Loading...
HomeMy WebLinkAboutUtilities 2007-05-08 Item 3B - Bid Award - Brike Excavating for 14234 57th Avenue South Side Sewer Connection Attachment III.B. INTEROFFICE MEMO To: From: Date: Subject: Mayor Mullet Public W orks Direct~ May 2, 2007 14234 5th A vea South Side Sewer Connection Project No. 07-SW03 BID RESULTS ISSUE Short Form Contract with Brike Excavating, LLC, of Renton, Washington, for installation of the sanitary sewer at 14234 57th Ave. South in the amount of $22,732.40. BACKGROUND The sanitary sewer for 57th Ave. South was installed in 1964 under LID No.5. The City improved 57th Ave. South in 1982 and the contractor informed the City that all existing homes were connected to the sewer prior to installation of sidewalks and paving of the street. On April 3, 2007, it was determined that the house at 14234 57th Ave. South was not connected to the public sewer and a cesspool was found in the backyard. City records listed the property as connected to the sewer and sewer bills and Metro fees have been paid for at least three years or more. The City requested quotes from five Small Works Roster contractors for the installation of the above side sewer. Four contractors responded with quotes. Gary Harper Construction, Inc., submitted the low quote of $9,230.00 plus sales tax including bond and insurance. On May 2, 2007, Mr. Harper requested that his quote be withdrawn. As the contract amount is under $25,000, no bid bond was required and therefore the City must accept Mr. Harper's request. The next low quote is from Brike Excavating, LLC, for $20,874.56 plus sales tax including bond and insurance. Brike's work for the City of Tukwila in the past has been satisfactory. ANALYSIS This project was not budgeted in the 2007 CIF, but funds remain in the 2007 I & I project budget of $30,000 and the $50,000 design funds for the sewer repair at 14438 59th Ave. South. Design is being completed in-house by City staff. RECOMMENDATION Information only as the contract is under $25,000. MC:ad attachments (P:Projecls\A - SW Projecul07SW03 14234 57 side sewe"lnfo Memo Bid Award Brike) II 05/02/2007 09:05 3608631966 GARY HARPER CONST PAGE 01 GARY HARPER CONSTRUCTfON, INC. 14831 223rd St SE Snohomish, W A 98296-3838 Phone: (360) 863-1955, Fax: (36G)163-1966 FACSIMILE TRANSMITTAlSMEET TO: ;Wr/e CC--(f.'C k COMPANY: C../-~ t<) f' (41:-.-<' (~ FAX NUMBE : 2o~.... errS /- S~~S- PHONE NUMBER: , ~ FROM: ~ I-h. DATE: "Cv-( ~b7e.r- .,/fy1c< ~ 'Z~" "7 TOTAL NO. OF PAG S, IN L COVER: SENDER'S~(ERENCE NUMBER: RE: YOUR REPS.NCE NUMBER: /., .f7.d..e.. JecJe/"" .2;,.r.-k//Cc .,L..o ~ ~ /VZ5'/ S-7-1 4cA2 .Jo~f-~ _URGENT _FOR REVIEW _AS REQUESTED _PLEASE REPLY rz- ~ t-. J; (> c> V?_ 2/(. II wo"fc h ,.... cI~t' k"h I';J? C II c.. z." c h?7 f?~A('.rC, I o,{' C. C;; I.i .....i<D I- de... .t.I, ~~ +4.'J c; 4-. 0 '-t V") -1--. ~ J:'h C~ ~ (~~~ /2. CITY OF TUKWILA April 27, 2007 Public Works Department (P:alice \Side Sewer Installation at 14234 57 Ave S Bid Tabulation) Side Sewer Installation at 14234 57th Ave. South BID TABULATION DESCRIPTION 1 UNIT IN AMOUNT II AMOUNT IN Perform all work associated with this project including bonding and insurance LS $13,670.00 $8,730.00 Trench Safety System LS 1,000.00 500.00 Subtotal $14,670.00 $9,230.00 8.9% State Sales Tax 1,305.63 821.47 TOTAL $15,975.63 $10,051.47 AMOUNT $18,574.00 2,300.56 $20,874.56 1,857.84 $22,732.40 IN AMOUNT IN AMOUNT 1 $28,321.00 $45,000.00 1,000.00 5,000.00 $29,321.00 $50,000.00 2,609.57 4,450.00 $31,930.57 $54,450.00