HomeMy WebLinkAboutTrans 2014-05-27 Item 2G - Resolution - 2015-2020 Transportation Improvement ProgramTO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director_! BY: Cyndy Knighton, Senior Program Manager DATE: May 23, 2014 SUBJECT: Resolution for Six -Year Transportation Improvement Program (2015 -2020) ISSUE Resolution to adopt the annual update of the Six -Year Transportation Improvement Program for 2015 -2020. BACKGROUND The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code of Washington (RCW). The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for projects competing for grants. Any project submitted for federal grant funding must be included in the local, regional and state adopted TIPs. The TIP is a rolling plan showing various funding sources: grants, developer and local funds. Projects "roll" as funds or stages occur (design report, final design and construction). Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation- related projects. The TIP generally lists only those transportation- related projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. The City's CIP lists transportation projects planned in the next six years and beyond, as well as water, sewer, surface water, and capital facilities projects. The TIP is required to be adopted by June 30 on an annual basis, while the CIP is prepared during Summer /Fall in conjunction with the City's budget preparation. Differences between the two may be due to priority changes, funding availability changes, or other factors which normally occur during the time between adoptions of each document. ANALYSIS The attached spreadsheet is the "Draft" 2015 - 2020 TIP and was created by modifying the 2014 - 2019 TIP to add or remove projects and adjust project costs. No prioritization was assigned and the list of projects is presented in alphabetical order. Prioritization of projects is reflected in the CIP. Added: 53rd Avenue S (CIP Page 6), Deleted: Andover Park W Widening (CIP Page 17), Cascade View Safe Routes to School (CIP Page 3), Interurban Avenue S (CIP Page 14), Minkler Blvd, Nelsen Place, S 168th St, S 178th Street Realignment, S 180th St /Andover Park W Intersection, Southcenter Blvd, Thorndyke Safe Routes to School (CIP Page 4), Traffic Signal Interconnect Program, Tukwila International Boulevard Phase IV, Tukwila International Boulevard /S 116th Way /SR 599 Intersection, Tukwila Manufacturing Industrial Center "Street Smart" Non - motorized Project (CIP Page 26), Tukwila Urban Center Transit Center (CIP Page 16) Modified: Cascade View Safe Routes to School Phase II RECOMMENDATION Council is being asked to approve the Resolution for the 2015 -2020 Six -Year Transportation Improvement Program and consider this item at the June 9, 2014 Committee of the Whole with a Public Hearing and subsequent June 16, 2014 Regular Meeting. Attachments: Draft Resolution 2015 — 2020 "Draft" Transportation Improvement Program Current Adopted 2014 — 2019 TIP W: \PW Eng \PROJECTS\A- RW & RS Projects \TIP \Info Memo TIP 2015.docx 103 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2015- 2020), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2015- 2020); and WHEREAS, on June 9, 2014, a public hearing was held regarding the City's Six - Year Transportation improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A six -year Transportation Improvement Program for the calendar years 2015 -2020 is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. W: \Word Processing \Resolutions \TIP 2015 -2020 5 -19 -14 CK:bjs Page 1 of 2 104 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2014. ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk De'Sean Quinn, Council President APPROVED AS TO FORM BY: Shelley M. Kerslake, City Attorney Filed with the City Clerk: Passed by the City Council: Resolution Number: Exhibit: City of Tukwila Six -Year Transportation Improvement Program from 2015 to 2020 W: \Word Processing \Resolutions \TIP 2015 -2020 5 -19 -14 CK:bjs Page 2of2 105 DRAFT 2015 - 2020 TIP SUMMARY May 21, 2014 2015 -2020 2014 CIP Project Costs in Thousands of Dollars FUNDING SOURCES TIP PROJECT TITLE Page No. 2015 2016 2017 2018 2019 2020 TOTAL Federal State/TIB Developer Unsecured City 1 53rd Ave S (S 137th St - S 144th St) 2 ADA Improvements 3 APE /Industry Dr Intersection 4 APE /Minkler Blvd Intersection 5 Annual Bridge Inspections and Repairs 6 Annual Overlay and Repair Program 7 BNSF Intermodal Facility Access 8 Boeing Access Rd Bridge Rehabilitation 9 Cascade View Safe Routes to School Phase 2 10 E Marginal Way (BAR - S 112 St) 11 Macadam Rd & S 144 St Intersection 12 Multipurpose Trails 13 S 133 St /SR599 Intersection 14 S 144th St Bridge - Sidewalks 15 S 144th St Phase 11 (42 Ave S -TIB) 16 Strander Blvd /SW 27th St Extension 17 TUC/TOD Pedestrian Improvements 18 TUC - Pedestrian /Bicycle Bridge 19 Walk & Roll Program 20 West Valley Hwy (1 -405 - Strander Blvd) 21 W Valley Hwy/ S 156 St Intersection 6 251 21 63 23 0 24 0 10 270 15 1,550 13 0 11 8,828 3 0 27 0 29 0 41 50 28 0 0 19 1,480 31 0 0 12 7,485 30 140 0 25 0 600 63 0 0 270 1,560 0 2,243 0 0 0 0 0 0 0 0 0 0 0 0 0 600 63 0 0 270 1,650 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 63 0 0 335 1,670 0 0 839 0 0 0 0 0 0 0 0 0 0 0 0 0 0 63 63 0 575 O 622 335 335 1,725 1,725 O 13,750 O 0 0 0 O 3,300 O 610 O 280 O 630 0 1,219 O 0 O 33,150 0 1,080 O 0 O 0 0 630 O 1,032 1,451 1,000 451 378 378 575 575 622 622 1,815 1,815 9,880 9,880 13,750 11,763 1,988 11,070 8,805 2,265 839 750 89 3,300 1,300 2,000 610 610 330 330 630 460 170 1,219 975 244 1,480 1,000 480 0 33,150 5,000 27,000 1,150 1,080 500 580 7,485 6,000 1,485 140 140 630 630 1,032 440 592 TOTAL PROJECTS REVISED FROM 2014 -2019 TIP 20,117 4,736 2,583 2,907 2,123 59,001 91,466 13,805 7,000 480 44,188 25,993 New: 53rd Avenue S (S 137th St - S 144th St) Modified: Cascade View Safe Routes to School Phase 11 Deleted: Andover Park W (Tuk Pkwy - Strander) Cascade View Safe Routes to School Interurban Avenue S Minkler Blvd (APW -S /C Pkwy) Nelsen Place S 168th St (S /C Pkwy -APE) S 178th Street Realignment S 180th St /Andover Park W Intersection Southcenter Blvd (I -5 -61st Ave Bridge) Thorndyke Safe Routes to School Traffic Signal Interconnect Program Tukwila Int'I Blvd Phase IV Tukwila Intl Blvd /S 116th Wy /SR599 Tukwila MIC "Street Smart" Non - motorized Project Tukwila Urban Center Transit Center 0 rn Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -06601 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk and illumination. Street portion will coordinate with Water and Surface Water capital improvement program projects. 06/09/14 06/16/14 251,000 251,000 04 C G O P S TW 0.420 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2015 0 0 251,000 251,000 P CN 2016 0 TIB 1,000,000 200,000 1,200,000 Totals 0 CN 1,000,000 451,000 1,451,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 251,000 0 0 0 0 CN 0 600,000 600,000 0 0 Totals 251,000 600,000 600,000 0 0 Report Date: May 21, 2014 Page 1 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m ai Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 4th WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/09/14 06/16/14 378,000 378,000 06 0 63,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2015 4th 0 5th & 6th 0 378,000 378,000 Totals 0 63,000 0 378,000 378,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 63,000 63,000 63,000 63,000 126,000 Totals 63,000 63,000 63,000 63,000 126,000 Report Date: May 21, 2014 Page 2 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m ai Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 4th WA -03766 Andover Park E /Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements 06/09/14 06/16/14 575,000 575,000 05 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2020 4th 0 5th & 6th 0 575,000 575,000 Totals 0 0 0 575,000 575,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 0 0 575,000 Totals 0 0 0 0 575,000 Report Date: May 21, 2014 Page 3 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 4th WA -03764 Andover Park E /Minkler Blvd. Intersection Andover Park E Minkler Blvd to Design and construct intersection and traffic signal improvements and widening for left turn pockets 06/09/14 06/16/14 20,000 20,000 03 CN 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 4th 0 5th & 6th 0 20,000 20,000 P CN 2020 0 0 602,000 602,000 Totals 0 0 0 622,000 622,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 20,000 CN 0 0 0 0 602,000 Totals 0 0 0 0 622,000 Report Date: May 21, 2014 8 Page 4 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m ai Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 4th WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance 06/09/14 06/16/14 1,815,000 1,815,000 06 0 270,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2015 4th 0 5th & 6th 0 1,815,000 1,815,000 Totals 0 270,000 0 1,815,000 1,815,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 270,000 270,000 270,000 335,000 670,000 Totals 270,000 270,000 270,000 335,000 670,000 Report Date: May 21, 2014 Page 5 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m ai Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 4th WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/09/14 06/16/14 9,880,000 9,880,000 06 C G O P S TW 1,560,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2015 4th 0 5th & 6th 0 9,880,000 9,880,000 Totals 0 1,560,000 0 9,880,000 9,880,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,550,000 1,560,000 1,650,000 1,670,000 3,450,000 Totals 1,550,000 1,560,000 1,650,000 1,670,000 3,450,000 _ Report Date: May 21, 2014 N Page 6 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 FMSIB WA -05409 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. 06/09/14 06/16/14 300,000 1,250,000 08 CN 2020 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 FMSIB 950,000 5th & 6th 0 300,000 1,250,000 P CN 2020 FMSIB 10,812,500 0 1,687,500 12,500,000 Totals 11,762,500 0 0 1,987,500 13,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 1,250,000 CN 0 0 0 0 12,500,000 Totals 0 0 0 0 13,750,000 Report Date: May 21, 2014 Page 7 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 STP(BR) / 1380(003) TUK -52 Boeing Access Road Bridge Rehabilitation Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing Boeing Access Road bridge structure over the Burlington Norther and Union Pacific Railroads. Work will include rehabilitation of the bridge sub - structure, seismic retrofit, and construction of a new bridge deck including pedestrian /bicycle amenities. 06/09/14 06/16/14 45,000 224,500 14 CN 0.200 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2015 STP(BR) 179,500 0 45,000 224,500 S CN 2015 STP(BR) 8,625,600 CN 0 2,220,100 10,845,700 Totals 8,805,100 0 2,265,100 11,070,200 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 224,500 0 0 0 0 CN 8,603,000 2,242,700 0 0 0 Totals 8,827,500 2,242,700 0 0 0 Report Date: May 21, 2014 Page 8 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m ai Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -03795 Cascade View Safe Routes to School Phase 2 S 140th St/33rd Ave S to Construct an off - street paved shard use path, sidewalks, and a traffic circle at the intersection of 33rd Ave S and S 140th Street. 06/09/14 06/16/14 89,000 839,000 28 0 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2018 0 WSDOT 750,000 89,000 839,000 Totals 0 0 750,000 89,000 839,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 839,000 0 0 Totals 0 0 839,000 0 0 Report Date: May 21, 2014 Page 9 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 4th WA -03770 East Marginal Way E Marginal Way Boeing Access Road to S 112th St Design and construct widening to 3 lanes including curb & gutter, sidewalks, drainage, landscaping, and utility undergrounding. 06/09/14 06/16/14 170,000 170,000 03 P S T W 0.280 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 4th 0 5th & 6th 0 170,000 170,000 P RW 2020 0 0 700,000 700,000 P CN 2020 STP 1,300,000 0 1,130,000 2,430,000 Totals 1,300,000 0 2,000,000 3,300,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 170,000 RW 0 0 0 0 700,000 CN 0 0 0 0 2,430,000 Totals 0 0 0 0 3,300,000 Report Date: May 21, 2014 w Page 10 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 4th WA -03763 Macadam Road /S 144th St Intersection Macadam Road S 144th Street to Widen Macadam Road to add a northbound left turn lane 06/09/14 06/16/14 90,000 90,000 03 RW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 4th 0 5th & 6th 0 90,000 90,000 P RW 2020 0 0 90,000 90,000 P CN 2020 0 0 430,000 430,000 Totals 0 0 610,000 610,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 90,000 RW 0 0 0 0 90,000 CN 0 0 0 0 430,000 Totals 0 0 0 0 610,000 Report Date: May 21, 2014 Page 11 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 4th WA -03783 Multipurpose Trails to Design and construct safe connections to public trails to promoste pedestrian and bicycle modes of transportation in lieu of motorized vehicles 06/09/14 06/16/14 50,000 50,000 28 CN 2020 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2015 4th 0 5th & 6th 0 50,000 50,000 P CN 2020 0 0 280,000 280,000 Totals 0 0 0 330,000 330,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 50,000 0 0 0 0 ALL 0 0 0 0 280,000 Totals 50,000 0 0 0 280,000 Report Date: May 21, 2014 Page 12 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 4th WA -03769 S 133rd St /SR 599 SB Ramps Intersection S 133rd Street SR 599 SB Ramps to Design and construct intersection improvements including a new traffic signal. 06/09/14 06/16/14 60,000 60,000 06 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 4th 0 5th & 6th 0 60,000 60,000 P CN 2020 STP 460,000 0 110,000 570,000 Totals 460,000 0 0 170,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: May 21, 2014 Page 13 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 STP(BR) WA -03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S 06/09/14 06/16/14 243,800 1,219,000 28 975,200 0.250 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2020 STP(BR) 975,200 5th & 6th 0 243,800 1,219,000 Totals 975,200 0 0 243,800 1,219,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 1,219,000 Totals 0 0 0 0 1,219,000 Report Date: May 21, 2014 Page 14 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03762 S 144th St Phase 2 S 144th Street 42nd Ave S to Tukwila International Blvd Design and construct paving, curb & gutter, sidewalks, drainage, illumination, and utility undergrounding. Coordinate with Tukwila Village development. May include on- street parking and bike lanes 06/09/14 06/16/15 480,000 1,480,000 03 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2015 0 TIB 1,000,000 480,000 1,480,000 Totals 0 1,000,000 480,000 1,480,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,480,000 0 0 0 0 Totals 1,480,000 0 0 0 0 Report Date: May 21, 2014 Page 15 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 FMSIB WA -05410 Strander Blvd /SW 27th St Phase III Strander Boulevard E City Limits to West Valley Hwy /SR 181 Design and construct 5 -7 lane facility over /under BNSF and UPRR, extending the current terminus of SW 27th St at the east City limits to West Valley Highway, including access into the permanent Sound Transit train station 06/09/14 06/16/14 0 5,000,000 01 ALL 2020 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2020 FMSIB 5,000,000 5th & 6th 0 0 5,000,000 P ALL 2020 TIGER IV 27,000,000 0 1,150,000 28,150,000 Totals 32,000,000 0 0 1,150,000 33,150,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 33,150,000 Totals 0 0 0 0 33,150,000 Report Date: May 21, 2014 Page 16 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 4th WA -03772 TUC /TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Design and construct bike and pedestrian connection between the Tukwila Urban Center and the Commuter Rail Station /TOD area. Connection may include an underpass under the UPRR line. 06/09/14 06/19/14 280,000 280,000 28 RW 0.750 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 4th 0 5th & 6th 0 280,000 280,000 P RW 2020 0 0 100,000 100,000 P CN 2020 STP(E) 500,000 0 200,000 700,000 Totals 500,000 0 580,000 1,080,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 280,000 RW 0 0 0 0 100,000 CN 0 0 0 0 700,000 Totals 0 0 0 0 1,080,000 Report Date: May 21, 2014 w Page 17 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m ai Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 / 1320(002) TUK -50 Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd (if extended) and Longacres Way (if extended) Near Riverside office complex to Best Western hotel 15901 WVHwy Development of a new pedestrian /bicycle bridge across the Green River, connecting the Tukwila Urban Center 'core' to the Sounder Commuter Rail /Amtrak Station and surrounding neighborhood of transit-oriented development. The project, a pedestrian /bicycle bridge across the Green River, will form the backbone of a pedestrian corridor connecting the compact land uses and high ridership bus stop in the core of the urban center, with the Sounder Commuter Rail /Amtrak Station and its surrounding transit - oriented development. This will improve public access to the station from all parts of the center, and provide a direct, safe and enjoyable walking experience. The high level of urban level amenity will attract the types and densities of uses envisioned in a regional center. 06/09/14 06/16/14 1,485,000 7,485,000 28 0 0.640 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2015 0 OTHER 6,000,000 1,485,000 7,485,000 Totals 0 6,000,000 1,485,000 7,485,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 7,485,000 0 0 0 0 Totals 7,485,000 0 0 0 0 Report Date: May 21, 2014 Page 18 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03761 Walk & Roll Plan (Nonmotorized Transportation Plan Various City Streets to Select, design, and construct non - motorized projects including bike lanes, sidewalks and trails. First priorities are: sidewalks on S 152nd Street, TIB to 42nd Ave S; sidewalk on S 130th St, TIB to S 130th St; sidewalk/bike lanes on Macadam, S 144th St to S 150th St. 06/09/14 06/16/15 140,000 140,000 28 0 140,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2015 0 0 140,000 140,000 Totals 0 140,000 0 140,000 140,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 140,000 0 0 0 0 Totals 140,000 0 0 0 0 Report Date: May 21, 2014 01 Page 19 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m al Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 4th WA -03779 West Valley Highway SR 181 /West Valley Highway 1 -405 to Strander Blvd Design and costruct widening to 7 lanes including curb & gutter, sidewalks, illumination, drainage, and traffic control 06/09/14 06/19/10 60,000 60,000 03 CN 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 4th 0 5th & 6th 0 60,000 60,000 P CN 2020 0 0 570,000 570,000 Totals 0 0 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: May 21, 2014 Page 20 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m ai Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 4th WA -03765 West Valley Highway /S 156th St SR181/West Valley Highway Southcenter Blvd to S 158th St Construct additional northbound left turn lanes at S 156th Street for northbound HOV to northbound 1 -405 06/09/14 06/16/15 50,000 50,000 03 O P S T W 2020 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 4th 0 5th & 6th 0 50,000 50,000 P CN 2020 CMAQ 440,000 0 542,000 982,000 Totals 440,000 0 0 592,000 1,032,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 50,000 CN 0 0 0 0 982,000 Totals 0 0 0 0 1,032,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 56,242,800 8,750,000 26,473,400 91,466,200 Report Date: May 21, 2014 Page 21 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/10/13 06/17/13 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2014 0 0 541,000 541,000 Totals 0 0 541,000 541,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 63,000 63,000 63,000 63,000 126,000 Totals 63,000 63,000 63,000 63,000 126,000 Report Date: May 31, 2013 Page 1 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03766 Andover Park E /Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements 06/10/13 06/17/13 05 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 100,000 100,000 P CN 2018 0 0 575.000 575,000 Totals 0 0 675,000 675,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 100,000 0 0 0 0 CN 0 0 0 575,000 0 Totals 100,000 0 0 575,000 0 Report Date: May 31, 2013 Page 2 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03764 Andover Park E /Minkler Blvd. Intersection Andover Park E Minkler Blvd to Design and construct intersection and traffic signal improvements and widening for left turn pockets 06/10/13 06/17/13 03 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 120,000 120,000 P PE 2019 0 0 20,000 20,000 P CN 2018 0 0 602,000 602,000 Totals 0 0 742,000 742,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 75,000 45,000 0 0 20,000 CN 0 0 0 0 602,000 Totals 75,000 45,000 0 0 622,000 Report Date: May 31, 2013 Page 3 tate it Teit tsportati Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m to Adopted, Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03760 Andover Park West Widening Andover Park West Strander Blvd to Tukwila Pkwy Complete widening for center turn pockets and landscape median for access control, widen sidewalks, upgrade ADA facilities, modify signal operation, upgrade street lighting, install pedestrian lighting. 06/10/13 06/17/13 04 C G O P S TW 0.400 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2014 0 TIB 1,420,000 339,000 1,759,000 Totals 0 1,420,000 339,000 1,759,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,050,000 0 0 0 0 Totals 1,050,000 0 0 0 0 Report Date: May 31, 2013 Page 4 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance 06/10/13 06/17/13 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2014 0 0 1,555,000 1,555,000 Totals 0 0 1,555,000 1,555,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 270,000 270,000 270,000 270,000 670,000 Totals 270,000 270,000 270,000 270,000 670,000 Report Date: May 31, 2013 Page 5 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m c'o Adopted Amendment m c� o P Type Utility Codes Total Length Environmental Type RW Required 16 WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/10/13 06/17/13 06 COOPS TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2014 0 0 9,655,000 9,655,000 Totals 0 0 9,655,000 9,655,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,500,000 1,550,000 1,560,000 1,650,000 3,395,000 Totals 1,500,000 1,550,000 1,560,000 1,650,000 3,395,000 Report Date: May 31, 2013 Page 6 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -05409 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allendtown. 06/10/13 06/17/13 08 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 FMSIB 950,000 0 300,000 1,250,000 P CN 2019 FMSIB 10,812,500 0 1,687,500 12,500,000 Totals 11,762,500 0 1,987,500 13,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 1,250,000 CN 0 0 0 m 0 12,500,000 Totals 0 0 0 0 13,750,000 Report Date: May 31, 2013 Page 7 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required: 14 TUK -52 Boeing Access Road Bridge Rehabilitation Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing Boeing Access Road bridge structure over the Burlington Norther and Union Pacific Railroads. Work will include rehabilitation of the bridge sub - structure, seismic retrofit, and construction of a new bridge deck including pedestrian /bicycle amenities. 06/10/13 06/17/13 14 0.200 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 BR 800.000 0 200,000 1,000,000 S CN 2014 BR 8,880,000 0 2,220,000 11,100,000 Totals 9,680,000 0 2,420,000 12,100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 1,000,000 0 0 0 0 CN 2,100,000 9,000,000 0 0 0 Totals 3,100,000 9,000,000 0 0 0 Report Date: May 31, 2013 Page 8 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted 3 m a m Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -03795 Cascade View Safe Routes to School S 140th St/33rd Ave S to Construct an off- street paved shard use path, sidewalks, and a traffic circle at the intersection of 33rd Ave S and S 140th Street. 06/10/13 06/17/13 28 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2018 0 WSDOT 750.000 89,000 839,000 Totals 0 750,000 89,000 839,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 839,000 0 Totals 0 0 0 839,000 0 Report Date: May 31, 2013 Page 9 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside -n 3 o n g. . & m m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment A m c o z 9 Improvement Type Utility Codes Total Length', Environmental Type RW Required 16 WA -03770 East Marginal Way E Marginal Way Boeing Access Road to S 112th St Design and construct widening to 3 lanes including curb & gutter, sidewalks, drainage, landscaping, and utility undergrounding. 06/10/13 06/17/13 03 P S T W 0.280 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 50,000 50,000 P PE 2019 0 0 170,000 170,000 P RW 2019 0 0 700,000 700,000 P CN 2019 STP 1,300,000 0 1,130,000 2,430,000 Totals 1,300,000 0 2,050,000 3,350,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 50,000 0 0 0 170,000 RW 0 0 0 0 700,000 CN 0 0 0 0 2,430,000 Totals 50,000 0 0 0 3,300,000 Report Date: May 31, 2013 Page 10 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside -n c n. m c m m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m m. m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 TUK -40 Interurban Avenue South (S 143 St to Fort Dent Way) Interurban Avenue South S 143 St to Fort Dent Way Reconstruct and overlay the existing roadway and construct curb and gutter, drainage, sidewalk, landscaping, illumination, utility burying, channelization, signing, and signal interconnect. 06/10/13 06/17/13 06 0.900 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2014 STP(U) 2,145,954 TIB 5,000,000 3,554,046 10,700,000 Totals 2,145,954 5,000,000 3,554,046 10,700,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 10,700,000 0 0 0 0 Totals 10,700,000 0 0 0 0 Report Date: May 31, 2013 Page 11 tate r. Trvnspor'tat *tt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside -n a n m g e m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type' Utility Codes II! Total Length Environmental Type RW Required 17 WA -03763 Macadam Road /S 144th St Intersection Macadam Road S 144th Street to Widen Macadam Road to add a northbound left turn lane 06/10,113 06/17/13 03 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 17,000 17,000 P PE 2018 0 0 90,000 90,000 P RW 2018 0 0 90,000 90,000 P CN 2018 0 0 430,000 430,000 Totals 0 0 627,000 627,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 17,000 0 0 0 90,000 RW 0 0 0 0 90,000 CN 0 0 0 0 430,000 Totals 17,000 0 0 0 610,000 Report Date: May 31, 2013 Page 12 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside c c o E= O .11: N E Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted D m a 3 mm, Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03773 Minkler Blvd Minkler Blvd Southcenter Pkwy to Andover Park W Construct widening for 3 lanes including curb & gutter, sidewalk, drainage and landscaping 06/10/13 06/17/13 03 P S T W 0.400 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2018 0 0 75,000 75,000 P CN 2018 0 0 865,000 865,000 Totals 0 0 940,000 940,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 75,000 CN 0 0 0 0 865,000 Totals 0 0 0 0 940,000 Report Date: May 31, 2013 Page 13 S3urrgtOr, , p r*n'erlt q�f Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m efl Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -03783 Multipurpose Trails to Design and construct safe connections to public trails to promoste pedestrian and bicycle modes of transportation in lieu of motorized vehicles 06/10/13 06/17/13 28 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2015 0 0 50,000 50,000 P CN 2019 0 0 280,000 280,000 Totals 0 0 330,000 330,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 50,000 0 0 0 CN 0 0 0 280,000 0 Totals 0 50,000 0 280,000 0 Report Date: May 31, 2013 Page 14 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside -n c n n o DT g m m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID ix al 5 Adopted Amendment Resolution No. Improvement Type Utility Codes li Total Length Type RW Required 19 WA -03780 Nelsen Place Nelsen Place S 156th St to S 158th St Design and construct paving, curb & gutter, sidewalks, drainage, and illumination 06/10/13 06/17/13 05 0.110 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 20,000 20,000 P CN 2019 0 0 180,000 180,000 Totals 0 0 200,000 200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 20,000 CN 0 0 0 0 180.000 Totals 0 - 0 0 0 200,000 Report Date: May 31, 2013 Page 15 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside c 0 f) C m � N 91. iagwnN A ;uoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 1 m ;uawpuawy ON uogniosaa adi(j ;uawanoJdwi 0 0 0 edit' iu ;uawuonnu3 pannbab M2! 16 S 133rd St/SR 599 SB Ramps Intersection S 133rd Street SR 599 SB Ramps to Design and construct intersection improvements including a new traffic signal. WA -03769 06/10/13 06/17/13 06 CGOPS TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 20,000 20,000 P PE 2018 0 0 60,000 60,000 P CN 2018 STP 460,000 0 110,000 570,000 Totals 460,000 0 190,000 650,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 20,000 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 20,000 0 0 0 630,000 Report Date: May 31, 2013 Page 16 tats t Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID 7 m Adopted Amendment, Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave 5 06/10/13 06/17/13 28 0.250 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 100,000 100,000 Totals 0 0 100,000 100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 100,000 Totals 0 0 0 0 100,000 Report Date: May 31, 2013 Page 17 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside m ,n. n _. m o m m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment XI m 0 o o Improvement Type' I Utility Codes' i Total Length Environmental Type RW Required 17 WA -03762 S 144th St Phase 2 S 144th Street 42nd Ave S to Tukwila International Blvd Design and construct paving, curb & gutter, sidewalks, drainage, illumination, and utility undergrounding. Coordinate with Tukwila Village development. May include on- street parking and bike lanes 06/10/13 06/17/13 03 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 68,000 68,000 P PE 2018 0 0 230.000 230,000 P RW 2018 0 0 40,000 40,000 P CN 2018 0 TIB 1.000,000 480,000 1,480,000 Totals 0 1,000,000 818,000 1,818,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 68,000 0 0 0 230,000 RW 0 0 0 0 40,000 CN 0 0 0 0 1,480,000 Totals 68,000 0 0 0 1,750,000 Report Date: May 31, 2013 Page 18 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside -n c n n E DT '' m m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -03778 S 168th St S 168th St Southcenter Pkwy to Andover Park E Design and construct new roadway including curb & gutter, sidewalk, drainiage, illumination, on- street parking, landscaping, and underground utilities. 06/10/13 06/17/13 01 GO P W 0.800 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 1,372,000 1,372,000 P RW 2019 0 0 7,500,000 7,500,000 P CN 2019 0 0 14,372,000 14,372,000 Totals 0 0 23,244,000 23,244,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 1,372,000 RW 0 0 0 0 7,500,000 CN 0 0 0 0 14,372,000 Totals 0 0 0 0 23,244,000 Report Date: May 31, 2013 Page 19 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside -n m n E ..7. m 'm_ Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number Begin & End Termini F. Project Description G. Structure ID m - m D a -o Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03784 S 178th St Realignment S 178th St Southcenter Pkwy to W City Limits Realign S 178th St from current intersection of Southcenter Pkwy /S 180th St to intersect with Segale Park Dr C and add a new traffic signal at the new intersection. 06/10/13 06/17/13 01 0.400 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2014 0 0 9,472,000 9,472,000 Totals 0 0 9,472,000 9,472,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 9,382,000 0 0 0 0 Totals 9,382,000 0 0 0 0 Report Date: May 31, 2013 Page 20 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID ai Adopted Amendment. Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03781 S 180th St /Andover Park W Intersection S 180th Street Andover Park W to Widen for north /south left turn pockets 06110/13 06/17/13 03 0.200 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 35,000 35,000 P RW 2019 0 0 15,000 15,000 P CN 2019 0 0 160,000 160,000 Totals 0 0 210,000 210,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 35,000 RW 0 0 0 0 15,000 CN 0 0 0 0 160,000 Totals 0 0 0 0 210,000 Report Date: May 31, 2013 Page 21 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside -n c ; n _. m g w m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03776 Southcenter Blvd Widening Southcenter Blvd 1 -5 to 61st Ave S Widen Southcenter Blvd and the 61st Avenue Bridge to add a lane for future traffic growth. 06/10/13 06/17/13 03 C G O P S TW CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 1,700,000 1,700,000 P RW 2019 0 0 1,400,000 1,400,000 P CN 2019 0 0 16,900,000 16,900,000 Totals 0 0 20,000,000 20,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 1,700,000 RW 0 0 0 0 1,400,000 CN 0 0 0 0 16,900,000 Totals 0 0 0 0 20,000,000 Report Date: May 31, 2013 Page 22 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m m m Adopted Amendment Resolution No. Improvement Type Utility Codesil Total Length Type RW Required 16 WA -05410 Strander Blvd /SW 27th St Phase III Strander Boulevard E City Limits to West Valley Hwy /SR 181 Design and construct 5 -7 lane facility over /under BNSF and UPRR, extending the current terminus of SW 27th St at the east City limits to West Valley Highway, including access into the permanent Sound Transit train station 06/10/13 06/17/13 01 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2019 FMSIB 5,000,000 0 0 5,000,000 P ALL 2019 TIGER IV 27,000,000 0 1,148,800 28,148,800 Totals 32,000,000 0 1,148,800 33,148,800 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 33,148,800 Totals 0 0 0 0 33,148,800 Report Date: May 31, 2013 Page 23 I tnutork State �i'tNlAetof Cff Tra41sporttron: Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside m c n _ n . m m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -03796 Thorndyke Safe Routes to School S 150th St Tukwila International Blvd to 42nd Ave S Construction of roadway improvements including a new sidewalk on the north side of S 150th St and a new crosswalk in front of Thorndyke Elementary School. Education, enforcement and encouragement elements are included after the construction as part of the Safe Routes to Schools program. 06/10/13 06/17/13 28 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2014 0 WSDOT 90,000 0 90,000 P CN 2014 0 WSDOT 367,000 255,000 622,000 Totals 0 457,000 255,000 712,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 28,000 14,000 0 0 0 CN 622,000 0 0 Totals 650,000 14,000 0 0 0 Report Date: May 31, 2013 Page 24 w Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m m m a Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03775 Traffic Signal Interconnect Program Various City Streets to Design and install hard wire interconnect system between traffic signals and the Traffic Operations Center 06/10/13 06/17/13 24 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 300,000 300,000 P CN 2019 STP 1,200,000 0 1,500,000 2,700,000 Totals 1,200,000 0 1,800,000 3,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 300,000 CN 0 0 0 0 2,700,000 Totals 0 0 0 0 3,000,000 Report Date: May 31, 2013 Page 25 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m m 0 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03772 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Design and construct bike and pedestrian connection between the Tukwila Urban Center and the Commuter Rail Station /TOD area. Connection may include an underpass under the UPRR line. 06/10/13 06/17/13 28 0.750 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 20,000 20,000 P PE 2019 0 0 280,000 280,000 P RW 2019 0 0 100,000 100,000 P CN 2019 STP(E) 500,000 0 200,000 700,000 Totals 500,000 0 600,000 1,100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 20,000 0 0 0 280,000 RW 0 0 0 0 100,000 CN 0 0 0 0 700,000 Totals 20,000 0 0 0 1,080,000 Report Date: May 31, 2013 Page 26 � y+� Washington State Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID = m m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03774 Tukwila International Blvd (Phase 4) Tukwila International Blvd Boeing Access Road to S 116th St Design and construct widening including paving, curb & gutter, sidewalk, drainage, illumination, landscaping, and utility undergrounding. 06/10/13 06/17/13 03 O P S W 0.700 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 271,000 271,000 P CN 2019 0 TIB 3,500,000 820,000 4,320,000 Totals 0 3,500,000 1,091,000 4,591,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 271,000 CN 0 0 0 0 4,320.000 Totals 0 0 0 0 4,591,000 Report Date: May 31, 2013 Page 27 io nzportetttfn Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Jagwnry Ayuoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 2 °m co a. a. CD 0. yuewpuewy •oN uogniosab Odic j yuewanoidwI c 0 0. N ad (j ieyuawuoJinu3 pannbay MJ 14 Tukwila International Blvd /S 116th St/SR 599 On -ramp Tukwila International Blvd S 116th St /SR 599 On -ramp to Design and construct southbound left turn lane, pedestrian signalization and lighting WA -03777 06/10/13 06/17/13 03 P 0.400 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 450,000 450,000 P CN 2019 STP 1,900,000 0 2,325,000 4,225,000 Totals 1,900,000 0 2,775,000 4,675,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 450,000 CN 0 0 0 0 4,225,000 Totals 0 0 0 0 4,675,000 Report Date: May 31, 2013 Page 28 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03798 Tukwila Manufacturing Industrial Center "Street Smart" Non - motorized Project Various City Streets to 1. Planning study of non - motorized improvement options along Boeing Access Road, to provide safe bicycle and pedestrian travel alternatives. 2. PE & CN of bike facilities on E Marginal Way S between Boeing Access Road and SR 599. 3. PE & CN of bike lanes and shared use path on Airport Way from Boeing Access Road /E Marginal Way S to the northern City limit. 06/10/13 06/17/13 28 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 CMAQ 96,960 0 24,240 121,200 S CN 2015 CMAQ 445,824 0 111,456 557,280 Totals 542,784 0 135,696 678,480 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 121,200 0 0 0 0 CN 0 557,280 0 0 0 Totals 121,200 557,280 0 0 0 Report Date: May 31, 2013 Page 29 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03734 Tukwila Urban Center - Transit Center Andover Park W Strander Blvd to Tukwila Pkwy Design and construct a transit center 06/10/13 06/17/13 23 C G O P S TW CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2014 5309(Bus) 1,400,000 WSDOT 4,735,000 79,000 6,214,000 Totals 1,400,000 4,735,000 79,000 6,214,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,500,000 0 0 0 0 Totals 2,500,000 0 0 0 0 Report Date: May 31, 2013 Page 30 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 / 1320(002) TUK -50 Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd (if extended) and Longacres Way (if extended) Near Riverside office complex to Best Western hotel 15901 WVHwy Design and preliminary engineering of a new pedestrian /bicycle bridge across the Green River, connecting the Tukwila Urban Center 'core' to the Sounder Commuter Rail /Amtrak Station and surrounding neighborhood of transit - oriented development. 06/10/13 06/17/13 28 0.640 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 CMAQ 1,496,000 0 137,000 1,633,000 P RW 2014 0 WSDOT 870,000 230,000 1,100,000 P CN 2014 0 WSDOT 6,000,000 1,485,000 7,485,000 Totals 1,496,000 6,870,000 1,852,000 10,218,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 250,000 0 0 0 0 RW 1,100,000 0 0 0 0 CN 3,743,000 3,742,000 0 0 0 Totals 5,093,000 3,742,000 0 0 0 Report Date: May 31, 2013 Page 31 fate Tran;sl ortstacxe Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03761 Walk & Roll Plan (Nonmotorized Transportation Plan Various City Streets to Select, design, and construct non - motorized projects including bike lanes, sidewalks and trails. First priorities are: sidewalks on S 152nd Street, TIB to 42nd Ave S; sidewalk on S 130th St, TIB to S 130th St; sidewalklbike lanes on Macadam, S 144th St to S 150th St. 06/10/13 06/17/13 28 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2015 0 0 140,000 140,000 Totals 0 0 140,000 140,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 140,000 0 0 0 Totals 0 140,000 0 0 0 Report Date: May 31, 2013 Page 32 shingri Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m m eo Adopted 3 o a 2 co Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03779 West Valley Highway SR 181/West Valley Highway 1 -405 to Strander Blvd Design and costruct widening to 7 lanes including curb & gutter, sidewalks, illumination, drainage, and traffic control 06/10/13 06/17/13 03 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 60,000 60,000 P CN 2019 0 0 570,000 570,000 Totals 0 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: May 31, 2013 Page 33 r shieri}ts t: a Departrrmii fT� Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside m 9. m LI d Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted A m 0 3 m Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03765 West Valley Highway /S 156th St SR181/West Valley Highway Southcenter Blvd to S 158th St Construct additional northbound left turn lanes at S 156th Street for northbound HOV to northbound 1 -405 06/10/13 06/17/13 03 0 P S T W CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 75,000 75,000 P PE 2018 0 0 50,000 50,000 P CN 2018 CMAQ 440,000 0 542,000 982,000 Totals 440,000 0 667,000 1,107,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 75,000 0 0 0 50,000 CN 0 0 0 0 982,000 Totals 75,000 0 0 0 1,032,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 64,827,238 23,732,000 90,912,042 179,471,280 Report Date: May 31, 2013 Page 34