 0 0.0 0 0.0 0 0 0 75.0 0 765 System 2 Total /Ave. 0 0.0 398 8.3 216 737 765 76.2 296 82,335 Uligi 'dSUiff%AMxr -- rasvormateetwr.:AV•5w Trane Air Conditioning Economics By: ABACUS CONSULTANTS COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 • W cti B U I L D I N G E N V E L O P E C O O L I N G L O A D S (Exposed Floor - Partitions - Infiltration) (At time of Space Peak) V 600 PAGE 3: Exposed Expsd Plenm Ceiling Floor Floor Partition Part. Infilt. Infilt. Infilt. Dry 8 Sensible Envelope Room Sensible CLTD Sensible CLTD Airflow Sensible Latent Temp. Load Total Number Description (Btuh) (F) (Btuh) (F) (Cfm) (Btuh) (Btuh) (F) (Btuh) (Btuh) System 2 Block 0 0.0 398 8.3 216 1,409 1,333 76.2 296 74,738 42 GYM 0 0.0 0 0.0 472 4,150 - 273 75.0 0 50,662 43 STOR 0 0.0 0 0.0 195 1,310 - 1,151 75.0 0 16,348 Zone 40 Total /Ave. 0 0.0 0 0.0 667 5,460 - 1,424 75.0 0 67,010 Zone 40 Block 0 0.0 0 0.0 667 5,449 - 385 75.0 0 66,767 System 3 Total /Ave. 0 0.0 0 0.0 667 5,460 - 1,424 75.0 0 67,010 System 3 Block 0 0.0 0 0.0 667 5,449 - 385 75.0 0 66,767 48 LOCK_SHOWER 0 0.0 3,456 9.0 57 253 -551 81.2 3,746 13,896 49 FAMILY 0 0.0 328 9.1 0 0 0 81.2 468 1,194 Zone 48 Total /Ave. 0 0.0 3,784 9.0 57 253 -551 81.2 4,214 15,090 Zone 48 Block 0 0.0 3,780 9.0 57 253 -551 81.2 4,214 15,090 50 FITNESS 0 0.0 0 0.0 67 300 - 652 75.0 0 12,985 Zone 50 Total /Ave. 0 0.0 0 0.0 67 300 - 652 75.0 0 12,985 Zone 50 Block 0 0.0 0 0.0 67 300 - 652 75.0 0 12,985 53 RAO WEST 0 0.0 0 0.0 45 201 - 437 75.0 0 3,695 54 RAO EAST 0 0.0 0 0.0 94 637 - 892 75.0 0 3,875 r.vwwe 51 Total /Ave. 0 0.0 0 0.0 140 838 - 1,329 75.0 0 7,570 Zone 51 Block 0 0.0 0 0.0 140 940 - 1,316 75.0 0 7,560 55 GYM CORK 0 0.0 0 0.0 18 -104 - 188 75.0 0 2,330 Zone 52 Total /Ave. 0 0.0 0 0.0 18 -104 - 188 75.0 0 2,330 Zone 52 Block 0 0.0 0 0.0 18 -104 - 188 75.0 0 2,330 System 4 Total /Ave. 0 0.0 3,784 9.0 281 1,287 -2,720 81.2 4,214 37,976 System 4 Block 0 0.0 3,780 9.0 281 1,259 -2,734 81.2 4,214 37,199 60 KITCHEN 0 0.0 0 0.0 22 68 - 161 77.1 576 8,822 Zone 60 Total /Ave. 0 0.0 0 0.0 22 68 -161 77.1 576 8,822 Zone 60 Block 0 0.0 0 0.0 22 68 - 161 77.1 576 8,822 System 5 Total /Ave. 0 0.0 0 0.0 22 68 - 161 77.1 576 8,822 System 5 Block 0 0.0 0 0.0 22 68 - 161 77.1 576 8,822 Irene Air Conditioning Economics By: ABACUS CONSULTANTS o.w,c, . v«+: w .•.c.rciu.�v,,: «. «:ww.r.Mnwn«.v� HEATING LOADS AT SPACE PEAK - ALTERNATIVE 1 1,,M*AtnktVir4,,MRti ?r ;aCMIVAYr..ttVOVIS MwOV.I..w.+.xw.».w...,,..∎•∎•• ... ....4* r...+:.. r x • • V 600 PAGE 34 BUILDING ENVELOPE HEAT I N G LOADS (Roof - Skylight) (At time of Space Peak) Roof Roof Skylight Skylight Return Air Roof Space Roof Skylight Skylight Skylt Return Air Skylt Space Skylt Sensible R.A. Sensible Space Return Air Space Solar Conduction R.A. Conduction Space Room Load CLTD Load CLTD Solar Solar CLF Load CLTD Load CLTD Number Description (Btuh) (F) (Btuh) (F) (Btuh) (Btuh) (Btuh) (F) (Btuh) (F) 1 HUMAN SERVICES 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 2 CONFERENCE 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 3 SENIOR ADULT 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 1 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 1 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 4 FIRESIDE 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 2 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 2 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 5 MULTI _P 0 0.0 -2,105 -55.0 0 0 0.000 0 0.0 0 0.0 6 DINING 0 0.0 -2,309 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 3 Total /Ave. 0 0.0 -4,414 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 3 Block 0 0.0 -4,414 -55.0 0 0 0.000 0 0.0 0 0.0 7 MISC_STOR 0 0.0 -1,024 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 4 Total /Ave. 0 0.0 -1,024 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 4 Block 0 0.0 -1,024 -55.0 0 0 0.000 0 0.0 0 0.0 8 BANG 0 0.0 -4,302 -55.0 0 0 0.000 0 0.0 0 0.0 Z....e 5 Total /Ave. 0 0.0 -4,302 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 5 Block 0 0.0 -4,302 -55.0 0 0 0.000 0 0.0 0 0.0 9 CLASS TRAIN 0 0.0 -1,252 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 6 Total /Ave. 0 0.0 -1,252 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 6 Block 0 0.0 -1,252 -55.0 0 0 0.000 0 0.0 0 0.0 10 YOUTH 0 0.0 -1,334 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 7 Total /Ave. 0 0.0 -1,334 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 7 Block 0 0.0 -1,334 -55.0 0 0 0.000 0 0.0 0 0.0 11 GAMES 0 0.0 -1,153 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 8 Total /Ave. 0 0.0 -1,153 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 8 Block 0 0.0 -1,153 -55.0 0 0 0.000 0 0.0 0 0.0 12 DANCE 0 0.0 -1,465 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 9 Total /Ave. 0 0.0 -1,465 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 9 Block 0 0.0 -1,465 -55.0 0 0 0.000 0 0.0 0 0.0 13 POTTERY 0 0.0 -1,336 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 10 Total /Ave. 0 0.0 -1,336 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 10 Block 0 0.0 -1,336 -55.0 0 0 0.000 0 0.0 0 0.0 14 ARTS 0 0.0 -1,568 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 11 Total /Ave. 0 0.0 -1,568 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 11 Block 0 0.0 -1,568 -55.0 0 0 0.000 0 0.0 0 0.0 15 PRESCHOOL 0 0.0 -1,568 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 12 Total /Ave. 0 0.0 -1,568 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 12 Block 0 0.0 -1,568 -55.0 0 0 0.000 0 0.0 0 0.0 16 WAIT 0 0.0 -1,163 -55.0 0 0 0.000 0 0.0 0 0.0 13 Total /Ave. 0 0.0 -1,163 -55.0 0 0 0.000 0 0.0 0 0.0 i,,. . 13 Block 0 0.0 - 1,163 - 55.0 0 0 0.000 0 0.0 0 0.0 17 CARDS 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 14 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Trane Air Conditioning Economics By: ABACUS CONSULTANTS HEATING LOADS AT SPACE PEAK - ALTERNATIVE 1 . W .rn.ux 155.19[:KL'Y.4. .iS9x.YYYfMSfi.tUawn.n V 600 PAGE 35 B U I L D I N G E N V E L O P E H E A T I N G L O A D S (Roof - Skylight) (At time of Space Peak) Roof Roof Skylight Skylight Return Air Roof Space Roof Skylight Skylight Skylt Return Air Skylt space Skylt Sensible R.A. Sensible Space Return Air Space Solar Conduction R.A. Conduction Space Room Load CLTD Load CLTD Solar Solar CLF Load CLTD Load CLTD Number Description (Btuh) (F) (Btuh) (F) (Btuh) (Btuh) (Btuh) (F) (Btuh) (F) Zone 14 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 18 STOR_ELEC 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 15 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 15 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 19 EXT RR -743 -50.6 0 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 16 Total /Ave. -743 -50.6 0 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 16 Block -743 -50.6 0 -55.0 0 0 0.000 0 0.0 0 0.0 20 INT_RR -392 -50.6 0 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 17 Total /Ave. -392 -50.6 0 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 17 Block -392 -50.6 0 -55.0 0 0 0.000 0 0.0 0 0.0 22 CORR -2,486 -50.6 0 -55.0 0 0 0.000 0 0.0 0 0.0 23 CORR OPEN 0 0.0 -3,784 -55.0 0 0 0.000 0 0.0 -7,290 -55.0 Zone 18 Total /Ave. -2,486 -50.6 -3,784 -55.0 0 0 0.000 0 0.0 -7,290 -55.0 Zone 18 Block -2,486 -50.6 -3,784 -55.0 0 0 0.000 0 -50.6 -7,290 -55.0 24 SNACK 0 0.0 -973 -55.0 0 0 0.000 0 0.0 -3,827 -55.0 ?5 ROT WAIT 0 0.0 -683 -55.0 0 0 0.000 0 0.0 -2,686 -55.0 .. -, id 20 Total /Ave. 0 0.0 -1,657 -55.0 0 0 0.000 0 0.0 -6,513 -55.0 Zone 20 Block 0 0.0 -1,657 -55.0 0 0 0.000 0 0.0 -6,513 -55.0 System 1 Total /Ave. -3,621 -50.6 - 26,019 -55.0 0 0 0.000 0 0.0 - 13,803 -55.0 System 1 Block -3,621 -50.6 - 26,019 -55.0 0 0 0.000 0 -50.6 - 13,803 -55.0 30 MAIN_RECEPT 0 0.0 -1,681 -55.0 0 0 0.000 0 0.0 -6,611 -55.0 Zone 30 Total /Ave. 0 0.0 -1,681 -55.0 0 0 0.000 0 0.0 -6,611 -55.0 Zone 30 Block 0 0.0 -1,681 -55.0 0 0 0.000 0 0.0 -6,611 -55.0 31 ADMIN_OPEN 0 0.0 -1,848 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 31 Total /Ave. 0 0.0 -1,848 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 31 Block 0 0.0 -1,848 -55.0 0 0 0.000 0 0.0 0 0.0 32 REC_SUP 0 0.0 -299 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 32 Total /Ave. 0 0.0 -299 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 32 Block 0 0.0 -299 -55.0 0 0 0.000 0 0.0 0 0.0 33 YOUTH_AD 0 0.0 -374 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 33 Total /Ave. 0 0.0 -374 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 33 Block 0 0.0 -374 -55.0 0 0 0.000 0 0.0 0 0.0 34 TEEN 0 0.0 -247 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 34 Total /Ave. 0 0.0 -247 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 34 Block 0 0.0 -247 -55.0 0 0 0.000 0 0.0 0 0.0 35 STAFF 0 0.0 -497 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 35 Total /Ave. 0 0.0 -497 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 35 Block 0 0.0 -497 -55.0 0 0 0.000 0 0.0 0 0.0 36 REST_STOR -381 -49.2 0 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 36 Total /Ave. -381 -49.2 0 -55.0 0 0 0.000 0 0.0 0 0.0 36 Block -381 -49.2 0 -55.0 0 0 0.000 0 0.0 0 0.0 37 AD_CC'tR -1,278 -49.2 0 - 55.0 0 0 0.000 - 1,630 - 49.2 0 -55.0 Zone 37 Total /Ave. -1,278 -49.2 0 -55.0 0 0 0.000 -1,630 -49.2 0 -55.0 Zone 37 Block -1,278 -49.2 0 -55.0 0 0 0.000 -1,630 -49.2 0 -55.0 • Trane Air Conditioning Economics By: ABACUS CONSULTANTS HEATING LOADS AT SPACE PEAK - ALTERNATIVE 1 V V 600 PAGE 36 B U I L D I N G ENVELOPE HEAT I N G LOADS (Roof - Skylight) (At time of Space Peak) Roof Roof Skylight Skylight Return Air Roof Space Roof Skylight Skylight Skylt Return Air Skylt Space Skylt Sensible R.A. Sensible Space Return Air Space Solar Conduction R.A. Conduction Space Room Load CLTD Load CLTD Solar Solar CLF Load CLTD Load CLTD Number Description (Btuh) (F) (Btuh) (F) (Stub) (Btuh) (Stub) (F) (Stub) (F) 38 INT_OFFS 0 0.0 -652 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 38 Total /Ave. 0 0.0 -652 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 38 Block 0 0.0 -652 -55.0 0 0 0.000 0 0.0 0 0.0 System 2 Total /Ave. -1,659 -49.2 -5,598 -55.0 0 0 0.000 -1,630 -49.2 -6,611 -55.0 System 2 Block -1,659 -49.2 -5,598 -55.0 0 0 0.000 -1,630 -49.2 -6,611 -55.0 42 GYM 0 0.0 - 21,334 -55.0 0 0 0.000 0 0.0 0 0.0 43 STOR 0 0.0 -1,891 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 40 Total /Ave. 0 0.0 - 23,225 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 40 Block 0 0.0 - 23,225 -55.0 0 0 0.000 0 0.0 0 0.0 System 3 Total /Ave. 0 0.0 - 23,225 -55.0 0 0 0.000 0 0.0 0 0.0 System 3 Block 0 0.0 - 23,225 -55.0 0 0 0.000 0 0.0 0 0.0 48 LOCK SHOWER -3,451 -52.7 0 -55.0 0 0 0.000 0 0.0 0 0.0 49 FAMILY -432 -52.7 0 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 48 Total /Ave. -3,883 -52.7 0 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 48 Block -3,883 -52.7 0 -55.0 0 0 0.000 0 0.0 0 0.0 TO FITNESS 0 0.0 -4,499 -55.0 0 0 0.000 0 0.0 0 0.0 i. . 50 Total /Ave. 0 0.0 -4,499 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 50 Block 0 0.0 -4,499 -55.0 0 0 0.000 0 0.0 0 0.0 53 RAO WEST 0 0.0 -1,452 -55.0 0 0 0.000 0 0.0 0 0.0 54 RAO EAST 0 0.0 -1,452 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 51 Total /Ave. 0 0.0 -2,904 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 51 Block 0 0.0 -2,904 -55.0 0 0 0.000 0 0.0 0 0.0 55 GYM_CORR 0 0.0 -922 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 52 Total /Ave. 0 0.0 -922 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 52 Block 0 0.0 -922 -55.0 0 0 0.000 0 0.0 0 0.0 System 4 Total /Ave. -3,883 -52.7 -8,325 -55.0 0 0 0.000 0 0.0 0 0.0 System 4 Block -3,883 -52.7 -8,325 -55.0 0 0 0.000 0 0.0 0 0.0 60 KITCHEN -1,556 -53.7 0 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 60 Total /Ave. -1,556 -53.7 0 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 60 Block -1,556 -53.7 0 -55.0 0 0 0.000 0 0.0 0 0.0 System 5 Total /Ave. -1,556 -53.7 0 -55.0 0 0 0.000 0 0.0 0 0.0 System 5 Block -1,556 -53.7 0 -55.0 0 0 0.000 0 0.0 0 0.0 71 MEZZ_C 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 71 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 71 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 72 MECH_PENT_W 0 0.0 -1,608 -35.0 0 0 0.000 0 0.0 0 0.0 Zone 72 Total /Ave. 0 0.0 -1,608 -35.0 0 0 0.000 0 0.0 0 0.0 Zone 72 Block 0 0.0 -1,608 -35.0 0 0 0.000 0 0.0 0 0.0 73 MECH_PENT_E 0 0.0 -1,336 -35.0 0 0 0.000 0 0.0 0 0.0 Zone 73 Total /Ave. 0 0.0 -1,336 -35.0 0 0 0.000 0 0.0 0 0.0 7 73 Block 0 0.0 -1,336 -35.0 0 0 0.000 0 0.0 0 0.0 an 6 Total /Ave. 0 0.0 -2,944 -35.0 0 0 0.000 0 0.0 0 0.0 System 6 Block 0 0.0 -2,944 -35.0 0 0 0.000 0 0.0 0 0.0 BUILDING ENVELOPE HEATING LOADS Number DosCription • 1 HUMAN SERVICES Watt Watt Plenum Plenm Load CLTD (Btuh) (F) 0 0.0 Wall Space Load (Btuh) (Watt - Window) (At time of Space Peak) Wall Space CLTD (F) -1,469 -55.0 Glass Space Solar (Btuh) Glass Return Air Solar (Stub) 0 0 0.000 Glass Glass Solar Space CLF Conduction (Btuh) Glass Space CLTD (F) -1,356 -55.0 Glass Glass Return Air R.A. Conduction CLTD (Btuh) (F) 0 0.0 �F:fk'RIiF" Ugh.+: r. nr.<: .....,......�.....e.........w.� r�..nt r ....*•...2ca.�.•r.....a.a.rvr�t. rya; t�. Nr: v-.✓ a.v.anrri.rm.r.,ww.rrn».tr,.raa avt4vVrtl74v' K)J FG; i�¢'. 1NfRHt:(. n6�AV¢ Nn�nnwtaa.'+.rnrv........��.. -. Trane Air Conditioning Economics By: ABACUS CONSULTANTS HEATING LOADS AT SPACE PEAK - ALTERNATIVE 1 W Room Number Description B U I L D I N G E N V E L O P E H E A T I N G L O A D S (Wall - Window) (At time of Space Peak) V 600 PAGE 37 Wall Wall Wall Wall Glass Glass Glass Glass Glass Glass Glass Plenum Plenm Space Space Space Return Air Solar Space Space Return Air R.A. Load CLTD Load CLTD Solar Solar CLF Conduction CLTD Conduction CLTD (Btuh) (F) (Stub) (F) (8tuh) (Btuh) (Stub) (F) (Stub) (F) 2 CONFERENCE 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 3 SENIOR ADULT 0 0.0 -1,343 -55.0 0 0 0.000 -814 -55.0 0 0.0 Zone 1 Total /Ave. 0 0.0 -2,812 -55.0 0 0 0.000 -2,170 -55.0 0 0.0 Zone 1 Block 0 0.0 -2,812 -55.0 0 0 0.000 -2,170 -55.0 0 0.0 4 FIRESIDE 0 0.0 -1,588 -55.0 0 0 0.000 -2,423 -55.0 0 0.0 Zone 2 Total /Ave. 0 0.0 -1,588 -55.0 0 0 0.000 -2,423 -55.0 0 0.0 Zone 2 Block 0 0.0 -1,588 -55.0 0 0 0.000 -2,423 -55.0 0 0.0 5 MULTI _P 0 0.0 -3,447 -55.0 0 0 0.000 -4,845 -55.0 0 0.0 6 DINING 0 0.0 -2,102 -55.0 0 0 0.000 -2,314 -55.0 0 0.0 Zone 3 Total /Ave. 0 0.0 -5,549 -55.0 0 0 0.000 -7,160 -55.0 0 0.0 Zone 3 Block 0 0.0 -5,549 -55.0 0 0 0.000 -7,160 -55.0 0 0.0 7 MISC STOR 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 4 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 4 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 8 BANQ 0 0.0 -4,086 -55.0 0 0 0.000 - 13,940 -55.0 0 0.0 5 Total /Ave. 0 0.0 -4,086 -55.0 0 0 0.000 - 13,940 -55.0 0 0.0 i.. .: 5 Block 0 0.0 -4,086 -55.0 0 0 0.000 -13,940 -55.0 0 0.0 9 CLASS TRAIN 0 0.0 -605 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 Zone 6 Total /Ave. 0 0.0 -605 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 Zone 6 Block 0 0.0 -605 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 10 YOUTH 0 0.0 -2,166 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 Zone 7 Total /Ave. 0 0.0 -2,166 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 Zone 7 Block 0 0.0 -2,166 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 11 GAMES 0 0.0 -1,752 -55.0 0 0 0.000 -542 -55.0 0 0.0 Zone 8 Total /Ave. 0 0.0 -1,752 -55.0 0 0 0.000 -542 -55.0 0 0.0 Zone 8 Block 0 0.0 -1,752 -55.0 0 0 0.000 -542 -55.0 0 0.0 12 DANCE 0 0.0 -953 -55.0 0 0 0.000 -1,085 -55.0 0 0.0 Zone 9 Total /Ave. 0 0.0 -953 -55.0 0 0 0.000 -1,085 -55.0 0 0.0 Zone 9 Block 0 0.0 -953 -55.0 0 0 0.000 -1,085 -55.0 0 0.0 13 POTTERY 0 0.0 -1,720 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 Zone 10 Total /Ave. 0 0.0 -1,720 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 Zone 10 Block 0 0.0 -1,720 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 14 ARTS 0 0.0 -1,720 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 Zone 11 Total /Ave. 0 0.0 -1,720 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 Zone 11 Block 0 0.0 -1,720 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 15 PRESCHOOL 0 0.0 -2,220 -55.0 0 0 0.000 -1,663 -55.0 0 0.0 Zone 12 Total /Ave. 0 0.0 -2,220 -55.0 0 0 0.000 -1,663 -55.0 0 0.0 Zone 12 Block 0 0.0 -2,220 -55.0 0 0 0.000 -1,663 -55.0 0 0.0 16 WAIT 0 0.0 -846 -55.0 0 0 0.000 -2,188 -55.0 0 0.0 Zone 13 Total /Ave. 0 0.0 -846 -55.0 0 0 0.000 -2,188 -55.0 0 0.0 13 Block 0 0.0 -846 :55.0 0 0 0.000 - 2,188 -55.0 0 0.0 a CARDS 0 0.0 - 501 - 55.0 0 0 0.000 - 814 -55.0 0 0.0 Zone 14 Total /Ave. 0 0.0 -501 -55.0 0 0 0.000 -814 - 55.0 0 0.0 Zone 14 Block 0 0.0 -501 -55.0 0 0 0.000 - 814 -55.0 0 0.0 J3• ". hrµ• w.:+ i.!. �aN4 .:ar�.:ra..nrow•,�t. >•NZn.w.J»o anr, w..> a.w +.n.rMt7<r•:.euhi.vMraTen. rm. w. w. rv,.... w..•...... r....,.... v.......... ............. Y......-... n......-.... w..,. ww,.. e.. wa ...n.. mcrmrvurar+ow»«m..r..n,. w..«.�... Trane Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 38 HEATING LOADS AT SPACE PEAK - ALTERNATIVE 1 U BUILDING ENVELOPE HEAT I N G LOADS (Watt - Window) (At time of Space Peak) Wall Wall Wall Wall Glass Glass Glass Glass Glass Glass Glass Plenum Plenm Space Space Space Return Air Solar Space Space Return Air R.A. Room Load CLTD Load CLTD Solar Solar CLF Conduction CLTD Conduction CLTD Number Description (Btuh) (F) (Btuh) (F) (Btuh) (Btuh) (Btuh) (F) (Btuh) (F) 18 STOR_ELEC 0 0.0 -1,584 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 15 Total /Ave. 0 0.0 -1,584 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 15 Block 0 0.0 -1,584 -55.0 0 0 0.000 0 0.0 0 0.0 19 EXT_RR -368 -50.6 -370 -55.0 0 0 0.000 -289 -55.0 0 0.0 Zone 16 Total /Ave. -368 -50.6 -370 -55.0 0 0 0.000 -289 -55.0 0 0.0 Zone 16 Block -368 -50.6 -370 -55.0 0 0 0.000 -289 -55.0 0 0.0 20 INT_RR 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 17 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 17 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 22 CORR 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 23 CORR OPEN 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 18 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 18 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 24 SNACK 0 0.0 -4,951 -55.0 0 0 0.000 -7,630 -55.0 0 0.0 25 ROT WAIT 0 0.0 -1,541 -55.0 0 0 0.000 -5,279 -55.0 0 0.0 20 Total /Ave. 0 0.0 -6,493 -55.0 0 0 0.000 - 12,909 -55.0 0 0.0 .....a 20 Block 0 0.0 -6,493 -55.0 0 0 0.000 - 12,909 -55.0 0 0.0 System 1 Total /Ave. -368 -50.6 - 34,962 -55.0 0 0 0.000 - 51,691 -55.0 0 0.0 System 1 Block -395 -50.6 - 34,933 -55.0 0 0 0.000 - 51,691 -55.0 0 0.0 30 MAIN_RECEPT 0 0.0 -6,812 -55.0 0 0 0.000 - 11,589 -55.0 0 0.0 Zone 30 Total /Ave. 0 0.0 -6,812 -55.0 0 0 0.000 - 11,589 -55.0 0 0.0 Zone 30 Block 0 0.0 -6,812 -55.0 0 0 0.000 - 11,589 -55.0 0 0.0 31 ADMIN OPEN 0 0.0 -1,237 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 31 Total /Ave. 0 0.0 -1,237 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 31 Block 0 0.0 -1,237 -55.0 0 0 0.000 0 0.0 0 0.0 32 REC_SUP 0 0.0 -1,061 -55.0 0 0 0.000 -488 -55.0 0 0.0 Zone 32 Total /Ave. 0 0.0 -1,061 -55.0 0 0 0.000 -488 -55.0 0 0.0 Zone 32 Block 0 0.0 -1,061 -55.0 0 0 0.000 -488 -55.0 0 0.0 33 YOUTH AD 0 0.0 -1,155 -55.0 0 0 0.000 -2,278 -55.0 0 0.0 Zone 33 Total /Ave. 0 0.0 -1,155 -55.0 0 0 0.000 -2,278 -55.0 0 0.0 Zone 33 Block 0 0.0 -1,155 -55.0 0 0 0.000 -2,278 -55.0 0 0.0 34 TEEN 0 0.0 -401 -55.0 0 0 0.000 -488 -55.0 0 0.0 Zone 34 Total /Ave. 0 0.0 -401 -55.0 0 0 0.000 -488 -55.0 0 0.0 Zone 34 Block 0 0.0 -401 -55.0 0 0 0.000 -488 -55.0 0 0.0 35 STAFF 0 0.0 -295 -55.0 0 0 0.000 -1,139 -55.0 0 0.0 Zone 35 Total /Ave. 0 0.0 -295 -55.0 0 0 0.000 -1,139 -55.0 0 0.0 Zone 35 Block 0 0.0 -295 -55.0 0 0 0.000 -1,139 -55.0 0 0.0 36 REST_STOR 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 36 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 36 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 37 AD CORR 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 ... . 37 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 37 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 38 INT_OFFS 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 .. >.he..wn, uv niur •.,nnrn. r«vw.uuuirKaty crli+fi IV1FLY ^K OSI.1 - mr0 Rent ran, .nvx• 0.01 .i+ 1341.1,,Mn ...n.mnnvvn* ter a Room Number Description Trane Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 39 HEATING LOADS AT SPACE PEAK - ALTERNATIVE 1 W B U I L D I N G E N V E L O P E HEATING LOADS (Watt - Window) (At time of Space Peak) Wall Wall Wall Wall Glass Glass Glass Glass Glass Glass Glass Plenum Plenm Space Space Space Return Air Solar Space Space Return Air R.A. Load CLTD Load CLTD Solar Solar CLF Conduction CLTD Conduction CLTD (Btuh) (F) (Btuh) (F) (Btuh) (Btuh) (Btuh) (F) (Btuh) (F) Zone 38 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 38 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 System 2 Total /Ave. 0 0.0 - 10,962 -55.0 0 0 0.000 - 15,983 -55.0 0 0.0 System 2 Block 0 0.0 - 10,962 -55.0 0 0 0.000 - 15,983 -55.0 0 0.0 42 GYM 0 0.0 - 33,660 -55.0 0 0 0.000 - 13,235 -55.0 0 0.0 43 STOR 0 0.0 - 14,267 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 40 Total /Ave. 0 0.0 - 47,927 -55.0 0 0 0.000 - 13,235 -55.0 0 0.0 Zone 40 Block 0 0.0 - 47,927 -55.0 0 0 0.000 - 13,235 -55.0 0 0.0 System 3 Total /Ave. 0 0.0 - 47,927 -55.0 0 0 0.000 - 13,235 -55.0 0 0.0 System 3 Block 0 0.0 - 47,927 -55.0 0 0 0.000 - 13,235 -55.0 0 0.0 48 LOCK SHOWER -1,379 -52.7 -2,369 -55.0 0 0 0.000 -1,139 -55.0 0 0.0 49 FAMILY 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 48 Total /Ave. -1,379 -52.7 -2,369 -55.0 0 0 0.000 -1,139 -55.0 0 0.0 Zone 48 Block -1,379 -52.7 -2,369 -55.0 0 0 0.000 -1,139 -55.0 0 0.0 50 FITNESS 0 0.0 -3,849 -55.0 0 0 0.000 -3,526 -55.0 0 0.0 • 50 Total /Ave. 0 0.0 -3,849 -55.0 0 0 0.000 -3,526 -55.0 0 0.0 d...MMe 50 Block 0 0.0 -3,849 -55.0 0 0 0.000 -3,526 -55.0 0 0.0 53 RAO WEST 0 0.0 -3,300 -55.0 0 0 0.000 0 0.0 0 0.0 54 RAO EAST 0 0.0 -6,930 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 51 Total /Ave. 0 0.0 - 10,230 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 51 Block 0 0.0 - 10,230 -55.0 0 0 0.000 0 0.0 0 0.0 55 GYM_CORR 0 0.0 -3,300 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 52 Total /Ave. 0 0.0 -3,300 -55.0 0 0 0.000 0 0.0 0 0.0 Zone 52 Block 0 0.0 -3,300 -55.0 0 0 0.000 0 0.0 0 0.0 System 4 Total /Ave. -1,379 -52.7 - 19,749 -55.0 0 0 0.000 -4,665 -55.0 0 0.0 System 4 Block -1,521 -52.7 - 19,600 -55.0 0 0 0.000 -4,665 -55.0 0 0.0 60 KITCHEN -550 -53.7 -568 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 Zone 60 Total /Ave. -550 -53.7 -568 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 Zone 60 Block -550 -53.7 -568 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 System 5 Total /Ave. -550 -53.7 -568 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 System 5 Block -550 -53.7 -568 -55.0 0 0 0.000 -1,627 -55.0 0 0.0 71 MEZZ C 0 0.0 -35 -35.0 0 0 0.000 -1,498 -35.0 0 0.0 Zone 71 Total /Ave. 0 0.0 -35 -35.0 0 0 0.000 -1,498 -35.0 0 0.0 Zone 71 Block 0 0.0 -35 -35.0 0 0 0.000 -1,498 -35.0 0 0.0 72 MECH PENT_W 0 0.0 -971 -35.0 0 0 0.000 0 0.0 0 0.0 Zone 72 Total /Ave. 0 0.0 -971 -35.0 0 0 0.000 0 0.0 0 0.0 Zone 72 Block 0 0.0 -971 -35.0 0 0 0.000 0 0.0 0 0.0 73 MECH_PENT_E 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 73 Total /Ave. 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 Zone 73 Block 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 •.em 6 Total /Ave. 0 0.0 -1,006 -35.0 0 0 0.000 -1,498 -35.0 0 0.0 tem 6 Block 0 0.0 -1,006 -35.0 0 0 0.000 -1,498 -35.0 0 0.0 BUILDING ENVELOPE HEATING LOADS (Exposed Floor - Partitions - Infiltration) (At time of Space Peak) Exposed Expsd Plenm Ceiling Floor Floor Partition Part. Infilt. Infilt. Infilt. Dry B Sensible Envelope n Sensible CLTD Sensible CLTD Airflow Sensible Latent 'Temp. Load Total Jer Description (Stub) (F) (Btuh) (F) (Cfm) (Stub) (Stub) (F) (Btuh) (Stub) 1 HUMAN.SERVICES 0 0.0 -810 -10.0 26 -1,550 0 75.0 0 -5,185 HEATING LOADS AT SPACE PEAK - ALTERNATIVE 1 Room Number Description .......,...-...........,... .............,....u.ri�...:k� +v o�v e�are-x wi�ruln.+.rw.n««n.w.,.. Trane Air Conditioning Economics V 600 By: ABACUS CONSULTANTS PAGE 40 B U I L D I N G E N V E L O P E H E A T I N G L O A D S (Exposed Floor - Partitions - Infiltration) (At time of Space Peak) Exposed Expsd Plenm Ceiling Floor Floor Partition Part. Infilt. Infilt. Infilt. Dry B Sensible Envelope Sensible CLTD Sensible CLTD Airflow Sensible Latent Temp. Load Total (Stub) (F) (Btuh) (F) (Cfm) (Stub) (Btuh) (F) (Btuh) (Btuh) 2 CONFERENCE 0 0.0 -270 -10.0 0 0 0 75.0 0 -270 3 SENIOR ADULT 0 0.0 -1,020 -10.0 22 -1,311 0 75.0 0 -4,488 Zone 1 Total /Ave. 0 0.0 -2,100 -10.0 47 -2,861 0 75.0 0 -9,943 Zone 1 Block 0 0.0 -2,100 -10.0 47 -2,861 0 75.0 0 -9,943 4 FIRESIDE 0 0.0 -1,172 -10.0 27 -1,644 0 75.0 0 -6,826 Zone 2 Total /Ave. 0 0.0 -1,172 -10.0 27 -1,644 0 75.0 0 -6,826 Zone 2 Block 0 0.0 -1,172 -10.0 27 -1,644 0 75.0 0 -6,826 5 MULTI _P 0 0.0 0 0.0 62 -3,763 0 75.0 0 - 14,161 6 DINING 0 0.0 0 0.0 36 -2,203 0 75.0 0 -8,928 Zone 3 Total /Ave. 0 0.0 0 0.0 99 -5,966 0 75.0 0 - 23,089 Zone 3 Block 0 0.0 0 0.0 99 -5,966 0 75.0 0 - 23,089 7 MISC STOR 0 0.0 0 0.0 0 0 0 75.0 0 -1,024 Zone 4 Total /Ave. 0 0.0 0 0.0 0 0 0 75.0 0 -1,024 Zone 4 Block 0 0.0 0 0.0 0 0 0 75.0 0 -1,024 8 BANO 0 0.0 -1,344 -10.0 104 -6,291 0 75.0 0 - 29,962 5 Total /Ave. 0 0.0 -1,344 -10.0 104 -6,291 0 75.0 0 - 29,962 'curie 5 Block 0 0.0 -1,344 -10.0 104 -6,291 0 75.0 0 - 29,962 9 CLASS TRAIN 0 0.0 -384 -10.0 15 -906 0 75.0 0 -4,774 Zone 6 Total /Ave. 0 0.0 -384 -10.0 15 -906 0 75.0 0 -4,774 Zone 6 Block 0 0.0 -384 -10.0 15 -906 0 75.0 0 -4,774 10 YOUTH 0 0.0 -448 -10.0 36 -2,193 0 75.0 0 -7,768 Zone 7 Total /Ave. 0 0.0 -448 -10.0 36 -2,193 0 75.0 0 -7,768 Zone 7 Block 0 0.0 -448 -10.0 36 -2,193 0 75.0 0 -7,768 11 GAMES 0 0.0 -448 -10.0 26 -1,580 0 75.0 0 -5,475 Zone 8 Total /Ave. 0 0.0 -448 -10.0 26 -1,580 0 75.0 0 -5,475 Zone 8 Block 0 0.0 -448 -10.0 26 -1,580 0 75.0 0 -5,475 12 DANCE 0 0.0 -448 -10.0 17 -1,057 0 75.0 0 -5,008 Zone 9 Total /Ave. 0 0.0 -448 -10.0 17 -1,057 0 75.0 0 -5,008 Zone 9 Block 0 0.0 -448 -10.0 17 -1,057 0 75.0 0 -5,008 13 POTTERY 0 0.0 -192 -10.0 30 -1,825 0 75.0 0 -6,700 Zone 10 Total /Ave. 0 0.0 -192 -10.0 30 -1,825 0 75.0 0 -6,700 Zone 10 Block 0 0.0 -192 -10.0 30 -1,825 0 75.0 0 -6,700 14 ARTS 0 0.0 -448 -10.0 30 -1,825 0 75.0 0 -7,188 Zone 11 Total /Ave. 0 0.0 -448 -10.0 30 -1,825 0 75.0 0 -7,188 Zone 11 Block 0 0.0 -448 -10.0 30 -1,825 0 75.0 0 -7,188 15 PRESCHOOL 0 0.0 -448 -10.0 31 -1,852 0 75.0 0 -7,752 Zone 12 Total /Ave. 0 0.0 -448 -10.0 31 -1,852 0 75.0 0 -7,752 Zone 12 Block 0 0.0 -448 -10.0 31 -1,852 0 75.0 0 -7,752 16 WAIT 0 0.0 0 0.0 15 -906 0 75.0 0 -5,104 Zone 13 Total /Ave. 0 0.0 0 0.0 15 -906 0 75.0 0 -5,104 9 13 Block 0 0.0 0 0.0 15 -906 0 75.0 0 -5,104 17 CARDS 0 0.0 -1,520 -10.0 10 -616 0 75.0 0 -3,451 Zone 14 Total /Ave. 0 0.0 -1,520 -10.0 10 -616 0 75.0 0 -3,451 Zone 14 Block 0 0.0 -1,520 -10.0 10 -616 0 75.0 0 -3,451 i1 SK.'+ kvu... v,...... ......... ............�...:...:.w.,v.arow. �v ..,.ursv. • u•Mn. . ma...:•• rile n,rto•ntkmwvam<4.M1.G1511$514AhH ssMV!: areixwF rwnr�aawwn +n. «..-.. • «�-.- Trane Air Conditioning Economics By: ABACUS CONSULTANTS HEATING LOADS AT SPACE PEAK - ALTERNATIVE 1 Room Number Description B U I L D I N G E N V E L O P E H E A T I N G L O A D S (Exposed Floor - Partitions - Infiltration) (At time of Space Peak) V 600 PAGE 41 Exposed Expsd Plenm Ceiling Floor Floor Partition Part. Infilt. Infilt. Infilt. Dry B Sensible Envelope Sensible CLTD Sensible CLTD Airflow Sensible Latent Temp. Load Total (Btuh) (F) (Btuh) (F) (Cfm) (Btuh) (Btuh) (F) (Btuh) (Btuh) 18 STOR_ELEC 0 0.0 -252 -10.0 22 -1,305 0 75.0 0 -3,141 Zone 15 Total /Ave. 0 0.0 -252 -10.0 22 -1,305 0 75.0 0 -3,141 Zone 15 Block 0 0.0 -252 -10.0 22 -1,305 0 75.0 0 -3,141 19 EXT_RR 0 0.0 0 0.0 12 -707 0 70.6 -604 -3,081 Zone 16 Total /Ave. 0 0.0 0 0.0 12 -707 0 70.6 -604 -3,081 Zone 16 Block 0 0.0 0 0.0 12 -707 0 70.6 -604 -3,081 20 INT_RR 0 0.0 0 0.0 0 0 0 70.6 -319 -711 Zone 17 Total /Ave. 0 0.0 0 0.0 0 0 0 70.6 -319 -711 Zone 17 Block 0 0.0 0 0.0 0 0 0 70.6 -319 -711 22 CORR 0 0.0 0 0.0 0 0 0 70.6 -1,925 -4,411 23 CORR_OPEN 0 0.0 0 0.0 0 0 0 75.0 0 - 11,074 Zone 18 Total /Ave. 0 0.0 0 0.0 0 0 0 70.6 -1,925 - 15,485 Zone 18 Block 0 0.0 0 0.0 0 0 0 70.6 -1,925 - 15,485 24 SNACK 0 0.0 0 0.0 99 -5,993 0 75.0 0 - 23,375 25 ROT WAIT 0 0.0 -480 -10.0 43 -2,594 0 75.0 0 - 13,264 20 Total /Ave. 0 0.0 -480 -10.0 142 -8,587 0 75.0 0 - 36,639 tune 20 Block 0 0.0 -480 -10.0 142 -8,587 0 75.0 0 - 36,639 System 1 Total/Ave.. 0 0.0 -9,684 - 10.0 664 - 40,124 0 70.6 -2,848 - 183,120 System 1 Block 0 0.0 -9,684 - 10.0 664 - 40,123 0 70.6 -2,848 - 183,117 30 MAIN_RECEPT 0 0.0 -480 -10.0 141 -8,519 0 75.0 0 - 35,692 Zone 30 Total /Ave. 0 0.0 -480 10.0 141 -8,519 0 75.0 0 - 35,692 Zone 30 Block 0 0.0 -480 10.0 141 -8,519 0 75.0 0 - 35,692 31 ADMIN,OPEN 0 0.0 0 0.0 17 -1,020 0 75.0 0 -4,105 Zone 31 Total /Ave. 0 0.0 0 0.0 17 -1,020 0 75.0 0 -4,105 Zone 31 Block 0 0.0 0 0.0 17 -1,020 0 75.0 0 -4,105 32 REC SUP 0 0.0 0 0.0 16 -997 0 75.0 0 -2,846 Zone 32 Total /Ave. 0 0.0 0 0.0 16 -997 0 75.0 0 -2,846 Zone 32 Block 0 0.0 0 0.0 16 -997 0 75.0 0 -2,846 33 YOUTH_AD 0 0.0 0 0.0 25 -1,523 0 75.0 0 -5,330 Zone 33 Total /Ave. 0 0.0 0 0.0 25 -1,523 0 75.0 0 -5,330 Zone 33 Block 0 0.0 0 0.0 25. -1,523 0 75.0 0 -5,330 34 TEEN 0 0.0 0 0.0 7 -453 0 75.0 0 -1,589 Zone 34 Total /Ave. 0 0.0 0 0.0 7 -453 0 75.0 0 -1,589 Zone 34 Block 0 0.0 0 0.0 7 -453 0 75.0 0 -1,589 35 STAFF 0 0.0 0 0.0 9 -529 0 75.0 0 -2,460 Zone 35 Total /Ave. 0 0.0 0 0.0 9 -529 0 75.0 0' -2,460 Zone 35 Block 0 0.0 0 0.0 9 -529 0 75.0 0 -2,460 36 REST_STOR 0 0.0 0 0.0 0 0 0 69.2 -424 -805 Zone 36 Total /Ave. 0 0.0 0 0.0 0 0 0 69.2 -424 -805 Zone 36 Block 0 0.0 0 0.0 0 0 0 69.2 -424 -805 37 AD_CORR 0 0.0 0 0.0 0 0 0 69.2 -1,030 -3,937 ....s 37 Total /Ave. 0 0.0 0 0.0 0 0 0 69.2 -1,030 -3,937 Zone 37 Block 0 0.0 0 0.0 0 0 0 69.2 -1,030 -3,937 38 INT_OFFS 0 0.0 0 0.0 0 0 0 75.0 0 -652 ' 4;0Mrr S.l;tagi7;'S; 9i<4( YdlSiett Trane Air Conditioning Economics By: ABACUS CONSULTANTS HEATING LOADS AT SPACE PEAK - ALTERNATIVE 1 W w.- r. mwt� -.wnwM�ilFMri'1%IC1eRniYYIA�gMM M'I�kMGM ur.alwavo m.....mr.+fi*,.torarrAw a�aMeV11tMH.r �afv'n.WnlM�r�+- h.ww+..+w «� B U I L D I N G E N V E L O P E H E A T I N G L O A D S (Exposed Floor - Partitions - Infiltration) (At time of Space Peak) V 600 PAGE 42 Exposed Expsd Plerm Ceiling Floor Floor Partition Part. Infilt. lnfilt. Infilt. Dry B Sensible Envelope Room Sensible CLTD Sensible CLTD Airflow Sensible Latent Temp. Load Total Number Description (Btuh) (F) (Btuh) (F) (Cfm) (Btuh) (Btuh) (F) (Btuh) (Btuh) Zone 38 Total /Ave. 0 0.0 0 0.0 0 0 0 75.0 0 -652 Zone 38 Block 0 0.0 0 0.0 0 0 0 75.0 0 -652 System 2 Total /Ave. 0 0.0 -480 -10.0 216 - 13,041 0 69.2 -1,453 - 57,416 System 2 Block 0 0.0 -480 -10.0 216 - 13,041 0 69.2 -1,453 - 57,416 42 GYM 0 0.0 0 0.0 472 - 28,528 0 75.0 0 - 96,756 43 STOR 0 0.0 0 0.0 195 - 11,758 0 75.0 0 - 27,916 Zone 40 Total /Ave. 0 0.0 0 0.0 667 - 40,286 0 75.0 0 - 124,672 Zone 40 Block 0 0.0 0 0.0 667 - 40,286 0 75.0 0 - 124,672 System 3 Total /Ave. 0 0.0 0 0.0 667 - 40,286 0 75.0 0 - 124,672 System 3 Block 0 0.0 0 0.0 667 - 40,286 0 75.0 0 - 124,672 48 LOCK_SHOWER 0 0.0 -3,840 -10.0 57 -3,423 0 72.7 -1,373 - 16,974 49 FAMILY 0 0.0 -360 -10.0 0 0 0 72.7 -172 -963 Zone 48 Total /Ave. 0 0.0 -4,200 -10.0 57 -3,423 0 72.7 -1,544 - 17,938 Zone 48 Block 0 0.0 -4,200 -10.0 57 -3,423 0 72.7 -1,544 - 17,938 50 FITNESS 0 0.0 0 0.0 67 -4,056 0 75.0 0 - 15,930 SO Total /Ave. 0 0.0 0 0.0 67 -4,056 0 75.0 0 - 15,930 Zuiie 50 Block 0 0.0 0 0.0 67 -4,056 0 75.0 0 - 15,930 53 RAO WEST 0 0.0 0 0.0 45 -2,720 0 75.0 0 -7,472 54 RAO_EAST 0 0.0 0 0.0 94 -5,711 0 75.0 0 - 14,093 Zone 51 Total /Ave. 0 0.0 0 0.0 140 -8,431 0 75.0 0 - 21,565 Zone 51 Block 0 0.0 0 0.0 140 -8,431 0 75.0 0 - 21,565 55 GYM_CORR 0 0.0 0 0.0 18 -1,088 0 75.0 0 -5,310 Zone 52 Total /Ave. 0 0.0 0 0.0 18 -1,088 0 75.0 0 -5,310 Zone 52 Block 0 0.0 0 0.0 18 -1,088 0 75.0 0 -5,310 System 4 Total /Ave. 0 0.0 -4,200 -10.0 281 - 16,998 0 72.7 -1,544 - 60,743 System 4 Block 0 0.0 -4,200 -10.0 281 - 16,998 0 72.7 -1,544 - 60,736 60 KITCHEN 0 0.0 0 0.0 22 -1,340 0 73.7 -352 -5,993 Zone 60 Total /Ave. 0 0.0 0 0.0 22 -1,340 0 73.7 -352 -5,993 Zone 60 Block 0 0.0 0 0.0 22 -1,340 0 73.7 -352 -5,993 System 5 Total /Ave. 0 0.0 0 0.0 22 -1,340 0 73.7 -352 -5,993 System 5 Block 0 0.0 0 0.0 22 -1,340 0 73.7 -352 -5,993 71 MEZZ_C 0 0.0 0 0.0 10 -404 0 55.0 0 -1,936 Zone 71 Total /Ave. 0 0.0 0 0.0 10 -404 0 55.0 0 -1,936 Zone 71 Block 0 0.0 0 0.0 10 -404 0 55.0 0 -1,936 72 MECH_PENT W 0 0.0 0 0.0 21 -800 0 55.0 0 -3,379 Zone 72 Total /Ave. 0 0.0 0 0.0 21 -800 0 55.0 0 -3,379 Zone 72 Block 0 0.0 0 0.0 21 -800 0 55.0 0 -3,379 73 MECH_PENT_E 0 0.0 0 0.0 0 0 0 55.0 0 -1,336 Zone 73 Total /Ave. 0 0.0 0 0.0 0 0 0 55.0 0 -1,336 Zone 73 Block 0 0.0 0 0.0 0 0 0 55.0 0 -1,336 :m 6 Total /Ave. 0 0.0 0 0.0 31 -1,204 0 55.0 0 -6,652 ,.:em 6 Block 0 0.0 0 0.0 31 -1,204 0 55.0 0 -6,652 . Trane Air Conditioning Economics By: ABACUS CONSULTANTS SYSTEM PSYCHOMETRICS - ALTERNATIVE 1 W System 1 PSYCHROMETRIC STATE POINTS Dry Wet Relat. Humid. Temp. Bulb Bulb Humid. Ratio Enthalpy Diff. (F) (F) ( %) (GR) (Btu /Lb) (F) Space 75.0 64.3 56.6 74.7 29.7 Main System Return Air Heat Pickup 1.5 Return Fan 0.0 Return Air 76.5 64.8 53.9 74.7 30.0 Outdoor Air 82.4 67.9 47.7 80.5 32.4 Return /Outdoor Air Mix 80.5 66.9 49.6 78.6 31.6 Blow through Fan 0.0 Entering Coil 80.5 66.9 49.6 78.6 31.6 Leaving Coil 55.0 53.9 93.5 61.3 22.7 Draw Through Fan 0.0 Duct Frictional Heat 0.0 Supply Duct Heat Gain 0.0 Cold Deck Supply Air 55.0 • 53.9 93.5 61.3 22.7 Supply Air 55.0 53.9 93.5 61.3 22.7 Percent Outside Air able Heat Ratio (SHR) M...:ent Supply Air Bypassing Coil Coil Airflow 67.72 ( %) 0.691 0.00 ( %) 22,609 (Cfm) V 600 PAGE 43 Trane Air Conditioning Economics By: ABACUS CONSULTANTS SYSTEM PSYCHROMETRICS - ALTERNATIVE 1 1 W System 2 Percent Outside Air able Heat Ratio (SHR) (_.cent Supply Air Bypassing Coil Coil Airflow PSYCHROMETRIC STATE P01NTS Dry Wet Relat. Humid. Temp. Bulb Bulb Humid. Ratio Enthalpy Diff. (F) (F) (%) (GR) (Btu /Lb) (F) Space 75.0 62.1 48.5 63.8 28.0 Main System Return Air Heat Pickup 1.2 Return Fan 0.0 Return Air 76.2 62.5 46.6 63.8 28.3 Outdoor Air 82.4 67.9 47.7 80.5 32.4 Return /Outdoor Air Mix 77.5 63.6 47.0 67.3 29.1 Blow through Fan 0.0 Entering Coil 77.5 63.6 47.0 67.3 29.1 Leaving Coil 56.0 54.0 88.5 60.1 22.8 Draw Through Fan 0.0 Duct Frictional Heat 0.0 Supply Duct Heat Gain 0.0 Cold Deck Supply Air 56.0 54.0 88.5 60.1 22.8 Supply Air 56.0 54.0 88.5 60.1 22.8 20.56 (%) 0.879 0.00 (X) 5,069 (Cfm) V 600 PAGE 44 Trane Air Conditioning Economics By: ABACUS CONSULTANTS SYSTEM PSYCHROMETRICS - ALTERNATIVE 1 W System 4 PSYCHROMETRIC STATE POINTS Dry Wet Relat. Humid. Temp. Bulb Bulb Humid. Ratio Enthalpy Diff. (F) (F) (%) (GR) (Btu /Lb) (F) Space 75.0 65.2 59.7 78.9 30.3 Main System Return. Air Heat Pickup 8.3 Return Fan 0.0 Return Air 83.3 67.8 45.5 78.9 32.4 Outdoor Air 82.4 67.9 47.7 80.5 32.4 Return /Outdoor Air Mix 82.9 67.8 46.6 79.7 32.4 Blow through Fan 0.0 Entering Coil 82.9 67.8 46.6 79.7 32.4 Leaving Coil 55.0 53.9 93.7 61.4 22.7 Draw Through Fan 0.0 Duct Frictional Heat 0.0 Supply Duct Heat Gain 0.0 Cold Deck Supply Air 55.0 53.9 93.7 61.4 22.7 Supply Air 55.0 53.9 93.7 61.4 22.7 Percent Outside Air able Heat Ratio (SHR) rarcent Supply Air Bypassing Coil Coil Airflow 50.71 ( %) 0.634 0.00 ( %) 5,157 (Cfm) V 600 PAGE 45 1 >v ✓nA^14.aw .nt}Nh %•`YP'.�.:'srrk'.�r..w Y• «.:•.r ..... .. r«.+.+m +.*. ,i +er'n. !. "t.**$Yrf;YYt i.�M.Glth?cm�M�N� ✓?ne ��+w�m �rv.ar ... . VtiM'. ltw ^,�ii::`1- �:1..ai:•..++..�. - .�f�v'l ..e n r.ts!)Cesa. i.., n 4. rv... .,.� r... ......« n ........ .w. -. >ww •snn wY .w...r+... - ......u� Trane Air Conditioning Economics By: ABACUS CONSULTANTS BUILDING U- VALUES - ALTERNATIVE 1 W B U I L D I N G U VALUES Room U- Values Room Room (Btu /hr /sqft /F) Mass Capac. Room Sumnr Wintr Summr Wintr (lb/ (Btu/ Number Description Part. ExFlr Skylt Skylt Roof Windo Windo Wall Ceil. sqft) sqft /F) 1 HUMAN SERVICES 0.200 0.000 0.000 0.000 0.000 0.320 0.329 0.100 0.000 89.6 17.60 2 CONFERENCE 0.200 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 86.1 17.22 3 SENIOR ADULT 0.200 0.000 0.000 0.000 0.000 0.320 0.329 0.100 0.000 88.6 17.49 Zone 1 Total /Ave. 0.200 0.000 0.000 0.000 0.000 0.320 0.329 0.100 0.000 88.7 17.50 4 FIRESIDE 0.200 0.000 0.000 0.000 0.000 0.320 0.329 0.126 0.000 93.4 18.55 Zone 2 Total /Ave. 0.200 0.000 0.000 0.000 0.000 0.320 0.329 0.126 0.000 93.4 18.55 5 MULTI_P 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.111 0.000 84.0 16.94 6 DINING 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.107 0.000 83.1 16.87 Zone 3 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.110 0.000 83.5 16.90 7 MISC STOR 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.000 77.8 15.83 Zone 4 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.000 77.8 15.83 8 BANG 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.120 0.000 82.4 16.67 Zone 5 Total /Ave. 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.120 0.000 82.4 16.67 9 CLASS_TRAIN 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 84.3 17.11 Zone 6 Total /Ave. 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 84.3 17.11 10 YOUTH 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 84.5 16.98 7 Total /Ave. 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 84.5 16.98 11 GAMES 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 83.9 16.87 Zone 8 Total /Ave. 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 83.9 16.87 12 DANCE 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 83.9 17.01 Zone 9 Total /Ave. 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 83.9 17.01 13 POTTERY 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 83.9 16.92 Zone 10 Total /Ave. 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 83.9 16.92 14 ARTS 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 84.2 17.00 Zone 11 Total /Ave. 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 84.2 17.00 15 PRESCHOOL 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.127 0.000 83.1 16.77 Zone 12 Total /Ave. 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.127 0.000 83.1 16.77 16 WAIT 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.195 0.000 83.3 17.01 Zone 13 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.195 0.000 83.3 17.01 17 CARDS 0.200 0.000 0.000 0.000 0.000 0.320 0.329 0.100 0.000 86.7 17.29 Zone 14 Total /Ave. 0.200 0.000 0.000 0.000 0.000 0.320 0.329 0.100 0.000 86.7 17.29 18 STOR_ELEC 0.200 0.000 0.000 0.000 0.000 0.000 0.000 0.100 0.000 82.7 16.04 Zone 15 Total /Ave. 0.200 0.000 0.000 0.000 0.000 0.000 0.000 0.100 0.000 82.7 16.04 19 EXT_RR 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.317 82.4 16.69 Zone 16 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.317 82.4 16.69 20 INT_RR 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.317 80.7 16.50 Zone 17 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.317 80.7 16.50 22 CORR 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.317 81.2 16.63 23 CORR_OPEN 0.000 0.000 0.320 0.329 0.033 0.000 0.000 0.000 0.000 111.9 23.84 Zone 18 Total /Ave. 0.000 0.000 0.320 0.329 0.033 0.000 0.000 0.000 0.317 89.6 18.59 '4 SNACK 0.000 0.000 0.320 0.329 0.033 0.320 0.329 0.100 0.000 84.9 16.63 ROT_WAIT 0.320 0.000 0.320 0.329 0.033 0.320 0.329 0.100 0.000 82.6 16.37 Zone 20 Total /Ave. 0.320 0.000 0.320 0.329 0.033 0.320 0.329 0.100 0.000 84.0 16.53 System 1 Total /Ave. 0.204 0.000 0.320 0.329 0.033 0.320 0.329 0.107 0.317 84.5 17.06 V 600 PAGE 46 Irene Air Conditioning Economics By: ABACUS CONSULTANTS BUILDING U- VALUES - ALTERNATIVE 1 • W B U I L D I N G U VALUES Ur u.- ..,e.,..„.•......,,...,.«..... ... «...:,... .e ., r,•••.x •nrt. •r.....,„r•..... ..«.. ,.•••• .. • Room U- Values Room Room (Btu /hr /sqft /F) Mass Capac. Room Su mr Wintr Summr Wintr (tb/ (Btu/ Number Description Part. ExFlr Skylt Skylt Roof Windo Windo Wall Cell. sqft) sqft /F) 30 MAIN_RECEPT 0.320 0.000 0.320 0.329 0.033 0.320 0.329 0.100 0.000 84.1 16.54 Zone 30 Totat /Ave. 0.320 0.000 0.320 0.329 0.033 0.320 0.329 0.100 0.000 84.1 16.54 31 ADMIN OPEN 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.100 0.000 81.8 16.62 Zone 31 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.100 0.000 81.8 16.62 32 REC_SUP 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 87.0 17.19 Zone 32 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 87.0 17.19 33 YOUTH AD 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 86.2 17.10 Zone 33 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 86.2 17.10 34 TEEN 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 83.5 16.81 Zone 34 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 83.5 16.81 35 STAFF 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 81.7 16.61 Zone 35 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 81.7 16.61 36 REST_STOR 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.317 80.5 16.47 Zone 36 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.317 80.5 16.47 37 AD CORR 0.000 0.000 0.320 0.329 0.033 0.000 0.000 0.000 0.317 84.5 17.40 37 Total /Ave. 0.000 0.000 0.320 0.329 0.033 0.000 0.000 0.000 0.317 84.5 17.40 38 INT_OFFS 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.000 80.6 16.49 Zone 38 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.000 80.6 16.49 System 2 Total /Ave. 0.320 0.000 0.320 0.329 0.033 0.320 0.329 0.100 0.317 83.1 16.74 42 GYM 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.110 0.000 83.8 16.89 43 STOR 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.100 0.000 95.2 18.15 Zone 40 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.107 0.000 84.7 16.99 System 3 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.107 0.000 84.7 16.99 48 LOCK SHOWER 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.317 98.6 19.92 49 FAMILY 0.200 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.317 92.7 18.91 Zone 48 Total /Ave. 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.317 98.0 19.81 50 FITNESS 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 82.2 16.67 Zone 50 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 82.2 16.67 53 RAQWEST 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.100 0.000 84.3 16.85 54 RAG EAST 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.100 0.000 88.6 17.33 Zone 51 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.100 0.000 86.5 17.09 55 GYM_CORR 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.250 0.000 74.6 14.97 Zone 52 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.250 0.000 74.6 14.97 System 4 Total /Ave. 0.200 0.000 0.000 0.000 0.033 0.320 0.329 0.110 0.317 86.2 17.34 60 KITCHEN 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.317 81.9 16.64 Zone 60 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.317 81.9 16.64 System 5 Totat /Ave. 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.317 81.9 16.64 71 MEZZ C 0.000 0.000 0.000 0.000 0.000 0.320 0.329 0.100 0.000 70.5 14.05 Zone 71 Total /Ave. 0.000 0.000 0.000 0.000 0.000 0.320 0.329 0.100 0.000 70.5 14.05 72 MECH_PENT_W 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.100 0.000 82.3 16.74 72 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.100 0.000 82.3 16.74 /3 MECH_PENTE 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.000 80.6 16.50 Zone 73 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.000 80.6 16.50 System 6 Total /Ave. 0.000 0.000 0.000 0.000 0.033 0.320 0.329 0.100 0.000 81.0 16.51 Building 0.205 0.000 0.320 0.329 0.033 0.320 0.329 0.107 0.317 84.5 17.02 V 600 PAGE 47 •Trpille Air Conditioning Economics By: ABACUS CONSULTANTS BUILDING U - ALTERNATIVE 1 • I.. 1.4 7 "" ------ •----------------------------- U - ----------------- =, -------------- „ ---- 7 - 7' ---------- 7'7' - Room U-Values ---------------------- (Btu/hr/sqft/F) Room Summr Wintr Sum r Wintr Number Description Part. ExFlr Skylt Skylt Roof Wind° Wind° Wall Ceil. Room Room Mass Capac. (lb/ : (Btu/ 'sqft) sqft/F) V 600 PAGE 48 re.�... err..: n. aussu, ra. �czK' amc•< u✓ xu, s: mnrw usueasnt• �. mN rn, nrw+ rr�wxw. S�1`+ aW. 9b.^a16RVN�hSthENeraS r�r a. iv+. w.« ww »,r+n..x.w.,.n...sxw.rwr..ra+ rrNN arwnrnefiwrvwmnfltV.• 7. f: �l 1NCM1E'.Cd�fAJ]r�f+7k&?7Wk?i' tl l Trane Air Conditioning Economics By ABACUS CONSULTANTS BUILDING AREAS - ALTERNATIVE 1 1 Floor Number of Area /Dupl Room Duplicate Room Number Description Flr Rm (sqft) BUILDING AREAS V 600 PAGE 49 Total Exposed Floor Partition Floor Skylight Sid Net Roof Window Win Net Wall Area Area Area Area /Rf Area Area /Wl Area (sqft) (Ggft) (sqft) (sqft) ( %) (sqft) (sqft) ( %) (sqft) 1 HUMAN SERVICES 1 1 405 405 405 0 0 0 0 2 CONFERENCE 1 1 135 135 135 0 0 0 0 0 0 0 22 26 3 SENIOR ADULT 1 1 510 510 510 0 0 0 0 45 16 244 Zone 1 Total /Ave. 1,050 1,050 0 0 0 0 120 19 511 4 FIRESIDE 1 1 586 586 586 0 0 0 Zone 2 Total /Ave. 0 134 37 229 586 586 0 0 0 0 134 37 229 5 MULTI_P 1 1 1,065 1,065 0 0 0 0 1,160 268 32 562 6 DINING 1 1 1,143 1,143 0 0 0 0 Zone 3 Total /Ave. 1,272 128 26 358 2,208 0 0 0 0 2,432 396 30 920 7 N1SC STOR 1 1 745 745 0 0 0 0 564 0 0 Zone 4 Total /Ave. 745 0 0 0 0 0 564 0 0 0 8 BANG 1 1 3,092 3,092 672 0 0 0 Zone 5 Total /Ave. 2,370 771 56 617 3,092 672 0 0 0 2,370 771 56 617 9 CLASS TRAIN 1 1 756 756 192 0 0 0 690 Zone 6 Total /Ave. 90 45 110 756 192 0 0 0 690 90 45 110 10 YOUTH 1 1 915 915 224 0 0 0 735 90 19 394 c...,a 7 Total /Ave. 915 224 0 0 0 735 11 GAMES 1 1 850 850 90 19 3 224 0 0 0 635 30 9 319 9 Zone 8 Total /Ave. 850 224 0 0 0 635 30 9 319 12 DANCE 1 1 920 920 224 0 0 0 807 60 26 173 Zone 9 Total /Ave. 920 224 0 0 0 807 60 26 173 13 POTTERY 1 1 778 778 96 0 0 0 736 90 22 313 Zone 10 Total /Ave. 778 96 0 0 0 736 90 22 313 14 ARTS 1 1 996 996 224 0 0 0 Zone 11 Total /Ave.' 90 22 313 996 224 0 0 0 864 90 22 313 15 PRESCHOOL 1 1 1,080 1,080 224 0 0 0 Zone 12 Total /Ave. 864 92 23 317 1,080 224 0 0 0 864 92 23 317 16 WAIT 1 1 528 528 0 0 0 0 Zone 13 Total /Ave. 641 121 61 79 528 0 0 0 0 641 121 61 79 17 CARDS 1 1 760 760 760 0 0 0 Zone 14 Total /Ave. 0 45 33 91 760 760 0 0 0 0 45 33 91 18 STOR_ELEC 1 1 280 280 126 0 0 0 0 0 0 288 Zone 15 Total /Ave. 280 126 0 0 0 0 0 0 288 19 EXT_RR 1 1 430 430 0 0 0 0 445 16 10 140 Zone 16 Total /Ave. 430 0 0 0 0 445 16 10 140 20 INT_RR 1 1 227 227 0 0 0 0 235 Zone 17 Total /Ave. 0 0 0 227 0 0 0 0 235 0 0 0 22 CORR 1 1 1,370 1,370 0 0 0 0 1,490 0 0 23 CORR_OPEN 1 1 512 512 0 0 403 16 2,085 0 0 0 Zone 18 Total /Ave. 1,882 0 0 403 10 3,575 0 0 0 24 SNACK 1 1 690 690 0 0 212 28 536 422 32 900 25 ROT_WAIT 1 1 485 485 150 0 149 28 376 292 51 280 Zone 20 Total /Ave. 1,175 150 0 360 28 913 714 38 1,181 System 1 Total /Ave. 19,258 4,752 0 763 4 16,506 2,859 32 5,993 ' 1 , 17A W.ti Trane Air Conditioning Economics By: ABACUS CONSULTANTS BUILDING AREAS - ALTERNATIVE 1 r.urwr+wc• B U I L D I N G AREAS ar:. x: �xi» wr.. r. wti•+... wr».......:...... �w. u+ s,..« w, a. ex»... xraa: yr'+? xa+ faruttizf�'sl'Hketa+73A'trYxMU! 'nax.9GV79N��rssNnN V 600 PAGE 50 Floor Total Exposed Humber of Area /Dupl Floor Partition Floor Skylight Skl Net Roof Window Win Net Wall Room Duplicate Room Area Area Area Area /Rf Area Area /Wt Area Number Description Flr Rm (sqft) (sqft) (sqft) (sqft) (agft) (%) (sqft) (sqft) (%) (sqft) 30 MAIN_RECEPT 1 1 1,193 1,193 150 0 366 28 926 641 34 1,238 Zone 30 Totat /Ave. 1,193 150 0 366 28 926 641 34 1,238 31 ADMIN_OPEN 1 1 989 989 0 0 0 0 1,018 0 0 225 Zone 31 Total /Ave. 989 0 0 0 0 1,018 0 0 225 32 REC_SUP 1 1 160 160 0 0 0 0 165 27 12 193 Zone 32 Total /Ave. 160 0 0 0 0 165 27 12 193 33 YOUTH AD 1 1 200 200 0 0 0 0 206 126 38 210 Zone 33 Total /Ave. 200 0 0 0 0 206 126 38 210 34 TEEN 1 1 132 132 0 0 0 0 136 27 27 73 Zone 34 Total /Ave. 132 0 0 0 0 136 27 27 73 35 STAFF 1 1 266 266 0 0 0 0 274 63 54 54 Zone 35 Totat /Ave. 266 0 0 0 0 274 63 54 54 36 REST_STOR 1 1 230 230 0 0 0 0 235 0 0 0 Zone 36 Total /Ave. 230 0 0 0 0 235 0 0 0 37 AD_CORR 1 1 559 559 0 0 101 11 787 0 0 0 37 Total /Ave. 559 0 0 101 11 787 0 0 0 38 INT_OFFS 1 1 348 348 0 0 0 0 359 0 0 0 Zone 38 Total /Ave. 348 0 0 0 0 359 0 0 0 System 2 Total /Ave. 4,077 150 0 466 10 4,107 884 31 1,993 42 GYM 1 1 10,935 10,935 0 0 0 0 11,754 732 12 5,562 43 STOR 1 1 970 970 0 0 0 0 1,042 0 0 2,594 Zone 40 Total /Ave. 11,905 0 0 0 0 12,796 732 8 8,156 System 3 Total /Ave. 11,905 0 0 0 0 12,796 732 8 8,156 48 LOCK SHOWER 1 1 1,920 1,920 1,920 0 0 0 1,983 63 8 692 49 FAMILY 1 1 240 240 180 0 0 0 248 0 0 0 Zone 48 Total /Ave. 2,160 2,100 0 0 0 2,231 63 8 692 50 FITNESS 1 1 2,400 2,400 0 0 0 0 2,479 195 22 700 Zone 50 Total /Ave. 2,400 0 0 0 0 2,479 195 22 700 53 RAO_WEST 1 1 800 800 0 0 0 0 800 0 0 600 54 RAQ_EAST 1 1 800 800 0 0 0 0 800 0 0 1,260 Zone 51 Total /Ave. 1,600 0 0 0 0 1,600 0 0 1,860 55 GYM_CORR 1 1 1,389 1,389 0 0 0 0 508 0 0 240 Zone 52 Total /Ave. 1,389 '0 0 0 0 508 0 0 240 System 4 Total /Ave. 7,549 2,100 0 0 0 6,818 258 7 3,492 60 KITCHEN 1 1 850 850 0 0 0 0 878 90 30 206 Zone 60 Total /Ave. 850 0 0 0 0 878 90 30 206 System 5 Total /Ave. 850 0 0 0 0 878 90 30 206 71 MEZZ_C 1 1 115 115 0 0 0 0 0 130 93 10 Zone 71 Total /Ave. 115 0 0 0 0 0 130 93 10 72 MECH_PENT_W 1 1 1,288 1,288 0 0 0 0 1,392 0 0 277 ie 72 Total /Ave. 1,288 0 0 0 0 1,392 0 0 277 73 MECH_PENT_E 1 1 1,120 1,120 0 0 0 0 1,157 0 0 0 Zone 73 Total /Ave. 1,120 0 0 0 0 1,157 0 0 0 System 6 Total /Ave. 2,523 0 0 0 0 2,549 130 31 287 Building 46,162 7,002 0 1,230 3 43,653 4,953 20 20,127 Y Trane Air Conditioning Economics By: ABACUS CONSULTANTS BUILDING AREAS - ALTERNATIVE 1 V 600 PAGE 51 BUILDING AREAS Floor Total. Exposed Number of Area /Dupl Floor Partition Floor Skylight Skl Net Roof Window Win Net Wall Room Duplicate Room Area Number Description Fir Rm Area Area Area /Rf Area Area /Wl Area (sqft) (sgft) (sqft) (sqft) (sqft) ( %) (sqft) (sqft) (X) (sqft) Trane Air Conditioning Economics By: ABACUS CONSULTANTS ASHRAE 90 ANALYSIS - ALTERNATIVE 1 ASHRAE 90. ANALYSIS Overall Roof U -Value = 0.041 (Btu /Hr /Sq Ft /F) Overall Wall U -Value = 0.149 (Btu /Hr /Sq Ft /F) Overall Building U -Value = 0.080 (Btu /Hr /Sq Ft /F) Roof Overall Thermal Transfer Value (OTTVr) = 3.44 (Btu /Hr /Sq Ft) Wall Overall Thermal Transfer Value (OTTVw) = 21.42 (Btu /Hr /Sq Ft) V 600 PACE 52 ix %A13 i e, .:! Kf ;4r:n'S'r /::a.uin•ti.'.+g :: rri.Z.N ta1t,AIt` v x 3 pi wow.V.,...ett dYSO4 Fire Department Review Control #M96 -0015 (510) Dear Sir: City of Tukwila Fire Department February 20, 1996 Re: Tukwila Community Center - 12424 - 42nd Avenue South The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air - moving equipment upon detection of smoke in the main supply -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (UMC 608) H.V.A.C. units rated at 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #1742) Duct smoke detectors shall be capable of being reset from the alarm panel. (City Ordinance #1742) 2. All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained, (City Ordinance #1742) (UFC 1001.3) Dedicated fire alarm system circuit breaker(s) shall be equipped with a mechanical lockout device. (NFPA John W. Rants, Mayor Thomas P. Keefe, Are Chief Headquarters Station: 444 Andover Panf East • Tukwila, Washington 98188 • Phone: (206) 5754404 • Fax (206) 575,4439 :Yours truly, cc: TFD file ncd c City of Tukwila Fire Department Page number 2 The Tukwila Fire Prevention Bureau 72 (1- 5.2.8.2)) In areas that are not continuously occupied, automatic smoke detection shall be provided at each control unit(s) location to provide notification of fire at that location. ‘NFPA 1 -5.6) This review limited to speculative tenant space only - special fire permits may be necessary depending on detailed description of intended use. Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. John W. Rants, Mayor Thomas P. Keefe, Fire Chief Headouarters Station : 444 Andover Park East • Tukwila Washington 98188.. Phone 12061 5754404 Fax 12061 575.4439 Taal Uni*Iikktatt4vszotomakertvaamowitatttiettemisikaottftimimmtmow,..Th,„.u,,,,,,ftwoo***tforprintimilxvititanivrosootasupiti4toortoc,p SCOTT 8. FROM CO INC 41:4 4733992 DEPARTMENT OF LABOR AND INDUSTRIES: THIS CERTIFIES THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED 8Y LAW AS A • ' • • • • 4' , . 4 3820 ,S. JUNE TTE ST • TA COP .WA 9844)9 • * 25 P 7 g7 7152_,y .• 370 P01 FEB 23 '96 09:08 PRIMARY AIR - COLD DECK -cam LE 12x8 I4I S T f OMOD I s NEW MECHANICAL WORK (HEAVY UNE) -- SHEET NUMBER WHERE SECTION IS DRAWN SHEET NUMBER WHERE SECTION 15 TAKEN FOUIPMFNT TFRMINAI BOX - SINGI F DIRT ROY 41,SE72000 zalsms vl --1 (Sr _ ,I 06,7 ,90 15:41 ARCHITECTURAL BACKGROUND (THIN UNE) EXISTING WORK OR EQUIPMENT (THIN UNE) EXISTING WORK TO BE REMOVED MATCHUNE OR PROPERTY UNE SECTION IDENTIFICATION (OFTAII SIMILAR) INDICATES DIRECTION OF CUTTING PLANE LETTER INDICATES SECTION (NO. INDICATES DETAIL) TYPICAL EQUIPMENT DESIGNATION (EXHAUST FAN SHOWN) BOX NO. LOW PRESSURE DUCT CONTROLS, TYP HEATING OR COOLING COIL ALTER ROOM THERMOSTAT OR TEMPERATURE TRAMSMITTER DUCTWORK DUCT (1ST FIGURE = SIDE SHOWN, 2ND FIGURE - SIDE NOT SHOWN) DUCT SECTION, POSITIVE PRESSURE DUCT SECTION, NEGATIVE PRESSURE ROUND DUCT SECTION DUCT SECTION, (CROSSHATCHING INDICATES PENETRATION THRU FLOOR OR ROOF) INCLINE RISE (5) OR DROP (0) IN DIRECTION OF ARROW FLEXIBLE CONNECTION VOLUME DAMPER r VOLUME DAMPER WITH REMOTE d OPERATOR a1 � - -1-HR RATING, AS APPLICABLE FIRE DAMPER ( -1 = HORIZ DUCT, —AI = VERT DUCT), 2-HR RATED, UON SMOKE DAMPER COMBINATION FIRE /SMOKE DAMPER EXISTING ARE DAMPER MOTOR OPERATED DAMPER OR 0 12X12 CD1 200 50 AFMS I SPMS RL ORL — - - - —140— CHS CHR HW5 HWR —RV— GV SP DRY J + Y 140 — SYMBOLS 90' ELBOW, R/D OR R/W =1.5 SQUARE CORNER ELBOW WITH TURNING VANES 90 OR TEE 90' CONICAL TAKE -OFF 45' LATERAL TAKE -OFF TRANSITION OR REDUCER (FOT= FLAT ON TOP, FOB =FLAT ON BOTTOM) WYE FITTING 90' RECTANGULAR TAKE -OFF WITH 45' TAPER 90' DIVERGING RECTANGULAR TEE, EITHER RADIUS OR TURNING VANES PARALLEL FLOW BRANCH CONNECTION, EITHER RADIUS OR TURNING VANES FLEXIBLE DUCT ROUND DUCT INDICATOR DUCTWORK OR PIPING OFFSET WITH 2-45' ELBOWS TERMINALS NECK SIZE DIFFUSER /GRILLE TYPE, AND NUMBER DESIGN CFM (WHERE APPLICABLE) CEILING DIFFUSER (FLOW ARROWS SHOWN ONLY IF AIRFLOW NOT SYMMETRICAL) s — CEILING RETURN /EXHAUST GRILLE UNEAR DIFFUSER, CEILING OR WALL MOUNTED (FLOW ARROWS SHOWN ONLY IF AIRFLOW NOT SYMMETRICAL) WALL SUPPLY GRILLE (SG) WALL RETURN /EXHAUST GRILLE (RG, EG) TRANSFER GRILLE (TG), DUCT CONNECTED, WALL MOUNTED WITH OPTIONAL CFM SHOWN TRANSFER GRILLE, CEILING MOUNTED WITH FULL-SIZED LINED DUCT CONNECTION AIRFLOW THRU DOOR GRILLE OR UNDERCUT WITH OPTIONAL CFM SHOWN AIRFLOW MEASURING STATION STATIC PRESSURE MEASURING STATION PIPING WASTE (W) VENT (V) RAIN LEADER OVERFLOW RAIN LEADER COLD WATER (CW) HOT WATER, POTABLE, 120F HOT WATER, POTABLE, TEMPERATURE OTHER THAN 1207 HOT WATER CIRCULATING (HWC), POTABLE, 1207 HOT WATER CIRCULATING, POTABLE, TEMPERATURE OTHER THAN 1207 CHILLED WATER SUPPLY CHILLED WATER RETURN HEATING WATER SUPPLY HEATING WATER RETURN REUEF VENT NATURAL GAS GAS VENT PIPE CAP PIPE PLUG UNION FLANGE . WE STRAINER WE STRAINER WITH CAPPED HOSE END BLOWDOWN VALVE ARE SPRINKLER ARE LINE DRY SPRINKLER DKJ Q W A -I RPBP DCVA 100 ID QI VCD AAV ID 1- P /T 100 rngo ,s GATE VALVE WITH TAMPER SWATCH GATE VALVE OR BALL VALVE BALL VALVE GLOBE VALVE CHECK VALVE BALANCING OR PLUG VALVE BUTTERFLY VALVE PRESSURE REDUCING VALVE (PRV) AUTOMATIC CONTROL VALVE, 2 -WAY AUTOMATIC CONTROL VALVE, 3-WAY RELIEF VALVE BALANCING /MEASURING VALVE FLEXIBLE CONNECTION IN PIPING PIPE ANCHOR PIPE ALIGNMENT GUIDE PIPE SUPPORT VALVE STATION OR ASSEMBLY INDIRECT DRAIN, PIPE TO DRAIN FLOOR DRAIN HEAT TRACE BETWEEN SYMBOLS OR TO END OF RUN HOSE BIBB BREAK IN PIPING OR DUCTWORK SANITARY MAIN PIPING AND AIRFI OW DIAGRAMS PIPING OR DUCTED AIRFLOW NON -DUCTED AIRFLOW FLOW CONTINUATION ARROW PUMP CENTRIFUGAL FAN IN -LINE FAN PLUG FAN VOLUME CONTROL DEVICE ACTUATOR (VALVES AND DAMPERS) MEMORY STOP (VALVES) SIGHT GLASS AUTOMATIC AIR VENT (AAV) PRESSURE GAGE THERMOMETER PRESSURE/TEMPERATURE TEST PORT VENTURI FLOW MEASURING ELEMENT (NUMBER INDICATES GPM) REDUCED PRESSURE BACKFLOW PREVENTER DOUBLE CHECK VALVE ASSEMBLY AUTO FLOW CONTROL VALVE (NUMBER INDICATES GPM) AAV ACU AD AF AFF AFM5 AHU AMB AMU AP ARRGT ATM ASSY BDD BFP BHD BHP BI BOO 80P BOT BTUH CAC CAP CC CD CFM CH CHLR CHP CHR CHS CHW CI CLG CNDS CNTFGL CO COMB COND CONT CONTR CDTG CP CPRSR CRP CRU CTF C.TK CU Cv CV DB DCHP DI DIM DI SCH DMPR DN DPV DIM EA EAC EAT EDH EF EFF EG EL EQUIV ESP EVAP EWC EWT EXH EXT FC FCO FCU FD FDC FF FGDCS FHC FL FLR FLTR FP FPM FPS FS FSRDIG FT ETU FV GA GAL GALV GPM GR GIB AUTOMATIC AIR VENT AIR CONDITIONING UNIT ACCESS DOOR AIRFOIL ABOVE FINISHED FLOOR AIR FLOW MEASURING STATION AIR HANDLING UNIT AMBIENT AIRFLOW MEASURING UNIT ACCESS PANEL ARRANGEMENT ATMOSPHERE ASSEMBLY BOILER BACKDRAFT DAMPER BACKFLOW PREVENTER BOTTOM HORIZONTAL DISCHARGE BRAKE HORSEPOWER BACKWARD INCLINE BOTTOM OF DUCT BOTTOM OF PIPE BOTTOM BRITISH THERMAL UNIT PER HOUR COMMON CONTROL AIR COMPRESSOR CAPACITY COOLING COIL CEILING DIFFUSER CUBIC FEET PER MINUTE CABINET HEATER CHILLER CHILLED WATER PUMP CHILLED WATER RETURN CHILLED WATER CHILLED WATER CAST IRON CEILING, COOLING CONDENSATE CENTRIFUGAL CLEANOUT COMBUSTION CONDENSER, CONDENSATE CONTINUE, CONTROL CONTRACTOR CLEANOUT TO GRADE CIRCULATING PUMP COMPRESSOR CONDENSATE RECEIVER AND PUMPS COMPUTER ROOM AIR CONDITIONING UNIT COOLING TOWER FILTER COMPRESSION TANK CONDENSING UNIT, CUBIC FLOW COEFFICIENT CONSTANT VOLUME DRYER (CONTROL AIR), DRAIN, DIAMETER DRY BULB DISTRIBUTION CHILLED WATER PUMP DUCTILE IRON DIMENSION DISCHARGE DAMPER DOWN DIFFERENTIAL PRESSURE VALVE DOMESTIC WATER HEATER EXHAUST AIR ELECTRONIC AIR CLEANER ENTERING AIR TEMPERATURE ELECTRIC DUCT HEATER EXHAUST FAN EFFICIENCY EXHAUST GRILLE, ENGINE GENERATOR ELEVATION EQUIVALENT EXTERNAL STATIC PRESSURE EVAPORATOR, EVAPORATIV ELECTRIC WATER COOLER ENTERING WATER TEMPERATURE EXHAUST EXTERIOR, EXTERNAL FAHRENHEIT FORWARD CURVE FLOOR CLEANOUT FAN COIL UNIT FIRE DAMPER, FLOOR DRAIN FIRE DEPARTMENT CONNECTION FOULING FACTOR, FLAT FILTER FIBROUS GLASS DUCT CONSTRUCTION STANDARD ( SMACNA) FIRE HOSE CABINET FLANGE FLOOR FILTER FIRE PUMP FEET PER MINUTE FEET PER SECOND FLOOR SINK FIRE, SMOKE AND RADIATION DAMPER INSTALLATION GUIDE ( SMACNA) FAN TERMINAL, FEET FIN TUBE UNIT FACE VELOCITY GAS GAUGE GALLONS GALVANIZED GALLONS PER MINUTE GRAVITY RETURN GYPSUM WALLBOARD HB HC HD HEDV HORIZ HP HPU HT HVAC HVACDCS HVU HWH HWP HWR HIS ID IE KW LAT LB LWR LWS LWCO LIT MB MBH MECH MH MJ MOD MTD NC NI C NO NO. NP NRE NTS OA OBD OD OD OPNG ORL OV PBD PD PF PL POC PR PRV PS PW OD RA RD REF RF RG RH RIO RPBFP RPM SA SCFM SOH SD SECT SF SG SMACNA SO SP 5PKR SPMS SS ST S.TK ABBREVIATIONS HUMIDIFIER HOSE BIBB HEATING COIL HEAD HOSE END DRAIN VALVE HORIZONTAL HORSEPOWER HEAT PUMP UNIT HEAT TRACE HEATING, VENTILATING, AND AIR CONDITIONING HVAC DUCT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE ( SMACNA) HEATING AND VENTILATION UNIT HOT WATER HEATING HOT WATER HEATING PUMP HIGH WALL RETURN, HOT WATER HEATING RETURN HIGH WALL SUPPLY, HOT WATER HEATING SUPPLY INDIRECT DRAIN /INSIDE DIAMETER INVERT ELEVATION KILOWATT LONG, LENGTH LEAVING AIR TEMPERATURE POUND LOW WALL RETURN LOW WALL SUPPLY LOW WATER CUT -OFF LEAVING WATER TEMPERATURE MIXING BOX THOUSAND BTU PER HOUR MECHANICAL MAINTENANCE HOLE MECH. JOINT MOTOR OPERATED DAMPER MOUNTED NORMALLY CLOSED NOT IN CONTRACT NORMALLY OPEN NUMBER NON - POTABLE NON - RECIRCULATING EXHAUST NOT TO SCALE OUTDOOR AIR OPPOSED BLADE DAMPER ON CENTER OUTSIDE DIMENSION OR DIAMETER OPENING OVERFLOW RAIN LEADER OUTLET VELOCITY PUMP PARALLEL BLADE DAMPER PRESSURE DROP, PUMPED DRAIN PLUG FAN PLENUM POINT OF CONNECTION PUMPED RETURN PRESSURE REDUCING VALVE PIPE SUPPORT PUMPED WATER QUICK DISCONNECT RETURN AIR ROOF DRAIN REFERENCE RELIEF FAN RETURN GRILLE RELATIVE HUMIDITY ROUGH -IN ONLY REDUCED PRESSURE BACKFLOW PREVENTER REVOLUTIONS PER MINUTE SUPPLY AIR STD. CUBIC FEET PER MINUTE SCHEDULE STORM DRAIN SECTION SUPPLY FAN SUPPLY GRILLE SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION SCREENED OPENING STATIC PRESSURE SPRINKLER STATIC PRESSURE MEAS. STATION STAINLESS STEEL /SANITARY SEWER SOUND TRAP STORAGE TANK flECEVED CITY OF TUNWILA FEB02 TCV TDH TG THD THR TOD TOP TOS TOF TP TRNSN TYP UBD UH LION V VA VV VCD VD VENT VF VFC VI VI V VTR 818 WCO WG WH WHA WT TEMPERATURE CONTROL VALVE TOTAL DYNAMIC HEAD TRANSFER GRILLE TOP HORIZONTAL DISCHARGE TOTAL HEAT REJECTION TOP OF DUCT TOP OF PIPE TOP OF STEEL TOP OF FOOTING TOTAL PRESSURE TRANSITION TYPICAL UPBLAST DISCHARGE UNIT HEATER UNLESS OTHERWISE NOTED VENT VALVE VARIABLE AIR VOLUME VOLUME CONTROL DEVICE VOLUME DAMPER VENTILATION, VENTILATOR VEE FILTER VARIABLE FREQUENCY CONTROLLER VIBRATION ISOLATOR VARIABLE INLET VANES VENT THRU ROOF WATT, WASTE, WIDE WET BULB (TEMPERATURE) WALL CLEANOUT WATER GAUGE WALL HYDRANT WATER HAMMER ARRESTER WEIGHT SMp °E T 4 0 0 111 0 I, 0, � 010MIS \ON NEW PEV�EW FED PU`N SEPARATE PERMIT REQUIRED POD: 0 MECHANICA ECTRiCUL LUMBING GAS PIPING 10009 61nd 0,6 Me Plus Ch,.iV s 1i1„u1.� 1u ,'lrors n 0.,n= 101,., 01,1 0001900 1,1 r 00191.10., ,,.10,,0,1 cUdw 11I pl CITY OF 1" BUILDING DIVISION 135 6 Ir ; I pur DRAWING INDEX M1.1 MECHANICAL LEGEND AND ABBREVIATIONS M1.2 MECHANICAL NOTES & SCHEDULES M1.3 MECHANICAL SCHEDULES M2.1 FIRST FLOOR PLAN WEST - HVAC M2.2 FIRST FLOOR PLAN EAST - HVAC M2.3 PARTIAL ATTIC PLAN WEST - HVAC M2.4 PARTIAL ATTIC PLAN EAST - HVAC M2.5 HVAC & PIPING DETAILS M2.6 HVAC & PIPING DETAILS M2.7 SEISMIC RESTRAINT DETAILS M2.8 SEQUENCE OF OPERATIONS & DIAGRAMS M2.9 SEQUENCE OF OPERATIONS & DIAGRAMS P1.1 FOUNDATION PLAN WEST - PLUMBING P1.2 FOUNDATION PLAN EAST - PLUMBING P2.1 FIRST FLOOR PLAN WEST - PLUMBING P2.2 FIRST FLOOR PLAN EAST - PLUMBING P2.3 ATTIC PLAN WEST - PLUMBING P2.4 ATTIC PLAN EAST - PLUMBING P2.5 PLUMBING RISER DIAGRAMS P2.6 PLUMBING & FIRE PROTECTION DETAILS A • R • C ARCHITECTS 1101 EAST PIKE STREET SEATTLE, WA 98122- 3915_.. 206 322 3322 206.322 9323 FAX 0 z M1.1 CONTENTS: MECHANICAL LEGEND AND At31:3I -EVIA HUNS SCALE: NONE DRAWN:JMC CHECKED: TEB PROJECT NO, SHEET: K A !I 1 #1 /1 I C. FAN SCHEDULE EQUIP NO. SERVICE TYPE ARRGT/ DISCHARGE AIRFLOW, CFM EXT SP, IN WG MAX OV, FPM RPM MOTOR HP DRIVE REMARKS EF -1 SENIOR CTR CNTFGL INLINE 600 0.38 0.5 615 540 1360 1280 113 BELT AHU -1 166 WOMENS 86 1750 68 7.5 10 iPF EF -2 SENIOR CTR CNTFGL INLINE 530 173 BELT 4 1750 68 7.5 MENS /PRESCHOOL POTTERY & 'PF .PF !FC HWP -1 300 0.375 - 0.5 315 1200 1/4 76 76 15 , 1 1800 + , 1800 r i j 1800 ' 4_ 1800 I I EF -3 CNTFGL INLINE BELT MUA -1 KITCHEN CERAMICS HYDRONIC HEATING SYSTEM APART OF SKID MOUNTED PACKAGED HYDRONIC HEATING SYSTEM HWP -2 HOT WATER '! __ -LINE CNTFGL MEN/WOMEN 240 120 7.5 4 10 8CP -1 BOILER CIRCULATION CNTFGL 68 EF -4 JAN/ELEC CN INLINE 150 3350 1460 80 80 50 10 2000 155 965 1144 __.. - - IJ /A - 1320 1540 1540 1050 1050 1050 1245 1750 1750 1750 1750 1/10 BELT E F -5 LOCKER ROOM CN INLINE UPBLAST UPBLAST UPBLAST UPBLAST UPBLAST INLINE INLINE INLINE INLINE INLINE 1.25 1 0.10 1.5 3/4 BELT LAUNDRY & ADMIN iHYDRONIC HEATING SYSTEM EF-6 RESTROOM KITCHEN HOOD CNTFGL CNTFGL - -- ROOF MOUNTED EXHAUST CP-2 HOT WATER :IN -LINE CNTFGL EF -7 OUTDOOR RESTROOM 1/10 1 10 1/10 1/3 1/3 DIRECT ROOF MOUNTED EF--B OUTDOOR CNTFGL CNTFGL CNTFGL PROP PROP -- - PROP PROP PROP 0.10 0.10 0.63 0.50 0.50 0.50 N/A N/A 780 N/A N/A N/A DIRECT ROOF MOUNTED EF-9 RESTROOM OUTDOOR C NTFGL STORAGE DIRECT ROOF MOUNTED EF -10 DISHWASHER US HT BELT ROOF MOUNTED EF -11 WEST MECH DIRECT EF -12 -- ROOMEXHAU ST__ EAST MEC 2000 2000 2000 900 1/3 1/3 DIRECT ROOM EX HAUST SF -13 SF -14 , MECH SUP DIRECT EAST MEC - 0.50 - 0.50 7A N/A /3 DIRECT DIRECT EF-15 ROOM SU PPLY ELEC CLOSET 1350 1/12 AIR HANDLER SCHEDULE (CONTINUED) AIR HANDLER SCHEDULE EQUIP NO. EQUIP NO. PUMP S CHEDULE TYPE MINIMUM OUTDOOR AIR CFM EQUIP NO SERVICE TYPE I FLOW GPM 1 TOTAL DYNAMIC HEAD, FT H2O PUMP RPM MIN EFF BHP MOTOR HP REMARDS CHP -1 !CHILLED WATER ' SUCTION CNTFGL AHU -1 166 1 86 1750 68 7.5 10 iPF CHP -2 CHILLED WATER END SUCTION CNTFGL !PF 7 22 166 AHU -3 86 4 1750 68 7.5 10 'PF .PF !FC HWP -1 HOT WATER SIN -LINE CNTFGL I 240 I 76 76 15 , 1 1800 + , 1800 r i j 1800 ' 4_ 1800 I I 4 _ 65 65 7.5 10 ''.'PART OF SKID MOUNTED PACKAGED MUA -1 KITCHEN FAN COIL UNIT HYDRONIC HEATING SYSTEM APART OF SKID MOUNTED PACKAGED HYDRONIC HEATING SYSTEM HWP -2 HOT WATER '! __ -LINE CNTFGL i 240 120 7.5 4 10 8CP -1 BOILER CIRCULATION CNTFGL 68 314 PART OF SKID MOUNTED PACKAGED _ YDRONIC HEATING SYSTEM 8CP -2 BOILER CIRCULATION - A N -LINE CNTFGL 120 5 5 5 10 15 15 12 15 70 68 , _ 3/4 1/4 714 1/4 1/4 PART OF SKID MOUNTED PACKAGED iHYDRONIC HEATING SYSTEM CP -1 DOMESTIC HOT WATER SIN -LINE CNTFGL 1 1750 CP-2 HOT WATER :IN -LINE CNTFGL 1750 1750 1750 �'; ,DOMESTIC CP -3 DOMESTIC HOT WATER CNTFGL CP-4 EAST WING DHW CIRCULATION _AN-LINE iIN -LINE CNTFGL AIR HANDLER SCHEDULE (CONTINUED) AIR HANDLER SCHEDULE EQUIP NO. EQUIP NO. AREA SERVED TYPE MINIMUM OUTDOOR AIR CFM SUPPLY FAN 1 EAT DEG F - RETURN FAN 1 COOLING AIRFLOW, CFM 22500 ESP, MOTOR IN WG (1) HP 1.75 20 TYPE PF I DIA. . IN 44 AIRFLOW, CFM ', 20750 ESP, MOTOR IN WG (1) HP! 0.75 7.5 ' TYPE I DIA. j IN PF ! 44 SEE CC -1 COOLING COIL SCHEDULE AHU -1 WEST WING HORIZONTAL AHU -2 ADMIN HORIZONTAL 5400 1.5 5 iPF ' 22 5260 3 !PF 7 22 SEE CC 2 COOLING COIL SCHEDULE AHU -3 GYM HORIZONTAL 20500 9200 ' 1.5 15 r -- 1.8 7.5 .5 .5 'PF .PF !FC - _ 44 ' - - 27 1 12.6 NO RETURN FAN NO COOLING COIL AHU4 LOCKER HORIZONTAL 6600 T .85 y 3 i PF 1_27 NO COOLING COIL MUA -1 KITCHEN FAN COIL UNIT 1500 NO RETURN FAN NO COOLING COIL AIR HANDLER SCHEDULE (CONTINUED) EQUIP NO. HEATING ECUIP N0. FILTER MINIMUM OUTDOOR AIR CFM I REMARKS EAT DEG F THICKNESS,'' IN. MAXIMUM SP DROP CLEAN MAXIMUM SP DROP DIRTY AHU -1 AHU -2' SEE HC -1 HEATING COIL SCHEDULE 2 2 2 2 - -_- 2 0.3 0.3 0.8 0.8 12200 2060 (2) (2) 12900 SEE HC -2 HEATING COIL SCHEDULE 500 AHU -3 AHU4 MUA -1 SEE HC -3 HEATING COIL SCHEDULE 0.3 0.3 0.3 0.8 _ - -_ 0.8 0.8 7100 TWO- SPEED, SINGLE WINDING, MOTOR(/ ),(2) SEE HC-4 HEATING COIL SCHEDULE 3160 (2) HC -3 AHU -3 NO HEATING COIL NO OUTDOOR AIR SCHEDULES NOTES: - (1) ESP IS EXTERNAL TO UNIT CASING; DOES NOT INCLUDE CASING, CLEAN FILTER, WET COOLING COIL, OR HEATING COIL. (2) SEE AIR HANDLER SOUND POWER SCHEDULE FOR ACOUSTIC REQUIREMENTS (3) MOTOR RPM 1800 HI SPEED \900 LO SPEED CHILLED WATER COIL SCHEDULE EQUIP N0. SERVICE AIRFLOW CFM EAT, F DB WB DB LAT , F WB MAX FV FPM MAX AIR PD IN WG H2O FLOW GPM EWT, DEG F LOUT, DEG F MAX H2O PD, FT HD REMARKS CC, AHU-1 CC -2 AHU -2 22500 79 64.5 1 53.5 53.5 500 I .68 5400 77.5 63 54 54 500 .33 132 45 1 55 7.07 34 45I 55 5.89 AMR 1,472009V312-008,11 -2 [Sr a tl 06-29 -1995 09:25 m GENFRAI NOTES - MFCHANICAI 1. "REF" INDICATIONS DENOTE WORK COVERED ELSEWHERE (CIVIL, LANDSCAPE, KITCHEN, ARCHITECTURAL, STRUCTURAL, OR ELECTRICAL), OR ITEM BASED ON A SPECIFIC MANUFACTURER'S DIMENSIONS (VERIFY). 2. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS (VOLTAGES, ETC.) OF MECHANICAL EQUIPMENT, UNLESS OTHERWISE INDICATED. 3. SEE ARCH DRAWINGS FOR ROOF CAP, ROOF CURB. ROOF DRAIN, AND VTR DETAILS. 4. PROVIDE CHROME PLATING FOR EXPOSED HW AND CW PIPING IN FINISHED ROOMS. 5. PROVIDE ESCUTCHEON PLATES FOR EXPOSED PIPING PENETRATIONS AND SHEET METAL FLASHING FOR EXPOSED DUCTWORK PENETRATIONS. 6. SEAL CONNECTIONS TO AIR SHAFTS AIRTIGHT. 7. PROVIDE AIRTIGHT SEAL AROUND PENETRATIONS IN AIR PLENUMS. 8. DUCTWORK AND PIPING INSTALLED ADJACENT TO ELECTRICAL CABLE TRAYS SHALL ALLOW MINIMUM ACCESS OF 6" ABOVE AND TO THE SIDE OF CABLE TRAYS. MEP-IAN! CAI ECUI PMENT I NSTAI J ATI ON NOTES 1. VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT ACCESS CLEARANCES CAN BE MET. 2. INSTALL SUSPENDED EQUIPMENT CONTAINING FANS THAT ARE NOT INTERNALLY SPRING ISOLATED WITH SPRING -AND- NEOPRENE HANGERS. PIPING NOTES 1. PROVIDE UNIONS OR FLANGES AT PIPING CONNECTIONS TO EQUIPMENT, COILS, TRAPS. CONTROL VALVES, AND OTHER COMPONENTS TO ALLOW DISASSEMBLY FOR MAINTENANCE. 2. PROVIDE REDUCERS AS REQUIRED FROM LINE PIPE SIZE TO EQUIPMENT/TRAP /COIL /CONTROL VALVE CONNECTION SIZE. 3. PROVIDE PIPING OFFSETS FOR BRANCH LINES TO EQUIPMENT. 4. PROVIDE DIELECTRIC UNIONS AT CONNECTIONS OF DISSIMILAR PIPE. 5. FOR PIPING TO ZONE HEATING COILS, COORDINATE LOCATIONS WITH DUCT LAYOUT DRAWINGS. PIPE SUPPLY WATER LINES TO COIL LEAVING AIR SIDES (AT BOTTOM) TO OBTAIN COUNTERFLOW ARRANGEMENT. 6. PROVIDE PRESSURE /TEMPERATURE TEST PORTS AT SUPPLY AND RETURN PIPING CONNECTIONS TO EQUIPMENT. 7, PROVIDE 2 -32 PSI PRESSURE RANGE FOR AUTO FLOW CONTROL VALVES UNLESS OTHERWISE NOTED. INSUI ATI ON /I INI NG NOTFG 1. EXTENT OF INTERNAL DUCT LINING: a. LOW PRESSURE RECTANGULAR SUPPLY AIR. b. RECTANGULAR RETURN AIR. 0. RECTANGULAR OUTDOOR AIR INTAKE. d. GRILLE AND DIFFUSER BOXES AND BOOTS. 2. EXTENT OF EXTERNAL DUCT INSULATION: a. SUPPLY AND RETURN AIR IN UNCONDITIONED SPACES AND MECHANICAL ROOMS NOT SPECIFIED TO BE INTERNALLY LINED. b. SUPPLY AIR ABOVE CEILINGS OR EXPOSED NOT SPECIFIED TO BE INTERNALLY LINED. 3. WRAP MISCELLANEOUS DUCT FITTINGS (CONICAL TAKEOFFS, ETC.) WITH INSULATION FOR CONDENSATION CONTROL. 4. AT LOCATIONS WHERE PLUMBING PIPING IS EXPOSED UNDER LAVATORIES, INSULATE THE EXPOSED PIPING AND TRAPS. FIRE PROTECTION NOTES 1. SPRINKLER CONTRACTOR - SEE ARCHITECT DWG'S SHOWING SPRINKLER HEAD LOCATION. SPRINKLER HEAD'S TO BE LOCATED AS INDICATED ON DWG'S BY ARCHITECT. VERIFY SPRINKLER HEAD LOCATIONS WITH CODE, ANY ALTERATIONS TO SPRINKLER HEAD LOCATION MUST BE APPROVED BY ARCHITECT. 2. ROUTE SPRINKLER PIPING AS CLOSE TO ROOF STRUCTURE AS POSSIBLE. PIJIMBING NOTES 1. PROVIDE WATER HAMMER ARRESTERS AT THE END OF HOT AND COLD WATER LINES SERVING TWO OR MORE FIXTURES; SIZE IN ACCORDANCE WITH PLUMBING AND DRAINAGE INSTITUTE REQUIREMENTS. 2. PROVIDE INDIRECT DRAIN PIPING FROM RPBFP TO NEAREST DRAIN; INSTALL FUNNEL AT RPBFP IF REQUIRED. 3. ROUTE COOLING COIL CONDENSATE DRAINS TO FLOOR DRAINS, SERVICE SINKS, CRAWL SPACE, OUTDOORS. ROOF. AS INDICATED. 4. PROVIDE TRAP PRIMERS AND PIPING FOR DRAINS AND FLOOR SINKS. ARRANGE PIPING TO ACHIEVE EQUAL FLOW TO EACH DRAIN AND FLOOR SINK FOR TRAP PRIMERS SERVING MULTIPLE DRAINS AND FLOOR SINKS. NOTES SHEET METAL NOTES 1. COORDINATE DUCTWORK WITH MISCELLANEOUS OBSTRUCTIONS IN CEILING SPACE. 2. DUCTWORK SIZES ARE INTERIOR DIMENSIONS. 3. PROVIDE 5 -PIECE OR SMOOTH SHEET METAL ELBOWS FOR CHANGES IN DIRECTION OF ROUND DUCTS. 4. PROVIDE CONICAL TAKEOFFS WITH VOLUME DAMPERS FOR ROUND DUCT BRANCHES, MINIMUM INLET DIAMETER 2 - INCHES LARGER THAN DUCT SIZE. 5. PROVIDE A MANUAL VOLUME DAMPER FOR EACH SUPPLY, RETURN AND EXHAUST AIR TERMINAL. 6. PROVIDE FLEXIBLE CONNECTION AT EACH DUCT CONNECTION TO FANS, EXTERNALLY- ISOLATED AIR HANDLING UNITS, FAN COIL UNITS, AND SIMILAR EQUIPMENT. 7. PROVIDE THREE FEET MINIMUM OF STRAIGHT SHEET METAL DUCT AT INLET OF EACH TERMINAL BOX; MATCH BOX CONNECTION SIZE. 8. MEDIUM PRESSURE FLEX DUCT CONNECTIONS MAY BE PROVIDED TO TERMINAL BOXES WHERE SPACE PERMITS. MINIMUM DEVELOPED LENGTH 3-FT., MAXIMUM DEVELOPED LENGTH 10-FT. INSTALL WITH STRAIGHT SECTIONS ONLY - NO BENDS OR KINKS ALLOWED. SUPPORT WITH MINIMUM 1 -INCH WIDE STRAPS AROUND DUCT, MAXIMUM SUPPORT SPACING B' -0", MAXIMUM SAG 0.5 -INCH PER FOOT OF SUPPORT SPACING. SUPPORT SYSTEM SHALL NOT CAUSE OUT OF ROUND SHAPE. 9. DUCTWORK DOWNSTREAM OF TERMINAL BOXES: a. PROVIDE TERMINAL BOX DISCHARGE DUCTWORK OF CONSTANT SIZE TO MATCH BOX DISCHARGE CONNECTION SIZE, OR MINIMUM SIZE PER SCHEDULE; MINIMUM 5 FT. OF RUN PRIOR TO FIRST TAKEOFF. b. PROVIDE CONICAL TAKEOFFS WITH VOLUME DAMPERS FOR DUCT BRANCHES FROM TERMINAL BOX DISCHARGE DUCTS (DO NOT USE STRAIGHT TEE'S). c. LOW PRESSURE FLEX DUCT MAY BE PROVIDED TO TERMINALS, WHERE SPACE PERMITS. MINIMUM DEVELOPED LENGTH 3-FT, MAXIMUM DEVELOPED LENGTH 10-FT. SUPPORT WITH MINIMUM 1 -INCH WIDE STRAPS AROUND DUCT, MAXIMUM SUPPORT SPACING 8' -0", MAXIMUM SAG 0.5 -INCH PER FOOT OF SUPPORT SPACING. SUPPORT SYSTEM SHALL NOT CAUSE OUT OF ROUND SHAPE. 10. PROVIDE HIGH EFFICIENCY PROFILE AIRFOIL TURNING VANES FOR RECTANGULAR SQUARE THROAT ELBOWS. 11. PROVIDE ACOUSTICAL TURNING VANES FOR RETURN AIR MITERED ELBOWS. 12. PROVIDE BLANK -OFF BAFFLES ON CD'S AS REQUIRED TO ACHIEVE THROW DIRECTIONS INDICATED; PROVIDE CUSHION HEAD EXTENDING 1/2 NECK DIAMETER BEYOND NECK, WITH CONTROL GRID IN NECK AT TAKEOFF POINT. 13. MAINTAIN MINIMUM 2' -0" CLEARANCE AT INLET AND OUTLET OF RA OPENINGS ABOVE CEILINGS. MAINTAIN MAXIMUM CLEARANCE POSSIBLE AT INLET AND OUTLET OF RA OPENINGS IN SHAFTS. 1r ji 11 ,0% 1,15 I'(tll\l II Fb 22199G ECEIVED CITY R CF Tl1KWIlA, FEB 0 2 199( PERMIT CENTER A • R • C ARCHITECTS _- _. -1101. EAST PIKE STVEET__.. SEATTLE, WA 98122 - 3912. 206.322 3322 .. ..- 206.322.9323 FAX , _ DATE: 07.01.95 CONTENTS MECHANICAL - NOTES SCHEDULES SCALE NONE DRAWN: JMC CHECKED: TEB PROJECT NO SHEET: WATER HEA TING COIL SCHEDULE ECUIP N0. SERVICE CAPACITY WM I AIRFLOW O MINIMUM CFM EAT DEG F MAX FV FPM MAX AIR PD, IN WG H2O FLOW GPM EWT, DEG F MAX H2O PD, FT HD REMARKS HC -1 _jAHU HCr2 -1 460.5 12900 23 22 500 .07 48 180 ,1.6 AHU -2 77.7 2180 500 .06 8 180 HC -3 AHU -3 721.6', _, _ 20500 53 500 .09 75 180 2.4 HC, AHU-4 114.9 I t 3650 26 I 500 .06 ` 12 180 4.2 SCHEDULES NOTES: - (1) ESP IS EXTERNAL TO UNIT CASING; DOES NOT INCLUDE CASING, CLEAN FILTER, WET COOLING COIL, OR HEATING COIL. (2) SEE AIR HANDLER SOUND POWER SCHEDULE FOR ACOUSTIC REQUIREMENTS (3) MOTOR RPM 1800 HI SPEED \900 LO SPEED CHILLED WATER COIL SCHEDULE EQUIP N0. SERVICE AIRFLOW CFM EAT, F DB WB DB LAT , F WB MAX FV FPM MAX AIR PD IN WG H2O FLOW GPM EWT, DEG F LOUT, DEG F MAX H2O PD, FT HD REMARKS CC, AHU-1 CC -2 AHU -2 22500 79 64.5 1 53.5 53.5 500 I .68 5400 77.5 63 54 54 500 .33 132 45 1 55 7.07 34 45I 55 5.89 AMR 1,472009V312-008,11 -2 [Sr a tl 06-29 -1995 09:25 m GENFRAI NOTES - MFCHANICAI 1. "REF" INDICATIONS DENOTE WORK COVERED ELSEWHERE (CIVIL, LANDSCAPE, KITCHEN, ARCHITECTURAL, STRUCTURAL, OR ELECTRICAL), OR ITEM BASED ON A SPECIFIC MANUFACTURER'S DIMENSIONS (VERIFY). 2. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS (VOLTAGES, ETC.) OF MECHANICAL EQUIPMENT, UNLESS OTHERWISE INDICATED. 3. SEE ARCH DRAWINGS FOR ROOF CAP, ROOF CURB. ROOF DRAIN, AND VTR DETAILS. 4. PROVIDE CHROME PLATING FOR EXPOSED HW AND CW PIPING IN FINISHED ROOMS. 5. PROVIDE ESCUTCHEON PLATES FOR EXPOSED PIPING PENETRATIONS AND SHEET METAL FLASHING FOR EXPOSED DUCTWORK PENETRATIONS. 6. SEAL CONNECTIONS TO AIR SHAFTS AIRTIGHT. 7. PROVIDE AIRTIGHT SEAL AROUND PENETRATIONS IN AIR PLENUMS. 8. DUCTWORK AND PIPING INSTALLED ADJACENT TO ELECTRICAL CABLE TRAYS SHALL ALLOW MINIMUM ACCESS OF 6" ABOVE AND TO THE SIDE OF CABLE TRAYS. MEP-IAN! CAI ECUI PMENT I NSTAI J ATI ON NOTES 1. VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT ACCESS CLEARANCES CAN BE MET. 2. INSTALL SUSPENDED EQUIPMENT CONTAINING FANS THAT ARE NOT INTERNALLY SPRING ISOLATED WITH SPRING -AND- NEOPRENE HANGERS. PIPING NOTES 1. PROVIDE UNIONS OR FLANGES AT PIPING CONNECTIONS TO EQUIPMENT, COILS, TRAPS. CONTROL VALVES, AND OTHER COMPONENTS TO ALLOW DISASSEMBLY FOR MAINTENANCE. 2. PROVIDE REDUCERS AS REQUIRED FROM LINE PIPE SIZE TO EQUIPMENT/TRAP /COIL /CONTROL VALVE CONNECTION SIZE. 3. PROVIDE PIPING OFFSETS FOR BRANCH LINES TO EQUIPMENT. 4. PROVIDE DIELECTRIC UNIONS AT CONNECTIONS OF DISSIMILAR PIPE. 5. FOR PIPING TO ZONE HEATING COILS, COORDINATE LOCATIONS WITH DUCT LAYOUT DRAWINGS. PIPE SUPPLY WATER LINES TO COIL LEAVING AIR SIDES (AT BOTTOM) TO OBTAIN COUNTERFLOW ARRANGEMENT. 6. PROVIDE PRESSURE /TEMPERATURE TEST PORTS AT SUPPLY AND RETURN PIPING CONNECTIONS TO EQUIPMENT. 7, PROVIDE 2 -32 PSI PRESSURE RANGE FOR AUTO FLOW CONTROL VALVES UNLESS OTHERWISE NOTED. INSUI ATI ON /I INI NG NOTFG 1. EXTENT OF INTERNAL DUCT LINING: a. LOW PRESSURE RECTANGULAR SUPPLY AIR. b. RECTANGULAR RETURN AIR. 0. RECTANGULAR OUTDOOR AIR INTAKE. d. GRILLE AND DIFFUSER BOXES AND BOOTS. 2. EXTENT OF EXTERNAL DUCT INSULATION: a. SUPPLY AND RETURN AIR IN UNCONDITIONED SPACES AND MECHANICAL ROOMS NOT SPECIFIED TO BE INTERNALLY LINED. b. SUPPLY AIR ABOVE CEILINGS OR EXPOSED NOT SPECIFIED TO BE INTERNALLY LINED. 3. WRAP MISCELLANEOUS DUCT FITTINGS (CONICAL TAKEOFFS, ETC.) WITH INSULATION FOR CONDENSATION CONTROL. 4. AT LOCATIONS WHERE PLUMBING PIPING IS EXPOSED UNDER LAVATORIES, INSULATE THE EXPOSED PIPING AND TRAPS. FIRE PROTECTION NOTES 1. SPRINKLER CONTRACTOR - SEE ARCHITECT DWG'S SHOWING SPRINKLER HEAD LOCATION. SPRINKLER HEAD'S TO BE LOCATED AS INDICATED ON DWG'S BY ARCHITECT. VERIFY SPRINKLER HEAD LOCATIONS WITH CODE, ANY ALTERATIONS TO SPRINKLER HEAD LOCATION MUST BE APPROVED BY ARCHITECT. 2. ROUTE SPRINKLER PIPING AS CLOSE TO ROOF STRUCTURE AS POSSIBLE. PIJIMBING NOTES 1. PROVIDE WATER HAMMER ARRESTERS AT THE END OF HOT AND COLD WATER LINES SERVING TWO OR MORE FIXTURES; SIZE IN ACCORDANCE WITH PLUMBING AND DRAINAGE INSTITUTE REQUIREMENTS. 2. PROVIDE INDIRECT DRAIN PIPING FROM RPBFP TO NEAREST DRAIN; INSTALL FUNNEL AT RPBFP IF REQUIRED. 3. ROUTE COOLING COIL CONDENSATE DRAINS TO FLOOR DRAINS, SERVICE SINKS, CRAWL SPACE, OUTDOORS. ROOF. AS INDICATED. 4. PROVIDE TRAP PRIMERS AND PIPING FOR DRAINS AND FLOOR SINKS. ARRANGE PIPING TO ACHIEVE EQUAL FLOW TO EACH DRAIN AND FLOOR SINK FOR TRAP PRIMERS SERVING MULTIPLE DRAINS AND FLOOR SINKS. NOTES SHEET METAL NOTES 1. COORDINATE DUCTWORK WITH MISCELLANEOUS OBSTRUCTIONS IN CEILING SPACE. 2. DUCTWORK SIZES ARE INTERIOR DIMENSIONS. 3. PROVIDE 5 -PIECE OR SMOOTH SHEET METAL ELBOWS FOR CHANGES IN DIRECTION OF ROUND DUCTS. 4. PROVIDE CONICAL TAKEOFFS WITH VOLUME DAMPERS FOR ROUND DUCT BRANCHES, MINIMUM INLET DIAMETER 2 - INCHES LARGER THAN DUCT SIZE. 5. PROVIDE A MANUAL VOLUME DAMPER FOR EACH SUPPLY, RETURN AND EXHAUST AIR TERMINAL. 6. PROVIDE FLEXIBLE CONNECTION AT EACH DUCT CONNECTION TO FANS, EXTERNALLY- ISOLATED AIR HANDLING UNITS, FAN COIL UNITS, AND SIMILAR EQUIPMENT. 7. PROVIDE THREE FEET MINIMUM OF STRAIGHT SHEET METAL DUCT AT INLET OF EACH TERMINAL BOX; MATCH BOX CONNECTION SIZE. 8. MEDIUM PRESSURE FLEX DUCT CONNECTIONS MAY BE PROVIDED TO TERMINAL BOXES WHERE SPACE PERMITS. MINIMUM DEVELOPED LENGTH 3-FT., MAXIMUM DEVELOPED LENGTH 10-FT. INSTALL WITH STRAIGHT SECTIONS ONLY - NO BENDS OR KINKS ALLOWED. SUPPORT WITH MINIMUM 1 -INCH WIDE STRAPS AROUND DUCT, MAXIMUM SUPPORT SPACING B' -0", MAXIMUM SAG 0.5 -INCH PER FOOT OF SUPPORT SPACING. SUPPORT SYSTEM SHALL NOT CAUSE OUT OF ROUND SHAPE. 9. DUCTWORK DOWNSTREAM OF TERMINAL BOXES: a. PROVIDE TERMINAL BOX DISCHARGE DUCTWORK OF CONSTANT SIZE TO MATCH BOX DISCHARGE CONNECTION SIZE, OR MINIMUM SIZE PER SCHEDULE; MINIMUM 5 FT. OF RUN PRIOR TO FIRST TAKEOFF. b. PROVIDE CONICAL TAKEOFFS WITH VOLUME DAMPERS FOR DUCT BRANCHES FROM TERMINAL BOX DISCHARGE DUCTS (DO NOT USE STRAIGHT TEE'S). c. LOW PRESSURE FLEX DUCT MAY BE PROVIDED TO TERMINALS, WHERE SPACE PERMITS. MINIMUM DEVELOPED LENGTH 3-FT, MAXIMUM DEVELOPED LENGTH 10-FT. SUPPORT WITH MINIMUM 1 -INCH WIDE STRAPS AROUND DUCT, MAXIMUM SUPPORT SPACING 8' -0", MAXIMUM SAG 0.5 -INCH PER FOOT OF SUPPORT SPACING. SUPPORT SYSTEM SHALL NOT CAUSE OUT OF ROUND SHAPE. 10. PROVIDE HIGH EFFICIENCY PROFILE AIRFOIL TURNING VANES FOR RECTANGULAR SQUARE THROAT ELBOWS. 11. PROVIDE ACOUSTICAL TURNING VANES FOR RETURN AIR MITERED ELBOWS. 12. PROVIDE BLANK -OFF BAFFLES ON CD'S AS REQUIRED TO ACHIEVE THROW DIRECTIONS INDICATED; PROVIDE CUSHION HEAD EXTENDING 1/2 NECK DIAMETER BEYOND NECK, WITH CONTROL GRID IN NECK AT TAKEOFF POINT. 13. MAINTAIN MINIMUM 2' -0" CLEARANCE AT INLET AND OUTLET OF RA OPENINGS ABOVE CEILINGS. MAINTAIN MAXIMUM CLEARANCE POSSIBLE AT INLET AND OUTLET OF RA OPENINGS IN SHAFTS. 1r ji 11 ,0% 1,15 I'(tll\l II Fb 22199G ECEIVED CITY R CF Tl1KWIlA, FEB 0 2 199( PERMIT CENTER A • R • C ARCHITECTS _- _. -1101. EAST PIKE STVEET__.. SEATTLE, WA 98122 - 3912. 206.322 3322 .. ..- 206.322.9323 FAX , _ DATE: 07.01.95 CONTENTS MECHANICAL - NOTES SCHEDULES SCALE NONE DRAWN: JMC CHECKED: TEB PROJECT NO SHEET: AIR HANDLER SOUND POWER SCHEDULE EQUIP NO PLUMBING FIXTURE SCHEDULE MARK NO FIXTURE T 63 SERVICE SIZE - INCHES I 125 j [2000 1 500 1 1000 2000 REMARKS 1 W V CW HW WC -1 'WATER CLOSET 14 2 1 AHU -1 RETURN DISCHARGE_(3) RADIATED (2) FLUSH VALVE WC -2 WATER CLOSET , 4 1 14 2 1 65 55 73 77 63 163 83 182 64 + X 58 81 1 72 70 158 AHU -2 SUPPLY FLUSH VALVE WC 3 WATER CLOSET L 2 1 3/4 ! ] FLUSH VALVE WC-4 WATER CLOSET ''PUSHBUTTON 1 FLUSH VALVE VALVE - - -- - -- - - PUSHBUTTON VALVE TEMPERED FAUCET -_ - - - - -- - /2° TEMPERED WATER TEMPERED WATER /2 TEMPERED WATER - - -- - - _ - -- - - - _ NON FREEZE UR -1 'URINAL 12 2 L -1 LAVATORY it -1 /2 ''1- -1/2 T1-1/2 1/2 1 -1/2 /2 1/2 ThJ2 ' _ !ELECTRONIC + _ - ' ,1/2 ,1/2 ; 1 (ENCASED, L -2 LAVATORY L -3 LAVATORY -- I -1/2 1 -1/2 1/2 r 112 1 /2 1/2 1/2 1/2 1/2 fi _. 1/2 _ 1 2 / 1/2 �1/2 _ ;_ 1/2 - - - !1 /2 11/2 11 1/2 1/2 1/2 - _ 1 1/2 - _ _ _ - - L-4 LAVATORY ,r 1-I/2 1 -1 /2 11 -1/2 - [1/2 1-1/2 j1 -1 / 1 -1/2 L-5 LAVATORY - __ -- 1 -112 SK-1 S I I 1-1/2 SK -2 SINK 1 -172 SK -3 SINK 1-1/2 SK-4 SNIK 1 -1/2 _-' !T-1/2 2 1 1 - 1/2 - _. _ 2 SS -1 ISERVICE SINK 3 SH -1 'SHOWER '3 SH - SHOWER 2 SH-2A ; 2 t 2 _.. _. _ 1 -1 J4 - I SH SHOWER 2 EWC -1 ELECTRIC WATER COOLER f1 -1 1 4 Y HB -1 WALL HYDRANT AIR HANDLER SOUND POWER SCHEDULE EQUIP NO MINIMUM REQUIRED SOUND DIRECTION ACOUSTIC RATING, dB RE 10 -12 W () REMARKS T 63 OCTAVE BAND CENTER FREQUENCY, HZ f 40000 8000 I 125 j [2000 1 500 1 1000 2000 AHU -1 SUPPLY DISCHARGE (1) RADIATED (2j 85 79 484 76 .4 73 73 62 55 _,46 4 67 48 71 53 1 46 76 47 71 52 76 -1 72 57 148 1 75 T41 69 ,67 139 65 1,64 41 36 169 L67 39 76 1 79 1_ 2 440 66 165 42 1 36 1 67 138 72 133 63 65 33 _133 60 63 29 130 630 AHU -1 RETURN DISCHARGE_(3) RADIATED (2) 88 77 469 EWH- FIRESIDE LOUNGE 82 80 {- 76 1 85 74 ~ 83 77 65 55 73 77 63 163 83 182 64 + X 58 81 1 72 70 158 AHU -2 SUPPLY DISCHARGE (1) 65 36 76 62 31 63 32 7 65 24 59 27 66 23 64 31 64 31 74 31 - - N RADIATED (2) AHU -2 RETURN DISCHARGE L3) RH-4 RADIATED (2) DISCHARGE (1) AHU -3 SUPPLY 1 RADIATED (2) AHU-4 SUPPLY DISCHARGE L7) RADIATED (2) 85 79 85 74 82 80 1 71 I65 84 80 176 65 56 - [47 AHU-4 RETURN DISCHARGE C3) RADIATED (2) ROOF HOOD SCHEDULE EQUIP N0. UNIT SERVED TYPE NO. REQ. MAXIMUM AIRFLOW, CFM W PENTHOUSE SIZE, IN. DUCT SIZE, IN. REMARKS I L H W T L RH -1 EF -1 GRAVITY 1 630 22 1 36 114 12 18 [CO CO N NI EWH- FIRESIDE LOUNGE RH -2 RH -3 EF -2 GRAVITY 1 1 630 420 22 22 1 36'. 14 +24 14 24 '14 N -- - --� -- -- - -_ - EF -3 GRAVITY RH-4 GWH -1 GRAVITY 1 420 22 DOMESTIC WATER HEATER SCHEDULE - ELECTRIC EQUIP NO. AREA SERVED _ STORAGE GALLONS AIRFLOW CFM STORAGE TEMP, F ELEMENT KW LOWER MAX H2O PD IN WG MOTOR HP REMARKS _ UPPER 7 EWH -1 ,OUTDOOR RESTROOMS 20 :120 5.3 180 5.3 180 4.5 4.5 1/30 1/30 MANUF: STATE, MODEL: POINT OF USE EWH- FIRESIDE LOUNGE 10 1100 5 ° 0 FLUE UNIT HEATER SCHEDULE - HOT WATER EQUIP NO. SERVICE TYPE CAPACITY MBH AIRFLOW CFM EAT DEG F H2O FLOW GPM EWT, DEG F MAX H2O PD IN WG MOTOR HP REMARKS UH -1 WEST MECH RM - HORIZONTAL 55 ~ 1100 1100 ' 50 1 50 5.3 180 5.3 180 0.23 0.23 1/30 1/30 1 _55 UH -2 ]EAST MECH RM HORIZONTAL AIR COOLED CHILLER SCHEDULE DOMESTIC WATER HEATER SCHEDULE - GAS TYPE TOTAL CAPACITY TONS EQUIP NO AREA SERVED PRESSURE DROP FT H2O HEAT EX CHANGER (HEAT OUTPUT MBH I MBH _.. --- -_ 'iR, -- F - -. ARRGT STORAGE TANK _ CCAP GAL TEMP F REMARKS TYPE GWH -1 EAST WING 'GAS 270 1224 ;332 100 1100 22% 180 I 225 'VERTI CAI 1270 1140 5 ° 0 FLUE GWH -2 !WEST WING 1 GAS '400 VERTICAL 1400 ,f40 r 5 0 FLUE AIR COOLED CHILLER SCHEDULE EQUIP NO. TYPE TOTAL CAPACITY TONS AM3IENT DB TEMP DEG F FLOW GPM PRESSURE DROP FT H2O N0. FANS 1 TYPE ' INO MOTORS ;HP EA CAPACI "Y # STEPS CONTROL MAX. STEP CAPACITY ELECTRICAL EER REMARKS MCA 1 MOCP ACC -1 ;RECIPROCATING 83.3 95 166 10 6 'PROP 6 2 ', 8 22% 180 I 225 9.5 I CD EQUIP N0. SERVICE TYPE BB -1 'PACKAGED HYDRONIC STEEL F RETUBE 1308 HEATING SYSTEM BB 2 PACKAGED HYDRON!C STEEL F RETUBE 1308 HEATING SYSTEM FAN POWERED TERMINAL BOX SCHEDULE - HOT WATER TERMINAL BOX FAN TITUS EQUIP TYPE AIRFLOW INLET OUTLET MAXI MUM ESP MOTOR MAXIMUM MAXI IAN MODEL N0. RANGE, SIZE DUCT SIZE SP DROP, IN WG HP CAPACITY DISCHARGE RADIATED NO. CFM IN IN IN WG BTU/H NC NC A FT 200 - 450 8" 15 X 12 0.07" 0.3" 1/10 (SEE VAV BOX LIST) 32 25 TITUS DTFQ SIZE 2 B FT 500 - 950 10" 15 X 12 0.1" 0.3" 1/4 (SEE VAV BOX LIST) 37 33 TITUS DTFQ SIZE 3 C FT 900 -1450 12" 22 X 12 0.09" 0.3" 1/3 (SEE VAV BOX LIST) 40 33 TITUS DTFQ SIZE 4 D FT 1300 -1750 14" 22 X 12 0.07" 0.3" 1/2 (SEE VAV BOX LIST) 47 34 TITUS DTFQ SIZE 5 E FT 1700 -2250 16" 22 X 16 0.06" 0. 3/4 (SEE VAV BOX LIST) 43 42 TITUS DTFQ SIZE 6 NOTE: 1. AIRFLOW RANGE REFERS TO FAN CFM, WHICH EQUALS MAX. PRIMARY CFM. SEE VAV BOX LIST FOR MIN. PRIMARY CFM. 2. FAN ESP IS EXTERNAL STATIC PRESSURE DOWNSTREAM OF HEATING COIL. 3. TERMINALS WILL HAVE SINGLE POINT ELECTRICAL POWER CONNECTION. 4. PROVIDE 1" THICK DISPOSABLE FILTER CARTRIDGE FILTER AND FRAME FOR ALL TERMINAL BOXES. 5. NOI SE CRITERIA DETERMINED ASSUMING 1" PRESSURE DROP FROM INLET TO DISCHARGE OF TERMINAL BOX. 6. NOISE CRITERIA BASED ON CONDITIONS SPECIFIED IN TITUS CATALOG AND IN ACCORDANCE WITH AR STANDARD 885 -90. CABINET HEATER SCHEDULE - ELECTRIC EQUIP N0. CH -1 SERVICE TYPE WEST CORRIDOR ENTRANCE IVERTI CAL SURFACE MOUNT IHORI RECESSED CH -2 SENIOR LOBBY CH -3 NOT USED CH-4 MAIN 1 IHORI ZONTAL RECESSED CH-5 NOT USED NOMINAL AIRFLOW, CFM MOTOR HP HEATING CAPACITY INPUT STAGES KW CH-6 FITNESS ENTRANCE !VERTICAL SURFACE MOUNT 300 10.04 6 1 CH -7 OUTDOOR RESTROOM IVERTI CAL SURFACE MOUNT 200 1 0.03 J1 CH-8 OUTDOOR RESTROOM ! VERTICAL SURFACE MOUNT .200 '0.03 i '1 CH-9 ELEC CLOSET ,VERTICAL SURFACE MOUNT 200 10.03 1 1 j REMARKS EXPANSION TANK SCHEDULE EQUIP NO. SERVICE TYPE CAPACITY GALLONS ACCEPTANCE GALLONS CHARGE, PSIG MAXIMUM SI ZE,_IN _ DIA LEN. REMARKS ET -1 LUM3I NG SYSTEM '!VERTICAL, DIAPHRAM 10.3 10.3 40 19 -114 15 -3/8 ' ET -2 PLUMBING SYSTEM '!VERTICAL, DIAPHRAM 12.5 10.0 40 23- 7,8!15 -3/8 ET -3 [CHILLED WATER SYSTEM IVERTI CAL, DI APHRAM 1 33.6 11.3 11 16 42,qhs ETA 1 HEATING WATER SYSTEM I VERTI CAL, DI APHRAM 1 110.0 34.0 15 24 I 67 I m Cwx'91ito199.5 nE as avow . nwF HASE12000 \2312-008\, -3 Is - t1 08-29 -1895 or3z BOILER SCHEDULE - GAS INPUT MBH GROSS OUTPUT M3H 1043 _ SUPPLY STACK H2O I MAX TEMP DIAMETER FLOW PD, DEG F IN GPM FT HD REMARKS 10 120 2_ PART CF SKID MOUNTED PACKAGED HYDRONIC HEATING SYSTEM 1043 180 10 120 2 PART OF SKID MOUNTED PACKAGED HYDRONIC HEATING SYSTEM SCHEDULES VAV TERMINAL BOX LIST TERMNAL BOX / SIZE 101 102 103 104 105 106 107 108 109 110 111 112 113 114 204 205 206 401 402 403 404 405 406 407 MAX MIN PRIMARY PRIMARY CFM CFM A D E 25.7 19.7 42.2 73.7 55 47.2 10.5 52.6 58.1 46.4 61.2 41.7 58.1 44.5 37.7 40.2 39.9 49.5 49.5 37.8 12.3 2.6 52 0,5 52 2 52 4.4 52 7.6 52 5.7 62 4.9 52 1.1 62 5.4 62 6 62 4.8 62 6.3 62 4.3 62 6 62 4.6 82 3.9 6 4.1 6 4.1 62 5.1 62 5.1 62 3.9 62 1.3 63 620 300 200 90 470 220 820 380 1740 840 1740 840 1150 700 340 760 Unused 1700 800 1880 890 1500 700 1980 1350 940 640 1880 _880 1440 880 1220 570 1290 610 1300 620 1600 750 1600 750 1230 600 470 160 925 380 470 190 570 230 1600 750 1600 750 1500 600 ;400 560 1500 600 1460 1480 1360 1360 880 330 980 400 COIL KBH 27.7 ! 14.1 77.1 47.9 47.9 44.9 41.9 44.9 32.1 29.9 24.5 29.3 COIL EAT GPM :•91 63 63 1,8 63 4.9 63 4,9 83 4.6 83 4.3 63 4.6 63 3.3 55 3.1 55 2.5 83 3 fi3 EWT 180 180 180 180 180 180 180 180 180 180 180 780 780 NOTES: 1. NOISE DISCHARGED FROM SUPPLY FAN SECTION OF AHU DOWN SUPPLY DUCT. 2. NOISE RADIATED FROM FAN SECTION OF AHU. 3. NOISE DISCHARGED FROM RETURN FAN SECTION OF AHU DOWN RETURN DUCT. Erai cm fl of Tulcwlu FEB 0 2 996 PERMIT CENTER A • R • C ARCHITECTS 1101 PIKE_ STREET SEATTLE, WA 98122-3915 _ 2_06.322.3322 206.322.9323 FAX CONTENTS: MECHANICAL cCHEDI 1LES - SCALE: NONE DRAWN: JMC CHECKED: TEB PROJECT NO: SHEET: SG-1 410 10x8 0 UP TO - 10x8 150 CH-9 I ,,- ,. 7 • /---- ' \\ 0 • '1 /i / 06 /- _l_ s 0 G_, x10' )..„,/, 3. ------ ,„.,.' 7:1°0 00 TO , z_it_otte', 18 x , Cr - -, Scri . (2) 12x12 320,2' - 24,12, (1) 121 BELOW CEILING AND 61) 12 ABOVE _ FLOOR ;!! 14x14 CD 1 450 22x18 600_ Mom =I N=11111 24,8 18-0 laiWg 22x16 940 104 9,17 H U TO di1124x12 C --a ' 04;1 IEF-1010 ROOF ,- Ozo'Av Sb 2.18 TG-1 400 • 18x18 0=1 r _ 500 1 22,22 .Ra+, , A 800 1 1 750 14x12 400 (TYP) AE,05,, i 14x12 375 (Tr) 16x12 SG-1 470 (TYP) 12110 SG-1 300 (TYP) 16112 50=1 470 4- (TYP) AEROB,, 3 24110 650 12x10 5.0.1 320 (TYP) c.L.F 22x22 5601 1 • I 1 • kix22 L12-1. C c ) 1 180 0 I 8x8 0=1 120 1 41 W , th ,, , p-24x 2 +. ' 11 fil 24x12 I „.-.., , 190 501 - _1 1 iii (...9 _w--- , I I I( '''' 4.,3 On C, Z4 2 -__ AL, = at,. ''', LN....----iLL4 , ' ," 220 110 NEC 0 . 5., , i 1 --- Mli . T0 103 IN L - C 6 , - ----- ' 1 ' I OVE 10 , \- 10x10 I - 1 , - p . , 11411Manr, ------ PI 1,1 1 ' `I''''l j 200 , h2LE-1 lop 00- 180 1 j , , ara=1. ■ 5,1 24:12 , 220 SCALE. I/&" = MECH R BOVE TO 10,11 71 Copylphl 01995, Abacus Con.lta,... P.5 NI lilyhts AYR HASEIRC00,312-000,2-1 (PAPER:Sr 1)06-2B-1985 GB: 28 12x10 5G-1 290 (TYP) 100 2.6=1 580 EE4'" T 0 107 1 1 1 co cH ' Lj ABO U Li i F 10 104 IN WEST , MECH RM ABOVE-, 1 0 0 0 12,10 UP 48:10 UP FIRST FLOOR PLAN NEST — FIVAG 0 c.) q _ p- ' ME. RM ABOVE Tc, 101 IN WEST 1,-- ADDITIONAL F, WORK THIS AREA SEE 34" 2 SgALE 22x22 00-1 .0 12:10 SG-1 290 (TYP) 580 , , -- —1 jr_ --I__ 14 1:/ EXHAUST UP TO I EF-6 (ON ROOF •0 M2.1 M2.5 NOTFS: O PROVIDE SOUND BOOT FOR RETURN GRILLE. SEE 0 240 WITH SCREENED OPENING (TYP). ® FOR INSTALLATION OF IEF-6IAND SEE 22x22 1220 1 . 12,10 SG-1 GFNFRAI NOTES: 1. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF DUCTS, GRILLES, REGISTERS, LOUVERS, ETC. 2. SEE ARCHITECIURAL DRAWINGS FOR EXACT LOCATIONS OF ALL ROOF PENETRATIONS. 2.10 SG41 650 1_1 IEF-10 2.1 825 TYIG6 ,-" r)-tvis & 8R DN TO UTILITY 1R \ 3 C1IS&CHR \ 0 UTILITY TRENCH 'F1 IIF ■ CITY FEB ( 2 )996 PERMIT CENTP. SEATRE. WA _aatz 2-an5_ 206.322 3322 \ \ , .... \ \ \.. 1 - 1 - \ ,,<.,,,,`, ,. \ '';''''' / L , 1 . I [ '' \ / - • . - I L / / \.< ' V / \ \ \ \ \ \ \ % \ \\ \ \ \ FOR CON'BNUATION SEE 7.2 DATE, 07.01.95 A • R • C ARCHITECTS 206.322.9323 FAX REM,: Ir 1 EXPIRES: 05-05-96 coNIENTs: FIR FLOOR PLAN WEST -- -- HVAC SCALE: 1/8. = DRAWN: RAF CHECKED: TEB PROJECT 00; SHEET: • , - E H L) � /� / //// \ / // ),,/ �\ / -1,, PRO I E/ V'S -- ----- (7 '4 _P� { FING AT �H OINT IN �I / TI TRENCH ( P s CONTINUATION/ _ M21� / 3 CHS R II � h DL_1 NE- / 1600 Jr \ 40x15_ 22316. 3 "HNS & R HWS ,& R� 36324 RG_l 1520 636 CD-1 100 12310 SG -1 350 12310 SG -1 350 12310 SG -1 350 16x12 M2.1,M2.2 M2.6 INSTALLATION (TYP) 22318 12310 48 0 S SG -1 350 636 TG -1 60 cm.) TG -1 200, jAHU -2 1 36320 UP TO AHU -2 1 M2.2 M2.6 UN TRAP IN ELATION SEE M2.4 FOR ADDITIONAL WO THIS AREA AND FOR ME HANKIE ROOM I . , 1 I I 1 1 46 °0 10 4 WSPd2 UP TOI ECH ROOM P KAGED HYDRONI Ha NG SYSTEM W H. PADI 3 miff 14x1 C - 7 48 0 J ('+1 - N 22x12 22312 ••D ► 1 SSz=1 1 560 560 1 30x1p 125. (TYP) 30330 24312 1;0 22320 RG -1 SG -2 p•h -TG_ 1620 • 880 ,1 840 16312 FIRE / OKE DAMPER INSTAL LATON '\ 14 °0 10310 14 •�xnLU�[rPALL�r Rnc out"rHn�L 24312 SG-2 880 ON ROOF FOR / L T L : / fl\c1OOI5 FIRST FLOOR PLAN EAST — HVAG SCALE, I /&" = I' -O" ": \ff72000,312 -008,12 -2 [PAPER Sr a 1ne -27-,085 09,1 ‘<\\\\ �f GENERAL NOTES: -- - - - 1. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS O1 PROf VIDE SOUND BOOT FOR GRILLE, SEE OF DUCTS, GRILLES, REGISTERS, LOUVERS, ETC. 1 Err— I I l i � I 24310 IL LL _24x1D - 5G-1 I 50 1 700 1 ( 700 18 "0 18 12310 12310 —.SG -1 1 SG-1 350 ! 350 3" HWS I# R DN TO UTILITY TRENCH 3 " CHS & R DN TO UTILITY TRENCH ; u 24310 SG -1 700 1 18 "0 r I 4 " - HWS 4il-i7 ate-, __ -.. __ 6x6" 3 CHS & R PIPINO'ABOVE CD-1 DUC RK AND 50 18x10 TIGHT O STRUCT SG -1 I L 6x12 320 =10100 � 6x6 .. _T 1 0 0 1 CD -1 al � �-1vC 50 2236 s 320 d•" i s \ 1236 \ i " s 6 J Bo 1 sr: � S Y �''� RG-1 S,11 1/ ' 20 10 1 ��.' �� v'\ 50 _.. 90 _ 1 Y0 100 _ 30 %0L- 10 0 RG 1 _ _ RG 16 12 �1 \ , �' 8x8 22x _ -� � .. G 12x12 �I CD 1 `-' -a ---F - - 11T R G-1 � iox1O 4S.L -1 180 CD-11 _ I' 210 � 116x10 146 0 16%10 /HTijc10 ',I 225 2 50 $� RG 1 - = q— �5 61 11 260 - -250 - p � T' l - _ 1 i I I 3.. L III 2 ' -0' CLEAR FOR MAINTENANCE IGWH -1 (REF) 18'0 BOILER FLUE 18" CLEAR 8• -0" CLEAR BOILER TUBE PULL CONTROL PANEL 3 =0 CLEAR FOR CONTROL PANEL ACCESS AND BOILER TUBE PULL 2. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL ROOF PENETRATIONS. II I FOR PARTIAL ROOF PLAN OF THIS AREA SEE M2.5 1 GRAVITY R IEF LOUVER (R ARCH) ADJUSTAB COUNTERS kANCED BACKDRAF�I DAMPER 16x81 ' 1036 10x 80 16081 1036 8x6 1638 50 O2 !MOUNT T -STAT IN GRILLE. TYP 82.6 CIT OF TUKWILA FEB 0 2 1996 1036 DN TO 1036 00� 8 . 2 8 . 5 INSTALLATION (TYP 1036 I ON - 6x6 DN TO 104 0=2 BO ON ROOF - 816 DN TO 836 00 A • R • C ARCHITECTS _. _ 1101 . EAST PIKE STREET__ - SEATTLE._ WA 06122-3915 206.322.3322 206.322.9323 FAX DATE: 07.01.95 DRAWN: RAF CHECKED: 168 PROJECT NO: SHEET: 3 z VI CONTONTS: - -_ FIRST FLOOR PLAN EAST T SCALE: 1/8" = 1' -0" • - 1 22x12 16x12 76x30 RELIEF AIR ROUTE BETWEEN 76x30 AND 66 "0 12x10 IEF - 11l C) ON TO SG -1 OSA PLENUM TIGHT TO STRUCTURE 100x26 OA TIGHT TO UNDERSIDE OF 100x26 OA MAINTAIN 3' -0" CLEAR FOR WALKWAY TIGHT TO STRUCTURE MAINTAIN 2' MINIMUM , ACCESS HATCH. MAINTAIN ', CLEAR TO STRUCTURE CLEARANCE AdOVE TO " AROUND ACCESS HATT _ STRUCTURE 10x8 DN 3' -O CLEAR FOR WALKWAY' e EC >OF PEA< 48x48 CLEAR FOR COIL PULL 22x12 q7-cois IEF-4 1 CLEAR FOR COIL PULL 01 ' I I LJ 1 FOR INSTALLATION OF OAHU -1 1 SEE M2.3,M.24 TO IEF - 11 26 "0 INSTALL VALVE ASSEMBLY HERE RWS� D E 1 }•�L 7 PARTIAL ATTIC PLAN WEST - HVAC & PIPING SCALE: 1/4" = 1' -0" RELIEF LOUVERS (REFERENCE) 76x30 RELIEF RELIEF PLENUM 66 "0 52 "0 3" CHS&R 2 -1/2" HWS&R 54 "0 SUPPLY RETURN 16x16 RELIEF AIR PLENUM ABOVE SEE M2.1 FOR CONTINUATION 11 AC NOTFS: 0 MAINTAIN 2' CLEARANCE UNDER TERMINAL BOX. O LOCATE TERMINAL BOX AS HIGH AS POSSIBLE. 0 32 ° 0 WITH SCREENED OPENING. ® DN TO SG-1 OS DN TO CD -1 ® 12 ° 0 WITH SCREENED OPENING MAXIMUM ALLOWABLE AHU DIMENSIONS UNIT IAHU -1 1 LENGTH 28' -1" WIDTH HEIGHT (1) NOTE: 1. HEIGHT INCLUDES BASE RAIL. / I I P \5E2000 \2312-0U9`M23 [PAPER SF _ 1.-29 -1495 09:09 WEST WING MECHANICAL ROOM SECTION SCALE: 1/4 = 1' -0" RECEIVEC CITY OF TUNYJILA FEB 0 21996 •PERMIT CENTER A • R • C ARCHITECTS 1101.. EAST PIKE ..SLREEI SEATTLE, _WA 96122 - 3 91 5 .. - 206.322.3322 206.322.9323 FAX CONTENTS -.. PARTIAL ATTIC - PLAN WEST - - - - - H - VAC SCALE: DRAWN: RAF CHECKED: TB PROJECT N0: SHEET: UNIT LENGTH WIDTH HEIGHT (1) IAHU -2I 19' -6" 4' -2" 4' -8" IAHU -3I 14' -2" 8' -3" 7' -2" IAHU -4 1 17' -6" 6' -7" 5-1" ^tEZZi- r�Ih'L - T EXHAUST PLENUM MAINTAIN 6' CLEAR ACCESS HATCH EXHAUST PLENUM "OT 11\sET2000w12 \02 ["«ER,' . ,pem -,a "s 1:3T M i 24,24 TO IAHU -2 F 32x24 70 'MOD 2 F INSTALL AT FLOOR L LEVEL 11=■ ®% IEF -5 EMI 1 1 �W iil �Z = — _ � MIMI MINN 4 TO '/ ■� I Iii) L g 11 1 � h I I � c 18'0 BOILER FLUE THRU ROOF ENCLOSURE (REFERENCE) 4' HWS& HWRDN / TO BOILER ROOM 2 MINIMUM CLEAR FOR WALKWAY (TYP ALL AHU'S) SEE M2.4 FOR CONTINUATION - 24x24 lAHU -2 32x14 6' MIN TYP ALL AHUS 46'0 88x30 TO OA PLENUM 88x30 UP OAHU -3 GYMNASIUM 70x24 UP TO 36x44 36x24 DN 36'0 DN TO 36x36 CLEAR FOR COIL PULL 3' -0' MINIMUM CLEAR FOR PIPING ALL AHU'S PARTIAL ATTIC PLAN EAST - HVAC SCALE: 1 /4" = 1' -0" OA PLENUM 18x60 UP TO OA PLENUM IAHU -4 LOCKER/FITNESS 12 "0 TO 32x14 54x14 TO 34'0 DN UP HIGH OA PLENUM M r - 36x24 TO EXHAUST PLENUM PLENUM RETURN GRILLE SEE M2.2 TYPICAL STOR j sCcE BEYOND- HOUSEKEEPING EYOND HOUSEKEEPING PAD OA PLENUM ABOVE ISF -14 Iff TO CLEAR FOR COIL PULL TO 11111-2 lY [E-T=S [E AT FLOOR 12"0 DN TO STORAGE ROOM 36'0 34'0 24x24 TO EXHAUST PLENUM CLEAR FOR COIL PULL 1 �- //j /, // EAST WING MECHANICAL ROONv SECTION SCALE: 1/4" = 1' -0" / 24x24 DN 14x54 DN ADMIN 24x24 TO' EXHAUST PLENUM. 36x20 4' 32x14 UP HIGH TO FOR INSTALLATION SEE () - M23 M26 8.0 ON TO ADMIN RESTROOM L 26>k20 LNUNDR T 3" CHS &R 4" HWS & R 26 ° 0 SUPPLY - - -34 0 SUPPLY 36'0 RETURN 8'0 DN TO LAUNDRY ROOM 24 "0 20 "0 26 "0 SUPPLY 1)¢" HW5 &R 4 "CHS &R 1Il I 1 L' - .� CHS & CHR HW5 & MAXIMUM ALLOWABLE AHU DIMENSIONS NOTE: 1. HEIGHT INCLUDES BASE RAIL I c C_)_ I r' CITY OF TUKWILA FEB 0 2 199E A • R • C ARCHITECTS 1191 EAST _PLKE. STREET- _ .SEATTLE, WA 98122 - 3915 206.322.3322 206.322.9323 FAX DATE: 07.01.95 CONTENTS. PARTIAL ATTIC PLAN - PLAN - EAST - HVAC SCALE: 1 8" 1' -0" - - -- DRAWN RAF CHECKED. 1E8 PROJECT N0' SHEET: wa 1,47200,2312- 0B,L12 -5 [g _ 9c] 06-29-1995 99:59 NOTFS: 0 2' CLEAR MINIMUM FOR DUCTS ENTERING AND EXITING SPACE. COORDINATE WITH OTHER TRADES. O 2' GEAR MINIMUM TO FLOOR FOR MAINTENANCE ACCESS UP TO STRUCTURE COORDINATE WITH OTHER TRADES. O 4' CLEAR MINIMUM TO FLOOR FOR MAINTENANCE ACCESS UP TO STRUCTURE COORDINATE WITH OTHER TRADES. TERMINAL BOX TRANSITION TO BOX CONNECTION SIZE AS REQUIRED LINED SHEET METAL EXTENDED PLENUM 10' -0" MAX (TYP) PROVIDE SHEET METAL SLEEVE AT FIBERGLASS - FLEX JOINT (TYP) SECTION SCALE 1/8" = 1' 0" SCALE NONE ROUND SHEET METAL DUCT DIAMETER TO MATCH CALLED OUT DIFFUSER NECK SIZE CONICAL SPIN -IN OR TWIST -LOCK FITTING WITH VD (TYP) SCALE NONE t LOW PRESSURE SUPPLY DUCT RETURN DUCT I NOTE 1 (D) (F) \_DUCT \—(G) TYP BASIC FIRE /SMOKE DAMPER INSTALLATION DETAIL LOW PRESSURE FLEX DUCT DIFFUSER (TYP) TYPICAL TERMINAL BOX INSTALLATION DETAIL rnqbi MEDIUM PRESSURE SUPPLY DUCT `SUPPLY DUCT O 2' CLEAR MINIMUM FOR MAINTENANCE ACCESS. O SPACE FOR H. AND HWR, CHS AND CHR, CW, HW, AND VENT PIPING. ® SPACE FOR CW, HW, G. FIRE PROTECTION AND VENT PIPING. O7 LIGHT MONITOR (BEYOND). 0 FAN POWERED TERMINAL 80X. 9O 12" WADE SPACE FOR ELEC CONDUIT. NOTFS: (A) RETAINING ANGLES, MINIMUM 1)t" X 0.059 (16 GA.), LAP STRUCTURAL OPENING 1" MINIMUM AND COVER CORNERS OF OPENING. (8) CLEARANCE W PER LINEAR FOOT BOTH DIMENSIONS. (0) STEEL SLEEVE (D) APPROVED FIRE DAMPER (CURTAIN OR BLADE TYPE). (E) SECURE RETAINING ANGLES TO SLEEVE ONLY, ON 8" CENTERS WITH ONE OF THE FOLLOWING: 1. ))" LONG WELDS W BOLTS AND NUTS 3. N0. 10 STEEL SCREWS 4. MINIMUM 3/16" STEEL RIVETS (F) SECURE DAMPER TO SLEEVE ON 8" CENTERS WITH ONE OF THE FOLLOWING: 1. W LONG WELDS 2. A" BOLTS AND NUTS IN HOLES PROVIDED 3. NO. 10 STEEL SCREWS 4. MINIMUM 3/16" STEEL RIVETS (5) CONNECT DUCT TO SLEEVE. (H) INSTALL ACCESS DOOR OR PANEL (J) COMPLY WITH SMACNA FSRDIG. 1. CONNECT DUCT TO FIRE DAMPER -6' MAXIMUM EACH SIDE WITH BREAK AWAY CONNECTION. 5' -0" MIN NOTE. PROVIDE SHEET METAL ELBOWS AS REQUIRED TO RESULT IN STRAIGHT FLEX DUCT (TYP) A M2.1 M2.5 OPEN ACCESSIBLE SPACE (TYP) CONTROLS MEDIUM PRESSURE DUCT \--TYPICAL STRAIGHT T WITH ORIFICE PLATE SHOWN, PROVIDE WHERE REQUIRED MEDIUM PRESSURE DUCT MEDIUM PRESSURE FLEX 3'-6" MIN, 10 -0" MAX (TYP) STRAIGHT DUCT AT BOX INLET (TYP) SCALE: NONE • TANGENTIAL AIR SEPARATOR m AAV COLD WATER MAKE -UP /DIAPHRAGM EXPANSION TANK PIPING DIAGRAM 5 GREASE TRAP 19018 WELDED DUCT MIN 18� ABOVE ROOF PRV STATION - AT 5' -0" AFF EXPANSION TANK OPENING (20)0x20» ) KITCHEN HOOD EXHAUST FAN DETAIL PSIG PER SCHEDULE NEMA 3R DISCONNECT, FACTORY WIRED FROM MOTOR TO DISCONNECT THROUGH THE BREATHER TUBE VENTED CURB EXTENSION LIQUID TIGHT FLEXIBLE CONDUIT ROOF DECK PARTIAL ROOF PLAN SCALE 1 /B" • 142.1 2.5 TYPICAL HVAC PUMP PIPING DIAGRAM M2.9 M2.5 M2.9 M2.5 FLASH AND COUNTERFLASH ROOF EXHAUST DUCT MEMBRANE FINISH CEILING L ROOFTOP EXHAUST FAN s1 DETAIL SCALE: NONE a GATE VALVE FOR PIPE SIZES 2" AND SMALLER (TYP) --- 1 11 1500-11 5 ) EXHAUST FAN CURB EXHAUST DUCT EXHAUST PLENUM (SIZE TO FIT FAN OPENING) (LINED) flECEIVEU CITV OF TUHWIIA F EE 0 2 199h PERMIT CENTER A • R • C ARCHITECTS 501 EA5T_P1KE. STREET SEATTLE, WA 96122 - 3915 206.322.322 206 322.9323 FAX DATE: 07.01.95 eX! o I IXPIRES: 05 -09 -96 SCALE: AS NOTED DRAWN: RAf CHECKED: TEB _ PROJECT N0: SHEET: CONTENTS'. HVAC & PIPING - DFTA -II _ fil GRILLE, VANES DIRECTED TOWARD HEEL OF ELBOW GRILLE WIDTH "Y r, SHORTER DIMENSION OF RECTANGULAR GRILLE 3" MIN, 12" IF SPACE PERMITS SCALE NONE 8 "0 SHEET METAL DUCT TO EXHAUST SYSTEM BALANCING DAMPER WITH QUADRANT, SET AIR FLOW THRU GRILLE TO CFM INDICATED ON PLAN LATCH CONTINUOUS HINGE CEILING RELIEF GRILLE DETAIL 20 GA. GALVANIZED AIR TIGHT STEEL BOX WITH GASKETED DOOR AND LATCH. REINFORCE DOOR AND DUCT CONNECTIONS TO MAIN- TAIN AIR TIGHTNESS. MOUNT BOX ON WALL WITH BOTTOM AT 76" AFF. ACCESS DOOR DRYER LINT FILTER DETAIL SCALE: NONE AHU CASING AHU CHANNEL BASE FULL HEIGHT FIBERGLASS BATTS CONTINUOUS UNDER AHU (REF) 3/4" WEDGE ANCHOR WITH WASHERS, MIN 4-1/2" INSERTION DEPTH INTO CONCRETE, 6' -0" OC NEOPRENE ISOLATION BUSHING AND WASHER 1" THICK CONTINUOUS NEOPRENE PAD, FULL WIDTH OF CHANNEL AIR HANDLING UNIT MOUNTING DETAIL SCALE NONE C.Niyht01995, Abou. ConewROnt> PS MI RyM1te RwemG. .WR H: \35T3090 \3312UOB \M2E [SF — 1j O6 -3P -1995 0&43 UNG OR WALL l 1" THICK UNED ELBOW WITHOUT TURNING VANES, CONNECT TO GRILLE, SUPPORT FROM STRUCT ABOVE "W" IF SPACE PERMITS, 10" MINIMUM (INSIDE GNING) OPEN TO CEILING PLENUM SHEET METAL DIVIDER FILTER HOLDER 4 "0 DUCT TO DRYER, PROVIDE REMOVEABL_ SECTIONS FOR CLEANOUT 8x8 EXHAUST GRILLE MATH OBD IN BOTTOM OF BOX \-12"x10-20 MESH STAINLESS STEEL SCREEN IN yxy ALUMINUM ANGLE FRAME. CONSTRUCT FILTER HOLDER IN DIVIDER TO PREVENT AIR BYPASS OF FILTER. 8 M2.21 M2.6 11( 6 10- 0015 9 M2.3,M2.4 M2.6 GYMNASIUM DRUM LOUVER DETAIL SCALE NOTE SCALE: NONE NOTE ALL EXPOSED FASTENERS TO BE CADIUM -PLATED PAN HEAD SCREWS AUTOFLOW CONTROL VALVE NOTF: ALL EXPOSED FASTENERS TO BE CADIUM -PLATED PAN HEAD SCREWS. F AIR VENT P/T <-•R + _ — Hws EU I P/ \� �-- HEATING COIL \ --DRAIN PLUG FAN POWERED TERMINAL BOX HEATING COIL PIPING DIAGRAM SPIRAL DUCT RECTANGULAR DUCT WITH 1' LINER (TIP) HAT CHANNEL SUPPORT ALL AROUND (TYP) CONTROL GRID, BLADES VERTICAL (TYP) OPPOSED BLADE DAMPER BLADES VERTICAL (TYP) DRUM LOUVER (TYP) DAMPER QUADRANT (TP). SPIRAL DUCT RECTANGULAR DUCT WN,H 1" UNER HAT CHANNEL SUPPORT ALL CONTROL GRID, BLADES VERTICAL OPPOSED BLADE DAMPER BLADES VERTICAL SUPPLY GRILLE, DOUBLE DEFLECTION, FRONT BLADES, VERTICAL, 3/4" MARGIN DAMPER QUADRANT OPEN SPACES SUPPLY GRILLE DETAIL MZ RETURN BALANCING/ MANUAL AIR VENT MEASURING _ VALVE / <HWR E —>G—M- 1714-- L P/T HWS D4 I t AHU SINGLE HEATING COIL PIPING DIAGRAM BALANCING/ MEASURING VALVE —. MIN 2" IE TO IE SUPPLY P/T L_ J ID USE SINGLE BUTTERFLY VALVE WITH MEMORY STOP FOR PIPE SIZES 2)¢" AND LARGER HOSE END DRAIN VALVE, CAPPED PIT INSTALL ON CC -1 ONLY. DELETE BYPASS PIPING, BALANCING/ MEASURING VALVE, AND THREE - WAY CONTROL VALVE ON ALL OTHERS. PROVIDE TWO -WAY CONTROL VALVE P/T AAV DRAIN PAN P/T MANUAL AIR VENT AND DRAIN PLUG COOLING COIL P P r IM 2" DEEP SEAL TRAP III HEATING COIL \ - -DRAIN PLUG SINGLE CHILLED WATER COOLING COIL PIPING DIAGRAM n M2.1,M22 126 M2.9 M2.6 NOTES: 1. PROVIDE PLUGGED MANUAL AIR VENT FOR EACH INDIVIDUAL COIL. 2. DRAIN PANS APPUCABLE TO COOLNG COILS ONLY. 3. COORDINATE EXACT QUANTITIES AND ARRANGEMENT OF COILS WITH EQUIPMENT MANUFACTURER. PROVIDE FLANGES CLEAR OF COIL REMOVAL (TYP . MIN 4" IE TO IE LJ MIN 4" DEEP SEAL ID TRAP (TYP) FULL SIZE OF PAN OUTLET CONN AUXILIARY DRAIN PAN AND PIPING INSULATED DRAIN PAN MULTIPLE WATER HEATING OR COOLING COIL PIPING DIAGRAM n M2.9 M2.6 2.9 M2.6 DATE: 07.01.95 RECEIVED CITY OF TUHWILA • FEB S 2 1996 PERMIT CENTER A • R • C ARCHITECTS 1101 _EAST_P S_TREET SEATTLE, JY A 98122 -3915 206.322 3322 206.322 9323 FAX EXPIRES: 05 -05 -96 I SCALE: NONE DRAWN: RAF CHECKED; TEB,,. PROJECT NO: SHEET: CONTENTS: HVAC & PIPINQ DETAILS - SCHFOUI F C - TYPICAL CONNECTIONS TO STRUCTURAL SUPPORTING MEMBERS TYPE M AX LOAD CAPACITY (LDS) IMANS1 ANCHORS TO CONCRETE (1, 2 3) YACHWE BOLT END OF BRACE SPREADER 97E MACHINE BOLT AT WOW (5) HOLLOW CORE PLANK ROD ANGLE TO SUPPORTING STRUCTURAL MEMBER (4) A 1010 34• L..16GA Or CABLE) G W 76• L91n21646r3• LLH 6 1415 %• %• C4xS4 %• * • L5x34x3• LLH D 566 2J Ye• 05x6.7 J• %• 2- L4x3x)Lx4 UN )A• 2020 296• y2 C6x65 (6) )4 2- L5x3x3Lx4 LLH E 2870 2W 0E C6x11.5 (6) )S• 2- L6x3yp0§x4 LLH F 4600 4 %• % cma (6) (6) 2- L5x34x10 L. 0 7010 4 . 36 00X153 (6) (6) 2- 16x3)59059111}4• LLH H 8240 4W 1 C12x20.7 (6) (6) 2- L8x4x0(913)4• L H FOR 9AB5 LESS IRAN 5 THICK, THIN 'SLAB INSERTS MAYBE USED. 2 EGAN9W ANCHORS 9O1. BE INSTALLED PER THE REQUIREMENTS GIVEN IN THE LATEST GOVERNING AUTHORITY REBEARGI REPORT FOR THE SPECIFIC ANCHOR 3. FOR ESSENTIAL FACNTIES, 50 PERCENT 6 THE EXPAR9W TYPE ANCHORS (ALTERNATE ARGRCRS IN ANY GROUP ARRANO?@In I HALL BE PROOF TENF ANCHORS TWICE NNE HEN AL SO CAPACITY N 1FT190N. IF ANY LONG FAIL THE IMMEDIATELY ADIIACENi ARd10RS MUST THEN ALSO BE TE510. 4. ILL SOHO TS I NTO HORIZONTAL L 5. WOOD MACHINE DOLTS I 6x 00000 YEMBERS UNLESS SHOWN OTHERWISE ON THE DETAILS B. MUST BE ENONERO INDIVIDUALLY. SCHFDUIE R - BRACING MULTIPLE PIPES ON TRAPEZE, SEISMIC HAZARD LEVEL B (SHL B) ( ) sub MAX DEAD LOAD W TRAPEZE 88s) VERTICAL TRANSVERSE 8 LONGITUDINAL ANGLES (4) (CABLE SIZE) MAMMON TRAP/. SPAN TRAPEZE SGE BRACES L.ONGITUdNAL BRACES (4) (CABLE 97E) CONNECTION TYPE TO STRUCTURAL MEMBER (2) gam MAX. LENGTH FOR RODS MAX LENGTH FOR RODS 320 L..16GA Or CABLE) S-! 1 x3)(x12GA L2)4Q01868 (%• GABLE) C }4 25 14• 00 L2x2x16CA ()G• GABLE) S - 4 • 1 x33yx12CA 80' L 18GA D )<2• 25' 3)4 610 L9@IBG CABL (Sr E) S - 4 • 1 96.3)( I x12W )A• D 12)4x2)8 6GA O( GABLE) 31 4 660 L92xI8GA Or CASE) 4-0• 'I /CUM IY.,A 36 C 66• 31• 5 940 L9.16. . cABEE) 4' -0' t% 3�x12GA 6 D 4C 3T 8 945 LBIE) or CAB 3 -10 1'j[x3)fp12GA 3T D'• 3T 1. THIS SCHEDULE IS BASED ON FOUR EQUAL -920 PIPE ARRANGEM.TS FOR PIPE 5 AND SMALLER. THE SCHEDULE ALSO Lams THE NUMBER OF 6 PP. TO TIBEE AND 8 M. TO TWO. HOWEHIt, ANY OWMEMATION OF PIPES CAN BE USED F THE TOTAL WARPED IMGLT OF THE PIPES ON A TRAPEZE IS EQUAL TO OR LESS THAN THE MAXIMUM DEAD LOAD NOTED AND THAT THE ...MUM TRAPEZE SPAN AND S. OF DIAGONAL BRACES NOTED N THE SOEDU E ARE YANTNED. 2 SEE DETAIL 5 FOR • CONNECTION ME' 10 STRUCTURAL SUPPORTING MEMBERS 3 PUCE STANDARD CUT WASHERS BETWEEN SHEET METAL ANGLES AND NUT. 4. PROVIDE TRANSVERSE AND LONOTUDNAL BRACES AT 40 FEET NAMUR FOR PIPES SMALLER THAN 4• AND AT 2D FEET MAXIMUM FOR PIPES 4• TO 87 INSTALL ONE TRANSVERSE BRACE AND ONE LONGITUDINAL BRACE AT EACH END OF THE TRAPEZE SCHFDUI F A - BRACING SINGLE PIPES AND CONDUIT, SEISMIC HAZARD LEVEL B (SHL 8) P MAX WE (MRS PER FOOT) BRACE SPACING (5) (6) VERTICAL HANGRS (3) TRANSVERSE BRACES (CABLE SIZE) L.ONGITUdNAL BRACES (4) (CABLE 97E) BOLT SOM (2) CONNECTION TYPE TO STRUCTURAL MEMBER (1) L2Yh16GA L MAX LENGTH FOR RODS .g2,1 7.9 40' 80 L9.16GA L2)4Q01868 (%• GABLE) L28238 888 Or CABLE) )8 A 14• 25• 3 10.8 40' 80' L 18GA 1-2*.A.8G6 (8 688.) L2156MIBG8 (3(• 68.0 .z. 8 H• 25• 4 16.3 40' f10' La2x18GA 12)4x2)8 6GA O( GABLE) U)2 2}u1868 ( 3(• CABLE) L3x3x12CA L C %• 31' 5 23.3 NT 80' 1.9.I.A 1.1..y16GA (% GABLE) L2JNa2�(1268 (3(• GABLE) %. D • 31 6 31.5 40' BLY L8.2G608 L2)/ 2J48 68 O4 0 .85) L2}4 2 288 (X• GABLE) ,. E 3N'• 3T 1. SEE DETAIL 5 FOR fXkINECTION ME' TO STRUCTURAL SUPPORTING MEM 2 PUCE STANDARD T IN T HEtS HDUL SHEET METAL ANDES AND NU 3. DIE VERTICAL HANGER IN THE SCR E S REQUIRED N ADdiIW TO 111E HGHER ROD ONLY WHEN THE MAXIMUM LENGTH FOR RODS EXC MEWED. 4. SEE GENERAL NOTES FOR LWgTUDWAL DIAGONAL BRACE REO/BEAIENTS 5. TRA:Z BRACE SPACING. & LWGNOINAL BRACE SP SCHEDUI F D - BRACING FOR ROUND DUCTS, SEISMIC HAZARD LEVEL B (SHL B) DUCT V VERTICAL D DIAGONAL B BOLT C CONNECTION M MAX R REMARKS 26 L L2Yh16GA L L9.18. A A 1 12 S SHONE LANCER 38 L L.2.6. ( ( A A 1 18 S SHOE HANGER 4B L L9016GA ( (CA:EA) A A 2 21 S SINGLE HANGER BO 1 12%221 2268 1 13x3x12GA C C 8 84 D DOUBLE HANGER 8< L L3x3x12CA L L3x3x12GA O DOUBLE HANGER 1. BEE SEIBYIC PIPE SUPPORT DETAIL 5 AND SCHEDULE C FOR . CONNECTION TYPE TO STRUCTURAL SUPPORTING MEMBERS 2 MAXIMUM WEIGHT OF DUCT OR COMBINATIONS OF DUCTS PER UNEAR FOOT. FOR DUCTS WEIGHING MORE THAN TINE MAXIMUM WEIGHT PER FOOT, USE THE NEXT HIGHER DUCT SIZE 3 THE DUCTS MAXIMUM DIMENSIONS SHALL GOVERN WHAT BRACING IS REWIRED. EXAMPLE A 52 DUCT SMALL BE BRACED U. A Mr DUCT. 4. PROVIDE TRANSVERSE BRACING AT W FLEET AND LONGITUDINAL BRACING AT BO FEET. 11\SET2000\2312-006\42 -7 E I) 06 -02 -1995 1126 fy oo,s SUPPORTING STRUCTURE --. TRANSVERSE BRACE (SEE SCHEDULE A) HANGER ROD CUP PIPE SIZE (SEE SCHEDULE A) TYPICAL SEISMIC BRACING FOR RIGIDLY SUPPORTED SINGLE PIPES SCALE NONE \ lui ` TRANSVERSE BRACING SAME AS OTHER 9DE CONNECTION TO SUPPORTING STRUCTURAL MEMBER TYPICAL SEISMIC BRACING FOR RIGIDLY SUPPORTED MULTIPLE PIPES SCALE NONE CONNECTION TO STRUCTURAL SUPPORT CONNECTION TO SUPPORTING STRUCTURAL MEMBER MEMBER (SEE SCHEDULE A) ADD VERTICAL BRACE WHEN , IS GREATER THAN MAXIMUM LENGTH (SEE SCHEDULE A) ROO SIZE (SEE SCHEDULE A) LONGTUDINAL BRACE AS REQUIRED. (SIZE PER SG2EDULE A) (SLOPE 1 TO 1) ADD PIPE SLEEVE THAT HAS M W2 LARGER THAN OD OF BOLT WHEN THERMAL INSULATED PIPING IS USED - DO NOT CONNECT BRACING HANGER DIRECTLY TO PIPE 1)4 34' MAX MAX TRANSVERSE BR SUPPORTING MEMBER TP M27 MAXIMUM TRAPEZE SPAN (SEE SCHEDULE B) VERTICAL SUPPORT SAME AS OPPOSITE SIDE LONGITUDINAL BRACE ONE EACH END OF TRAPEZE (SLOPE SAME AS TRANSVERSE BRACE LONG - NON. BRACE AT OPPOSITE END NOT SHOWN FOR CLARITY) ADD VERTICAL ANGLE FRGM SCHEDULE B WHEN 'L' IS GREATER THAN MAXIMUM LENGTH 11 L. I - '6. IWOW � _ I � r II HOEDOWN CLAMP, TYP PIPE 97E (SEE SCHEDULE B) 1% 50.x3(,• WASHER HANGER ROD 801.1 - ARSE J 1 MIN 2 MAX CONNECTIONS TO SPREADERS TYPE A THRU H ( 1 SCALE NONE USE WITH VERTICAL, DIAGONAL AND LONGITUDINAL L'S TYPIMZ7 5 " -0• :A.LAUM TO STRUCTURAL SUPPORTING LEADER SINGLE HANGER BRACING FOR ROUND DUCTS 28" THROUGH 48" SCALE NONE DUCT 97E 8' -0 MAX TO STRUCTURAL SUPPORTING WEARER NOTE DUCT SIZE ¢ BOLTS w ¢ ANGLE VERTICAL HANGER TRANSVERSE BRACE ACHINE BOLT 2)5902 GAUGE STRAP 3x3x3/16 R WASHER 44 GAUGE SHEET METAL STRAP TRANSVERSE BRACE ¢ BOLTS 4. ¢ ANGLE EQ NO SEE SCHEDULED FOR VERTICAL HANGERS, DIAGONAL AND HORIZONTAL BRACES, BOLT SIZE, CONNECTION TO SUPPORT STRUCTURE, AND SPACING OF BRACING. 14. CAST IRON PIPE OF ALL TYPES, GLASS PIPE, AND ANY OTHER PIPE JOINED WITH A SHIELD AND CLAMP ASSEMBLY, WHERE THE TOP OF THE PIPE IS 12 INCHES CO MORE CONNECTOR TO SUPPORTING STRUCTURAL MEMBER FROM THE SUPPORTING STRUCTURE, SHALL BE BRACED ON EACH SIDE OF A CHANGE IN I Of 90 f J•� (�,\ f 1ti DIRECT ON ZED BETWEEEGREES OR MORE. RISER JOINTS SHALL BE BRACED OR N FLOORS. - 2)412 GAUGE STRAP TRANSVERSE BRACE LONGITUDINAL BRACE VERTICAL HANGER MACHINE BOLT L3x3x)(x3 3x343/16 It WASHER SEE SCHEDULE 0 FOR VERTICAL HANGERS DIAGONAL AND HORIZONTAL BRACE5. BOLT SIZE. CONNECTOR TO SUPPORT STRUCTURE. AND SPACING OF BRACING DOUBLE HANGER BRACING FOR ROUND DUCT UP TO 84" SCALE NONE LONGITUDINAL BRACE - LONGITUDINAL BRACE EACH 9DE AS REQ�D 2 CFNFRA) ROWS FOR 0810810 RRA ?.IN0 OF PI PFS AND CONDIII T• 1. INFORMATION SHOWN COKES FROM THE SMACNA SEISMIC RESTRAINT MANUAL - GUIDELINES FCR AFGHANI CAL SYSTEM, FIRST EDI TI CR 1991. CONTRACTOR TO OBTAIN COPY CF MANUAL FCR USE ON THIS PROJECT, ONLY SELECTED DETAILS HAVE BEEN SHOWN TO PROVIDE AN INDICATION OF THE TYPE OF SEISMIC SUPPORTS REWIRED. THE SE I521C HAZARD LEVEL (SHL) FOR THIS PROJECT IS SHL B. 2. PROVIDE SEISMIC BRACING FOR ALL PIPES EXCEPT WHERE NOTED OTHERWISE. 3. PROVIDE SEISMIC BRACI FOR FIRE PROTECTION PIPES IN ACCORDANCE WITH NFPA N0. 13 AND NOT AS NOTED/DE TAI LED HEREIN. 4. NO SEISMIC BRACING IS REQUIRED WHEN PIPING IS SUSPENDED BY INDIVIDUAL HANGERS 12 INCHES OR LESS IN LENGTH, AS MEASURED FROM THE TOP OF THE PIPE TO THE BOTTOM OF THE SUPPORT WHERE THE HANGER IS ATTACHED. 5. PROVIDE SEISMIC BRACING FOR ALL FUEL OIL PIPING, GAS PIPING, SUCH AS FUEL GAS, MEDICAL GAS PI PI PIG, AND COMPRESSED AIR PIPING THAT IS 1 INCH NOMINAL DI METER OR LARGER. 6. PROVIDE SEISMIC BRACING FOR ALL PIPING LOCATED IN BOILER ROOMSS, MECHAM, CAL EQUIPMENT ROOMS AND REFRIGERATOR MECHANICAL ROOMS THAT 15 IA INCHES NOMINAL DIAMETER AND LARGER. 7, PROVIDE SEISMIC BRACING FOR ALL PIPES 2)4 INCHES NOMINAL DIAMETER AND URGER. B. TRANSVERSE BRACING SHALL BE AT 40 FEET MAXIMUM EXCEPT WHERE A LESSER SPACING IS INDICATED IN THE TABLES FOR BRACING OF PIPES. 9. - LONGITUDINAL BRACING SHALL BE AT BO FEET MAXIMUM EXCEPT WHERE A LESSER SPACING IS INDI GATED I THE TABLES. IN PIPES WHERE THERMAL EXPANSION IS A CONSIDERATION, AN ANCHOR POINT MAY BE USED AS THE SPECIFIED LONGITUDINAL BRACE PROVIDED THAT IT HAS A CAPACITY EQUAL TO CR GREATER THAN A LONGITUDINAL BRACE. THE LCNGI TUDI NAL BRACES AND CONNECTIONS MUST BE CAPABLE OF RESISTING THE ADDITIONAL FORCE INDUCED BY EXPANSION AND CONTRACTION. 10. FOR FUEL OIL AND ALL GAS PIPING, AS SPECIFIED (N 5, THE BRACING DETAILS, SCHEDULES, AND NOTES MAY BE USED, EXCEPT THAT TRANSVERSE BRACT NC SHALL BE AT 20 FEET HMI MUM, AND LONGITUDINAL BRACING SHALL BE AT 40 FEET MAXIMUM, 11. TRANSVERSE BRACING FOR ONE PIPE SECT! CR MAY ALSO ACT AS LONG! ND NAL BRACING FORA PIPE SECTION CF THE SAME SIZE CONNECTED PERPENDICULAR TO IT IF THE BRACING IS INSTALLED WITHIN 24 INCHES OF THE ELBOW CR TEE. 12. DO NOT USE BRANCH LINES TO BRACE MAIN LINES. PROVIDE FLEXIBILITY IN JOINTS WHERE PIPES PASS THROUGH BUILDING SEISMIC JOINTS OR EXPANSION JOINTS OR MERE RIGIDLY SUPPORTED PIPES CONNECT TO EOUI RENT WITH VIBRATION ISOLATORS. FOR THREADED PIPING, THE FLEXIBILITY MAY BE PROVIDED BY THE INSTALLATION CF SWING JOINTS. FOR PIPING WITH MANUFACTURED BALL JOINTS, SELECT THE LENGTH OF PIPING OFFSET USING SEISMIC DRIFT I PLACE OF THE EXPANSION GIVEN IN THE JOINT MANUFACTURERS' SELECT!. TABLE. SEISMIC DRIFT m 0.015 FEET PER FOOT OF MEI GHT ABOVE THE BASE MERE SEISMIC SEPARATION OCCURS. 13. A RIGID PIPING SYSTEM SHALL NOT BE BRACED TO DISSIMI PARTS OF THE BUILDING OR TO TWO DISSIMILAR BUILDING SYSTEMS THAT MAY RESPOND DIFFERENTLY DURI AN EARTHQUAKE. 15. VERTICAL RISERS SHALL BE LATERALLY SUPPORTED WITH A RISER CLAP AT EACH FLOOR. FOR BUILDINGS GREATER THAN SIX STCRI ES HI GH, ALL RISERS SHALL BE ENGINEERED INDIVIDUALLY. 16. PROVIDE SUPPORTS FOR RISERS IN HUBLESS PIPING SYSTEMS WHERE THE RISER JOINTS ARE UNSUPPORTED BETWEEN FLOORS. 17. PROVIDE LARGE ENOUGH PIPE SLEEVES THROUGH WALLS W FLOORS TO ALLOW FOR ANTICIPATED DIFFERENTIAL MOVEMENTS. 1 8 . BRACING DETAILS, SCHEDULE AND NOTES ARE TO BE USED WITH DUCTILE P I PEI NON - DUCTILE PIPE TO BE BRACED TO RE GUI RESENTS OF SEISMIC HAZARD LEVEL (SHL) A. CAST IRON PIPING SHALL BE BRACED TO PREVENT ANY DISCERNABLE AMOUNT OF HORIZONTAL MOVEMENT. PROVIDE SEISMIC SUPPORTS ACCEPTABLE TO LOCAL INSPECTOR. 1 9 . REFER TO SPEC IF I CAT GINS AND NATIONAL /LOCAL OWES FOR SPACING REQU I RELENTS AND HANGER TYPES USED FOR SUPPORTING ORDINARY GRAVITY LOADS. 20. ALLOW PIPE UNDERGOING THERMAL EXPANSION TO MOVE FREELY (LONGITUDINALLY) WITHIN HANGER CLAM EXCEPT AT ANCHOR (PINNED) LOCATIONS. GENERAL NOTES FOR SFI SARI C RRACI Na OF morn DIICTS• 1. INFORMATION SHOWN COMES FROM THE SAMNA SEISMIC RESTRAINT MANUAL - GUIDELINES FCR LECHANI CAL SYSTEMS, FIRST EDITION 1981, CONTRACTOR TO OBTAIN COPY OF MANUAL FOR USE ON THIS PROJECT, ONLY SELECTED DETAILS HAVE BEEN SHOWN TO PROVIDE AN INDICATION OF THE TYPE CF SEISMIC SUPPORTS REWIRED. THE SEISMIC HAZARD LEVEL (SHL) FOR THIS PROJECT IS SHL B. 2. SEISMICALLY BRACE RECTANGULAR DUCTS WITH CROSS SECTIONAL AREAS CF 6 SQUARE FEET AND LARGER. BRACE FLAT OVAL DUCTS IN THE SAME MANNER AS RECTANGULAR DUCTS. BRACE ROUND DUCTS WITH DI METERS OF 26 INCHES AND LARGER. BRACE FLAT OVAL DUCTS THE SAKE AS RECTANGULAR DUCTS OF THE SALE NOAH NAL SIZE. NO SEISMIC BRACING IS REWIRED IF THE DUCT IS SUSPENDED BY HANGERS 12 INCHES CR LESS IN LENGTH, AS MEASURED FROM THE TOP OF THE DUCT TO THE BOTTOM CF THE SUPPORT WHERE THE HANGER IS ATTACHED. HANGERS MUST BE POSITIVELY ATTACHED TO THE DUCT WITHIN 2 INCHES OF THE TOP OF THE DUCT 1 0 0 8 1 8 INIMUM OF TWO X10 SHEET METAL SCREWS. 3. TRANSVERSE BRACING SHALL OCCUR AT THE INTERVAL SPECIFIED ON THE DRAWING SCHEDULES CR AT BOTH ENDS IF THE DUCT RUN IS LESS THAN THE SPECIFIED INTERVAL. TRANSVERSE BRACING SHALL BE INSTALLED AT EACH DUCT TURN AND AT EACH END OF A DUCT RUN, WITH A MINI OF ONE BRACE AT EACH END. 4. LONGITUDINAL BRACING SHALL OCCUR AT THE INTERVAL SPECIFIED ON THE DRAWING SCHEDULES WITH AT LEAST ONE BRACE PER DUCT RUN. TRANSVERSE BRACING FOR ONE DUCT SECTION MAY ALSO ACT AS LONGITUDINAL BRACING FORA DUCT SECTION CONNECTED PERPENDICULAR TO IT IF THE BRACING IS INSTALLED WITHIN FOUR FEET OF THE INTERSECTION OF THE DUCTS AND IF THE BRACING IS SIZED FCR THE LARGER DUCT. DUCT JOINTS SHALL CONFORM TO SMACNA DUCT CONSTRUCTION STANDARDS. 5. A GROUP OF DUCTS NAY BE COMBINED IN A LARGER FRAME SO THAT THE COMBINED WEIGHTS AND DI MENSI CRS OF THE DUCTS ARE LESS THAN OR EQUAL THE MAXIMUM WEIGHT AND DI LENSIWS OF THE DUCT FOR WNI CH BRACING DETAILS ARE SELECTED. 6. WALLS, INCLUDING GYPSUM BOARD NONBEARING PARTITIONS, WHICH HAVE DUCTS RUNNING THROUGH THEM MAY REPLACE A TYPICAL TRANSVERSE BRACE. PROVIDE SOLID BLOCKING AROUND DUCT PENETRATIONS AT STUD WALL CCNSTRUCTI ON. 7. UNBRACED DUCTS SHALL BE INSTALLED WITH A 6 MINIMUM CLEARANCE TO VERTICAL CEILING HANGER WIRES. B. REFER TO SPECIF I CAT! COS AND NATI ONAL/LOCAL CODES FOR SPACING REQUIREMENTS AID HANGER TYPES USED FOR SUPPORTING ORDINARY GRAVITY LOADS. PERMIT CENTER A • R • C ARCHITECTS _11(1 EAST PIKE STREET _SEATTLE,_WA M1 _22 -3915 206 322 3322 206.322 X 9323 FAX DATE: 07.01.95 CONTENTS:. SEISMIC RESTRAINT DETAILS SCALE: NONE DRAWN: DJE CHECKED: TEB RECEIVED PROJECT NO: CITY OF Tl1KWILA SHEET: FEB 0 2 1595959 ROOF 0 0 - ❑- - MOD MOD MOD MOD MEZZANINE FIRST FLOOR ROOF MEZZANINE FIRST FLOOR EF TO EXHAUST 'PLENUM SEQUENCE OF OPERATIONS EF 1.0 CENTRAL AIR HANDLING SYSTEMS - GENERAL FROM PLENUM TO EXHAUST PLENUM MOD¢ RETURN/ EXHAUST FAN -< EA FROM JAN /STORAGE /ELEC FROM ARTS & CRAFTS RESTROOM FROM MEN'S RESTROOM EA FROM WOMETS RESTROOM AHU -1 WEST WING AIRFLOW DIAGRAM SCALE NONE VCD FROM PLENUM Q 0 TO SPACE FROM LOCKER ROOM ADMIN RESTROOM (AHU -2) LAUNDRY ROOM (AHU -3) & GYM STORAGE (AHU -3) AHU -4 LOCKER /FITNESS /RACQUETBALL AIRFLOW DIAGRAM SCALE: NONE A. General: 1. Operation: Systems provide heating, cooling, ventilation, and space pressurization. AHU's - 1, 2, & 4 are variable vol., with certain areas constant volume in order to provide makeup a i r . AHU -3 is constant volume. 2. The Building Automation System (BAS) monitors status of fans through differential pressure switches across the inlet and outlet of the fan and provides alarm upon failure of any device. An alarm is generated upon failure of any device. B. System Start /Stop: 1. Programed Scheduling: Each air handling unit (AHU) is individually started and stopped by the BAS based upon programmed occupied and unoccupied tines, with weekday, weekend, and holiday schedules. Optimal start /stop is performed by the BAS. 2. Interlocking is programmed as follows: a. Return fan Is not permitted to operate unless AHU is operating. b. Associated exhaust fans are interlocked with each AHU. Motor operated dampers are open where applicable. c. Minimum outdoor air motor operated damper opens upon fan start-up (normally closed). d. The fan -powered (W) Variable Air Volume terminal box fans are interlocked with AHU operation. W terminal box primary air dampers completely close then W terminal box fans start prior to AHU supply fan start to Insure correct W terminal box fan rotation. 3. When shut -down of an air -handling unit occurs, dampers and valves shall be in the following positions. a. Outdoor air damper: Closed b. Return air doneer: Open c. Relief damper: Closed d. Coil control valve: Closed ROY P,SET2D,2312{138\ u2A [SF - t) nb -2e -1995 14:21 i AFMS /- AHU -1 11_1 -OMOD f ! FILTER CC YES I AHU-4 MOD u I ❑ MOD RETURN/ FILTER HC SUPPLY EXHAUST FAN FAN FROM PLENUM TO SPACE HC SUPPLY FAN TO FROM rn SPACE PLENUM v FROM PLENUM F AN POWERED V AV BOX TYPICAL i 1.1 VARIABLE AIR VOLUME SYSTEMS - AH5 -1, 2, & 4 4;1 49 TO FROM I KITCHEN pLENUMI\ ¢ > EA FROM KITCHEN EXHAUST HOOD FAN POWERED VAV BOX TYPICAL 4. When shut down of an air - handling unit occurs, fan-powered terminal boxes served by the shut down air handler shall: a. Shut down their fens b. Close primary air damper 5. The following conditions will cause an air handling unit to shut down. a. Smoke detectors in supply air and return air streams. b. Freeze protection control. c. Fire Alarm system interlock. d. High static pressure limit at supply fon discharge. Provide for VAV systems only. C. Freeze Protection Control: A hard wired freeze prevention thermostat shuts down the air handling unit, closes the outdoor air damper, opens the coil control valves, and signals the BAS when the leaving air temperature decreases to 40 degrees F; manual reset. The BAS starts the 'operating' chilled At puny (CHP) and system hot water pump (HWP), and signals the BAS. Locate the freeze prevention thermostat sensor downstream of the heating coil. Also provide a DDC analog Input temperature sensor at this location. A. Supply Air Flow Control: The BAS modulates the supply fan volume control device (VCD) to mo intain constant duct static pressure approximately 2/3 of the way down the medium pressure supply trunk ductwork. as follows: 1. The airflow is modulated down (VCD towards closed position) as terminal boxes throttle primary airflow. 2. Initial setpoint 0.75 inches wg. t'>i q0-voi5 FROM DISHWASHER EXHAUST HOOD FIRST FLOOR SCALE NONE 8. Return/Exhaust (R/EF) Air Flow Control: The BAS modulates the return fan VCD to maintain constant buildin g pressurization ion as follows: 1. The supply and return air flows are input to the BAS via flow measuring elements located in the fan inlets. 2. The R/EF airflows are modulated to maintain a designated air flow differential between SA and RA, in order to maintain a slight positive building pressurization. The R/EF airflows will decrease as VAV supply air flow decreases.. 3. The relief /exhaust damper is modulated to maintain a constant differential pressure between the exhaust discharge plenum and the mixed air plenum, to ensure thorough mixing of OA and RA; initial setpoint 0.5 inches W.G. differential. C. Outdoor Air Flow Control: 1. In order to maintain the required minimum outdoor air flow, the air terminal unit VAV dampers aggregate total minimum air flow is equal to or is slightly higher than the minimum outdoor air flow setpoint. 2. The BAS modulates the outdoor air damper to maintain setpoint cfm value under all SA flow conditions. The outdoor air quantity is continuously measured via airflow measurement station. Under low SA flow conditions, the RA damper is modulated closed as required to maintain minimum OA airflow setpoint. D. System Temperature Control, Occupied Mode: 1. AHU's -1 & 2: The BAS sequentially modulates the heating coil control valve, the outdoor air damper and return air damper, and cooling coil control valve to maintain the supply air temperature setpoint; Initial setpoint 55 F. 2. AHU-4: The BAS sequentially modulates the heating control valve, and the outdoor air damper and return air damper to maintain supply air temperature setpoint; initial setpoint 55 F. System has no cooling capability other than economizer. Intent of system in cooling mode is to maintain space temmperature as close as possible to setpoint with economizer. Modify alarms accordingly. 3. Cooling supply air tenperaturq reset is based upon the zone with the highest demand. The / zone with the space temperature most out of range is the basis for reset. The supply air temperature is reset to the highest value possible, while simultaneously maintaining 75% of design primary airflow for this zone. 4. The BAS overrides the economizer cycle during warm weather if the outdoor air temperature exceeds the return air temperature. 5. A mixed air low limit control overrides economizer dampers to prevent supply air temperature from decreasing below 50 F. E. Zone Temperature Control, Occupied Mode: 1. General: Zone controls are DDC type through the BAS, and consist of a room temperature sensor and a microprocessor controller at the r terminal unit. Initial setpoint 72 F for heating and 75 F for cooling. Terminal box fans operate continuously in occupied mode. 2. Cooling: Primary air damper on fan powered terminal box is modulated between minimum and maximum airflow to maintain the space temperature setpoint. 3. Heating: Primary air damper on fan powered terminal box is throttled to minimum and the heating hot water control valve'is modulated in sequence to maintain the space temperature setpoint. 0 BDD BDD - <RA FROM GYMNASIUM YAFMS MODI - FROM STORAGE ROOM EA FROM O UTDOOR RESTROOM EA < FROM OUTDOOR STORAGE AHU -3 GYMNASIUM AIRFLOW DIAGRAM F. Zone Temperature Control, Unoccupied and Worm-Up Modes: 1. Unoccupied Lode: The BAS shuts down the main fans and terminal box fans, and cycles the terminal box fans and modulates heating coil valves (zero outside air) to ointain minimum zone temperature: initial setpoint 60 F. 2. Override: Occupied mode may be energized and r handling units started upon off -hour demand for space heating, cooling, or ventilation through the BAS, via override buttons at the room temperature sensors. Set initial timed interval at 2 hours (adjustable). 3. Warm -up: The BAS optimal start /stop program initiates the warm up cycle. All terminal box VAV dampers are at minimum, air handling units are started, MU heating toll control valve is fully opened, terminal box heating coil control valves are fully opened, outdoor air damper is fully closed, and return air dapper is fully open. Exhaust fans are de- energized. AHU heating coil control is released to occupied mode control when return air reaches setpoint of 72 deg. F. Zone control is released to occupied mode control as each zone reaches space temperature setpoints. Warm -up made is terminated when all spaces reach occupied mode space temperature setpolnt or when occupied time period starts, whichever occurs first. 4. Coot -down: The optimum start /stop program initiates the cool -down cycle. The VAV terminal boxes are placed in occupied mode control (fans on), air handling unit Is started, economizer cycle is activated, and coil control valve is modulated as required. 1.2 CONSTANT VOLUME SYSTEM - AHU -3 AHU 3 FILTER HC SUPPLY FAN A. Supply Air Flow Control: The system is constant volume with two speeds. Normal speed is low speed with override to high speed from wall switch or DDC system at operator's discretion. Provide both wall switch and DDC override. Locate wall switch in gymnasium storage area; coordinate exact location with Owner's representative. B. Relief Air Flow Control: The system is constant volume. Acounter -balanced gravity relief backdraft damper provides relief during economizer cycle operation. Balance relief damper to maintain 0.05 Inches positive space pressure. C. Outdoor Air Flow Control: The BAS modulates the outdoor air damper to maintain the minimum OA airflow setpoint cfm under each supply air mode (low speed and high speed). There are two setpoints for the outdoor air quantity - one for low speed and one for high speed. The outdoor air quantity is continuously measured via airflow measurement station D. System Temperature Control, Occupied Mode: 1. The BAS sequentially modulates the heating control valve, the outdoor air damper, and return air dumper to maintain SA temperature setpoint. The SA temperature is reset by the space temperature control. Initial space temperature setpoints; 72 F for heating and 75 F for cooling. System has no cooling capability other than economizer. Intent of system in cooling node is to maintain space temperature as close as possible to setpoint with economizer. Modify alarms accordingly. 2. The BAS overrides the economizer cycle during warm weather if the outdoor air temperature exceeds the return '4.t.r_ temperature. 3. A mixed air low limit control overrides economizer dampers to prevent supply air temperature from decreasing below 50 F. TO GYMNASIUM m ROOF EZZANINE 3.0 EXHAUST FANS/SUPPLY FANS 3.1 EXHAUST FANS EF-6 EA FIRST FLOOR B. Interlock MUA -1 with EF -6. 3.2 EXHAUST FANS EF -1, 2. 3, 4, 5 & 10 VCD MOD ❑ - RETURN/ EXHAUST FAN (RA FROM PLENUM 0 Y AFMS u � AHU -2 ADMIN OFFICES AIRFLOW DIAGRAM SCALE NONE E. System Temperature Control, Unoccupied and Worm -Up Modes: 1. Unoccupied Mode: The BAS shuts down the main fan, and cycles the fan and heating coil (zero outside air) to mointaln minimum space temperature; Initial setpoint 60 F. 2. Override: Occupied mode may be energized and air handling unit started upon off -hour demand for space heating, cooling, or ventilation through the BAS, via override button at the room temperature sensor. Set initial timed Interval at 2 hours (adjustable). 3. Warm-up: The BAS optimal start /stop program Initiates the MfffPGp cycle. Air handling unit Is started, heating coil control valve Is fully opened, outdoor air dampers are fully closed, and return IF damper is fully open. Exhaust fans are de -energized. Warm, up mode Is terminated when space temmperature reaches setpoint. 4. Cool -down: Optimum start /stop program initiates the cool down cycle. Air handling unit Is started and economizer cycle Is activated, 2.0. Make -up Air Unit: MUA -1 1. Unit operates when associated exhaust fan EF- 6 operates. Motorized damper opens when fan operates and closes when fan is off. 2. Status of fans is monitored through current sensors in motor starter. Filter pressure drop is monitored. An alarm is generated upon failure of any device or upon filter pressure drop exceeding the setpoint limit. 3. When MUA -1 is operating reduce the R/EF airflow on AHU -1 by 1500 cfm. A. General: Fans specifically noted to be controlled or monitored by the BAS shall have status monitored in BAS through o current sensor In their motor starter. An alarm is generated upon failure. Shutdown occurs from fire alarm system Interface to central air handling system as applicable. B. Exhaust fans that do not have starters but ore controlled by theBAS shall comply with "A" above except they shall have status monitored by contact position or by a differential pressure switch. A. Occupied mode: Energized via wall mounted push button switch with pilot light. A. Occupied mode: Fans ore started /stopped by the BAS. Fans shall operate continuously during the occupied mode. Motorized dampers are open (where applicable). B. Unoccupied mode: Fans ore deactivated. Motorized dampers are closed (where applicable) RECEIVED CITY OF'TDKWI!A FEB 0 2 1996 PERMIT CENTER AHU -2 FILTER CC HC SUPPLY FAN C. Interlocks: Provide software Interlock for exhaust fan operation on same occupied mode time schedule as associated equipment. D. Energize EF -10 with the dishwasher and deenergize the fan 10 minutes after the dishwasher slops operation. 3.3 EXHAUST FANS EF -11 & 12/SUPPLY FANS SF -13 & 14 A. Fan Is energized on a rise In space temperature above set point; 80 F (adjustable), via a wall mounted electric thermostat. Fans cycle on and off as required to maintain space temmperature setpoint. Motorized damper opens when fan operates and closes when fan Is off. Interlocks: Interlock SF -13 with EF -11, and SF -14 with EF -12. 3.4 EXHAUST FAN EF -7, 8 & 9 4.0 HEATERS 4.1 ELECTRIC CABINET HEATERS CH -1 THRU CH-8 4.2 HYDRONIC UNIT HEATERS UH -1 AND UH -2 A. Unit is energized on a fall in space temperature below set point, 50 F (adjustable), via a wolf mounted DDC temperature sensor. Fon shall start and hydronIc heating control valve shall open. Unit shall cycle on and off as required to maintain space temperature setpoint. Valve shall close when unit is off. 5.0 MISCELLANEOUS EXHAUST FAN ASSOCIATED EQUIPMENT EF -1 AHU -1 EF -2 AHU -1 EF -3 AHU -1 EF-4 AHU -1 EF-5 AHU-4 EF -10 DISHWASHER A. Fan operates from light switch (by electrical). A. Heater is enabled from BAS. Failure of BAS will close contact to allow heater operation. Heater operation is interlocked with zone terminal box to prevent simultaneous heating & cooling. Heat output is modulated via integral thermostat. Status is monitored In BAS through dry contact. Domestic Water Circulating Pumps: Pumas are started If any air handling unit Is in occupied mode or warm -up /cool -down mode. Pumps are de- energized If all Air handling units are In unoccupied mode. Status of pumps Is monitored through current sensors in motor - starters. An alarm Is energized upon failure during operation. Combination Fire /Smoke Dampers: F/S dampers are closed and reopened by the fire alarm system (ref electrical). Fire Alarm System Interface: Upon receipt of fire alarm signal, BAS system Issues A stop command to all fans. Restart sequence begins upon receipt of all -clear signal from fire alarm system. Fans are restarted one at a tine, with 15 second delay between starts. Provide wiring to fire alarm control panel and connect to dry contacts; coordinate with fire alarm system contractor. D. Combustion Air Dampers: To prevent heating equipment operation unless dampers are fully open, Interlock two position control dampers with associated water heater. FAN POWERED VAV BOX TYPICAL DATE: 07.01.95 A •_ • C ARCHITECTS 1101 EAST PIKE STREET _. _ SEATTLE, _WA_ 98122- 391 -5 206.3223322 _ 206.322.9323 FAx CONTENTS; SEQUENCE OF - OPERATIONS & DIAGRAMS SCALE: NONE DRAWN: RAF CHECKED: TED PROJECT N0: SHEET: ( FOR INSTALLATION IAHU -11 ROY 51,SEr:0095,2312 [sr - +7 06 2s 1•17 M26 SCALE NONE IAHU -2 IAHU -4 1 IAHU-3 (TERN f:::: :::TYPICAL WEST NING ALBOX HEATING COIL FOR INSTALLATION FOR INSTALLATION SEE �(TYP) M29 I M2.6 / r - FOR INSTALLATION SEE f 1(TYP) 6 M2.9 1 M2 xrs HYDRONIC HEATING SYSTEM DIAGRAM TYPICAL EAST KING TERMINAL BOX HEATING COIL SEE © (n P) M2.9 M26 ms las CW MAKEUP POC GAS LINE POC ALL EMAPMENr ENCLOSED TO BE PROVIDED AS A SKID MOUNTED PACKAGE ,-FOR INSTALLATION IET-4 1 I BB -1 SEE ( . (TIP) M2.9 ,M2.5 or s DPV IBCP -1 1 IBCP -1 1 D4 J • ICHP -1 1 CHILLED WATER SYSTEM DIAGRAM SCALE NONE FOR INSTALLATION i SEES 2 l I M2.9 M2.6 g g - - -ds- _ - tl� -J FOR INSTALLATION SEE M2 M2.9 I M2.5 6.0 CHILLED WATER SYSTEM cos ACC-11 HYDRONIC HEATING SYSTEM SEQUENCE OF OPERATIONS 7.0 HYDRONIC HEATING SYSTEM A. General: System Is a skid - mounted packaged system consisting of two natural gas -fired boilers, BB -1 & 2; two boiler circulating pumps, BCP -1 & 2; two hot rooter loop pumps, HWP -1 & 2; and control panel TCP -1. This acka ed system provides heating hot water to heating P 9 Y P 9 9 coils in AHU's - 1,2,3, .4 for system temperature control, and to heating coils in individual terminal boxes for zone temperature control. B. System Start/Stop: 1. Occupied Mode: The packaged hydronic heating system is started by the BAS. System operation is enabled at an outside air temperature fail to 60 F. The BAS shall start system prior to occupied hours with optimal start /stop program. System is disabled at outside air temperature rise to 65 F. These are initial set points and ore adjustable. P 1 Occupied Mode shall be defined to include occupied hours of operation of any air handling systems. 2. Unoccupied Mode: The system shall start if any heating coil control valve is open 20% or more (adjustable), as measured by the BAS, and if outside air temperature is below 60 F (adjustable). Once started, the system shall remain in operation for a minimum time period of 2 P P hours (adjustable). At the end of the minimum time period, if no heating coil control valve is open 10% or more (adjustable), as measured by the BAS, then the system will be de- activated. 3. Freeze Protection Control: If the system is in the unoccupied mode and the outside air temperature drops to 35 F (adjustable) the system shall start. The heating system shell remain in operation (pumps on, boilers cycle to maintain loop temperature) until the outside air temperature rises to 40 F (adjustable). C. BAS Interface: 1. Hydronic heating system controls, provided with packaged system, handle basic sequence of operation Independent of BAS as described below in part 'D'. 2. Provide the following status points in the BAS (connect to contacts in TOP -1). a. General Alarm. b. System on /off 3. The following dry contact status points are provided in TCP -1 for future BAS connection. a. BB -1 boiler and BCP -1 pump operating (pump running and fuel valve open). b. BB -2 boiler and BCP -2 pump operating (pump running and fuel volve open). c. HWP -1 operating. d. HWP -2 operating. e. BB -1 boiler or BCP -1 pump foil. f. BB -2 boiler or BCP -2 pump fail. g. HWP -1 fail. h. HWP -2 fail. 1 4. The following analog points are provided in TCP -1 for future BAS connection. a. Heating loop temperature (controlled variable), scaled 40 -240 deg. F. b. Boiler return temperature, scaled 40 -240 deg. F. c. Outside air temperature, scaled 0 -100 deg. F. D. Packaged Hydronic Heating System Controls: 1. Basic Sequence of Operation: a. Upon a call for heat from the BAS, TCP -1 will start the lead boiler pump and boiler. Based on main building eatin loo temperature 9 9 P mP TS- ( 1), the controller will comand increasing boiler capacity following a PID proportional/integral/derivative ) control ( loop. The set point will be determined by the OA reset schedule (TS-4). If the boiler return temperature falls below 140 F TS -2 TS -3 mP ( TS-3) (adjustable setpoint), the mixing valve will isolate the boilers from the primary loop allowing them to recirculate. The burner will be held at low fire until the boiler return temperature reaches 125 F. When the boiler return rises above 125 F, the burner i w II be allowed to follow the controller firing rate command signal (4- 20MA). When the lead boiler reaches 90% capacity, the lag boiler will be started. The low fire hold and mixing valve control shall follow the same sequence as the lead boiler. As the boiler return temperature rises above the return setpoint, the mixing valve will undulate to allow boiler flow to the primary loop while maintaining 140 F minimum boiler return temperature. If the primary loop setpolnt is below 140 F, the mixing valve will mix boiler and loop water to maintain the boiler return temperature. If the primary loop and boiler return are above 140 F, the full boiler pump flow will be from and to the primary loop. When both boilers are on line. they will be modulated In parallel. As the load drops and both boilers modulate down to low fire, the lag boiler will be dropped from the sequence when the both boilers are at 35% capacity. The pumps will continue to run for 5 minutes after the bolter shuts down to allow the boiler water temperature to stabilize. b. The system loop hot water heating pumps (HWP -1 and 2) are each sized for 100% system capacity d5mond. Under normal conditions, one parry operates and the other is stood -by. TCP -1 starts the pump whenever a remote system start signal is received from the BAS. Upon failure of the operating pump, the stand -by pump is energized, the operating pump Is shut -down, and the failure Is annunciated. Determine pump failure via a current sensor in the motor S 0 starter. The lead pump will be automatically alternated every 100 operating hours (field adjustable). 2. Auto Lead Select: Each time the lead boiler fuel valve has been opened for 100 hours. the lead boiler will be changed. 3. Forced Lead Select: The boiler selected as lead by the lead boiler selector will be lead until the selector is changed or the lead boiler fails. 4. Heating Hot Water Loop Pressure Control: The hot . water heating differential pressure control valve . is modulated to maintain constant differential pressure between supply and return mains. Initial setpolnt 25 psi. 4. Abnormal Operation: 0. Pump Failure (Audible Alarm): If the pump starter trips or current switch fails to reach current flow, the pump will be commanded to stop, he associated boiler will p, wI be stopped, and the pump fall alarm message will be enunciated. (Trip of current failure) the boiler run /fail lamp will be flashed. The lead boiler will be changed immediately, no matter which lead lead select is selected (auto or forced). b. Boiler Control Switch Open: The lead boiler will be forced to change. The boiler control switch closed message will be turned armed off. Na alarm will sound unless both boilers are Inoperable. Automatic operation of the boiler pump is prevented by TCP 71. c. Boiler Low Water Cut - ff'(LWC0)/High Limit (LIM) Failure (Audible Alarm): The lead boiler will be forced to change, and the LWCO/LIM alarm message will be displayed. The LWCO and LIM are continuously monitored whenever the burner control switch Is closed. Automatic operation of the boiler pump is prevented by TCP -1. d. Boiler Fall to Start (Audible Alarm): The lead boiler will be changed imediately, no mutter which lead lead select is selected (auto or forced).. Message will be displayed. This failure occurs when the limit circuit Is complete and the fuel valve fails to open for any reason. Automatic operation of the boiler pump is prevented by TCP -1. e. Controller Failure: In the event of a failure of TCP -1 or any of its critical components, both pumps and boilers will be commanded to start, 'The control of the mixing valve will be automatically transferred to the backup valve controllers. 5. Forced Manual Operation (Controller TCP -1 Not Operating): a. Selecting Boiler to Manual Mode: The boiler pump switch mist be selected to auto mode, the control valve will be transferred to backup control, and the burner will follow the bolter mounted modulating and limit controls. The pilot lamps controlled by the controller will Illuminate as In automatic mode. A failure of the burner to start when the boiler mounted operating limit closes will be enunciated. A failure of the LWCO or high limit will enunciate as in the automatic mode. A failure of the pump current switch or stoner trip will enunciate as in the automatic mode. The controller will not be able to shut down the boiler or pump. b. Selecting Pump to Manual Mode: The pump will run continuously and pump pilot lamps will operate normally. The pump flow and trip messages cannot be displayed.. The auto mode with the controller not operating imi Identical to the forced manual mode. 6. Controller TCP -1 Failure: u e If the controller foils, the remote alarm Is activated, the audible alarm sounds and both pumps and boilers will start (If selected to auto mode). The mixing valve will follow the backup control. The boiler operation will follow the boiler mounted limits and modulating control, and will maintain the loop temperature at the boiler- mounted limit settings. CHILLED WATER SYSTEM SEQUENCE OF OPERATION A. General : The system consists of an air- cooled chiller, ACC -1. with factory mounted DDC control panel TCP -2, and two chilled water pumps, CHP -1 & 2. The system serves cooling coils In AH0 -1 & 2 for system temperature control. 8. System Start/Stop and Temperature Control: 1. Purpose: To maintain the chilled water supply temperature within proper limits for optimum operation of the building cooling system, while keeping the temperature within safe flmits for chiller operation. Equipment Is operated as described below. 2. Start /Stop: a, Upon a call for cooling, the following will occur In sequence: 1) ACC -1 is signaled to to g start by the BAS 2) Lead CHP starts 3) After flow is established via a field Installed chilled water flow switch by ACC -1's DDC control panel, (TCP -2), the chiller starts. 4) Coll for cooling will be defined as any chilled water control valve opening 20% or more on any unit In the occupied mode or In the cool -dorm mode. This is an Initial setpoint and le adjustable. Measure chilled water control valve position with the BAS. b. When all chilled water control valves are traveling toward closed position and reach 10 % closed as measured by the BAS, the following will occur In sequence: 1) The BAS notifies TCP -2 that cooling is no longer needed. 2) TCP -2 will shut down ACC -1. TCP -2 energizes the crankcase heater and closes the solenoid valves, par chiller manufacturer's sequence. 3) If the ambient temperature as sensed by TCP -2 Is below 36 F, cooler and control box heaters are also energized, per chiller manufacturer's sequence 4) Periodic pumpout based on refrigerant pressure. C. Temperature Control: TCP -2 controls ACC -1 to mointaln set leaving chilled water temperature by loading and unloading Individual compressors In ACC -1 and staging the multiple compressors In ACC -1 as necessary. Inillal setpoint for leaving chilled water temperature 45 F. A low -limit controller In TCP -2 for the leaving chilled water temperature prevents freeze -up. Initial sepolnt: 36 F. D. Chilled Water Pumps (CHP -1 & 2): Each pump Is sized for 100% system capacity demand. One pump operates (lead pump) and the other Is stand -by (log pump). Upon failure of the operating pump as sensed by a differential pressure sensor across the pump, the stand- by pump Is energized and the operating pump Is shut down by the BAS. The BAS shall alternate lead and log pumps every 7 days (adjustable). E. Fault Analysis: 1. Connect ACC -1 statue and alarm /trouble outputs in TCP -2 to the BAS. 2. The BAS has status and"alarm Inputs for CHP -1 & 2. nNvEo cm El or ruxwlu FEB 0 2 1996 A • R • C ARCHITECTS 1101 EAST PIKE STREET SEATTLE, WA 98122- 3915.,, 206.322 3322 206.322.9323 FAX DATE: 07.01.95 \ CONTENTS: SEQUENCE OF OPERATIONS - & DIAGRAMS ,CALE: NONE DRAWN: RAF CHECKED: TED PROJECT N0: SHEET: M :1?