HomeMy WebLinkAboutPermit M96-0177 - HOULIHANS RESTAURANTrY1
kt011+k'fl R&
City of Tukwila c• (206)431.3670
Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188
Permit No: M96 -0177
Type: B -MECH
Category: NRES
Address: 16840 SOUTHCENTER PY
Location:
Parcel #: 262304 -9129
Contractor License No TRSIN * *153N2
TENANT HOULIHAN'S RESTAURANT
16840 SOUTHCENTER PY, TUKWILA WA 98188
OWNER CAPITAL & COUNTIES USA INC
101 CALIFORNIA ST SUITE 2525, SAN FRANCISCO CA
CONTACT KEN KESSLER Phone: 531 -1335
7717 PORTLAND AV E, TACOMA WA 98404
CONTRACTOR T R S, INC Phone: 531 -1335
6626 TACOMA MALL BL, TACOMA WA 98409
******************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Permit Description:
INSTALLATION OF HOODS
UMC Edition: 1994
Valuation:. 27,000.00
Total Permit Fee: 51.25
******************************************* * * * * * * * * * * * * ** * * * * * * * * ** * * * * * **
Perm 'Center Authorized Signature Date
I hereby certify that I have read and examined this permit and know the
same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate
or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and
obtain this building permit.
Signature* _ � Date: .\4 .°T3
Print Name :
Title: jpg�,
MECHANICAL PERMIT
Status: ISSUED
Issued: 12/30/1996
Expires: 06/28/1997
This permit shall become null and void if the work is not commenced within
180 days from the date of issuance, or if the work is suspended or
abandoned for a period of 180 days from the last inspection.
1'6$40 SOUTHCENTER
CITY OF TUKWILA
PY
Permit No: M96 -0177
Status: ISSUED
Applied: 12/17/1996
Issued: 12/30/1996
Address:
Suite:
Tenant: HOULIHAN'S RESTAURANT
Type: B -MECH
Parcel #: 262304 -9129 .
kk*k * * ** * * * ** ** ** * * *k k***' k*• k*• k kA** kkk*•* � kk* kkk kk* k•!e * * *kk* *•kk*** * *kk - k*
Permit Conditions:
1. No changes will be made to the plans unless approved by the
Architect. or Engineer and the...Tukwila_Building Division.
All permits, i nspect i cin records, ar }d approved plans shall be
available at the Job `site prior to the start of any con -
struction. These: - ;documents ;are to;be maintained and avail-
able until final' = inspection approval is granted
3. All construction to be done in conformance with approved
plans and requirements..of• the Uniform Bui iding :•Code (1994
Edition) as Uniform Mechanical .Code (1994..Edition)..
and Washington State Energy Code; (1994 Edition).
Validity , of 'Permi t The issuance of a permit. or approval l . of
p1ans,r s'pecifications, and'=computations shall' not beacon
strued 'to.'be a permit . fort or an approval of, any violation,
of any: of provisions of the.:buiiding code or of any
other ° or'dinance of the Jurisdiction. No permit presuming t
give "authority to violate or cancel the provisions of this
code- b e - v a l i d .
y . MANUFACTURERS INSTALLATION INSTRUCTIONS REQUIRED ON SITE
FOR 'THE BUILDING: INSPECTOR'S REVIEW:
i.: Electrical 'permits. shall °�be ,obtained through the Washington
Sta `t'e D i v'isio n. of L.aborand Industries' anti all electrical'
wowi 11 be' .inspected .•by. that ,agency " (,20- 6630).
Readitv•.accessible access to roof , 'Mounted :equipment°
required
Project Name/Tenant:
\ -- scut \o/
Description of work to be done:
Value of Construction:
27,(
Site Address:
1 ,;= z I ■Jr_ - � c -cvri4c ,, 1 _v,N«T1N‘kilul
City State /Zip:
,
Tar, Parcel Number:
2gna 1,
, \tJA
Property caner: _
(�
Phone:
Phone:
Street Address:
Icy C 91)0 1vAN ` -.,)ri ? IA
City State /Zip:
( \
Fax #:
Contact Perso
Phone:
Street Address: City State /Zip:
— 2 - 7 \ Pr ANA A \� �- , TIACCMA \ \)/\ Q QCy1 >> :21
i
Fax #:
(2 0 %- ? 4`.12
Cor ctor_
Phone:
(7c
Street Address: City State /Zip:
�1 S= n �y �r> ��t i 1fEci�V� ,�I� � A 3 1
Fax #:
� 2ao 7.3 - Z
Architect: �—
Phone
Street Address: City State/Zip:
t CInn4y-(c =.. -1- Acr*AA \ A ` 4tV -- 32c
Fax #:
(2C°k.D- 3- `7 2
Engineer:
Phone:
Street Address:
City State /Zip:
Fax #:
MISCELLANEOUS; PERMIT REVIEW AND APPROVAL•REQUESTED: (TO BE FILLED OUT BY APPLICANT).:.
Description of work to be done:
Will there be storage of flammable /combustible hazardous material in the building? ❑ yes no
Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sheets
❑ Above Ground Tanks ❑ Antennas /Satellite ❑ Bulkhead /Docks El Commercial Reroof
CI Demolition ❑ Fence „Mechanical El Manufactured Housing - Replacement only
❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection /Exit Systems
❑ Temporary Facilities ❑ Tree Cutting
MONTHLY SERVICE BILLINGS: TO :.
Name:
Phone:
Address:
City /State /Zip:
0 Water
0 Sewer
0 Metro
0 Standby
CITY OF''UKWILA
Permit Center
6300 Southcenter Boulevard, Suite 100
Tukwila, WA 98188
(206) 431 -3670
• R STAFF USE ONLY
Project Number: •
Permit Number:
0 til
Miscellaneous Permit Application
Application and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or facsimile.
APPLICANT;REQUEST.FOR MISCELLANEOUS PUBLIC WORKS PERMITS'
❑ Channelization /Striping
❑ Flood Control Zone
❑ Landscape Irrigation
❑ Storm Drainage
❑ Water Meter /Exempt #
❑ Water Meter /Permanent #
❑ Water Meter Temp #
❑ Miscellaneous
❑ Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s):
❑ Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq. ft.grading /clearing
❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public
❑ Street Use ❑ Water Main Extension 0 Private 0 Public
0 Deduct 0 Water Only
Size(s):
Size(s):
Size(s): Est. quantity: gal Schedule:
❑ Moving Oversized Load/Hauling
WATER METER DEPOSIT /REFUND BILLING:
Name:
Address:
Phone:
City /State /Zip:
Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall
expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days
upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application
shall be extended more than once.
Date application accepted:
1 2 -ci III/_
Date application expires:
Applicatrchn by: (initials)
MISCPMT.DOC 7/11/96
:
BUILDING OWNER Of9.AUTHORIZED AGENT: _.---
Signature :_- --
Date: /
Print nam ��
1e4 0 P'S f • .C'd �°�
Phone:
Fax #:
Address: y J
City /State /Zip:
• ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN
• BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED
• ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT
• STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON
LICENSED STRUCTURAL ENGINEER
> CIVIL/SITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER
(P.E.)
ALL MISCELLANEOUS PE s T APPLICATIONS MUST BE SUBM
D WITH THE FOLLOWING:
❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If
not available at the time of application, a copy of this license will be required before the
permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit
in Lieu of Contractor Registration ".
Building Owner /Authorized Agent. If the applicant is other than the owner, registered architect/engineer,.,or, contractor licensed
by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and
obtain the permit will be required as part of this submittal.
1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS
PERMIT.
MISCPMT.DOC 7/11/96
c Gr //9. 9 /g04--
-.'..
Account Code
000/345.830
000 /322.100
Description
F'L.AN CHECK - NONf2ES
.MECHANICAL - NONI2E8
•:•+'** hh* h* k******* kl rkhh* h******* hh* **k ***k*hk *A*** **
CITY OF TUI(4 TLfl. NA AA (), TRflNSMIT
k***.***********A**** *** Ak**••k"k**k*It *k*kh*********/r**k*hhk****h
TRANSMIT Number [960 Amount: 51.25 12/30/96 10:20
Payment Method: CHECK Notation: SPECIALTY WOOD Xnit: SMC
Permit No:. M93 -0177 Type: 13 -MECH MECHANICAL. PERMIT
Parcel No: 262304 - 9129
Site Address: 16840 SOU'FHCENTER PY
Total Fees: 51.25
This Payment 51.25 Total ALL• Pmts: 51.25
kl.ii l ance w ° .0()
**** *1 ****** k*****' /.*** **** **** ** *** **
Amount
10.25
41.00
Underwriters Laboratories Inc.0
File MI-118527 Vol. 1
M anti lacturer:
(146077 -001)
Applicant:
(146077 -001)
I,istee:
(146077 -001)
TRS INC
2614 PACIFIC IIWY Ii
FIFE WA 98424
SAME AS MANUFACTURER
SAME AS MANUFACTURER
FOLLOW - UP SERVICE PROCEI)IIRI
(TYPE R)
EXHAUST HOOD wrrlloUT FIRE DAMPER
(YYCW)
Issued: 5 -23 -96
260011W. Lake Road
Canes, WA 0860741542
(360) 017 -5500
FAX l lo. (360) 817 -0000
\ inn a century of
public, solely
'ass' est. 1804
This Procedure authorizes the above Manufacturer to use the Listing Mark of
Underwriters Laboratories Inc, only on Listed products covered by this procedure, in
uccortlance,with the Listing and Follow -Up Service Agreement.
The Prescribed Mark or Marking shall be used only at the above manufacturing location
on such products which comply with this Procedure and any other applicable
requirements.
The Procedure contains information liar the use of the above named I Ianulacturer and the
representatives of Underwriters Laboratories Inc. and is not to he used for any other
purpose. It is lent to the Manufacturer with the understanding that it is nut In he copied,
either wholly or in part, and that it will be returned to Underwriters Laboratories Inc.
upon request!
This • PROCEDURE, and any subsequent revision, is the property of 11N 1)1 R WRITERS
LABORATORIES INC:' and is. not transferable
UNDERWRITERS' LABORATORIES, INC.
S
S. Joe I3hatia
Vice President, Follow -lip Services
RECEIVED
CITY OF TUKWILA
DEC 1 7 1996
PERMIT CENTER
A iiol•lur•prufil oiil iuirnbc n
to public !..tfcly and
rt.uuuillCd to r(uaht; !,t •n'ici;
maximum 30 in.
•
File M1118527 Vol. 1 Sec.
3. '1'fie following information:
A. l load clearance to the cooking surface 42 in. (311 6in
(2ft 6in.) minimum to front lower edge of hood ;'
13. Minimum exhaust airflow 375 CFM /FT of 1-1ood:'
C. Maximum supply airflow 140 CFM /FT of I.1ood,'
ii.
Minimum side hood overhang to appliance 12 inches
• 1?. Minimum front hood overhang to appliance 18 inches
4. Equipment having field wiring terminals shall be marked }'Use Copper
Conductors Only" the field wiring junction box.
5. Suitable for use with cooking appliances developing surface, temperatures up to
600 °F.
6. 120v, 601-1Z , 12 Amps or less
7. Use only UL Classified grease filters.
8. Fusible Zink rated 165 °F
INi,S'I'A1 j,A'1'I ON INSTRUCTIONS:
A copy 01'111. 1 (C9600849.100) shall be packaged with each exhaust hood.
•CAULS
r "
MH18527 Vol. 1
P4 1411
SIZE NM SIIAPE Ur MJCTVfP1
M IERNIIIED DY HUIDD DIHCIISIDUS
MARC UP AIR
II
I
F• 6 1 /P. 1 H
6) /
IV
11
1,1
ONC.
- ▪ Custom Stainless Steel
2614 PACIFIC WWY. E. TACOMA, WA 9E4 24
TACOMA '(206) 927 -I335 SEATTLE (206) 62 2-1221
FAX ( 206) 92 ?4610
•
j 3 /
sd+e -w >w n: ac;r.. rn+ ;•e.:.r:w...i,,.w,•,yenxbrv.,:sr .rrn rs ^�»a• 5';�S'r*,'.+7i?#.'ttt;` "'E.?, ,:7.t:��7 ?e�!^'•iS54,r
Sec. 1
and Report
PCRrrIRAftn
/ "( PANEL
51 Z I)PCII
3/16' IINLCS
'1 7/16
1
PEN IIPArr.II
PAU1'1.
25 % 111`f 11
S;ANQUY._UQQ.L) W/ 3/16• IflLS P 1/2• Nr:
e 1/4' 11c
5/ 1
f 36
C96-00845 - 1
15
ILL - Issued: 5 -23 -96
(Page 1 of 2)
CY.11AIIST
lL r
r
1 "5
CEILING
CLOSURE
vE • Iry
Sec. 1
and Report
MAKE UP AIR
DUCT
FIRE DAMPER
r
cxHAUSr
DUC1
ILL -3 Issued: 5 -23 -96
MH18527 Vol.
Sec. 1 ILL -4 Issued: 5 -23 -96
and Report (Page 1 of 2)
;00011
441.
EXH
DUCT SUPPORT
CHANNELS
ATTACH TO DUCT
AND FIRE SHAFT
DUCT
6" SPACC
ALL 4 SIDES -
ROOF
ILLUSTRATION 1/ 3
FIRE SHAFT
BUILT TO LOCAL CODES
Installation Instructions
Overview
Install hood in accordance with NFPA -96, removal of smoke and grease -laden vapor from commercial cooking
equipment.
General Contractor Responsibilities
General Contractor responsible for installing system in accordance with, and meets all specific requirements of local
code officials.
Hood Installation Procedure
1) Upon receiving TRS, Inc. system, inspect for shipping damage, and if present, notify carrier immediately. Any
concealed damage should be noted and reported to delivering carrier. File a claim with carrier if appropriate.
"" TRS, Inc. will not accept responsibility for any shipping damage. All systems are thoroughly Inspected
before leaving the factory.
2) Uncrate hood being careful not to scratch stainless steel or painted surfaces.
3) Uncrate ductwork and inspect for damage.
4) Position ductwork Into fire shaft standing on end, with the 1/2" flange on the floor. Lift ductwork to prescribed
height, see illustration #2.
5) Center ductwork in the fire shaft so that there is equal space surrounding the ductwork.
6) From roof, attach duct support channels to duct, straddling roof curb, see illustration # 3.
7) Insert 3/8" threaded rod into mounting brackets on hood and lift into position, fastening rods to ceiling structure.
8) Adjust with turnbuckles so that the front of the hood is at least 6' -6" from finished floor.
9) Cooking surface distance should be as is indicated on TRS, Inc. nameplate, unless otherwise specified by local
code authorities.
10) Seal exhaust duct with continuous weld using 16 gauge mild steel or 18 ga stainless steel.
11) Locate and weld exhaust and make up air collars to hood, (if shipped loose for field installation), taking
precaution not to scratch hood surfaces.
12) Level hood with turnbuckles or from ceiling structure.
13) Connect supply duct to appropriate collar.
14) Hook up supply fire damper through access panel on supply duct as provided by installer. Tighten the HFE
fusible element by hand with a minimum of 0.885 in/lb torque, to a maximum of 5.31 in/lb torque.
* Assure that any ductwork or fasteners do not interfere with the operation of damper.
* Supply air fire damper assembly shown on illustration # 4.
15) Connect proper circuits for Fan motor control circuit and Light control circuit.
16) Install grease filters, drip tray(s), and grease cup(s).
17) Light bulbs are not provided and are to be furnished by purchaser. Use only recognized brands, 100 watt
maximum, unless project specifications require smaller capacity.
18) Protect hood at all times, by wrapping In plastic until other work is completed or system is ready for operation.
Fan Installation
1) Upon receiving TRS, Inc. system, inspect for shipping damage, if present, notify carrier immediately. Any
concealed damage should be noted and reported to delivering carrier. File a claim with carrier if appropriate.
** TRS, Inc. will not accept responsibility for any shipping damage.
2) Determine from project plans, the exact location of the roof top units. Place exhaust unit section over hood
exhaust duct, if at all possible, to minimize exhaust duct installation.
3) After installing the curb, set the curb cap, if used, according to project specifications. RECEIVED
** Provide adequate caulking, flashing or other weatherproofing means. CITY OF TUKWILA
4) Wire fans in accordance with project specifications.
DEC 1 71,,1c,
Fan Operations
1) After complete installation and wiring of fans, start the fans. PERMIT CENTER
2) By physical observation, check the supply and exhaust fans for proper operation by checking voltage, motor
overload, amperage, noise level, etc.
3) Check the direction of fan rotation for proper air distribution.
4) Verify that the motor and bearings have adequate lubrication and that the belts have proper tension.
5) Deflection in belt tension should not exceed 1/2 ".
6) Check that the air intake filters are in clean and in place, and the inlet damper in the hood supply collar is open.
"` "" REFER TO INSTALLATION /MAINTENANCE MANUALS FURNISHED BY FAN MANUFACTURERS FOR
FURTHER ASSISTANCE.
APPLICATION
Wall Mount canopy style for use over all types where integral make -up air is desired. Refer to General
Specifications and illustration for various styles of make -up air designs.
MAKE UP AIR OPTIONS
Front face discharge
This method of bringing air into the kitchen or space is very flexible and has many advantages. Typical supply
volume is based on 80% or more, depending on air balance desired. Supply air temperatures should range from 60°
F to 65° F, but may be as low as 50° depending on air volume, distribution, and kitchen internal heat load.
Internal Discharge
Up to 40% of the exhaust air may be supplied through this system depending on the type of cooking equipment
involved. This may be untempered raw air in most areas, depending on climatic conditions and the type of cooking
equipment. If the winter temperature is below 10° F, consult factory.
Perimeter Down Discharge
Up to 80% of the exhaust air may be supplied through this system, but the air must be tempered to 65° F or higher
to avoid discomfort.to personnel.
EXHAUST FAN/ MAKE UP AIR UNITS
All exhaust fans to be furnished and Installed by others, in compliance with local and national codes. Fans should be
backward inclined blades, and sized to meet TRS, Inc. air volumes and static pressure drop for the total installation.
Discharge ducts should be vertical (horizontal available), and located away from air intakes. Supply or make -up air
fans to be furnished and Installed by others in compliance with local and national codes. Must be capable of
handling the required air quantity at the total static pressure of the system. Exhaust and Supply fans should be
electrically Interlocked for simultaneous operation.
FIRE PROTECTION
NFPA 96 and most other codes require a fire extinguishing system for protection of the duct and plenum, and for the
protection of cooking equipment, such ,as fryers, griddles, ranges and broilers which may be a source of ignition of
grease. Check with local authorities for exact requirements. UL listed fire protection systems can be installed on the
job site by fire equipment distributors.
GENERAL SPECIFICATIONS
Exhaust Hood shall be constructed of 18 GA type 304 stainless steel, all exposed surfaces have a #4 finish.
Construction to meet requirements of NFPA 96 and NSF Standard # 2. Hood to incorporate full length, semi -
concealed grease gutter, which slopes to a removable grease cup. Filters to be UL classified stainless steel baffle
type, mounted at 45° angle. Hood to be equipped with 100 watt incandescent lights mounted at a maximum of 48"
centers and prewired to a single connection point. Hoods built in multiple sections to be furnished with junction
boxes for field connections by electrical contractor. (Recessed 150 watt incandescent or fluorescent fixtures
available).
• Canopy Hood without fire damper. Hood to be UL classified under "Exhaust Hood for Restaurant Cooking
Appliance"
• Canopy Hood with fire damper. Hood to be equipped with spring loaded fire damper located at each duct
collar. Fire damper to be: (a) fuse link activated, (b) thermmostaticaliy activated.
Hood to be UL listed under "Automatic Damper and Hood for Restaurant Cooking Appliances."
Make -up air options: Hood to have an air supply plenum, including duct collar(s), with fuse
linked fire dampers, and:
Include full length stainless steel perforated face panel for low velocity face discharge make up air.
Incorporate a full length stainless steel internal perforated panel for discharging directly into cavity of hood.
..;ri';'.., ." F= N^. txrxyr" 1 r � �i'• ��r`' I, � �Y Y7�* ef? 3" t� 't�f."9;:t.�::xY'
Hood Operations
Determine that the installation is complete in accordance with project plans and specifications, that the duct is
complete and that all electrical connections have been made.
1) The system must include a volume damper in the supply air, the supply air is 37% of the exhaust air
2) Ascertain that all motors have been provided with overload protection devices or have built -in overloads.
3) Electrical systems should be installed with disconnecting means, proper fusing and proper grounding systems to
protect against hazardous shock.
4) Check all motors, coils, etc., for proper voltage and connection.
5) Ensure all electrical components have adequate access and connections are tight.
Place system into operation as provided in the control sequence.
1) Air flow in the supply duct should be verified by taking a duct traverse if possible, if not, average velocity across
the supply nozzle can be taken with a rotating vane anemometer.
2) Determine the supply CFM by .multiplying average velocity by the cross sectional area of the duct in square
feet.
3) Capacity of the exhaust system should be determined by a duct traverse if possible, if not, average readings
taken with a rotating vane anemometer across the filter bank.
4) Multiply the average velocity by the cross sectional area of the duct in square feet or by the net free area of the
filter bank.
5) If the air flow is, as measured, is not in accordance with project specifications, adjust the speed of the respective
fans as required End recheck.
6) Final balancing, if required, should be done with the supply intake damper to ensure lowest operating costs.
7) After the system has been placed in operation and balancing of the system has been accomplished,
a visual inspection of the entire system is recommended.
8) Inspection should include such things as unusual noises, excessive exhaust or supply air and general operation
of the system.
9) In the event that smoke is not being exhausted, determine that the exhaust air is sufficient.
10) If the air is sufficient, balance the supply air with the damper in the supply collar until all products of combustion
and cooking are exhausted.
11) It is extremely important that the system be released in the best possible condition.
12) Always instruct the owner /operator in the proper operation, care and maintenance of the system.
Maintenance
1) Hood to cleaned with mild soap and warm water.
2) Thoroughly clean grease cups and filters each 24 hour period. To clean filters and cups, remove from hood and
wash by hand, dishwasher or steam clean.
3) Wipe clean all interior and exterior surfaces of hood including light fixtures.
4) Painted surfaces should be cleaned with mild detergent solution and wiped dry with a drying cloth.
' Never use harsh or abrasive cleaners on stainless steel or painted surfaces.
Fans
1) Air intake filters should be checked once a month, or more often, if conditions dictate.
2) Check all belts for slippage, and tighten or replace as necessary.
3) Perform cleaning on the exhaust fan interior and wheel as required to prevent accumulation of grease which may
lead to fire hazard.
4) At least every six months, check all electrical connections for tightness.
5) Oil or lubricate all motors and bearings every six months or more often if conditions dictate.
Installation Instructions
Overview
Install hood in accordance with NFPA -96, removal of smoke and grease -laden vapor from commercial cooking
equipment.
General Contractor Responsibilities
General Contractor responsible for installing system in accordance with, and meets all specific requirements of local
code officials.
Hood Installation Procedure
1) Upon receiving TRS, Inc. system, inspect for shipping damage, and if present, notify carrier immediately. Any
concealed damage should be noted and reported to delivering carrier. File a claim with carrier if appropriate.
"" TRS, Inc. will not accept responsibility for any shipping damage. All systems are thoroughly inspected
before leaving the factory.
2) Uncrate hood being careful not to scratch stainless steel or painted surfaces.
3) Uncrate ductwork and inspect for damage.
4) Position ductwork into fire shaft standing on end, with the 1/2" flange on the floor. Lift ductwork to prescribed
height, see Illustration #2.
5) Center ductwork In the fire shaft so that there is equal space surrounding the ductwork.
6) From roof, attach duct support channels to duct, straddling roof curb, see illustration # 3.
7) Insert 3/8" threaded rod into mounting brackets on hood and lift into position, fastening rods to ceiling structure.
8) Adjust with turnbuckles so that the front of the hood is at least 6' -6" from finished floor.
9) Cooking surface distance should be as is indicated on TRS, Inc. nameplate, unless otherwise specified by local
code authorities.
10) Seal exhaust duct with continuous weld using 16 gauge mild steel or 18 ga stainless steel.
11) Locate and weld exhaust and make up air collars to hood, (if shipped loose for field installation), taking
precaution not to scratch hood surfaces.
12) Level hood with turnbuckles or from ceiling structure.
13) Connect supply duct to appropriate collar.
14) Hook up supply fire damper through access panel on supply duct as provided by installer. Tighten the HFE
fusible element by hand with a minimum of 0.885 in/lb torque, to a maximum of 5.31 in/lb torque.
Assure that any ductwork or fasteners do not interfere with the operation of damper.
* Supply air fire damper assembly shown on illustration # 4.
15) Connect proper circuits for Fan motor control circuit and Light control circuit.
16) Install grease filters, drip tray(s), and grease cup(s).
17) Light bulbs are not provided and are to be furnished by purchaser. Use only recognized brands, 100 watt
maximum, unless project specifications require smaller capacity.
18) Protect hood at all times, by wrapping in plastic until other work is completed or system is ready for operation.
Fan Installation
1) Upon receiving TRS, Inc. system, inspect for shipping damage, if present, notify carrier immediately. Any
concealed damage should be noted and reported to delivering carrier. File a claim with carrier if appropriate.
** TRS, Inc. will not accept.responsibility for any shipping damage.
2) Determine from project plans, the exact location of the roof top units. Place exhaust unit section over hood
exhaust duct, if at all possible, to minimize exhaust duct installation.
3) After installing the curb, set the curb cap, if used, according to project specifications.
** Provide adequate caulking, flashing or other weatherproofing means.
4) Wire fans in accordance with project specifications.
Fan Operations
1) After complete installation and wiring of fans, start the fans.
2) By physical observation, check the supply and exhaust fans for proper operation by checking voltage, motor
overload, amperage, noise level, etc.
3) Check the direction of fan rotation for proper air distribution.
4) Verify that the motor and bearings have adequate lubrication and that the belts have proper tension.
5) Deflection in belt tension should not exceed 1/2 ".
6) Check that the air intake filters are in clean and in place, and the inlet damper in the hood supply collar is open.
* "* REFER TO INSTALLATION /MAINTENANCE MANUALS FURNISHED BY FAN MANUFACTURERS FOR
FURTHER ASSISTANCE.
t.
APPLICATION
Wall Mount canopy style for use over all types where integral make -up air is desired. Refer to General
Specifications and illustration for various styles of make -up air designs.
•
MAKE UP AIR OPTIONS
Front face discharge
This method of bringing air into the kitchen or space is very flexible and has many advantages. Typical supply
volume Is based on 80% or more, depending on air balance desired. Supply air temperatures should range from 60°
F to 65° F, but may be as low as 50° depending on air volume, distribution, and kitchen internal heat Toad.
Internal Discharge
Up to 40% of the exhaust air may be supplied through this system depending on the type of cooking equipment
involved. This may be untempered raw air in most areas, depending on climatic conditions and the type of cooking
equipment. If the winter temperature is below 10° F, consult factory.
Perimeter Down Discharge
Up to 80% of the exhaust air may be supplied through this system, but the air must be tempered to 65° F or higher
to avoid discomfort,to personnel.
EXHAUST FAN/ MAKE UP AIR UNITS
All exhaust fans to be furnished and installed by others, in compliance with local and national codes. Fans should be
backward inclined blades, and sized to meet TRS, Inc. air volumes and static pressure drop for the total installation.
Discharge ducts should be vertical (horizontal available), and located away from air intakes. Supply or make -up air
fans to be furnished and installed by others in compliance with local and national codes. Must be capable of
handling the required air quantity at the total static pressure of the system. Exhaust and Supply fans should be
electrically interlocked for simultaneous operation.
FIRE PROTECTION
NFPA 96 and most other codes require a fire extinguishing system for protection of the duct and plenum, and for the
protection of cooking equipment, such as fryers, griddles, ranges and broilers which may be a source of ignition of
grease. Check with local authorities for exact requirements. UL listed fire protection systems can be installed on the
job site by fire equipment distributors.
GENERAL SPECIFICATIONS
Exhaust Hood shall be constructed of 18 GA type 304 stainless steel, all exposed surfaces have a #4 finish.
Construction to meet requirements of NFPA 96 and NSF Standard # 2. Hood to incorporate full length, semi -
concealed grease gutter, which slopes to a removable grease cup. Filters to be UL classified stainless steel baffle
type, mounted at 45° angle. Hood to be equipped with 100 watt incandescent lights mounted at a maximum of 48"
centers and prewlred to a single connection point. Hoods built in multiple sections to be furnished with junction
boxes for field connections by electrical contractor. (Recessed 150 watt Incandescent or fluorescent fixtures
available).
• Canopy Hood without fire damper. Hood to be UL classified under "Exhaust Hood for Restaurant Cooking
Appliance"
• Canopy Hood with fire damper. Hood to be equipped with spring loaded fire damper located at each duct
collar. Fire damper to be: (a) fuse link activated, (b) thermmostatically activated.
Hood to be UL listed under "Automatic Damper and Hood for Restaurant Cooking Appliances."
Make -up air options: Hood to have an air supply plenum, including duct collar(s), with fuse
linked fire dampers, and:
Include full length stainless steel perforated face panel for low velocity face discharge make up air.
Incorporate a full length stainless steel internal perforated panel for discharging directly into cavity of hood.
Hood Operations
Determine that the installation is complete in accordance with project plans and specifications, that the duct is
complete and that all electrical connections have been made.
1) The system must include a volume damper in the supply air, the supply air is 37% of the exhaust air
2) Ascertain that all motors have been provided with overload protection devices or have built -in overloads.
3) Electrical systems should be installed with disconnecting means, proper fusing and proper grounding systems to
protect against hazardous shock.
4) Check all motors, coils, etc., for proper voltage and connection.
5) Ensure all electrical components have adequate access and connections are tight.
Place system into operation as provided in the control sequence.
1) Air flow in the supply duct should be verified by taking a duct traverse if possible, if not, average velocity across
the supply nozzle can be taken with a rotating vane anemometer.
2) Determine the supply CFM by .multiplying average velocity by the cross sectional area of the duct in square
feet.
3) Capacity of the exhaust system should be determined by a duct traverse if possible, if not, average readings
taken with a rotating vane anemometer across the filter bank.
4) Multiply the average velocity by the cross sectional area of the duct in square feet or by the net free area of the
filter bank.
5) If the air flow Is, as measured, is not in accordance with project specifications, adjust the speed of the respective
fans as required and recheck.
6) Final balancing, if required, should be done with the supply intake damper to ensure lowest operating costs.
7) After the system has been placed in operation and balancing of the system has been accomplished,
a visual inspection of the entire system Is recommended.
8) Inspection should include such things as unusual noises, excessive exhaust or supply air and general operation
of the system.
9) In the event that smoke is not being exhausted, determine that the exhaust air is sufficient.
10) If the air is sufficient, balance the supply air with the damper in the supply collar until all products of combustion
and cooking are exhausted.
11) It is extremely important that the system be released in the best possible condition.
12) Always instruct the owner /operator in the proper operation, care and maintenance of the system.
Maintenance
1) Hood to cleaned with mild soap and warm water.
2) Thoroughly clean grease cups and filters each 24 hour period. To clean filters and cups, remove from hood and
wash by hand, dishwasher or steam clean.
3) Wipe clean all interior and exterior surfaces of hood including light fixtures.
4) Painted surfaces should be cleaned with mild detergent solution and wiped dry with a drying cloth.
" *" Never use harsh or abrasive cleaners on stainless steel or painted surfaces.
Fans
1) Air intake filters should be checked once a month, or more often, if conditions dictate.
2) Check all belts for slippage, and tighten or replace as necessary.
3) Perform cleaning on the exhaust fan interior and wheel as required to prevent accumulation of grease which may
lead to fire hazard.
4) At least every six months, check all electrical connections for tightness.
5) Oil or lubricate all motors and bearings every six months or more often if conditions dictate.
Project: r
U t,r a- N S
Type of Inspec f
[--1 N .
Address:
/ONO S.C.
Date called:
Special instructions: t
Date wanted:
a.m.
Requester:
/ �✓
Phone No.:
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
% -o117
PERMIT NO.
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431 -3670
`Z
C• MENTS:
Approved per applicable codes.
Corrections required prior to approval.
$42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must.'
be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
I Receipt No,:
Date:
t
City of Tukwila
Fire Department
Fire Department Review
Control #1.196 -0177
(512)
December 23, 1996
Re: Houlihan's Restaurant - 16860 Southcenter Parkway
•Dear Sir:
The attached set of b u i l d i n g plans have been reviewed by
The Fire Prevention Bureau and are acceptable with the
following concerns:
1. An approved automat i s fire-extinguishing system is
required for this project..
Commercial -type food heat- processing equipment from
which grease -laden vapors emanate in normal cooking
application shall be protected by an approved
automatic e x t i n g u i s h i n g system. The extinguisher
system shall be interconnected to the fuel and current
supply so that the fuel or current is automatically
shut off to all equipment under the hood, when the
system is actuated. (UFC 1006)
John W. Rants, Mayor
Thomas P. Keefe, Fire Chief
A sodium bicarbonate or potassium bicarbonate
dry-chemical-type portable fire extinguisher having a
minimum rating of 4C -B shall be installed within 30
feet (9144 non) of commercial food heat - processing
equipment, as measured along an unobstructed path of
travel. (UFC 1006.2.7)
All new automatic fire - extinguishing systems and all
modifications to existing automatic fire- extinguishing
systems shall have fire department review and approval
of drawings prior to installation or modification.
Portable fire extinguishers shall be securely
installed on the hanger or in the bracket supplied,
placed in cabinets .or wail recesses. The hanger or
bracket shall be securely and properly anchored to the
Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575.4404 • Fart (206) 5754439
City of Tukwila
Fire Department
Page number. 2
mounting surface in accordance with the manufacturer's
instructions. The extinguisher shall be installed so
that the top of the extinguisher is not more than 5
feet above the floor and the clearance between the
bottom of the extinguisher and the floor shall not be
less than 4 inches.
Extinguishers shall be located so as to be in plain
view (if at all possible), or if not in plain view,
they shall be identified with a sign stating, "Fire
Extinguisher ", with an arrow pointing to the unit.
(NFPA 10, 1 -6.3) (UFC Standard 10 -1)
Clear access to fire extinguishers is required at all
times. They may not be hidden or obstructed. (NFPA
10, 1-6.5)
2. Local U.L. central station supervision is required.
(City Ordinance #1742)
All new fire alarm systems or modifications to
existing systems shall have the written approval of
The Tukwila Fire Prevention Bureau. No work shall
commence until a fire department permit has been
obtained. (City Ordinance #1742) (UFC 1001.3)
3. •RRequired fire resistive construction, including
occupancy separations, area separation walls, exterior
walls due to location on property, fire resistive
requirements based on type of construction, draft stop
partitions and roof coverings shall be maintained as
specified in the Building Code and Fire Code and shall be
properly repaired, restored or replaced when damaged,
altered, breached, penetrated, removed or improperly
installed. (UFC 701)
This review limited to speculative tenant space only
special fire permits may be necessary depending on
detailed description of intended use.
John W Rants, Mayor
Thomas P. Keefe, Fire Chief
Any overlooked hazardous condition and /or violation of the
Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone; (206) 5754404 • Fax (206) 575.4439
Page number
adopted Fire or Building Codes does not imply approval of
such condition or violation.
Yours truly,
cc: TFD file
ncc
City of Tukwila
Fire Department
5/Z
• The Tukwila Fire Prevention Bureau
Headquarters Station: 444 Andover Park East • : Tukwila, Washington: 98188 • Phone (206) .57.5-4404
John W. Rants, Mayor
Thomas P. Keefe, Fire Chief
Fax. (206) 575-4439
12/30/36
:EUE 10 :48 FAX 20 531 2962 SPEC.WOOD/TRS/KESSLER
. • 1.•••••■••■•■11 .4 I. • ■•••■•■••■•••■••••• • •••
" Vd•V•74 1'..... " 1=4117 ', ==• 1 • 4 :•*Ntt i 2Z=Ze .."4""I tc• ari•rj=
DEPARTMENT OF LABOR AND INDUSTRIES
THIS CERTIFIES THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED V LAW AS A
j I . ...0 •■•■1.10,10•■• 01••••••••■• * ...., ••■•..11 %OS at....
. •
, .'", •
1 E : 'T ..t•• a
.'• ' ...b:..t. • . '..71.-, ..- ..?'
,, 7-
"Y 4
,,....0
iLial-
) 1•4').. CrA
ti.
•
D'',7,.. ..,,...f ..•
I... ...:
".../• 414
, .
Jc4.':
; .•;;1 ' q ,141.0 r:"/I •
...I: 4 • ‘: .:` / ; .".. i , ''
•
alto • a.m. •01,1 • I •• i•■• •• • wow ••Y•m••
•••
SKINATUPle
ISSUE
•
••■•■••••••■•■■•••••■•
fIENS1EBED AS PROBDEO BY LAW AS k ... ... .. .
1?, . $ if .. ..: ••1 I :,....!".. • ii.!, ••.,
• ei
I tiq •, 1)11114UMAIRlio. .:: '.. 1 1.• ' .. ::A •
?i 441011 iiii•33t4
1 . o e . . '!"' • ' f , . EOFECT 'A fa . 40 . 1 2)115 A
1 . : ,. .i, .11 -.... •1,• f .. 4, , .-- -.
fil 'a 6' TAM* WALL
BLV '':'
• . •
TACOMA VA : 09 ... ...; .'..1 .:7::•;,1,, i;. ',.I' IF.:
...%, pp 4 . . t • .i f • I • • ■ • :. 1.1•14
1 •ECI,14 tAL Tit -
et-
t, ;.;?
•:,+• •
• • • ,
r$
,i
STATE OF WASHINGTON
v DEPART NT OF LA AND INDUSTRIES
F825-052.00013-92)
..,..........m....4••••••••••■•11
• .11ECF1‘15.0
("ATV OF 11,11WILA
21 0 0 2
DEC 3 0 1990
,
A
1
R
iiiiiiiNF]lb .
g■ '
M
MIMMIMM11
MI
- II NM
MINIM
1
_Q_
LO. CI
1 ma
4er
6 4
%10
O
noon
!rile
ism
1 ia
0 H
00@)5
10
MFCH
1 we I
1
Plk
I rc) Pm' rm
I in
DRY
1 WS 1 •i
MO IN Sag
F A
:o:o::o:o:
0
BFFR C001 FR
MC]
DISH WASH
fl
STAFF I
1 111
FNTRY VESTIBUI
M2110.01
Off/gaa.
; PRFP
' IP'
-
"I/ Y IP" COOK j w
room
COOK 2
EIEI
1
• f 180.■••■■11/AIIT • WIPT
rini 11 II ,
el. 4s
.•
• tsunami • imi■•
rAmi. : L .,:iu mi
[--
ell 777 Et H Mcli 7.. 1,
1 11
1E1
1.1
41110
410
4
411110
4111*
41111,
lir I
4111,
11,'
411111110
0 NINO ROOM '2
uJ
4111"
41M,
111111111
1
4j
sOj
a
rncib-0111
FLOOR PLAN
1
COMO ROOMS
ISOM
SURMA.
DAIRMIa
MIMI CO
I * Immo wm.
OCCUPANCY COUNT
K-1
1 OF 1
REVISIONS
1/4%1'-0'
PEPRESOIDOME
J.8.
CESOMER
R. W.
Ocsa.PAN
FLOOR
PLAN
SEPARATE PERMIT
REQUIRED FOS:
o MECHANICAL
$
o PLUMBING
GAS PIPING
CITY OF TUKWILA
BUILDING DIVISION
A . • •••■•
HLE COPY
I .111(1,1,arld the 11., lHuc,k approvalsare
ors opproval of
uoes OW, UH11011
of any
or olu of ,on
,rior s uupy oppro,
PN
DIN OF IMO
APP"
DEC 2 6 1996
II &ODIC DIVISION,
.,%7EVA.
7Fr I 7 KKK'
O DISH WASHER HOOD
SCALE: '/2' - *' -9'
O TYPE II FAN SECTION
SCALE: ` /2' = *' -C
O TYPE II HOOD SECTION
SCALE: ` /2' = " -C'
CITY OF NKWIIA
7 1
O COOKLINE PLAN
SCALE: £ /2' =r -0•
18
6'-6
O OOOKLI»E ELEVATION
SCALE: r /2 = -' -G
rn4boi 77
5'3 _ =c _ - 7.5'¢.C'EC5
5 e -- - _v5' -CCD
901. 5 _ b CO"
�< REORVG _N R GAT -� == i_ <� __N e_TED • -e ••c'L.:.o _ q
5' X 15' EXHAUST DUCT
9' X 24' MM FIRE DAMPER
18'
/15' X 15' EXHAUST piCT
f -6
9' X 24' MLA EIRE DAMPER
13' X 13' EXHAUST DUCT
9' X 28' 261 f1RE DAMPER
GR'__ FOR r'L;;'- 4'7•R -ROL;
TO
-IR
1 .40LR GE.'NG
NOTE
51-14, TO BE
NOT
- R Ste. G5
O FIRE SHAFT SECTION ✓
SCALE:
O HOOD SECTION
SCALE:
'ER5 5
o G.E- .5.. - C
095'R�G'O�
RO ER'e .'NE OR RE,Rh
�
c Gh
SCREENED
J -510 514
L- _ 5'ED R,ER
HOOD NO L G5TE
N '0 :14 5 YE.DED
GON511,C "On
f.. .. 5'5 ,ALL F'_4SNONG
'NCB- FIRE ..4D9 3504165:
CA1N
DEC 26 1996
BUILDING DIVISION
.14 59-1%.
O COOKLINE PLAN
9' % 2A' 1(1A DUCT
HOOD CALCULATIONS
- S' -S' TYPE I IL p63Y1»T MOOD RECKONED A TOTAL CF 4013 CFtt EASIANST. WOOD RECUT ES (2
EXHAUST DUCT EACH to EXHAUST 4 TOTAL OF 408 CFn. 7 X n' DUCT SIZE
RATED • S2' SP. EXHAUST SHAFT 136411. LE CONSTRUCTED OF AN 4,4D FIRE RATED TYPE
AStEISPLY. (1) 3OLL132 Flt. EACH TO GE 4 JEW-AM 2•..JORID 11/2 HP. WIT
FLUE -LP AIR TO GE E3GSREEIEO AT NO LESS THAN SOS OF EJf44IJSTED TOTAL AT 3030 CFtt
TUNE UP 41R TOT AL, Drt11 A IEi1011 DUCT DPBiSg0 OF 2 - S• X 24 OVERALL EACH DUCT TO
WIPPLY NO LESS THAN 1012 0F1L 0AIQ4O• AIR INN TO SE AN AWN ES -330
SCALE: P /2" = P' - 0'
15'
(1/1 PAS)
1
/16'
20' X 20' EXHAUST WILT
..._<E -
3' % SP EXHAUST DUCT
9' X21' NIA DUCT _ O .. a C_._ NE,
6 6
ORA
O FIRE SHAFT SECTION
SCALE: :°!-
Gi5'E2. � -
O COOKLINIE ELEVATION O MOOD SECTION
SCALE: T/2".1' SCALE.:
C_.5 2...C7
s_� e /E,
, E.7
e'G CONSTF,C.710,
E.-cif = 7.62 -Q�RE�