Loading...
HomeMy WebLinkAboutUtilities 2007-01-17 Item 3A - Discussion - 2007 Public Works Utility IssuesTo: Mayor Mullet From: Public Works Director Date: January 10, 2007 Subject: 2007 Public Works Utility Issues ISSUE Discuss Utility Engineering issues that will be top priorities for the 2007 Utilities Committee and select Council meetings. BACKGROUND The 2007 -2012 Financial Planning Model and Capital Improvement Program was adopted on December 11, 2006, and includes numerous projects that are slated for design and construction in 2007. Also, numerous development projects are in the works that have indirect impacts on our engineering program and projects. DISCUSSION The following issues are highly likely to be brought forward to Committee: Surface Water Items NPDES Phase II update Cascade View Drainage Improvements closeout GIS Inventory Area 4 Annual Drainage Program and Private System Adoptions Tukwila International Blvd High -Flow Bypass (included in TIB Phase II/111) Water Items Sewer Items Water Utility System Plan GIS Inventory Area 4 Update Allentown/Foster Pt Project closeout(w/s/swm) Kent/Tukwila Intertie j Southcenter Blvd Water Main Replacement Sewer Repair at 14438 59 Ave S MLK Jr Wy Waterline Sewer Infiltration and Inflow (I &I) Municipal Water Law Gravity Sewer under I-405 to Tukwila Parkway Potential Annexed Area Water Turnover Tukwila South development Westfield Sewer Repair General Standby Power Upgrades Foster Point Sidewalks Rising Cost of Construction Materials TMC 14 update RECOMMENDATION For discussion. (p:Bob \UC 2077 Utility Eng Imes 1 -17-07) INFORMATION MEMO Duwamish Gardens