HomeMy WebLinkAboutUtilities 2013-05-06 Item 2B - Discussion - 2013 Work Plan: Utilities CommitteeTO:
City of Tukwila
Jim Haggerton, Mayor
Department of Public Works Bob Giberson, P.E., Director
Mayor Haggerton
Utilities Committee
FROM: Bob Giberson, Public Works Director
BY: Robin Tischmak, City Engineer
DATE: May 3, 2013
SUBJECT: 2013 Utilities Committee Work Plan
ISSUE
Updated information includes anticipated schedules for the list of 2013 funded utility projects may be brought forward to
the Utilities Committee.
DISCUSSION
Public Works previously discussed the 2013 work program at the January 22, 2013 Utilities Committee. Anticipated
schedules and potential committee agenda items, as well as obtain direction from the committee regarding any
preferences or requests for how agenda items are included and presented.
NPDES Program — Present Annual Report for discussion along with new permit requirements. (Completed)
Second Quarter
2012 Small Drainage Program (Construction) — Project close -out. (May 2013)
2013 Small Drainage Program — Award design & construction contracts. (No 2013 Program)
EMW Emergency Storm Pipe 11 -19 -12 - Award design (Complete) & construction contracts, close emergency.
APW /APE Emergency Sewer Repair March 2013 — Closeout and merge with CBD Sewer Rehabilitation.
Third Quarter
Lift Station #15 Improvements — Award construction contract.
Surface Water Comprehensive Plan — Discuss future policies & adopt plan.
Tukwila 205 Levee — Discuss certification options and funding.
Annual Sewer Repair Program — Approve contracts for design and construction.
CBD Sanitary Sewer Rehabilitation — Award design (Complete) & construction contracts.
Sewer Lift Station # 2 Upgrades — Award generator replacement & repairs contract,
Sewer Comprehensive Plan — Adopt plan.
Andover Park W /Strander New Water Main — Coordinate construction with APW street project.
Water Comprehensive Plan — Adopt plan.
Howard Hanson Dam Flood Control Measures Removal — Construction closeout & close emergency.
Fourth Quarter
Soils Reclamation Facility — Award preliminary design & site location contract.
Solid Waste Interlocal Agreement — City action by April 30, 2013 for Amended and Restated ILA.
Mandatory Garbage Collection
Franchise Agreement with Allied Waste (Tukwila South & PM)
Franchise Agreements — PSE, T- Mobile, Comcast, XO, Level 3, ELI, Zayo, 360Networks, and SCL.
Regional Fiber Consortium Projects
RECOMMENDATION
Information only.
W:1PW Eng10THERIRobin Tischmak \InfoMem0 -rev 2013 UC WorkProgram gl.doc
5