HomeMy WebLinkAboutCOW 2014-05-27 Item 5B - Ordinance - Tukwila South Sewer Connection Fees (Southcenter Parkway Extension)COUNCIL AGENDA SYNOPSIS Initials .Meeting Date Prepared 4 Al s review Council review 05/27/14 BG ` `-Tht 44 06/02/14 BG ❑ Resolution 1Jtg Date ►. Ordinance ❑ Bid Award Mtg Date • Public Hearing ❑ Other Altg Date Arts Date Attg Date 06/02/14 11 /g Date SPONSOR ❑ Coun& • .Ila or ❑ I-iR ❑ DCD ❑ Finance ❑ Fire 1 IT ❑ P&R ❑ Police El PI!"' SPONSOR'S This Ordinance will establish the sewer connection fees for parcels and plats as part of the SUMMARY Southcenter Parkway Extension sewer improvements in the Tukwila South area. The sewer connection fees are based on the square footage of the buildable parcels and will be collected when building permits are issued. The total sewer construction was $2,525,570 of which 73% was funded by grants, leaving a balance of $694,504.14. A new section is proposed for an escalator in the sewer connection fees for full Council to consider. ITEM INFORMATION ITEM No. 25 STAFF SPONSOR: BOB GIBERSON IORIGINAL AGI \D,1 DATE: 05/27/14 AGENDA ITIEM TI'I'I.E Ordinance Establishing Sewer Connection Fees as part of the Southcenter Parkway Extension for Tukwila Project South CATEGORY l I Discussion 05/27/14 ❑ Motion Aftg Date ❑ Resolution 1Jtg Date ►. Ordinance ❑ Bid Award Mtg Date • Public Hearing ❑ Other Altg Date Arts Date Attg Date 06/02/14 11 /g Date SPONSOR ❑ Coun& • .Ila or ❑ I-iR ❑ DCD ❑ Finance ❑ Fire 1 IT ❑ P&R ❑ Police El PI!"' SPONSOR'S This Ordinance will establish the sewer connection fees for parcels and plats as part of the SUMMARY Southcenter Parkway Extension sewer improvements in the Tukwila South area. The sewer connection fees are based on the square footage of the buildable parcels and will be collected when building permits are issued. The total sewer construction was $2,525,570 of which 73% was funded by grants, leaving a balance of $694,504.14. A new section is proposed for an escalator in the sewer connection fees for full Council to consider. REVIE'D BY f 1 COW Mtg. ❑ CA &P Cmtc ❑ F &S Cmte ❑ Transportation Cmte Cmte ❑ Arts Comm, ❑ Parks Comm. 11 Planning Comm. COMMITTEE CHAIR: KATE KRULLER 11 Utilities DATE: 05/19/14 RECOMMENDATIONS: SPONSOR /ADMIN. COMMITTEE Public Works Department Unanimous Approval; Forward to Committee of the Whole COST IMPACT / FUND SOURCE ExPENI7I`1'UIZI REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0.00 $0.00 $0.00 Fund Source: 402 SEWER FUND Comments: MTG. DATE RECORD OF COUNCIL ACTION 05/27/14 06/02/14 MTG. DATE ATTACHMENTS 05/27/14 Informational Memorandum dated 05/16/14 Draft Ordinance with Exhibits New Section with CPI Escalator and CPI Table 2011 to Present Minutes from the Utilities Committee meeting of 05/19/14 06/02/14 25 26 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director BY: Mike Cusick, Senior Program Manager DATE: May 16, 2014 SUBJECT: Southcenter Parkway Extension Project No. 98410437 Ordinance Establishing Sewer Connection Fees for Tukwila South ISSUE Establish the sewer connection fees for parcels and plats as part of the Southcenter Parkway Extension Project in the Tukwila South area. BACKGROUND In 2012, the City of Tukwila completed the installation of sanitary sewers and a sewer pump station to serve the area of the City bounded on the north by South 180th Street, on the south by South 204" Street, on the east by the Green River, and 1 -5 on the west (see attached Tukwila South Plat map). DISCUSSION The sanitary sewers were installed as part of the Southcenter Parkway Extension Project to serve the Plat of Tukwila South. The installation of the sewer in Southcenter Parkway allowed an existing dry sewer line in South 200th Street that was installed in 1999 to be put into use. The existing sewer will allow 4 parcels on Orillia Road to be connected to the sanitary sewer system. The sewer line in Orillia Road can also be extended up the hill towards South 188" Street at a later date to serve a larger area if required. At the time of the installation of the sewer in Southcenter Parkway, King County requested to be connected to the new sewer to service the Bow Lake Transfer Station that was under construction. The County's sewer line crosses the Plat of Tukwila South in an easement. The sewer connection fees are based on the square footage of the buildable parcels which can be served by the sewers. FINANCIAL IMPACT The total cost of sewer construction, including design and construction management, was $2,525,570.90, of which 73% was funded by Federal and State grants from various agencies. The balance of $694,504.14 will be collected from the sewer connection fees as building permits are issued. The sewer connection fee will be based on the area of the parcel being developed at that time. RECOMMENDATION Council is being asked to approve the Ordinance setting sewer connection fees for the Tukwila South area per the Plat map and adjacent parcels and consider this item on the Consent Agenda at the June 2, 2014 Regular Meeting. Attachments: Draft Ordinance Tukwila South Plat Map Tukwila South Sewer Connection Fees Spreadsheet W:''PW Eng1PROJECTSIA- RW & RS PrcjectslSoirthcenter Pkwy' Extension (57th Ave Si (9841O437itSewer Conneclionsllnfo Memo Sewer Connection Ordinance 5- 16- 14.docx 27 D'AFT AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ESTABLISHING SEWER CONNECTION FEES FOR THE PRELIMINARY PLAT OF TUKWILA SOUTH AND PROPERTY FRONTING ON ORILLIA ROAD, TO BE CODIFIED AT CHAPTER 14.19 OF THE TUKWILA MUNICIPAL CODE; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, upon completion of the Preliminary Plat of Tukwila South and the newly - installed sanitary sewer improvements, the City Council desires to have in place an equitable and adequate rate structure to finance the operation and maintenance of the sanitary sewer utility; and WHEREAS, the sanitary sewer lines meet the Washington State Department of Ecology standards including the minimum pipe diameter of 8 inches; and WHEREAS, any sewer connection will be assessed a connection fee that is determined by the infrastructure construction costs minus grant funding and the area of each parcel of land or designated plat that is tributary to the sanitary sewer system; and WHEREAS, any water connection will be assessed a connection fee that is determined by the Highline Water District; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY ORDAINS AS FOLLOWS: Section 1. Regulations Established. Tukwila Municipal Code (TMC) Chapter 14.19, "Sewer Connections — Preliminary Plat of Tukwila South," is hereby established to read as follows: CHAPTER 14.19 SEWER CONNECTIONS — PRELIMINARY PLAT OF TUKWILA SOUTH Sections: 14.19.010 Sewer Connection Requirements and Fees 14.19.020 Service Area Boundaries 14.19.030 Funding Recovery Review W: Word Processing \Ordinances \Sewer connection fees - Tukwila South prelim plat 5 -21 -14 MC:bjs Page 1 of 3 29 Section 2. TMC Section 14.19.010 is hereby established to read as follows: 14.19.010 Sewer Connection Requirements and Fees A. Homes on Orillia Road existing on July 1, 2013 will be required to connect to the sewer and pay associated connection charges if any portion of any building is situated within 250 feet of a sanitary sewer line or lateral and if: 1. Septic tank or health problems are identified by the King County Health Department that require repair of the septic tank system; or 2. The home changes ownership; or 3. Remodeling occurs adding a bathroom or bedroom. B. Parcels within the Preliminary Plat of Tukwila South will be required to connect to the sanitary sewer system and pay in full associated sewer connection charges before issuance of the City of Tukwila's building permit for the specific development. C. Change of ownership requires payment in full of the sewer connection fees. D. The Preliminary Plat of Tukwila South and Orillia Road sewer connection fees will start at $0.056530 per square foot of total property based on King County records and the Preliminary Plat for Tukwila South as shown in Figure 14 -7. E. Notice of sewer availability and connection requirements shall be placed on titles of properties within the Tukwila South Plat and Orillia Road sewer service area. King County recording fees will also be paid in full with the sewer connection fees. Section 3. TMC Section 14.19.020 is hereby established to read as follows: 14.19.020 Service Area Boundaries A. The sewer service boundary area is the north margin of South 204th Street; the area west of the Green River and Segale Business Park; the east margin of Orillia Road, Interstate 1 -5 and the City SeaTac; and the south margin of South 180th Street. A map of the parcels within the service area known as the Preliminary Plat of Tukwila South is attached hereto as Figure 14 -8. B. The Preliminary Plat of Tukwila South is dated June 2013, the King County Bow Lake Transfer Station, tax parcel 352304 -9037 and tax parcel 023900 -0300, 023900- 0310, 023900 -0247, 023900 -0365, and 023900 -0320 along Orillia Road with the exception of Plat #7 of the Preliminary Plat of Tukwila South, tax parcel 023900 -0310, and portions of that plat that are labeled Sensitive Area Tracts, Exceptions, Reserve Drainage Tracts, Open Space Tracts and Not Buildable Tracts, will have sanitary sewer system connection costs based on net area of 12,062,664 square feet of area that is tributary to the sanitary sewer system. W: Word Processing \Ordinances \Sewer connection fees - Tukwila South prelim plat 5 -21 -14 MC:bjs 30 Page 2 of 3 Section 4. TMC Section 14.19.030 is hereby established to read as follows: 14.19.030 Funding Recovery Review The successful implementation of later phases of the sanitary installation for the City is dependent on the repayment of general fund revenues from the sewer connection fees. The City Council will review connection requirements, exemptions and other revenue recovery alternatives to ensure the sewer plan remains viable and adequately funded. Section 5. Corrections by City Clerk or Code Reviser. Upon approval of the City Attorney, the City Clerk and the code reviser are authorized to make necessary corrections to this ordinance, including the correction of clerical errors; references to other local, state or federal laws, codes, rules, or regulations; or ordinance numbering and section /subsection numbering. Section 6. Severability. If any section, subsection, paragraph, sentence, clause or phrase of this ordinance or its application to any person or situation should be held to be invalid or unconstitutional for any reason by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of the remaining portions of this ordinance or its application to any other person or situation. Section 7. Effective Date. This ordinance or a summary thereof shall be published in the official newspaper of the City, and shall take effect and be in full force five days after passage and publication as provided by law. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2014. ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk APPROVED AS TO FORM BY: Shelley M. Kerslake, City Attorney Jim Haggerton, Mayor Filed with the City Clerk: Passed by the City Council: Published: Effective Date: Ordinance Number: Attachments: Figure 14 -7 — Tukwila South Sewer Connection Fees Figure 14 -8 — Service Area Boundary Map of Preliminary Plat of Tukwila South W: Word Processing \Ordinances \Sewer connection fees - Tukwila South prelim plat 5 -21 -14 MC:bjs Page 3 of 3 31 rWa wvn se row w.zu»,wsn'wd srzs:tetoaxun •6uvddeto-zweD.ai we AvMaw area NOISIA9J JO NoLrdIN394a 'ON 'Aar ld'Id X IVAIIY/II1 Id H.Lf1OS d'IIM?I1LL -r LEBI- 0L5-90Z xeJ 0002- 9L9 -9oZ ou04d wo eafJ9d0Jd81B629MMM 88186 VM b6M $IU o 'Ja lJBd ela6e8 1189 BdB6'VM 11/011l1'8zO99 me. 'ad ANVdW03 A11119V11 03111111 V SHI.L2IHdO'Id TIVO3 S 3 .Z 9f.69 N S09, f99Z '9113 'f99Z LJ 4 711 I/, /p n cv O 0 m y V 0 N o cv cv 01 t1� O O \O OI O O M ON CV CD 00 CD CD C\1 O / O =�_- 1 3 .9I.17.—LO S 0 1 / I// JAY D. BABCOC( P.LS. NO 30429 33888838 SHEET 11: LEGAL DESCRIPTIONS, • A• IHIO- PllIl 111115 m��._ -- 11 g 4"Y= gggsss o >o *es s_-�a kis ... i4 H 1111111111111 `il, !:, A, � Asa 3% 3z i iSYiiiiiiii aaaaaaaaaaa e1, &12'- 1.1„, 1s3 66666666666666 30'i :, wwwww4kawwwwa I LI 1 -- 1 0 I _ z sw a I W N I I-- - Z i 7 J �- 7 _ " Z z Z a < z z 3 v<i \\ ' 2" pp g 1, 1,z,,, Z °z �x rc Za <� z z = /// �\ $, i. Q a aoamirc >-, a°wcs cxi o jS ¢ 1 1 2 i. MI x Z Nw x w w1, it a1, .iYi L___________ wo u 0 0 0 0 O iiiiffli:!1Efi005:4h1:11 K a :4 Z Z Z Z r1, V I 0 7 7 ,�- -�— 9 -so 0. 0 0 .4t$ B a 0 BI C O® p l a I l N c • .O. cam 1 1 1 1 1 ++ ................ R; I _17 I r II1 111 Sold 41,091 Nod c3a 90'SZfI Al ,11,,0£[8! Ni,f[SZfl lf� 1N39.311e MO,91 NO! SNON arinop 013N /4 WAEJ �3 ge53 '3f o R 88 1,gg s 'R rim; tN �K dad'' § wpFw '1az t' isa3g g1, ° $ 0 r � Nf,. • I 011 � 1 �.11 <p 1 1 vl 1 j 1 �,i^Y I� I �: / 1 I 1 -f1, {' � gg . . ll��v ,rirhIigll 1 j� r- a$g 10 fh 11 i I z g3d p,:r .�,g f 1�_ -i 101IPT! I I _ I 86i,2 1 I I� N �• ITT A8i iigiligi8i� g V 1, Q s� Ord• I I"' I 1 1, i i i i i i ,�+�,, 1 / I I x°5..1 F- a��p 1L 1,Z9Z 3 -L l,2Y.L9 l—J Ngillomo 1,l! r,aa AagAAaAAAR () _ 1,J n "FignaWAR SIZE AREA! 16.331,640± S0. F1. / 374± ACRES = TOTAL AREA: 10,858,542 ± S0: FT. a n 4 TAL AREA: 3.031.010± S0. FT. 8 = TOTAL AREA: 414,274* S0. FT. 9 8 8 541 V ES C LL8 ff a � V_, a B 00 23 88 z Po 2,1 § b b ° .@ g fsi psi 0 g 8 11, h ° 1" 8 AND BRUCE MITCHELL AND HUGH 4 gP i s 2 0-=1 t.11 a Y A AA RnAiAAN AA A 2 3 1 33 Tukwila South Sewer Connection Fees Area Tributary to the Sewer System Installation of the Sewer System minus Grants $ 681,904.14 Total Area Tributary to the Sewer System (sq. ft.) 12,062,664 Cost per Square Foot $0.056530 Plat Number 147 not included as it can connect to existing sewer. Plat Number 14105 not included due to lot size. Figure 14 -8 5/5/2014 Design $ 59,416.80 Construction Mgmt 91,950.62 Construction 2,374,203.48 Total Sewer $ 2,525,570.90 Less Grants (73 %) $ 63 parcels x $200 KC Recording 681,904.14 12, 600.00 $ 694,504.14 Plat Number AREA (Square Feet) AREA (Acres) Percent of Total Area Sewer Connection Fee Reference Only of Adjoining Parcel Numbers Additional Parcel Numbers 1 40,142 0.92 0.003327789 $ 2,669.23 3523049038 3523049008 2 186,049 4.27 0.015423542 $ 10,917.38 3523049025 3523049009 3 158,037 3.63 0.013101335 $ 9,133.85 3523049032 4 335,971 7.71 0.02785214 $ 19,192.49 3523049118 5 144,011 3.31 0.011938574 $ 8,340.96 3523049015 6 112,996 2.59 0.009367417 $ 6,587.68 3523049027 7 0 0.00 0 $ 200.00 310,716 3523049036 8 71,429 1.64 0.005921471 $ 4,237.88 3523049116 9 323,645 7.43 0.02683031 $ 18,495.70 3523049017 10 230,637 5.29 0.019119907 $ 13,237.94 3523049041 11 178,101 4.09 0.01476465 $ 10,268.08 3523049117 12 219,571 5.04 0.01820253 $ 12,612.38 3523049013 13 213,166 4.89 0.017671553 $ 12,250.31 0222049033 14 192,232 4.41 0.015936115 $ 11,066.90 3523049013 15 248,319 5.70 0.020585752 $ 14,237.51 0222049008 16 293,127 6.73 0.024300354 $ 16,770.51 0222049037 17 271,250 6.23 0.022486742 $ 15,533.80 0222049040 18 324,473 7.45 0.026898951 $ 18,542.51 0222049043 19 349,001 8.01 0.028932333 $ 19,929.08 0222049057 20 322,937 7.41 0.026771616 $ 18,455.68 0222049061 21 477,529 10.96 0.039587359 $ 27,194.78 0222049011 22 393,093 9.02 0.032587579 $ 22,421.60 0222049015 23 505,132 11.60 0.04187566 $ 28,755.19 0322049049 24 289,626 6.65 0.02401012 $ 16,572.60 3523049124 25 226,576 5.20 0.018783248 $ 13,008.37 3523049039 26 73,558 1.69 0.00609799 $ 4,358.24 0322049092 27 96,008 2.20 0.007959104 $ 5,627.35 0322049093 28 97,651 2.24 0.00809531 $ 5,720.23 0322049052 29 82,078 1.88 0.006804302 $ 4,839.88 0322049062 30 88,991 2.04 0.007377392 $ 5,230.67 0322049056 31 501,134 11.50 0.041544224 $ 28,529.18 0322049006 32 173,621 3.99 0.014393256 $ 10,014.82 0222049036 33 122,299 2.81 0.01013864 $ 7,113.58 0322049090 34 130,953 3.01 0.01085606 $ 7,602.79 0322049100 35 116,946 2.68 0.009694874 $ 6,810.97 0239000352 36 358,928 8.24 0.029755286 $ 20,490.25 0222049036 37 904,596 20.77 0.074991397 $ 51,336.94 0322049047 38 180,593 4.15 0.014971237 $ 10,408.95 3523049045 39 339,873 7.80 0.028175618 $ 19,413.07 0323049068 40 282,045 6.47 0.023381652 $ 16,344.05 3523049050 3523049049 41 170,722 3.92 0.014152927 $ 10,050.94 3523049034 3523049051 42 218,906 5.03 0.018147402 $ 12,774.79 3523049040 3523049033 43 28,132 0.65 0.002332176 $ 1,990.32 3523049090 3523049019 44 246,379 5.66 0.020424925 $ 14,127.84 3523049109 45 60,778 1.40 0.005038522 $ 3,835.79 3623049078 3523049065 46 69,579 1.60 0.005768129 $ 4,333.31 3523049016 3523049066 47 121,674 2.79 0.010086827 $ 7,078.25 0322049106 PARCEL B 45,604 1.05 0.003780632 $ 2,778.03 CITY OF TUKWILA 3523049038 PARCEL C 147,231 3.38 0.012205525 $ 8,523.00 CITY OF TUKWILA 3523049008 100 873,082 20.04 0.072378873 $ 49,355.45 352304 -9037 KC Transfer Station Paid 101 79,385 1.82 0.006581051 $ 4,887.65 023900 -0365 COLUCCIO 0322049067 102 204,767 4.70 0.016975272 $ 11,975.51 023900 -0320 COLUCCIO 0322049005 103 94,200 2.16 0.007809221 $ 5,525.14 023900 -0247 THOMPSON 104 45,900 1.05 0.00380513 $ 2,794.73 023900 -0300 KOYAMOATSU 105 0 $ - 023900 -0310 LA PIANTA LLC 12,062,664 276.92 100% $ 694,504.14 Per the Ordinance: All rates listed in Figure 14 -7 of the Preliminary Plat for Tukwila South shall automatically be adjusted at the time due by applying a Consumer Price Index (CPI) escalator to the sewer connection fees listed in Figure 14 -8. The beginning rate for the CPI value will be the 2013 Annual Average of the All Urban Consumers (CPI -U) for Seattle, which was 241.563. The sewer connection fee for each parcel within the Preliminary Plat for Tukwila South shall automatically increase at the time the fee is due by an amount calculated using the following equation: Current CPI -U minus 241.563, divided by 241.563, multiplied by the Sewer Connection Fee listed in Figure 14 -8. [((Current CPI - 241.563)/241.563) x Sewer Connection Fee]. For purposes of this calculation, "Current CPI -U" shall be the CPI -U in place at the time the sewer connection fee is paid. For Example, The sewer connection fee listed in Figure 14 -8 for Parcel A is $12,774.79. In February 2014, the current CPI -U was 242.770. To calculate the CPI fee escalator, you would take the then current CPI -U of 242.770 and subtract 241.563, then divide that number by 241.563, resulting in a fee escalator of .004996626. This fee escalator would then be multiplied by $12,774.79 for an additional $63.83. This amount would then be added to $12,774.79, for a current sewer connection fee of $12,838.62. 3:bdsers \ana- I \AppData \ Local \Microsoft \Windows \Temporary Internet Files \ Content .Outlook \71%UFMDY \Tukwila South Sewer Connection Fees Spreadsheet 5- 22- 14.xls, Proposed Section F. To be considered by Council for the Tukwila South Sewer Connection Fee Ordinance F. All rates listed in Figure 14 -7 of the Preliminary Plat for Tukwila South shall automatically be adjusted at the time due by applying a Consumer Price Index (CPI) escalator to the sewer connection fees listed in Figure 14 -8. The beginning rate for the CPI value will be the 2013 Annual Average of the All Urban Consumers (CPI -U) for Seattle, which was 241.563. The sewer connection fee for each parcel within the Preliminary Plat for Tukwila South shall automatically increase at the time the fee is due by an amount calculated using the following equation: Current CPI -U minus 241.563, divided by 241.563, multiplied by the Sewer Connection Fee listed in Figure 14 -8. [((Current CPI — 241.563)/241.563) x Sewer Connection Fee]. For purposes of this calculation, "Current CPI -U" shall be the CPI -U in place at the time the sewer connection fee is paid. 35 CONSUMER PRICE INDEX - 2011 to Present All Urban Consumers (CPI -U) Urban Wage Earners & Clerical Workers (CPI -W) Year Month Seattle Portland U.S. Seattle Portland U.S. 2011 January 220.223 (1.6 %) 216.400 (1.8 %) February 229.482 (1.5) 221.309 (2.1) 225.790 (2.1) 217.535 (2.3) March 223.467 (2.7) 220.024 (3.0) April 231.314(2.1) 224.906 (3.2) 228.313 (2.7) 221.743 (3.6) May 225.964 (3.6) 222.954 (4.1) June 233.250 (3.2) 225.722 (3.6) 230.072 (3.7) 222.522 (4.1) First half' 11 230.815 (2.0) 223.105 (2.6) 223.598 (2.8) 227.455 (2.6) 218.872 (2.7) 220.196 (3.2) July 225.922 (3.6) 222.686 (4,1) August 233.810 (2.7) 226.545 (3.8) 230.558 (3.2) 223.326 (4.3) September 226.889 (3.9) 223.688 (4.4) October 235.916 (3.8) 226.421 (3.5) 232.697 (4.3) 223.043 (3.9) November 226.230 (3.4) 222.813 (3.8) December 234.812 (3.5) 225.672 (3.0) 231.297 (3.8) 222.166 (3.2) Second half '11 234.715 (3.3) 226.077 (3.1) 226.280 (3.5) 231.415 (3.7) 221.508 (3.3) 222.954 (3.9) ANNUAL AVERAGE 232.765 (2.7) 224.590 (2.9) 224.939 (3.2) 229.435 (3.2) 220.190 (3.0) 221.575 (3.6) 2012 January 226.665 (2.9 %) 223.216 (3.1%) February 235.744 (2.7) 227.663 (2.9) 232.081 (2.8) 224.317 (3.1) March 229.392 (2.7) 226.304 (2.9) April 237.931 (2.9) 230.085 (2.3) 234.808 (2.8) 227.012 (2.4) May 229.815 (1.7) 226.600 (1.6) June 239.540 (2.7) 229.478 (1.7) 236.222 (2.7) 226.036 (1.6) Firsthalf'12 237.344 (2.8) 228.746 (2.5) 228.850 (2.3) 233.959 (2.9) 223.712 (2.2) 225.581 (2.4) July 229.104 (1.4) 225.568 (1.3) August 240.213 (2.7) 230.379 (1.7) 236.750 (2.7) 227.056 (1.7) September 231.407 (2.0) 228.184 (2.0) October 241.355 (2.3) 231.317 (2.2) 237.947 (2.3) 227.974 (2.2) November 230.221 (1.8) 226.595 (1.7) December 237.993 (1.4) 229.601 (1.7) 234.588 (1.4) 225.889 (1.7) Second half'12 239.981 (2.2) 230.811 (2.1) 239.338 (1.8) 236.564 (2.2) 225.389 (1.8) 226.878 (1.8) ANNUAL AVERAGE 238.663 (2.5) 229.779 (2.3) 229.594 (2.1) 235.281 (2.5) 224.551 (2.0) 226.229 (2.1) 2013 January 230.280 (1.6 %) 226.520 (1.5 %) February 239.898 (1.8) 232.166 (2.0) 236.542 (1.9) 228.677 (1.9) March 232.773 (1.5) 229.323 (1.3) April 240.823 (1.2) 232.531 (1.1) 237.405 (1.1) 228.949 (0.9) May 232.945 (1.4) 229.399 (1.2) June 242.820 (1.4) 233.504 (1.8) 238.963 (1.2) 230.002 (1.8) First half '13 240.777 (1.4) 233.735 (2.2) 232.366 (1.5) 237.271 (1.4) 228.033 (1.9) 228.812 (1.4) July 233.596 (2.0) 230.084 (2.0) August 242.767 (1.1) 233.877 (1.5) 239.343 (1.1) 230.359 (1.5) September 234.149 (1.2) 230.537 (1.0) October 242.787 (0.6) 233.546 (1.0) 239.363 (0.6) 229.735 (0.8) November 233.069 (1.2) 229.133 (1.1) December 241.055 (1.3) 233.049 (1.5) 238.021 (1.5) 229.174 (1.5) Second half '13 i /242.350 (1.0) 237.322 (1.5) 233.548 (1.4) 238.987 (1.0) 231.399 (1.5) 229.837 (1.5) ANNUAL AVERAGE V 241.563 (1.2) 235.528 (2.5) 232.957 (1.5) 238.129 (1.2) 229.716 (2.3) 229.324 (1.4) 2014 January 233.916 (1.6 %) 230.040 (1.6 %) February - 242.770 (1.2) 234.781 (1.1) 239.607 (1.3) 230.871 (1.0) March 236.293 (1.5) 232.560 (1.4) April May June First half '14 July August September October November December Second half '14 ANNUAL AVERAGE NOTE: U.S. All Cities CPI data is published monthly, the Seattle- Tacoma - Bremerton area data is published bi- monthly, and the Bureau of Labor Statistics also calculates and publishes semi - annual averages and annual averages for the Seattle - Tacoma - Bremerton, Portland - Salem, and U.S. indexes. 3fi1e percentage increase (in parentheses) denotes the increase (or decrease) from the prior year. UTILITIES COMMITTEE Meeting Minutes May 19, 2014 — 5:15 p.m — Foster Conference Room, 6300 Building City of Tukwila Utilities Committee PRESENT Councilmembers: Kate Kruller, Chair; Allan Ekberg, Kathy Hougardy Staff: David Cline, Bob Giberson, Robin Tischmak, Ryan Larson, Frank Iriarte, Mike Cusick, Gail Labanara, Laurel Humphrey CALL TO ORDER: Committee Chair Kruller called the meeting to order at 5:15 p.m. I. PRESENTATIONS II. BUSINESS AGENDA A. Community Connectivity Consortium: Project Agreement 64 Staff is seeking Council approval of Community Connectivity Consortium Project Agreement 64, which provides for the design and installation of a 288- strand fiber optic cabling system for member use and installation of a 72- strand fiber optic backbone cable for Tukwila's exclusive use. This project provides a critical gateway to the Sabey Data Center, originating from Southwest Grady Way and interurban Avenue South. UNANIMOUS APPROVAL. FORWARD TO JUNE 2, 2014 REGULAR CONSENT AGENDA. B. Bid Award: East Marginal Way South Storm Pipe Replacement Staff is seeking Council approval to award a bid to the James W. Fowler Co. in the amount of $2,058,782.30 for construction of the East Marginal Way South Storm Pipe Replacement Project. In November 2012, a 30 -inch storm water pipe on East Marginal Way South just south of South 124t Street burst, creating a sinkhole, and a complete replacement of the pipe system in that area was deemed necessary. James W. Fowler Co. was the lowest of five bids received and is under the engineer's estimate of $2,485,995.00. As part of the project, the City plans to relocate Valley View Sewer and Water District 125 facilities, with reimbursement expenses paid through a separate agreement that will come before the Utilities Committee. With contingency, the project is over budget and the additional $175,000 is available from the Surface Water ending fund balance. UNANIMOUS APPROVAL. FORWARD TO MAY 27, 2014 COMMITTEE OF THE WHOLE. C. Public Works Trust Fund Loan Application: Andover Park East Water Main Replacement Staff is seeking Committee approval to apply for a Public Works Trust Fund loan in the amount of $3,131,000.00 for the Andover Park East Water Main Replacement Project. This project includes replacement of the water line, installation of a 15" sewer line and the repair and overlay of Andover Park East from Strander Boulevard to 1 -405. The original water and sewer lines are from 1961 and are no longer sufficient to support current and future development. UNANIMOUS COMMITTEE APPROVAL. D. Ordinance: Establishing Sewer Connection Fees for Tukwila South Staff is seeking Council approval of an ordinance that would establish the sewer connection fees for parcels and plats in the Tukwila South area. In 2012 the City installed sanitary sewers and a sewer pump station to serve the Tukwila South Plat as part of the Southcenter Parkway Extension Project. The total cost of sewer construction was $2,525,570.90, 73% of which was grant funded. The balance of $694,504.14 will be collected from the sewer connection fees as 37 Utilities Committee Minutes May 19, 2014 - Page 2 building permits are issued, and under this proposal the fee will be based on the area of the parcel being developed. Fees will start at $0.056530 per square foot. King County is now connected to the new sewer to service their Bow Lake Transfer Station, and approval of this ordinance will clear the way for their $49,355.45 payment as determined by the proposal. Councilmembers and staff discussed the fee implementation with particular regard to the timing of payments. The City will not recoup its expenses until development occurs and permits are issued, which could be a long time. The Committee decided to forward the ordinance to the May 27 Committee of the Whole, rather than the June 2 Consent Agenda. In addition, they asked staff to be prepared to discuss options for a possible fee escalation tied to the Consumer Price Index (CPI) for the sewer connection fees. UNANIMOUS APPROVAL. FORWARD TO MAY 27, 2014 COMMITTEE OF THE WHOLE. E. Resolution: Adopting Sewer Comprehensive Plan Staff is seeking Council approval of a resolution that would adopt the 2013 Sewer Comprehensive Plan, which is an update that reflects changes in regulatory requirements for water and sewer utility systems as well as completed Capital Improvement Projects, the Tukwila South annexation area, and other emergent needs. This update has been approved by the Washington State Department of Ecology and King County. The Department of Community Development has issued the SEPA determination. UNANIMOUS APPROVAL. FORWARD TO JUNE 2, 2014 REGULAR CONSENT AGENDA. III. MISCELLANEOUS Meeting adjourned at 6:25 p.m. Next meeting: Monday, June 2, 2014 - 5:15 p.m, - Foster Conference Room ,'' Committee Chair Approval Minutes by LH.. Reviewed by GL 38