Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M96-0094 - BOEING #9-101
ouK6 4tcl Mq(04--00cig City of Tukwila Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 Permit No: M96 -0094 Type: B- MECHAN Category: NRES MECHANICAL PERMIT Address: 9725 EAST MARGINAL WY S Location: Parcel #: 000340 -0018 Contractor License No: BOEINC*294ML TENANT BOEING #9 -101 9725 EAST MARGINAL WY S, SEATTLE, WA 98124 OWNER BOEING PO BOX 3707 - M/S 1F -09, SEATTLE WA 98124 CONTRACTOR BOEING COMPANY P.O. BOX 3707, M/S IF-09, SEATTLE, .: "WA 98124 CONTACT TERRY BENNETT Phone: 206 544 -2975 P.O. BOX 3707, M/S 46 -87, SEATTLE,' WA 98124 * kk k** k** k** kk*** k* kk**** kk********** k* kk** k*** k *k *k * * * * * ** * * * * * * * * * ** * ** ** Permit Description: INSTALL TARIT DEIST COLLECTORS. UMC Ed i t j 1994 Pern Center Authorized Signature 1. kkA *kk*,* kk**A*** k• k*• k• k• k• kk**• k' k• kk* k***• k• k**• k****** 'k * * ** * * *'k * * ** * * * *'k ** I hereby.cer.tify that I have read an'd examined this permit and know the same to- be true and correct. All provisions of law and ordinances governing this work will. be. complied with, whether specified herein or not The granting • of this permit does not presume to give authority to violate or cancel provisions of any other state or local laws regulating construction or the performance of work. :I am authorized to sign for and obtain thi bu i 1 g pern t Signature:_ Date: _071 Valuation: Total Permit Fee: 2± - Date (206) 431 -3670 Status: ISSUED Issued: 08/16/1996 Expires: 02/12/1997 80,000.00 86.88 Print Name: Title: This permit shall become. null and void i.f the work is not commenced within 180 days from the date o.f issuance, or if the work is suspended or abandoned for a period of`180= days.from, the last inspection. .r— mr..n..urms. .....•..— .rte- .............vya11W.u,u.0 CI''TY . OF TUK•WIL.A Andress: 9725 EAST MARGINAL WY S Permit . " M96 -0094 Siite, Tenant: BOEING #9 -101 Status: ISSUED Type: B- MECHAN Applied: 07/23/1996 Parcel #: 000340-0018 Issued: 08/16/1996 k• kA k* k• kk• k*k h* k' k' k• k• kkk• k* k• k* kk' k• k** k kk• k• k• k• k• kkk• k• kk kk• kA• k• kk• k•kkk'k*kkh•AkkkkAkAl*kk Permit Conditions: I, No changes will be made to the plans unless approved by the Architect or Engineer and ,the•- _ l a B u i l d i n g Division. 2. All permits, inspection; records, and approved plans :.hall be available at the .jab site "prior to the start: of any con - struction. These , : document • are to be maintained and a v a i l - a b l e until final ''i nspecti,on `.approva 1 is granted 3. All constru4i o'n to ; be''Aone .in conformance : with approved plans and requirements of the .Uniform Bui ldiny`:Code'. (:1994 Edition).. as amended, Un i form Mechanical, Code (1994.. Ed iti on) t and Washington State Energy ,Code (1994 Edition). " 4. Validity of Permit. ; ` The. issuance of a permit or approval of plans' specificati'ons and computations shall not be con.- str~ue,d to'': be a permit ; for, or an approval of any violation of any of' p r o v i s i o n s of the b u i l d i n g ng code or of ,, any other' ordinance of the juris'diction. No permit pr,esuniing g i veh au thori ty to v i o 1 to car cancel the provisions of ,this code? shal l be v a l i d . " 5: MAN iFACTURER':� INSTALLATION; INSTrIDNS- REOUIRED ON, :SITE Ft R THE BUILDINB •IN � PECTOR . REVI t . Eiet trica �{ permi is "'sha'j,1 be.`c�b d' throug t h e Wa hing � ir'e l fvi�iun c `st,,,Labor and ,Indtlskrie an elec�tr ~ictiai, wa {t�N; wi 11' "be in^ ec ted b•y , `that agency (:24`B- 66'30) Project Name/Tenant: BOEING DEFENSE AND SPACE GROUP Value of Construction: --- yW OOc) , Site Address: City State /Zip: 97,2.5 Z, i?'la � tom c 7ia Tax Parcel Number: c9e)o 3 1/49 -oo iS Property Owner: THE ROE ING COMPANY Phone: Street Address: Pn BOX 3707 M/S 46 -87 SEATTLE, WA ity State/Zip: Fax #: Address: Contact Person: TERRY BENNETT Phone: 544 -2975 Street Address: City State /Zip: PO BOX 3707 M/S 46 - SEATTLE, WA. 98124 Fax #: 544 - 2854 Contractor: Phone: Street Address: City State /Zip: Fax #: Architect: Phone: Street Address: City State /Zip: Fax #: Engineer: , g S + # 76° - o i Phone: Street Address: City State /Zip: Fax #: ,- ..i..; :am SCt" L wo.t.t .i(P. Rmo. '1 vio.Nilt►Nti Aoof1.0viail ook . .4. TO)iiikAl Lowoo..t %9 itAko a i11 . + ,, i;'.?.; Description to be don MOW of work :' . // � � ` iw � � i.-� I 4%;.Z...• $' '-_ ---;-- - Will there be storage of flammable /combustible hazardous material In the building? ❑ yes It no Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sheets ❑ Above Ground Tanks ❑ Antennas /Satellite Dishes 1 ❑ Bulkhead/Docks ❑ Commercial Reroof ❑ Demolition ❑ Fence gal. Mechanical ❑ Manufactured Housing- Replacement only ❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection/Exit Systems ❑ Temporary Facilities ❑ Tree Cutting MONTHLY ,SERVICEOILLINGSrTO;;t'.; ;. ;::.,.;, ,. ,Y:;:.,;•;; , t.;''; ;; . 1', r; •: ,' ; Name: Phone: Address: I City /State /Zip: 0 Water 0 Sewer 0 Metro 0 Standby CITY OF T( - KWILA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Miscellaneous Permit Application Application and plans must be complete In order to be accepted for plan review. Applications will not be accepted through the mall or facsimile. ... :`.t ;i1.0 )!.,i r, tii%'AP,pLICANTINEQUES I�I;IMISflEL1L''ANECiU� UBLIC� O KS;PE (S:Y� 'txtA: ;';r i T� ip W R faltll T '�<s, „t'� '. aiL1 ». •,:. Channelization /Striping ❑ Flood Control Zone ❑ Landscape irrigation ❑ Storrn Drainage ❑ Water Meter /Exempt 11 ❑ Water Meter /Permanent It ❑ Water Meter Temp 11 ❑ Miscellaneous U Curb cut/Access /Sidewalk U Fire Loop /Hydrant (main to vault) #: Size(s): ❑ Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq ft gradin&learing ❑ Sanitary Side Sewer 8: ❑ Sewer Main Extension 0 Private 0 Public ❑ Street Use ❑ Water Main Extension 0 Private 0 Public 0 Deduct 0 Water Only Size(s): Size(s): Size(s): Est. quantity: gal Schedule: ❑ Moving Oversized Load/Hauling WATEl3fM$TEi (DEPOSIT /REFUND 61L'LING Name: I Phone: Address: I City /State /Zip: Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and Is subject to possible revision by the Permit Center to comply with current tee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Date application accepted: - 1-d5 -9 co Date application expires: 1 'c 9 7 Application takY: (initials) MISCPMT.UOC 7/8/96 BUILDING OWNER OR AUTMONIZEU'AGE NT ::.: . SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR Abt Ve.Grolihd Tanks /VVater :Stlpported'di'rectI' Upon grade .4.:: exceeding 5,000'gellons and a ratio of height to dletneteror.WIdth;' Which exceeds 2:1 Signature: .. �r, r EN- „..,e, - Date: ,/.2...5A, Print name: TERRY BENNETT ❑ Phone: Fax Fax f1: 544 -2854 Address: BOX 3707 M/S 46 -87 SEATTLE, WA. City /State /Zip: 98124 ❑ SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR Abt Ve.Grolihd Tanks /VVater :Stlpported'di'rectI' Upon grade .4.:: exceeding 5,000'gellons and a ratio of height to dletneteror.WIdth;' Which exceeds 2:1 PERMIT REVIEW ' SUbmit' Not' M•9 '. ,` ' ❑ Antennas /Satellite Dishes Submit checklist No: M -1 in Awnings /Canopies - NosIgriage Commercial°.Tenaht Improvement Permit '. ❑ Bulkhead/Dock ,,Submit checklist ; No M-10 0 Commercial Reroof Stibhiit ohecklist No: M =6• ❑ ' Demolitioh Submit • Nb,t M 3 :•M = 3a' 0 Fences - Over 6 feet Height 'Subinit,checkllst: -•N -9 • Land :Altering /Grading /Preloads SUbmit checklist .:.No: •. M =2; ❑ Loading Docks Commercial Tenant Improvement , Permit. Submit. checklist Noo -.17 o' Mechenleal;(Residential & Commercial) •SUbtnit checklist;'. `No,CM- 80-i +6, H =16 cj MlsceflaneoUs ,Pubiic,Wbr'ks,Permits • See PUblic,Wbrks S1ibrnittal,•CHet kU t ❑ Mantlfactltred!HousIng (IED'INSIGNIA° ONLY) _ . SUbhiit checkllst,' M =5; • ❑ Mbvlhg :Ovei:sfied'Load/Hai.iling . 1 'SUbhilt!chectiiil;t; 'Ndt ,1 Parklhg;Lots ,Submlt .No; .M=4. ❑ Reeidentlai ;Reroof• - Exempt.with following exceptions If'raof structure . to,be repait:ed or replaced , . •±i1esidential°BUilding Permit ' . Submit f hecklist No: M'6 :: Submit checklist. : No • M-i1 i. =::, ❑ petaiiiittg = Over 4 feet in ❑ Temporary Facilities' :SUbhilt:cHeoklist;:.,. No; . M.7.`, ❑ ,Teittpbrary Pedoetliel PPotectlon/Etfit,SVsteMS'' SUlihiit oHecklist No:. M =d "' • ❑ Tree Cdtting Sllbmit checklisf' •No M =2 ALL MISCELLANEOUS P IT APPLICATIONS MUST BE SUB ED WITH THE FOLLOWING: D ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN > BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED D ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT > STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED STRUCTURAL ENGINEER > CIVIL/SITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER (P.E.) ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder. OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent It the applicant is other than the owner, registered architect /ehglneer, :or contractorIlcerised by the State of WNashIngton; ;a notarized /ettet'/rorn tlia proporty owriee autlfotizirig the'agent fo s ubrnit , fhls perii'ilt nppllcntldli and obtain tie permit will be required ds part •oftlils submittal: • I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. MISCPMT.DOC 7/9/96 �., �, f:hA ,k �i�.' �t • . .. �ir •.. `�.`� `.1 r ..�/ t. r, \e,��� r ..r. r ..4 r�ri `r. r ` .. t i.`• ' {" �.. �i 4 AA k'h*IA*k *:t** *k•k *k k,k * *A k *A *4 *kA ** * AAA •kA*•b * * * *k•l.A *kol *•A *•k'A kk•A *ky CITY OF TUKWILA. WA TRANSMIT * *k'A* * *4*** A *A * * *kkA *k** *A *A *A **k* Ad kk*A *A hA *A *k% *144A * **k TRANSMIT Number: R96004t Amount: ,r 8G.US 00/16/96 10:0'r Payment Method: CASH NQ•ttatiare.ODEING Init: SMC Permit Nor M96-0094 4 Tvpe.' 13-MFCHAN MECHANICAL PERMIT Parcel Noa. 0OQ340 -0Qi 3 Site Address: 9725 EAST MARGINAL WY ',1 Total Feet': 56.00 This Payment. 86.t8 Total ALL Pints.:. 86.813 • fiat ant e: .00 *** A *kA *4 *A **A•**41 *A * * *# *k * * *** *k4Ak** •h *k*•A* *#*`A,4'* *•A * *k* ** ,,. Account Code Description Amount 000/345.B20 PLAN L »HI:CI( ._ NONRE8 17.38 000/322 MECHANICAL — HO34RES 69.5() • 2300 08/17, . 963.7 TOTAL 86.88 Project:6 ��JJ . *c 101 v1 inspect Type of inspectn: Date called: Date wanted: n: (` I n I T [ — q _ m. Address: ` t ,` pia' Noun 0" Special instructions: Q-eimit i3 0) Co\\ r\ X9 Requester: .DsZX -Y Phone No.: 5'4.0— 504-) INSPECTION CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Receipt No.: r INSPECTION RECORD Retain a copy with permit t4 tt+YSuf', PERMIT NO. (206).._431 -3670 COMMENTS: Inspector: Date:/ Corrections required prior to approval. $42.00 REINSPECTION FEE REQUIRED. Prior to Inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection. Date: ProJeo a s\ EI i 9 j O' Type of inspectionr n Date called: 10 _ 2-Zs.-9t° dd 'Y •'AL w Specil instructions: itiZMt� 16 4,5 17 Zo if=s: f.)olz )-I of c01.1(nid y -1 Date wanted: Io 2 p.m Requester: R1 131 (4 )•\ fgANo.:,3 _ .. 7 INSPECTION NO, INSPECTION tiECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION' 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERMIT NO. (206) 431 -3670 Approved per applicable codes. , Corrections required prior to approval. COMMENTS: LA ,, J-;: °,A Inspector: Date : / oye.( ( $42,00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Ca I to schedule reinspection. Receipt No.: Date: Project : �` o l _ 0 1 6 ► i (( DOalled: Type of Inspection: t"_ • tea... f (D/ w /9 r _ Address: 7` Special instructions: aa " Date wanted: / 0/ 1 °1 • Requester: I�- �/�( Phone No.: 9 COMMENTS: Inspector: INSPECTION iECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431 -3670 Approved per applicable codes. EZporrections required prior to approval. Date: / ( $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. J 4(t, - , „) APfa(pdep, Receipt No.: Date S -9 -101- 4364 -SLB JULY 11, 1996 SECTION 15000 MECHANICAL 1.00 This job is to install four (4) Boeing supplied dust collectors and connect to relocated equipment at (4) new Power Stations and install one (1) Boeing supplied dust collector and connect to an existing Power Station system. Because of regulations, all dust separators shall be located outside the 9 -101 Building. 1.01 Mechanical permit for dust collectors to be supplied by Boeing. All other permits to be supplied by contractor. 1.02 Contractor to fabricate transitions and woven metal vibration joint to dust collector units at manufacturer provided panels at front of units, or at top if coming from a higher elevation. See Fire Protection Section for Dry Sprinkler information and Structural for housekeeping pads. 1.03 Provide vertical clean required to keep air flow building openings and air and straight piece cut at screening. air outlet ducts for units as minimum 10 feet from all intakes. Terminate with elbow 45 degrees. Provide bird 1.04 Contractor to provide and install all ducting connecting dust collectors and Power Island equipment. Follow SMACNA Duct Construction Practices providing an air tight system. Provide clean -outs at changes in direction and minimum every 40 feet. Paint and label duct and supports. 1.05 Contractor to modify and /or add transition elements between ducting and shop equipment. See sketch and attached equipment schedule for required changes. 1.06 Provide compressed air to all'dust collector units. Connect to existing shop air w/ valve, route to outside and connect w/ valve to new collector units. Label. Nq(, 1XYd1ij 1.07 See Reference Detail M -2, attached, for typical duct penetration. Seal 1" compressed air penetrations. RECEIVED CITY of TUKWILA J111. 2 3 tsss PERMIT CENTER 5 -9- 101 - 4364 -SLB JULY 11, 1996 1.08 Label all ducts, pipe and tubing according to Boeing Label Standards listed below. Provisions will be made to have all piping clearly labeled as to its contents and direction of flow. The labeling will adhere to the following schedule: Outside Diameter Size of Size of of Pipe Color Band Letter 3/4" 1 -1/2" 2 -1/2" 8" over 10" 1 -1/4" 2" 6" 10" 3.00 Mechanical Drawing List 9- 101 -1M13 Rev A HVAC 9- 101 -1M14 Rev B HVAC 9- 101 -1M15 Rev A HVAC 9- 101 -1M20 Rev B HVAC 9- 101 -1M21 Rev B HVAC 9- 101 -1M113 Rev A Piping 9- 101 -1M114 Rev C Piping 9- 101 -1M115 Rev C - Piping 9- 101 -1M121 Rev F - Piping SK 75B 960711 M -1 - Detail SK 75B 960716 M -2 - Detail 8" 8" 12" 24" 32" 1/2" 3/4" 1 -1/4" 2 -1/2" 3 -1/2" Pipe Contents Letter Color Band Color White Blue Compressed Air (0 -110 psi) Vacuum (dust collection) 2.00 Except for (5) Torit Dust Collectors, all materials is to be provided and fabricated by Contractor. 2.01 All sheet metal work to be galvanized steel. Ducts and fittings to meet Uniform Mechanical Code for Class III. Duct material to be a minimum of 18 GA with fittings at 16 GA. Elbow bends to have a minimum radius equal to twice the duct diameter. 2.02 Compressed air tubing to be copper, Type L with wrot fittings. Valves to be bronze body ball valves, Class 150, with locking handles and teflon seats and seals. I-Zt -Z 1 BAND SAW Blade Width Blade Shields Bottom Outlet Upper Lower Detail Size Modification A1-A 31-072532 1/2" Fabricate Fabricate M-1,A&B 2" Fabricate transition to 5" duct A1-E 30-026811 1/2" Exists Exists NONE 3" Fabricate transition to 5" duct S2-A 31-075791 1/2" Fabricate Exists M-I A 4" Fabricate transition to 5" duct S3-A BC 707560 1/2" Fabricate Fabricate M-1,A&B 4" Fabricate transition to 5" duct Job # 760607-00 POWER ISLAND EQUIPMENT MODIFICATION 9-101 BLDG. DISC SANDERS T T N N T T N N A1-C A1-D A1-F A1-G S2-B S2-C S3-C S3-D 31-072182 31-072533 31-070827 31-072948 31-706418 31-075503 10-355534 31-027788 Disc Dia 24" 16" 24" 16" 24" 16" 24" 16" Remove fan/motor None Yes None None None None None Yes Exhaust Outlet Size 2"x 4" 4" 3" 3" Elbow Ffrom3-1/2" 4" flex hose 2-1/2" Dia Modification Required Fabricate transition to 6", seal air tight. Remove & fab transition to 5", seal air tight. Remove & fab transition to 6", seal. Rebolt plate 1-1/4x9-1/2 Fabricate transition to 5", seal air tight. Remove & fab transition to 6", seal air tight. Fab. shorter transition to 5", seal air tight. Remove & fab transition to 6", seal air tight. Remove & fab transition to 4", seal air tight. Hood Modifications None None None None None Add sheet metal to back Add sheet metal to back None PEDESTAL GRINDER Wheel Enclosure Outlet Modifications Dia Dia Width 75% + ..„. • T N A1-B S3-E 31-072946 31-071074 left right left right 8" 1" 1 " 1" 1 " yes yes yes yes Oval 2-3/8x3-3/8 Oval 2-3/8x3-3/8 Fabricate transitions from oval outlet on each side. Join together & connect to system w/ 6" duct. Remove fan. Fabricate transitions from oval outlet on each side. Join together & connect to system w/ 6" duct. DRILL PRESS . N N A1-H S3-B 31-070831 31-031066 Existing vacuum NONE NONE •• ,,,,,,,,, ,• • • Comments No vacuum required No vacuum required T = titanium N = non-combustible S.L.Berosik 7/11/96 EQPTSCLD.XLS NOTES: DRAIN DYi S IEROSI( CNECKED BY: APPROVED BY: APPROVED BY: DATE: 7 -11-96 SCALE: NONE 9 -101 SIDE VIEW UPPER SHIELD I. SEE EQUIPMENT MODIFICATION LIST FOR BAND SAWS NEEDING SHIELDS. 2, INDIVIDUAL SHIELDS TO BE FITTED TO CONFIGUR- ATION OF BAND SAWS AS REQUIRED. 3. SHIELDS TO BE FABRICATED FROM 16 GA GALV. SHEET METAL. 4, SEE EXISTING SHIELDS ON BAND. SAW E, AREA I. BAND SAW SHIELDS AVOUFASUP 2 -1/2' LOWER SHIELD SCALE: NOTE (4) POWER ISLANDS D.C. SHEET NO. BACK VIEW 3 - 1/2" 3 -1/2" PRWECT NO. 760607 -00 CRAVING N0. SK 75B 960711 M -1 DRAW ET; 51,15GIZ.0 k‘ CHEMED .y: APPROVES C Y: APPROVED OY ALUMINUM F1.ASH,NC CONTINUOUS SEALNNr sACXER ROD CONTINUOUS SEALANT BACKER � \ ALUMINUM WriING SIDfNC PROfILE CLOSUR PROVIDE POMONA. CHANNEL FRAMING AROUND DUCT F€1EM TOP, SOT.. AND SIDES GIRT <0 INSULATION OATt: 1 /IIQ /96 SAL SIDING • ..ft...1 w STRUCTURAL < ✓1 MALL PENETRAT FLASHING POWER ISLAND U X 2 X 3/16 FAS c IINC FRAME TIP ALL 1 -SIOES 1 I i I 5TRUCrUP.AL I STEEL. axtnot I ;I /2 R,AD1IS FL HIND titcaci 7LOGO — OD ft. 0 sv-j55 9 bo - T Ib 9 Mw _ Arse X Q + 4 <) t ]W Y \ 4 z W w '' V! 4 a a w t u) ( C 1 ) _ ) tU t!) q tt (7, 1O 7 (0 0) W -( t) D) N (0 (V p N C7 C) hl 0 Q N N .N (.) NI Cal (V (1_ 11) CO (U U] 7- t(7 O) 'O to 1n +00.70 co vi 1ri N N CV 0) J - O c0 (7 Itt CV (0 8 In CO J ) (O (ll 8 0) CO tt 5 r- (— - )0 17c r,p 1 ` (7 ) 8 ri (0 (0 10 0 U) (0 0 (D ocl (') J y 1-- O 00) O- f tI t 8 1 1 - (o C7 1 1., N to n) ( 10 a) N (0 0) rl (0 r7 11 1- N 'v 0 11) II) t -0 to (V v J 1-- t0 0 (0 to U) t tr) I.) vi CO t O J N N '(7 Ih IO ;- v 0 r- (.0 1) CO co r ^ T In to (p i0 03 07 ) (D C07 01 11 lit U N (0 r «) 0) V 0 o) N O 7 (D 0 (_) 11 f or c0 0 t r •_ ((7 10 0) r`- m .'n � y l) f I(7 (0 2 m (O v (0 11) 1- (o CL i) t- CV N 01 07 O) t• 0 .J N N • (7 0) (7t 88 r (l 0) t(7 h7 N n 1 (7 Ch -t to (0 v v C) 2 I I-- C) N t_ (D -7 c0 r` 0 J CO 11 70 z 7.1.1 C) �t C7 C) 0) 2 tr) h. 0 J (0 'f h V U7 (t_ () I 1t ('7 10 0) (c7 N 0) n (7 1- 0 J to 0) 1— (-3 n w N aj z U 0 J N 0 t0 CO t7 ( . r') (') C) r) C) (') r7 C) C7 Cl Cl 0) r) r) •Y(A10r' 0 7 suattl19 P tMI nest Mb?d 9 MINIUM f 1 C rACE M010ns I*(}gntEQMOlUrrt ril WM11001VN LAITY F)(I'l 05 1 01 , 1 NIMP M01011; 2QO & 575 Nutoft'3 Mows rnr)or MolortS 41 I4 Y V144�JIII I 1191 0311 >- 0 z Lu LL 2 .• • 1 1 1 .-'O 00 9 -4 • - 4 • ts. z 0 0. a. z rn t (r) u tu - A 1- z to114.11011.111V115 R1101.011 3 so, tam I 1100 WA 11 u) C) I17 (1) 117 c 1 0) (.;) 1 0 0 7s) ( ) 0 03 - to 117 ti v3 0 0.1 ID 11. ()9 d co 05 C.3 - 4 113 tr) CC, 1 0 Ul (. (1) (0 10 _J 0 CO 0 CD t-- 0 2 0 1 0 0 (7 0 117 a3 0 2 0 3 10 C4 0 Cl/ CI ID CV (1) _J tl) In . 1 • (? D.4 co ai (1) 0 (7) I V I- C) 1'- 1-- ti ; • . , • f (0 0) CV 0? -- C"3 CL 2 CO r ••••:- 0 10 t--• (3) 10 CV 1 0 CV 0 C3 2 1- (0 cv cv 01 CV Cv (V CV k 01 (V CV r-s.. 1- ". - 1--.1.-. t; II) I() 0 1 c;) 0 !.•1 ID (‘, 11 1- - 4 11) 0 0 0) Z13 - 7" CO c'S 1 - to t 01 (1 ) 0 0 0) co u? (1. 117 0 If (1) (3) CV 2 0 a) • 1- 0 01 CV eV CV F r- 9 C7 )0 (.0 C.) 01 cc.) 1- t 111 1' U) U) r.) L 7 ) ) 7 07 10 (0 c:3 :5 (I) co L r- (-3 (9 V to (-) (7) ) (7) 2 a) . - _J 1 - f- t: 1-. -1 0 oi CO C3 51101077 g0014-I NOISO 11013 3U01091,111114 y- r n 4-- 40 (0 2 1-- r) (1 r_13 '0 to CD r- co U.) 'rr (0 (1 co (7) r-- 0 co h- ); z -.1 05 2 t - 0 (17 C') fit (1) 0) CC1 , 1. 0 0 0 11 - C..; ri an (C) 0 0_ .1 11 (3) CV (7; 0 0 0 0- 11 113 C 5 ) 1 ) C4 ri CV CV 1 0I 9. (-'3 (") C CV 0 CO 0) CO C CV (NI (.1 11) 1;4 (-7 (1- 4-) IL/ 0 (. 0 C3 C 10 cif 10 9- (. (73 a_ 11 0 0 0 0 0 0 0 0 0 0 0 L (1) 0 01 (23 co 1- cv CO 0) 8 8 01 CV 4) c) cv 1: "-- at a 0 '21 co I1) -s (3) C') (-)4 5 137 14101011 1 10A cv 19 t-.. 17) 01 V") 4,3 II) 0 10 10 10 SLC I COL 11 4 0 0 aZ3-4∎•s ids'. 11."31" iu.41 .is:� July 26, 1996 Dear Mr. Bennett: Sincerely, Kelcie J. Peterson Permit Coordinator File: M96 -0094 Y AY City of Tukwila Mr. Terry Bennett The Boeing Company P.O. Box 3707 M/S 46 -87 Seattle, Washington 98124 Department of Community Development Steve Lancaster, Director SUBJECT: Development Permit Application Number M96 -0094 Boeing #9 -101 9825 East Marginal Way S This letter is to inform you that your permit application received at the City of Tukwila Permit Center on July 23, 1996, was reviewed at the July 26, 1996, plan review meeting. Your application was determined to be complete. Your permit has begun the plan review process, you will be notified of any corrections or when you plan is approved. If you have any concerns or questions please contact me at the City of Tukwila Permit Center at (206) 431 -3672. -Waig /Jj431Y7 .. T roi etrsuwenanwtmm11ra ..4,15,rn»urot wMOo7Co FILE COPY John W. Rants, Mayor 6300 Southcenter Boulevard. Suite #100 • Tukwila_ Wa.chlnatnn 0111 RR • 121)/il 421.2A7n • R2 v. MA) 42 L2AAC :K"�•*,F;�:,a, �gJi,KiISTjiAI•IQN NUMBEF3 : '. '•,.`'.; • . .::-. .}7(PI . i „a +Mgr: • ;.:• 'r 6 , i , . .• ' •e» DEPARTMENT OF LABOR AND INDUSTRIES THIS CERTIFIES THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED BY LAW AS A R te• �C:CX.":Cc�y: " < ?.y :::}' r - �`,'• s`•� ?rj P. "F "'"itk.r X7.•07 .' WA .''98124 -2207 ;ta STATE OF WASHINGTON F6 DRAWING INDEX DRAWING N0. SHEET N0. TITLE DRAWING N0. SHEET N0. TITLE 9- 101 —A1 Al TITLE SHEET SPECIFICATIONS 1 MECHANICAL 9- 101.1M13 1M13 HVAC PLAN SPECIFICATIONS 2 MECHANICAL 9- 101.1M14 1M14 HVAC PLAN SPECIFICATIONS 3 EQUIPMENT MODIFICATIONS 9- 101.1M15 1M15 HVAC PLAN SK 75B 960711 M -1 BAND SAW SHIELDS 9- 101.1M20 1M20 HVAC PLAN SK 75B 960716 M -2 TYPICAL PENETRATION 9- 101.1M21 1M21 HVAC PLAN APPENDEX -- A MOTOR EFFICIENTCIES 9- 101.1M113 1M113 PIPING PLAN DATE 'GR. K. BULLIS 5 -7 -92 9- 101.1M114 1M114 PIPING PLAN 9- 101.1M115 1M11„ PIPING PLAN 9- 101.1M121 1M121 PIPING PLAN CHECKED ,� No 760607 -01 Lj REVISION BY APPROVED DATE svM REVISION BY APPROVED DATE API7EZAW FACILITIES DEPARTMENT 'p ❑ AUBURN, WA. 98002 ❑ EVERETT, WA. 98201 0 KENT, WA. 98031 0 PORTLAND, OR. 97220 0 REN TON, WA. 98055 iii SEATTLE, WA. 98124 ACCfPT °� �I APPROVED ���� 15 BY DRAS. WN REYNOLDS DATE i2 - 20 - 90 SUBTITLE TITLE SHEET L AST REVSI°N f SYMBOL 1 DATE F -22 POWER ISLANDS SLB 7 /17/96 DNEDRm SHEET Al or APPROVED SY DEPT. DATE 'GR. K. BULLIS 5 -7 -92 ' ARCHITECTURAL MASTER D.C. CHECKED ,� No 760607 -01 APPROVED AP DWG NO. 9-101—Al FROM SEATTLE - TACOMA AIRPORT DEVELOPMENTAL CENTER BOEDNIG IMULEITAHY AERPLANES 1=1 8 Go FROM DOWNTOWN SEATTLE g=w1 F=22 POWER SFAD8 FROM KENT & AUBURN NO SCALE AREA MAP BOEING DEVELOPMENTAL CENTER 9725 EAST MARGINAL WAY SOUTH TUKWILA, WASHINGTON 98108 BLDG. ADDRESS: 9725 E. MARGINAL WAY S. TUKWILA,WASHINGTON \\\ mq ooq PROJECT SITE 9 -101 BUILDING LOCATION P'� � 11 1 (II II NO SCALE PROJECT CHECKLIST El-IECK BOX EI THESE DRAWINGS CONFORM TO THE 1988 U.S.C., U.F.C., U.P.C., AND THE 1990 BARRIER FREE CODE AS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH CITY OF TUKWILA ZONING_ G' ENGINEERING CALCULATIONS ( IF APPLICABLE ) 0 ROOMS LABELED PER OCCUPANCY PER U.B.C. TABLE 33 -A. BUILDING FLOOR NUMBER ON PRINT FOR AREA OF CONSTRUCTION. NUMBER OF PRINTS REQUIRED FOR PERMIT PACKAGE Ig1 MECHANICAL, 5 COMPLETE SETS BRIEF PRO,ECT NARRATIVE THIS JOB INSTALLS FIVE (5) TORIT DUST COLLECTORS FOR F -22 SHOP POWER ISLANDS. THESE DUST COLLECTION UNITS WILL BE LOCATED OUT SIDE THE BUILDING AND WILL MEET ENVIRONMENTAL REQUIREMENTS FOR SEPARATE SYSTEMS FOR DIFFERENT MATERIALS. 9 GENERAL NOTES CONSTRUCTION SET OF DOCUMENTS, REVIEWED AND STAMPED BY CITY OF TUKWILA MUST BE ON SITE I1tJRNG CONSTRUCT. DO NOT PROCEED WITH CONSTRUCTION WITHOUT ABOVE MENTIONED SET OF DOCUMENTS. 1. VERIFY ALL DIMENSIONS AND CONNECTIONS BEFORE ANY WORK. 2. NOTIFY FACILITY ENGINEERS , SHOULD EXISTING CONDITIONS REQUIRE DESIGN REVISIONS. 3. COORDNATE WORK WITH OTHER CRAFTS. 4. RETURN THIS SAME SET TO TERRY BENNETT AT BLDG. 9 -51 COL N /1, AFTER COMPLETION OF THIS CONSTRUC11C _ 76C607=O1 LAND USE CODE BUILDING CODES OCCUPANCY GROUP CONSTRUCTION TYPE FLOOR AREAS: BUILDING FOOTPRINT BUILDING GROSS TUNNELS FIRST FLOOR FIRST FLOOR MEZZANINE SECOND FLOOR BUILDING HEIGHT STORIES OCCUPANT LOAD: HANDICAPPED REQUIREMENTS FIRE PROTECTION SEISMIC ZONE By Date CODE SUMMARY TUKWILA 1988 UBC, WASHINGTON STATE ENERGY CODE, WASHINGTON STATE BARRIER FREE CODE AND ADDITIONS PER CITY OF TUKWILLA GROUP 0, DIVISION 2, OFFICE & FACTORY TYPE 11, NON— COMBUSTIBLE 713,829 1,116,306 50,910 713,829 55,689 295,878 78 FT. 4 NO CHANGES CITY OF TUKWILA APPROVED AUG 1 5 1996 AS NOTED BUILDING 517 N BARRIER FREE FULLY AUTOMATIC, F/S CLASS 1 SPRINKLERS THROUGHOUT FILE COPY l unG_rntr -J r the Plan Choo:c suSjo,i t0 crrcrs and omissions 2-::i c ' of plans does not email** MD violation of cny azDpted cods a adkimew awes s f contractor's copy of approved Ong .f - - ► — REVISIONS NO CHANGES SHALL BE MADE TO THE SCOPE OF WORK WITHOUT PRIOR APPROVAL OF TUKWILA BUILDING DIVISION. NOTE: REVISIONS WILL REQUIRE A NEW PLAN SUBMITTAL AND MAY INCLUDE ADDITIONAL PLAN REVIEW FEES. SEPARATE PERMIT REQUIRED FOR: (MECHANICAL © ❑ PLUMBING CAS PIPING C : v OF TUKWILA GU LDING DIVISION RECEIV cITY OF TUK WILA I : ' - . u m PERMIT CENTER '1M A 1.. M 1M10 1M11 1M12 Y1M13' 1M14 1M15 1M16 1M17 1M18 1M19 1M20 1M21 1M22. 1M23 1M24 1M25 1M26 1M27 1M28 1M29 1M30 1M31 1M32 1M33 / TORT MOL 1 SDF -6 0 : 10 HP, 480 VI ESP %!✓!/T Hof, SPINDLE SANDER DISC SANDER 14/20 DRILL RADIAL SAW • I� 5 GAL DISC SANDER j ■ r I I! Ms-1ORR MODEL 81 PRESS GRINDER a(f• •r 50/20 ROTEX PUNCH CAP 64/24 PORTABLE EYE -WASH 55/24 106 20 75/24 I 32/20 45/24 14/20 1 BOD EL 16' -8" BOD EL 18' -0 12' -d' (Tw) DISC SANDER 'TO? ••r. } '�� pr HEAT COIL 18 r I- 11 COOL COIL 11 FOR COIL, SEE DWG 109 -101- 38/20 4 TO BAND SAW DRILL PRESS SPENCER S 308056 12 CAT 3610444 50 HP, 7' HG REDRAWN SPENCER HAT SEP CONNECT T VERTICAL R CAP BEHIND WALLS ---"*" (4) F -22 POWER ISLANDS Job 5' -5 120/24 SLEEVE FOR CRANE ROD SUPPORT (4)36" x18" GRILLE 2000 CFM EACH 760607 -01 KB SLB RWS EJC DATE 06.26.96 07.08.96 SDI Rasa) CFM SECURITY BAR SEE BOEING STD 83- BMAC -1 OA 62/46 nic104cevi Br DST IN UNE FM DENN- CENiRE)P 4000 CFM 0 5 SP 1 HP 480V, 3 0 V -BELT IONG FURNACE, 1000 C 2089; 10 60N MID KF52006 6000 WATS € , 24/24 450 CFM (8) 35x18" GRILLES @ 2500 CFM EACH �CANES r 1 YE0808F2 208 CFM i!I FACILITIES DEPARTMENT PARTIAL FLOOR PLAN SCALE: 1/8 =1' -0" ACCEPTABIUIY m; tem wmroa DAMMAM! APPRdm ,csRw» Br DoE GRATIN DECKED APPROVED MECHANICAL MASTER RECENED CITY OF TUKWILA JUL 2 3 1j PERMIT CENTER HVAC PLAN LEGEND: GENERAL NOTES: • ASBESTOS NOTIF1CA110N: A good faiih survey of the work area has been conducted and asbestos containing material was not discovered that would be involved in the construction of this project. Do not remove, damage or disturb any asbestos material adjacent to the work area. Please contact Boeing Facilities Department if asbestos containing material is damaged or discovered that is required to be removed to support work. CONSTRUCTION NOTES: INSTALL TORIT DUST COLLECTOR MODEL SDF -6 OUTSIDE 9 -101. SEE STRUCTURAL DRAWINGS FOR PAD AND LAGGING INFORMATION. SEE MECH SHT 1M113 FOR AIR CONNECTION. ORIENTATE UNIT SO EXPLOSION PANELS ARE AWAY FROM BUILDING. FABRICATE 8"0 DUCT TRANSITION TO UNIT INTAKE AND ROUTE THROUGH WALL BELOW PRE -CAST PANELS AND THROUGH COVERED WINDOW. ROUTE UP PARALLEL TO 6" DUCT AND ROUTE TO POWER ISLAND AT R /4. MINIMIZE CHANGES IN DUCT LEVEL OR DIRECTION. 3 . DISCONNECT EXISTING DUST COLLECTOR AT R /4. CONNECT NEW 8" DUCT TO EXISTING DUCT SYSTEM GOING TO BAND SAW AND DISK SANDER. ® PROVIDE CLEANOUTS AT CHANGE IN DIRECTIONS AND AT MAXIMUM 40 FT INTERVALS. SEE SPECIFICATIONS FOR REFERENCE WALL PENETRATION DETAIL. 1M39 1M40 1M40 1F 44 I 1M42 1M45 1M43 1M46 1M34 1M35 1M36 1M37 BLDG. 9 -101.1 9 11 KEY PLAN 0 COL N -S/1 -6 D.C. APPROVED AUG 1 5 1996 AS NOTED JOB NO. 1M13 A BOL 760607 -01 9- 101.1M13 DATE OF =mum Inv TA4IT DUST COLLECTOR DONNFLO 2DF4 1900 CFM, 10.3' 5 HP 480 V r q OATS 2/2/95 6/21/96 BY KGP SLB APPROVED EJC b1U PENSION F -22 HIGHBAY J #147009 -00 (4) POWER ISLANDS Job # 760607 ROUTER FOUNDATION APPR OVED PLAN SCALE: 1 /8" = 1' -0" FACILITIES DEPARTMENT SPENCER VACUUM PRODUCER WITH SPENCER INERTIAL SEPARATOR, TORIT CARTRIDGE COLLECTOR, & SPENCER SURGE CONTROLS ❑ AUBURN, WA. 98002 ❑ EVERETT, WA. 98201 El rI KENT, WA. 98031 I_I PORTLAND, OR. 97220 ❑ RENTON, WA. 98055 ❑ SEATTLE, WA. 98124 C � r A EPT SPEOFlCATWN IS APPROVED APPROVED BY DEP DA DRAM BY CHECKED GR. CHECKED APPROVED APPROVED ® 1 0 DATE SUBTITLE 0 O O CONSTRUCTION NOTES: PROVIDE & INSTALL DUCTING FROM RELOCATED SHOP EQUIPMENT. FOLLOW SMACNA DUCT CONSTRUCTION PRACTICES. PROVIDE BLAST GATES AT BRANCHES. 2G+INSTALL BOEING PURCHASED TORIT DUST COLLECTOR AS SHOWN. EXPLOSION PANELS TO FACE AWAY FROM BUILDING. PROVIDE CLEANOUTS AT CHANGES IN DIRECTION. P›..-SEE SPECS FOR WALL PENETRATIONS. r ECEIVEF aTV of Tuxw HVAC PLAN MECHANICAL MASTER BLDG. 9 -101.1 COL. 1-6/S—W LEGEND: GENERAL NOTES: 0 ASBESTOS NOTIFICATION: A good faith survey of the work area has been conducted and asbestos containing material was not discovered that would be involved in the construction of this project Do not remove, damage or disturb ony asbestos material ad to the work area. Please contact Boeing Facilities Ddepartment if asbestos containing material is damaged or discovered that is required to be removed to support work. The following materials in the area adjacent to this job are assumed to be positive for asbestos: FLOOR TILES PIPE INSULATION 1910 1616 1611 1617 1922 1923 1928 1929 1612 1618 1924 1930 1913 1919 1925 1634 1935 1636 1939 1640 1M41 10144 1620 1926 1632 1937 1642 1945 1615 1621 1627 1933 1938 1M43 1646 9 -101.1 KEY PLAN CITY OF TUKWILA APPROVED AUG 1 5 1996 AS NOTES BUILDING DIV1816N f) --0 s LAST PENSION SHEET 1M14 Jae N0. 760607 -00 & —01 DwO NO. 9- 101 -1M14 REN oN FOR PIPING IN THIS AREA SEE DWG 9- 101 -1M450 C (4) POWER ISLANDS — Job if 760607 11 BY SLB.7 APPROVED zc�C. DATE 6/21/96 SYM FOR PIPING IN THIS AREA SEE DWG 9 -101 -1M525 1 BENSON nJ J L 11 APPROVED DATE 1M5 17 Y SAND 5 VALVE Ulti CCITP Vff 3005 115V, Tim 300 aN-LB (WEE CONFOCL VALVE) A LL WASH ARE A BOE/AW FACILITIES DEPARTMENT SPQR DUST COLLECTOR S/N 312981, 600CFM, 15If, 3500RPM, 460V, I8.6A, 5.5 "86 r n b PLAN SCALL-1 /8" = I' -O' ACCEPTABILITY MSS DESIGN AND/OR SPECDICATNR7 IS APPROVED APPROVE) BY DEPT. P� ° il 1 111 lu DA DRANK BY D.R. CHESTERFIELD CHECKED 0. 9 D. M. VILLA CHECKED APPROVED APPROVED ASBESTOS NOTIF A GOOD FAITH SURVEY OF THE WORK AREA HAS BEEN CONDUCTED AND ASBESTOS CONTAINING MATERIAL WAS ci, A NOT DISCOVERED THAT WOULD BE INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. DO NOT REMOVE, JUL 2 a 1696 DAMAGE OR DISTURB ANY ASBESTOS MATERIAL ADJACENT TO THE WORK AREA. PERMIT CENTER PLEASE CONTACT BOEING FACILITIES DEPARTMENT IF ASBESTOS CONTAINING MATERIAL IS DAMAGED OR DISCOVERED THAT iS REQUIRED TO BE REMOVED TO SUPPORT WORK. 1 1/31/95 BP.TLE MECHANICAL MASTER LEGEND: —0 -- VACUUM OUTLET GENERAL NOTES: PLAN PLUMBING CONSTRUCTION NOTES: PROVIDE 6 INSTALL DUCTING FOR RELOCATED SHOP EQUIPMENT AS SHOWN, PROVIDE BLAST GATES AT EACH BRANCH. FOLLOW SMACNA DUCT CONSTRUCTION PRACTICES. INSTALL BOEING PURCHASED TORIT DUST COLLECTOR AS SHOWN. ROUTE 10" DUCT THROUGH WALL TO EQUIPMENT INSIDE. PROVIDE CLEANOUTS AT CHANGE IN DIRECTIONS. .. SEE SPECS FOR WALL PENETRATIONS. BLDG. 9101.1 9 -101.1 KEY PLAN COL. W —Z /1 -6 D.C. CITY OF TUKWILA APPROVED AUG 15 1996 AS NOTED BUILDING DIV1SI N I MIO !MI6 IMI1 IMI7 IM22 1923 IMI2 IMIB IM24 1928 IM29 IM30 1934 IM35 IM39 1940 IM13 1919 IMI4 IM20 1925 IM41 114 IM26 1932 IM37 1942 IM45 0 0 1921 IM27 1933 1938 IM43 IM46 - 0 - II - s ° —CD — 06 LAST BEMs 1 M15 JOB N0. 760607 -00 & —01 DNO NO. 9- 101 -1M15 ` 06 DATE 1610 1M11 1M12 1M13 1M14 1M15 1M16 1M17 1M18 1M19 'I'M 1M21 1M22 1M23 1M24 1M25 1M26 1M27 1628 1M29 1M30 1M31 1)132 1M33 STM A REVISION NSTALL F -22 DUST COLLECTION J757143 -01 (4) F -22 POWER ISLANDS Job #760607 4111111E3E UP RV -21 19,000CFM BY APPROVED KGP e EJC SLB � LIP DATE 7/9/96 REVITON BY APPROVED DATE 0 PLAN SCALE: 1/8" = 1' -0" 0 0 B®E/AW FACILITIES DEPARTMENT ❑ AUBURN, WA. 98002 ❑ EVERETT, WA. 98201 ❑ KENT, WA. 98031 ❑ PORTLAND, OR. 97220 C1 REN T ON, WA. 98055 • SEATTLE, WA. 98124 R V 20 19,000 ;FM 4 �� ✓ PROVIDE CLEAN OUTS AT CHANGE IN DIRECTIONS AND AT ❑ ❑ MAXIMUM 40 FT INTERVALS ALONG DUCT. TD UH -36 6 CONTROL PANEL 0 01. S/13 UH -36 25,000CFM 1M201109 -101- 4422 —MB rn q�oqy A1EPTABIIJ1Y THIS DESIGN AND /OR SPECIFICATION IS APPROVED AaPROVEO BY DEPT. DA DRAWN BY D.R. CHESTERFIELD CHECKED CHECKED APPROVED APPROVED O DATE 6/9/93 TITLE BTITLE SEE SHEET 1621 FOR CODOIUATION OF DUCTS 0 0 10 MECHANICAL MASTER CITY OF TUKVJiLA PERMIT CENTER LEGEND: BLDG. 9 -101.1 GENERAL NOTES: CONSTRUCTION NOTES: CONTINUE 8" & 10 "0 DUCTS ON SHEET ROCK WALL ALONG COLUMN LINE "9 ". SUPPORT DUCT AT A MAXIMUM 12' O.C. C ROUTE BOTH DUCTS FROM WALL TO UNDER SIDE OF FME TOOL AND OVER TO ELECTRICAL PLATFORM. E• ROUTE 10 "0 DUCT TO WEST SIDE OF ELEC. PLATFORM AND CON— NECT TO EQUIPMENT AT TITANIUM MATERIAL POWER ISLAND. PLAN — HVAC DUCTING ROUTE 8 "0 DUCT TO EAST SIDE OF ELEC PLATFORM AND CONNECT TO EQUIPMENT AT COMPOSITE MATERIAL POWER ISLAND. CITY OF TUOWILA APPROVED AU6 1 5 1996 AS 9011D BUILDING 011/071614 1639 1M40 1641 10144 1642 1645 1646 1634 1635 1M36 1637 9 -101.1 KEY PLAN COL. 6- 11 /S —W D.C. JOB NO. DWG NO 1638 1643 —Q UST RE. s zz za B 7/9/96 snn DATE SHEET 1M 20 DP 760607 9- 101 -1M20 DN TORIT DUST COLLECTOR DOWNFLO MODEL # 2DF4 1800 CFM, 14.0 TSP FBRA —WEB FILTERS 7.5 HP, 480 V 3 PHASE ~ TORIT DUST COLLECTOR DOWNFLO' MODEL # 3DF6 ALUMINUM WHEEL 1M21 M533 2780 CFM, 10.8" TSP 8 7.5 HP, 480 V 3 PHASE PLAN SCALE: 1/8" = 1' -0" d P IH �Ih ,li II1 1 DN A REVISION F -22 VACUUM SYSTEM J #757143 -01 POWER ISLANDS — Job # 760607 -01 KGP SLB 4f APPROVED EJC DATE 6/24/96 SYM BY APPROVED DATE BOEZAW FACILITIES DEPARTMENT ❑ AUBURN, WA. 98002 ❑ EVERETT, WA. 98201 [WENT, WA. 98031 ❑ PORTLAND, OR. 97220 ❑ RENTON, WA. 98055 ■ SEATTLE, WA. 98124 DE AI T � u O THIS SP H D a IS APPROVED APPROVED EY DEPT. DATE DRAWN BY D.R. CHESTERFIELD CHECKED ENdt G APPROVED APPROVED 6,9/93 CONSTRUCTION NOTES: Ei (2) NEW TORIT DUST COLLECTORS ON HOUSEKEEPING PADS PER MANUFACTURER'S INSTRUCTIONS. PROVIDE AND INSTALL DRY SPRINKLER HEADS IN EACH UNIT. 'ROUTE 8" AND 10'0 DUCTS FROM UNITS TO INSIDE BUILDING. EXTEND ALONG WALL AS SHOWN. SEE SHEET 1M20 FOR CONTINUATION AND CONNECTIONS TO POWER ISLAND EQUIPMENT. SEE SHT 1M121 FOR COMPRESSED AIR FOR FILTER ELEMENT PURGE AT EACH DUST COLLECTOR UNIT. ®PROVIDE CLEANOUTS AT CHANGE IN DIRECTIONS AND AT MAXIMUM 40 FT INTERVALS. SEE SPECFICATIONS FOR WALL PENETRATIONS. SUBTITLE PLAN — HVAC DUCTING nnE MECHANICAL MASTER BLDG. 9 -101.1 COL. 8- 11 /W —Z D.C. SHEET 1M21 aP JOB N0. 760607 -01 DWG N0. 9- 101 -1M21 1 OF TU Q cln R oP ruMV,,ts Jii_ 2 V i.~ G PERMIT CENTER LEGEND: GENERAL NOTES: * ASBESTOS NOTIFICATION: A good faith survey of the work area has been conducted and asbestos containing material was not discovered that would be involved in the construction of this project. Do not remove, damage or disturb any asbestos material adjacent to the work area. Please contact Boeing Facilities Department if asbestos containing material is damaged or discovered that is required to be removed to support work. 1M10 0,116 1622 IM11 1617 1623 1612 1618 1624 1631 1636 1628 1M29 1630 r 1M34 1635 1639 1M40 1M13 1619 1M25 1641 144 1614 1620 1626 1632 1637 1M42 1645 1615 1627 1633 1638 1M43 1646 �1M21% ia 9 -101.1 KEY PLAN CITY Of TUKWILA APPROVED AUG 1 5 1996 AS NOTLD BUILDING DIVISION --45 s zl - O 25 "B" 8/24/98 LAST REVISION I SYMBOL DATE 1M110 1M111 1M112 /1M11 WO 1M114 1M115 1M116 1M117 1M118 1M119 1M20 1M21 1M22 1M23 1M24 1M25 1M26 1M27 1M28 1M29 1M30 1M31 1M32 1M33 REDRAWN (4) F -22 POWER ISLANDS Job 760607 -01 SLB RWS 06.26.96 07.16.96 4 CW RISER (TV ACCEPTAB PLUMBING PLAN t 1 1 i , f -2 �2 1/2 1 r2 CAP 1 I 2"v A HWR— t 1/ I 1/2" (TYP 15) f Iv 1 — 1/2" 3/4 1/2" HWS Q 4 -1 1/2 CAP 2 VAC PORTABLE - EMERGENCY EYEWASH 9 - i I i i I3 -r8 CA BUNG FLANGE 1- 1 1/2" RISER �. 1" T , 1 1 /4E 2" F 7 1 1/2" CAP 1 1/2" CAP PLUG (TYP) HWS HWR DOE7W FACILITIES DEPARTMENT CC W DF 1" VAC TO 2ND FLOOR rnqbooq PARTIAL FLOOR PLAN SCALE: 1/S =1' -0" 'V ( CONSTRUCTION NOTES: CONNECT TO EXISTING 1 -1/2" AIR LINE AT VALVE. REDUCE TO 1" & ROUTE TO TORIT DUST COLLECTOR. CONNECT W/ VALVE TO DUST COLLECTOR FILTER PURGE CONNECTION PER MANUFACTURERS INSTRUCTIONS. RECENED CITY OF TUKW!CA JUL S 3 1936 PERMIT CENTER LEGEND: GENERAL NOTES: ASBESTOS NOTIFICATION: A good faith survey of the work area has been conducted and asbestos containing material was not discovered that would be involved in the construction of this project. Do not remove, damage or disturb any asbestos material adjacent to the work area. Please contact Boeing Facilities Department if asbestos containing material is damaged or discovered that is required to be removed to support work. MECHANICAL MASTER COL N —S/1 -6 CITY OF TUKWILA APPROVED AUG 1 5 1996 AS NOTED BUILDING VDG I ,s1 rs ON 1M39 1M40 1M40 1M44 1M42 1M45 1M43 1M46 iD BLDG. 9101.1 1M34 1M35 1M36 1M37 1M38 9 1.1 KEY PLAN Q s 21 22 23 A 7/6/96 0111111/ 1M113 JOB BO. 760607 -01 osc w. D.C. 9-101.1M113 r COMP. AIR r VAC SUMP PUMPS CKT. 1 1W 4 M515 1/2 PLACES 1. /2 CO 1/2 1' C/A UNE TO THE PULSE ALR CLEANING SYS 1 E OF DCOIUO1A 1 1/2 COPPER 1 1/7 DROP w/VUVE 12'-Q' ,-3 COMP. AIR DROP WITH ISOLATION VALVE 1 1/2 DROP w/r11LVE 1r-Q ABDVE GRADE 1 ,�1 r COMP. AIR DROP WITH ■ ISOLATION VALVE TORIT DUST COLLECTOR 1/2" T T I EMERGENCY 1 SHOWER L 1 4" COPPER H i 2 1/2" COPPER cp rnq -oogy PLAN SCALE: 1/8" = 1' -0" ITN 11111 RECEIVED cTV o rR,IC�IJ PERMIT CENTER LEGEND: DUPLEX COMPRESSED AIR DROP DUPLEX COMPRESSED AIR DROP W /FILTER L DUPLEX COMPRESSED AIR DROP W /LUBRICATOR ® VACUUM DROP —VAC — HARD VACUUM LINE — DOMESTIC WATER LINE — HARD VACUUM LINE GENERAL NOTES: 1. ALL UTILITY PIPING MUST AVOID DEDICATED SPACE ABOVE ELECTRICAL PANELBOARDS OR BOXES. (AREA UP TO 25 FT. ABOVE FLOOR OVER PANELBOARD) THAT IS LENGTH AND WIDTH OF BOXES. CONSTRUCTION NOTES: CONNECT W/ 1" VALVE TO EXISTING COMPRESSED AIR. ROUTE TO TORIT DUST COLLECTOR OUTSIDE THE 9 -101 NORTH WALL. CONNECT W/ VALVE TO FILTER ELEMENT PURGE SYSTEM PER MANUFACTURERS INSTRUCTIONS. 49 CITY OF TUKWILA APPROVED AUG 1 5 1996 AS NOTED BUILDING DIV13ION iiigniMENGTE A x000 FAR suave. OF THE WORK AREA RAS BEEN CONNOTED AND ASBESTOS COMMO MAIM/ WAS NOT DBCOVERED TIMP ROM BE NOT M THE COASTRUGIION OF MS PROJECT. CO DO NOT REN M MACE, AREA iMi ANY ASBESTOS EM MA= 70 MK( MOSE COMACT MEND F TARES DEPARTMENT IF AMENDS CONTAINING WTERW. B MIMED OR SUPPORT 0 THAT S REWIRED ID BE Ra10YED 10 1M110 1M116 + m 1M111 16117 1M122 1M123 1M112 1M118 1M124 1M128 1M129 1M130 1'1M134 16135 1M139 16140 1MI13'( ���� 1M119 16125 1M132 1M137 114131 1M136 1M141 16144 111120 16126 1M142 16145 o c 16115 16121 16127 1M133 1M138 16143 16146 !D QQ 9 -101.1 KEY PLAN 0 M -@ zM z0 PROVIDE VAC. & COMP. AIR PER J #147009 POWER ISLANDS Job # 760607 -01 DMV SLB % __ _ APPROVED B REVISION INSTALL VACUUM SYSTEM J/757143 -01 DATE REN9 BY APPROVED AFIZEZAW FACILITIES DEPARTMENT A TABIU Y i OEP SPIIaFY..APON MS MPROVFD APPROVED BY DEPT. DA DRAWN BY D. CHESTERFIELD CHECKED 0. D. VILLA R.ES R. . SGUIRES APPROVED E. CARRIGAN APPROVED DATE 2 - 3 - 95 MECHANICAL MASTER PLAN — PLUMBING BLDG. 9 -101.1 COL. S- WF /1 -6 D.C. SHEET LAST REVISION SYMBOL 1M114 DAZE JOB N0. 760607 -01 DWG N0. 9- 101 -1M114 "c" 6 24 9E FOR PIPING IN THIS AREA SEE DWG 9- 101 -1 M525 1 "A FROM TRENCH SECURE TO UTILITY SEE DETAIL 1M115 451 UTILITY STAND (1Y SEE DETAIL 1 I/2' COMP. AIR DROP FOR UTILITY STAND 1 12' CAPPED HARD VACUUM A FOR PIPING IN THIS AREA SEE DWG 9 - 101 -1M450 NOT ilTt IEATOT 314' REL vta 3/4 r3/4 I i /4' C.W. TO HEATER & 1VSfI FOUNTAIN 2' PENT ROOF 11•11M11,■ii Ai i ! M[ Cam= I ad t;. TURCO RATER NEATENS 7O PM MITR 55 DELTA 'T' OUIPi1TT AT 110 DECREES F. I I/2''13RAIN NOVICE CltINCUT AT BOTTOM OF TRITE NON. 1 1 II . 1/2 AIR N TRENCH 2 COPPER RAVED DRAIN 2' COPPER RAPED DRAIN (SEE DWG 109 - 101 - 4512 -MI FOR COYITINUATION) 1/2' HX p CA 1 1/2' 1BI CA rYq6 -oozy RECEIVED CITY OF TUIMA JUL 2 3 1936 PERMIT CENTER LEGEND: — A - - CW— CID —HB — GENERAL NOTES: CONSTRUCTION NOTES: 9 -101.1 KEY PLAN 0 COMPRESSED AIR LINE DOMESTIC COLD WATER DUPLEX OUTLET - COMPRESSED AIR LINE DUPLEX OUTLET - COMPRESSED AIR LINE W /F1LTER DUPLEX OUTLET - COMPRESSED AIR LINE W /LUBRICATOR DRAIN BASIN VACUUM DROP HOSE BIBBS WITH VACUUM BREAKER CONNECT I "0 TO EXISTING COMPRESSED AIR W/ VALVE. ROUTE TO OUTSIDE AND CONNECT W/ VALVE TO TORIT DUST COLLECTOR FILTER ELEMENT PURGE SYSTEM. CITY OF TUKWIL A APPR AUG 15 1996 AS NOTED STU A REVISION PROVIDE SUMP PUMP, WATER & C.A. JOB $147003 INSTANT WATER HEATERS 4 COL. YI JOB #747382 -01 POWER ISLANDS Job J1 760607 -01 BY DMV RAD SLB �r4 APPROVED DATE 6.3.95 1.23.96 6.24.96 SYM REVISION BY APPROVED DATE B�6 IAffg FACILITIES DEPARTMENT ACCEPTABIUTY TH6 DESIGN AND /OR SPECIFICATION IS APPROVED APPROVUL BY DEFT. DATE CHES TERFIELD DATE D. cNEacm D. M. VILLA CHECKED APPROVED APPROVED 11 - 09 - 94 SUBTITLE TITLE MECHANICAL MASTER PLUMBING PLAN BLDG. 9 -101.1 COL, W -Z/1 -6 D.C. SHEET JOB N0. 760607 -01 LAST REVISION SYMBOL DATE 1M115 9- 101 -1M11E 0 tell. BUILDING DIVISION ASBESTOS NOTIFICATION aee0 ralih nmF el.1M nrk ara Aa pa a g - ad rG Ia anfalnlnp alrrlal ra wl dimn fMl wale 4 InaIYM In 1M anlralla of IMo r J I. he ranrN, daopd a dlpuro a Mhpip aelplal ddJaaf t t0 fM ark . Clan mnial let Fm lfln pk v , it aMla fe lelnirq AoNrlal Ir eaetr/ ar dlanrored ILaI ik rpulra he rmk fo wkpxl art. :211.1:1;211V4 M the : 17'4° Ihln loh aenla: 14100 14116 1 M111 1M117 1M1221 14123 14112 14118 14124 14128 16129 14130 1M134 14135 1M139 14140 14113 14119 14125 14131 14138 14141 1044 14114 1M120 14126 14132 14137 1M142 14145 14121 14127 14133 14138 14143 14146 10 m --© IS z, z SIMPLEX o I" VARD V Ili u ' TUNNEL 15 I I /2" 1 1 1 -mum 1 DN i 11111 1 1 1 1 I I/2 POC A TREi a1 IM121 M500D �.` Wir ■ • UTILITY STAND (TYP) IM121N15 00DI I'A (2 PLCS 111 Q IM121 M500DI 1'0 CA • CP 11 2 / HARD VACUUM LIN (SIMPLEX J 2" COAL'. AIR DN Li — 1 FAJ I L- -� ' P 1/2" i I 1 /2'A IN TRENCH 1'A (3 PL SEE DETAI IM12221MM5O1D2 UTILITY STAND (Tl(P ) SEE DETAI�` I IM121 M500D2 I /2 "A, SI IM121 M500 PLAN 7 T 1 TUNNEL 1 I /4'A FOR AIR BEARING SURFACE CONN (2 PLCS) SEE DETAI L -1 r I,, ° A I N TRENCH ENCH I CA D8' AFF FOR THE PULSE CLEANING S YST ON DCOIZ08A I I /2'A IN TRENCH DN r q 0 -oo gy LEGEND: DUPLEX COMPRESSED AIR DROP W/ FILTER - --(9-- DUPLEX COMPRESSED AIR DROP W/ LUBRICATIR 0 HARD VACUUM LINE GENERAL NOTES: CONSTRUCTION NOTES: ›-TIE INTO I" C/A LINE TO SPENCER UNIT W/ VALVE. CONTINUE 1 "0 C/A LINE TO (2) NEW TORIT DUST COLLECTORS, CONNECT W/ VALVES TO EACH FILTER PURGE SYSTEM PER MANUFACTURERS INSTRUCTIONS. RECEIVED CI1' OF TUKWILA . ASBESTOS NOIIFlCA110N: A good faith euney of the work area hoe been conducted and asbestos contahFg material woe not discovered that would be hlvahed N the canebuction of this Project Do not remove, damage or dbWrb any aebeetos material adjacent to the work area. Please contact Boeing Poor iea Deportment N asbeatas containing nwteriol h damaged or discovered that h reputed to be removed to support wok T l 5 IM110 1M116 1M111 1M117 1M122 1M123 1M112 1M116 1M124 1M12 iM129 1M130 1M134 iM135 1M139 iM140 1M113 1M114 1M119 1M120 1M12 iM126 1M131 1M132 1M1 1M137 1M141 1M142 1014 1M145 1M115 i ii 1M127 1M143 1M146 0 9 -101.1 KEY PLAN CITY OF TUKWIIA APPROVED AUG 1 5 1996 AS NOTED EUILD NG DP.0 REVISION B C AS -BUILT LOCATION OF I I/2" AIR EXTEND 2 1/2" HARD VAC. INSTALL DUST COLLECTION 4757143 -01 MODIFY AIR OUTLET 762246 PROVIDE I" AIR OUTLET J 767096 AR GS DMV KGP ,' DMV 4P EJC DMV 4P EJC APPROYID CL EJC DATE 8 -1 -95 F 6/3/96 m REVISION POWER ISLANDS - Job >4 760607 -01 SLB 40 SCALE: 1/8" = 1' -0" CITE 5/25/96 FACILITIES DEPARTMENT ACCEPTABILITY THIS DESIGN MAR SFECIFICATICN IS APAR AFFRONT, BY DEPT. . T M. DITTMAR D. M. VILLA C EC ID APPROVED APPROVED DATE 7 -7 -92 DATE 10 - 26 - 94 PERMIT CENTER SUBTITLE PLUMBING & PIPING PLAN TITLE BLDG. 9 -101.1 BLDG. 9 ®101.1 COL. 6-11/W- Z D.C. LAST REVISIM4 1M121 F MIME JCS NO. 760607 -01 9- 101 -1M121 — 0 —0 —0