Loading...
HomeMy WebLinkAboutUtilities 2007-01-17 Item 3D - Discussion - Water District 125 Foster Point Pipeline Transfer INFORMATION MEMO To: From: Date: Subject: Mayor Mullet Public Works Director January 8, 2007 Water District 125 Infrastructure Transfer - Foster Point ISSUE Assumption of Water District 125 local infrastructure in the Foster and Foster Point areas. BACKGROUND Water District 125 serves 5 customers in the Foster Point area and another 91 customers in the Foster neighborhood just east ofl-5 and west of 53rd Avenue South lying south ofthe Metro Park and Ride. Under the City's Allentown/Foster Point water and sewer improvements, water meters serving Tukwila customers on Foster Point were connected to the Water District 125 system. This system was built in 1994 and currently supplies water from Skyway to both Foster and Foster Point. In 2006, Council recommended the buyout and assumption of this portion of Water District 125 for $250,000 (refer to the July 05,2006 Utilities Committee). Water District 125 established the asset value and is in agreement that the infrastructure and customers in this portion of Tukwila with the exception of Baker Commodities can be transferred to Tukwila. This transfer was part of the clean-up items laid out by the Skyway Water System Coordination Plan. The transfer of the pipes, meters, services, valves, and hydrants from Water District 125 to the City of Tukwila requires a process that will amend each of the agency's wholesale water supply contracts (plant listing attached with a value of $243,641). Water District 125 as a full service wholesale water utility must receive approval from the City of Seattle. The City of Tukwila will need to bring this item to the Cascade Water Alliance Board. The historical consumption for transferred customers must be added to the Cascade block in the CW A Take or Pay contract with Seattle. The agencies are currently crafting a transfer agreement that defmes the infrastructure assets, customer listing, and consumption base. RECOMMENDATION Information and discussion only. PB:ad attacments: PACE Memorandum PACE Valuation UC Minutes 07-05-06 (p:A1keIUC 011607 WD 125) ;1 Jun 13 06 08:45a Penhallegon Associates 425-827-5043 p.2 MEMORANDUM From: June 5, 2006 File Dave Hutley Foster Point Pipe Valuations Date: To: SubJect: The Foster Point water facility valuations originally developed in 2004 have been updated to reflect current conditions as of this date. The original 2004 valuations were developed as follows: . Where known, the original construction costs for each individual project were inserted into the table.. A factor of20% was added to reflect design, survey, inspection, etc. . In those instances where the original construction cost was not known or could not be determined, an estimate of the probably current construction cost was prepared using current average consnuction costs per lineal foot of various sizes of pipe. This cost was then translated into an estimated construction cost for the year of construction using the Engineering News Record Construction Cost Index (CCI) for that year and the current CCL . The project costs were depreciated over a period of 50 years using straight-line depreciation. . An estimated current value was arrived at by multiplying the yearly depreciation cost by the number of years since the facility was constructed and deducting that from the original or estimated construction cost In the current valuation update, the numbers used to estimate current constlUction costs were adjusted to reflect current conditions. (These are'significantly higher than in 2004.) This produced higher numbers for the estimated construction costs for the year of construction and also higher yearly depreciation values. The end result is that, even though two years of depreciation have been added, the estimated CUlTent value of the facilities is slightly higher than in 2004. P:\P03\Q3111 \doc\Memo to Filll &-5-06.doc -~=~ CPACE PACE Engineers, Inc. 11255 Kirkland Way, Suite 300 j Q Kirkland, WA 98033 0 Phone: 425.827.2014 Fax: 425.827.5043 Foster Point Water facility Valuation King County Water District #125 TER POINT Es timated CO SOS VALUATIO ti mated CurCer►t tn WATER FACILITY VAL Tt CT NO. Estimated Yearly m Constructed Value G COUNTY wA Original Current 2 Year Cost Depreciation L 8 KING Year ENR Index Cost i Project Cost $290\ e 41� Constructed Index $33,713, $14,500 $861„ r �acillty 4563 $7q,300 $43,052_ $4,689. 1985 $139 4563 $6,953 $136,0 w 1965 $12,0 $3,400 m Foster Point Bridge Casin�4 Installation 08 86 2'i 456 $30,40 4,689. Main Replacement 1985 a Foster Point Bridge M 6087 $7,546 1996.- $171. Tukwila Interne $40,0 Main Replacement 59 1994 0 1996 Water M 8 ,575 $23,343, 8065 0 e nts 94 -1, 51st Ave. S. 2000 $130,000 3 a, 1994 Main Replacement 1st Ave S 1408 $3,002 c+ S. 5 1970 $24,000 $60 $71 7 m ents 139th St. Service Replacements 985 $4 S. Ito 53rd to interurban 1964 $1$4 1300 LF 6," in 52nd Ave. S. $g,177. St. 52nd to 53rd Ave S. 1932 $30,000 $122 4,879 4" in S. 137th 300 LF 4' 2409 $6,1 $5,142 137th Ave. 56th Ave S 1975 $20,Dp $550 1000 LF 2„ in. S. 143rd St. $27 ,517 CO $243 S. 141st to S. 1975 2409 000, in 52nd S $220, 600 LF 2 Ave. S. 985. Total N j 142nd St. 52nd to 53rd A 1 g64 250 LF 4 ►n S. 144th St. S. 137th to S. C 2200 LF 4" in 53rd Ave. S ement, etc. ection, construction rr►a 125tLF for 4 $145lLF for 6" 2005, survey, insP f51LF for 2 have been prepared. Current index is 8459 as of percent to reflect cast n' �NR CGi indexes. have been increased by 20 ct costs for current construction construction casts constructed year casts are determined using 1 Known final costs are not known, 2 For protects where original year costs have be Value as of 200 w h er e currenth .Gee depreciatio year of construction. 3 For projects ear, e c 4 ASSUm const 0 uc year cost minus y ear depreciation since Y 5 Takes C\ p03 \03111\doc'Revised Foster Point Valuation.xls Utilities Committee July 5, 2006 - 5:00 p.m. Present: Jim Haggerton, Chair; and Pam Linder. Excused: Verna Griffin Jim Morrow; Bob Giberson; Frank Iriate; Gail Labanara; Pat Brodin; Mike Cusick, Diane Jenkins. Business AQenda A. 2006 Small DrainaQe ProQram Construction ManaQement Supplemental AQreement The 2006 Small Drainage Program (SPD) was awarded to Dennis R. Craig Construction on June 19, 2006. City staff is not available to provide construction management of the project. Therefore, supplemental agreement NO.2 is being submitted with DMJM Harris for $62,700. Jim H. asked about the first supplemental agreement. Council approved five consultant companies for blank construction management agreements over a two-year period. The first supplemental agreement (No.1) with DMJM Harris was for the Allentown/Foster Point project. This agreement for the 2006 SOP is within budget and is approximately 19% of the construction award amount. Though this percentage is higher than the average 15% construction management fee, it was felt that the value is based more on the number of days allowed for construction. Only the work performed will be paid. Unanimous approval; forward to Committee of the Whole. B. Water District 125/nfrastructure Assessment - Foster Point How best to serve the customer's water needs in the Foster Point area, in accordance with the Growth Management Act (GMA), is being explored. It was pointed out that the City of Tukwila assumed the former Water District 25 system in Allentown, Foster Point, and Campbell Hill areas in order to correct deficiencies and ensure sufficient fire flow. There are similar concerns for Water District 125. Water District 125 serves five residential services in Foster Point and 91 ~.\.~~ ~.' water customers from a distribution pipe west of Interurban/east of 1-5. Recently, the City embarked to make water and ~ sewer improvements in Allentown/Foster Point. All water services in Foster Point will be transferred to Water District's 125 newer main. This means Tukwila customers would be supplied water wholesale through another agency's system. There are concerns related to GMA in terms of how an area is planned and who should provide utility services. There are three options to alleviate these concerns and the third option is preferred for the acquisition of the areas. The consensus from committee was to proceed in this direction. It is estimated that it would cost approximately $250,000 for this acquisition. Jim H. asked about 125's infrastructure. Pat highlighted the length and dimensions of the pipes, water mains, hydrants, etc. Upon acquisition, the deficiencies and fire flow issues could then be addressed. Also, the City could provide coordinated responses and be more fully prepared for emergency situations. Water District 125 does not wish to consider transferring Baker Commodities (the rendering facility) at this time. The next step would be to proceed with the development of a memorandum of understanding (MOU) and include the improvements in the Capital Improvement Program (CIP) to correct deficiencies. Discussion Only. Old Business Pam thanked city staff for responding to citizen's concerns on the Allentown Project, specifically along 42rld Ave S. She also asked what is happening on S 144lh Street. The City has met with Seattle City Light and expressed displeasure with the progress that they are making. Jim H. asked for an update on public works projects. Some of the projects include: the Allentown/Foster Point sewer project; Cascade View drainage (substantially complete); Tukwila International Blvd. Phase 2 and 3 (90% of design phase is complete); S 144th St (Seattle City Light still has to underground - Comcast and Qwest have removed their equipment. This will be followed by asphalt overlay and bus shelters). Also, bids are being advertised for the 2006 Overlay Program, Boeing Access/East Marginal Way intersection will be next, and preparations are underway for bids on the Traffic Signal Interconnect Project. Work is continuing on the development of a Local Improvement District (LID) for Klickitat; it was announced that the City was successful in receiving a $3 million grant for construction on Klickitat. There will be sewer line improvements at Fort Dent Park as the Family Fun Center is ready to build their final phase, which is smaller than originally proposed. Flow meters are being installed to monitor capacity for Family Fun Center and Starfire. It is unknown if there is sufficient capacity at this time; funds may need to be set aside in the CIP. Westfield Mall - there is a small dip in the sewer line on the north end of the mall that will have to be corrected prior to the Mall assuming responsibility for the utilities. Southcenter Parkway - the design has been put on hold; Mr. Segale will not go forward with the annexation unless there is a signed developer's agreement, however, the City cannot proceed with right-of-way acquisition until the annexation process has been completed. Once these steps have been completed, it was noted that construction would not begin for 15 months. Jim H. provided an update on the hiring of a finance director for the Cascade Water Alliance. An offer has been made and it is assumed that the candidate will begin August 1. Also, he highlighted activities being planned for the National League of Cities' ITC Steering Committee coming to Tukwila September 14-16. Adjournment: 5:50 p.m. 0'1/- Committee Chair Approval ~J. Reviewed by GL. ~o