Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M93-0027 - COMPUTER CITY
m93-0027 computer city 404 strander boulevard hvac ��� City of Tull (206) 431-3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 Permit No: M93 -0027 Type: B -MECH Category: NRES Address: 404 STRANDER BL Location: Parcel #: 022320 -0020 Contractor License No: AIRSYE *229KN TENANT COMPUTER CITY 404 STRANDER BL, TUKWILA, WA 98188 OWNER FIDELITY ASSOCIATES 4211 HOLLY LANE, M h LA 9;8040. CONTRACTOR AIR SYSTEMS ENGINEERING' Phone: 206 628 -9484 909 SOUTH 28THSTREET, TACOMA, WA 98405-T CONTACT DAN HAMILTON .Phone: 206 628 -9484 909 SOUTN;28THSTREET., ,TACOMA, WA 9840 9 *************** vlr * * *, * * * * * * 4c * * *: * * ** * * * * * * * * ** Permit DescriptAon: INSTALL;fNEW HEATING,`& AIR 'CONDITIONING SYSTEM ROOFTOP,/A/C UNITS, EXHAUST','FAN, T- STATS. 2 15 TON 1 10 %TON 4 71/2 TON & ^1. 5 _ UMC Ed i ti'ori : { 1991 MECHANICAL PERMIT Valuation: Total Permit Fee: Status: ISSUED Issued: 03/04/1993 Expires: 08/31/1993 8,000.00 :80.63 { * ** **** *********** w********* **. * * ** * * * * * * * *; * * ** * * * *, * * * * ** Perini tr Ce'nter" Quthorii I hereby certify that I have` read an'd' this permit a n d know:the same .to be..truend';.,correct. All provisions of law ,and ordinances :' governing g�-';;�th i's,. work will be complied wi th,.'wh ether- 's"pec,i f i ed .,here1 "n or not The granttng;;ofthis permit does not ;presume�,to; give authority to/Violate or cancel the;. of any other stave`,or,,l,ocal:'laws regul construction;: the` p,erforTance of work. I "arri'authorized to sign for and obtain this b ui - Signature: Print Name:_ Z4k4le. Date This permit shall become nul1and U;p;i d''i, "f;'ah`e::wo`rk is not commenced within 180 days from the date of issuance; "or ''if' work is suspended or abandoned for a period of 180 days from the last inspection. DEPARTMENT:. DATE IN : DATE APPROV REQUIREMENTS / COMMENTS ���Y: BUILDING - initial review a 19 01/1(0 0 'Z 2 , /63 (ROUTED) z_12.2 I� CONSULTANT: Date Sent - Date Approved - VRD FIRE PROTECTION: (J Sprinklers 0 Detectors • N/A FIRE INSPECTOR: K,z sip INIT: 1 .�,JC FIRE DEPT LEI ihR DATED BY: (init.) Z PLANNING ZONING: BAR/LAND USE CONDITIONS? ❑ Yes U No SCREENING REQUIRED? 0Yes EJ No INIT: iREFERENCE FILE NOS.: 0 OTHER INIT: BUILDING - I nal review UMC EDITION (year): c1 � -` INIT: � � BUILDING OFFICIAL h194 INIT: AMOUNT OWING: ?le, (03 CONTACTE 6 Y �A C L ���Y: 0. DATE NOTIFIED --- ,7 — �J (init.) VRD 2nd NOTIFICATION BY: (init.) 3RD NOTIFICATION • BY: (init.) PLAN CHECK NUMBER M°►l- n oa� Mechanical Permit Application Tracking REVIEW COMPLETED CITY OF TUKVIC 9 Department of Community Development — Permit Center 6300 Southcenter Boulevard - #100, Tukwila, WA 98188 (206) 431 -3670 PROJECT NAME C SITE ADDRESS 4CA 5 /34 PA INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that the status of the project may be ascertained at any time. • Plan corrections shall be completed and approved prior to sending to the next department. • Any conditions or requirements for the permit shall be noted in the Sierra system or summarized concisely in the form of 'a formal letter cr memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ", date and initial. DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. SUITE NO. 01/07/93 PROPERTY OWNER 1:))0 F) \4 l L_E PHON E z3Z, (0 65 ADDRESS Ir- 211 c I Z IP CONTRACTOR \ ste � ° PHONE cf ADDRESS c. �/ S � 2 �� J 1-- J EXP. DATE ZIPci a9 -2...0 t ' 9 WA. ST. CONTRACTOR'S LICENSE # • . ARCHITECT O PHONE ADDRESS _22/2_,_ ZIP 2 CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 PLAN CHECK NUMBER C APPLICATION MUST BE FILLED OUT COMPLETELY SITE ADDRESS PROJECT NAME/TENANT C YV Tr al G - I . TYPE OF WORK: O New /Addition EI,Modifications 0 Repair 0 Other: DESCRIBE WORK TO BE DONE: J N-S c n - ILL MEL 171i4T1IN C Au C niDjnoiir66 6 iSa clkty,k.kt) I)nur< ( 7)) 5 - r()) lO ror )ST Fin r- STA 5 BUILDING USE (office, warehouse, etc.) NATURE OF BUSINESSCdol p(I I WILL THERE BE A CHANGE IN USE? CONTACT PERSON 1. f.14 14.N \M $OP[: SioP. , -Yes IF YES, EXPLAIN: CENTER MECHANAL PERMIT APPLICATION Mechanical Fee Worksheet must also be filled out and attached to this : • •lication. FEES (for staff use only) SUITE # me -1 T•1:11i Pizimorar j•Iil► • =ASIC PERMIT FEE UNITS FEE PLAN CHECK FEE THER: TOTAIL' VALUE OF CONSTRUCTION - a NUMBER :OPUNITS 7ia7??J (t) S roI) gel \kJMV Itou 71)12.j.. Kim oFI TG 2FTAU. WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? L No 0 Yes IF YES, EXPLAIN: BUILDING OWNER OR AUTHORIZED AGENT SIGNATURE — PRINT NAME w o o wS ADDRESS O� �G 6 2' DATE PHONE LMy DATE APPLICATION ACCEPTED DATE APPLICATION EXPIRES FEB 19 199a APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed information on applicaiiori and plan submittal raquirements. Appii;,atio:; and plans must be complete in order to be accepted for plan review. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. 'The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 433 -1849. PHONE ( t f Lf 03/29/89 SBMITTAL CHECKLIST MECHANICAL • Completed mechanical permit application (one for each structure or tenant) O Two (2) sets of mechanical plans, which include: • Floor plan • System layout • Elevations (for roof mounted equipment) El Structural calculations stamped by a Washington State licensed engineer may be required if structural work is to be done (2 sets) Note: Hood and duct systems require a building permit for the duct shaft. ��0 10 0,101,. crz.ea J` load y str aux-o ccpx■ 1.x.5 cc..1c . ** *****,*******/r**********J 0!**** **'kkkk**** ** **k *k***kk k* *****kk CITY .. Or TUI(WILA,, WA. TRANSMIT k* k*********** r* * k*** k**J* * **Jr* * * * ***J*k *h* * ** ** TRANSMIT NumberI 9 3000270 °Amount: 00.63 03/04/3,3 1 Permit Noe, M93 -0627 Type: U -MECH .MECHANICAL PERMIT Parcel 'No: 022320 -0020: . 3it_e Address : :404 5TRANDER .i3L ' Payment Method : . CHECK Y Notation: AIR . : 8YS'ENO rNC Ini *************k kk**. k'***k kk*, Jr** J4 'k* *kk * *h ** * *k *:k ** ** * *k * * * * '* * , Account Code ' Descry i pt i . ors . Paid 00.0/345.830 P LAN CHECI( �- NONREa 16.1 .. 000/3:2.100: 'MECHANICAL. •- .NONRE &` :' 64.50 • Total. ('Ph is . Pa'y'm'e'nt ).d 80.63: GENERA 16.13 GENERA 64.50 TOTAL 80.63 CHECK 80.63 CHANGE 0.00 8568A000 1535 Fees: 80.'63 ' Total All Pay.inent5: 00..63 Bal anc a 00 Address: 404 STRANDER BL CITY OF TUKWILA Permit No: M93 -0027 Tenant: COMPUTER CITY Status: ISSUED Type: B -MECH ; . Applied: 02/19/1993 Parcel #::022320 -0020 • Issued: 03/04/1993 Permit Conditions: 1 No changes will be made too %ne4l ans ` , 1.ess.- „,approved by the . Architect and the �T.u�rl�r1 l a'8 �r 1 "1•d i n 9 - D ° i uii`i` s i �o n ' . , 2. Plumbing permit "h8 ob,,ta though t'Ke 4. .tt1e -King County etf Depart o'f ub 1. c Health ,' P 1 umbi ng will r4' e inspecte by �( •"° , , Y� ,,...,.:.a, s �.,, ,.. d ,�at ag�4nc��,� i x;,1,1 ga's i (296-4722) A � -4, .i ,,�. 4,5, 1. /gy 3 Electric t -rx .., •� n a � rm.:1 ,) 1 be,.�ob'�t`ai ried thv�ough the , i 114 State DIYii'ion of :L,abor, and In,dustr•ies an d'' e ca; 11, p, . work wi 1.1., be i pected''by tfi'a,.'ragency (248 - 665,7)`,` `� „fp pe,i i ts, inspec,t�1on re arid,,approved p'l,ans'',,shal l maintetned'avai labile at ,.t;hed \Job site'” prior to the:, start, of any oa fstr uction. e . The docur nt. es" are to be maintained .' it'"i 1,,a* final-- i;.nspeat.00f mo 1 on " app.r'ova 1 i s granted . "`,, {ss it l e access• t ..t.o gun ted equipment a i r s posed in:s r)kling ,mat,e,rla,) shall have i Flame d Rat iF'h g o, ulatio 2 '"'.5 or {',1 e ss''e, CI ''ter a'i'a"1 st shall bear 41 de yt i �J � � �an ' 1 4 � ''' 2t �i�:k1 eP wing the 'f e•�,,I$ e , formanc rating thereof t Von t,"o be ; done' ., 1i z n , cor'fa0ance ni th appro :f.t,� i �''j� nts� of ,It hre Code (1991 n asr ended °''br,,.theh °'Wash�i,n . ton t'a e';I3ui1ding :Cod1e,�'1 an'tcal • Code (1991 Ed` tion end°•- Washington Sta e ,(1981 Second Editi . •�+�- • ,. �� '' z , "'� Perm j t. The issuance jofe a, permi 1 ...,,t approval of , ,,., fl cati,ons and computatio all n` t b.e coral= , J, a permit for, or an JI;(;tinftivlie;flatiod ` he p ov i s '.ions of this ,, code ol,.�,, s f th.e, *r urisd No permit p.regum ga�'to � �e/ vi`'cc 1 to or �capcel the rovi�io »s of s 'is c ef' p . r': ava i )2,4 1 es:u 5 . R acce r e q e d 6. An f 7. A11 pla Spr e i a i on�sho . nstr�u'c and „re g Ed i Un Ener 8. Va 1 i ,l ) i r m �Me'cf Cad”' y f plans pc9 of any strued ,i be \ t ordinan S � author ity,o', shall be v'e ki Ay' City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Project Name C.-.,0 ( , (✓ f " Address VAL •..5 r PA A/0612. (L. Suite # Ret- n current inspection schedule Needs shift inspection Approved without correction notice Approved with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre-Fire: Permits: Authorized Signature FINALAPP.FRM TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM fi ,' 6.., iti+'j "C 7 6 .1' F 4 4 . 41:1*:A 4 o•ix j, h "S ;7 7fir -: -, 4 777' x '7 Gary L. VanDusen, Mayor Control No. n1 13 - L U Permit No. D to T.F.D. Form F.P. 85 J Frarar fr r,-- T ype o ns de, -7--- Address: tra 67 si-r, Date Called /..- r_,.3 Special nstructions: Date Wanted: am, . Requester: Phone No.: INSPECTION RECORD C. Retain a copy with permit k• - CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 , Approved per applicable COMMENTS: • 0. ‘0'.:' * ,.., . . ' • ' • . ' ^ i . ' . GM-C fTp ce- ctions required prior to approval. ■•••■■■■■■••■•■••■, 04/ Ae** PERMIT • (206) 431-3670 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. COMMENTS: ' ' type of Inspection: r-!- , ___,(i .‹.)77 a A `i" e 64 'T7'LGtAk iciv Date Called: co .r. g,...„ q Special Instructions: ` 9 : .. ..... l \ 0 p ,% ... ,c' Date Wanted: !! __ �+ Q C� .- -1. 1 m. .m. .*.-1-43.4—.33 ,� . t... r -C - .. - PrASS . A - — �utc.T Dv vs.0-3 t_Q ---T'. du-7% I L i ' P r t t — A t,19 C,41(.— 1 = d l_-- "--:'"7 nl S 9■E a ►J . • -pwc (444r e . ' type of Inspection: r-!- , ___,(i .‹.)77 a A `i" e 64 'T7'LGtAk iciv Date Called: co .r. g,...„ q Special Instructions: ` 9 : .. ..... l \ 0 p ,% ... ,c' Date Wanted: !! __ �+ Q C� .- -1. 1 m. .m. Requester: Phone No.: (o a Q _ q TN. r C INSPECT RECORD Retain a p with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 11 O oo 7 PERINI NO (206) 431 -3670 ❑ Approved per applicable codes. Corrections required prior to approval. Dale: ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. kdireir. 40• ...d... i .1._'_.. ..._- / • AO Al _4.,.. - —Air Type of Inspection: • : _ --.......i..*,...— 4 1^P71 s t n i c t . . . • Date Wanted: 23 anr€ Requester: Phone No.: NLApproved per applicAble codes. 0 INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION iter 6300 Southcenter Blvd., #100, Tukwila, WA 98188 MU-002 (206) 431-3670 Corrections required prior to approval. 0 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. r ece0 No.: Date: COMMENTS: ' no Duc s $ 4!dfr. X 0. TJfrYfc q' U/7G"( c".0c".04-1/ C 7 C 2 6 (.�•,,� he 1 7f4. %. / o� 4 /7 1 -* 'T. -04+ / � .- Li.. 0' (si .. ' 6,4 i)-7 sL., /e ,n, / rri�zrs- L• /u d c.4.7 Spode] Instructions: /Fov5 4 ..., .7-7 c e. vim 6 6/e,r /- z y c/-*//4..M.72, b i ' u / !_.i E�f1T `I 4�C... , , U 4 a,-,/ rte. ..," ei6 Y. SG�S c« vl / /) 1 ----- /: Type oflns (),�,, Add ?i"i " a ' Date Called: `'_ `✓ ( / � Spode] Instructions: Date Wanted: 5 _' f _93 a p.m. Requester: t i {A -- Phone No.: / ( 3 . X _ (pi_ g 4_ .�+ ...,�� , Recept No.: INSPECTION RECORD Q Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 ❑ Approved per applicable codes. Corrections required prior to approval. ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: Mq 3 PERMIT NO. (206) 431 -3670 ,COMMENTS: ' D 0,.c_3— pt, N s Fl-o M C. . S i r) £ ✓. E_ e r J i (3 (..r CAYS A2c: AP0iL A,`O 'iO r rsi 5rnL Type Inspepog C.> c: I-0 t + -5 pc-rz. S c4..1A 6 to t r) L t d•J' & e--(S/ S � S r►%, L ;2..� rat-A- , ,r,--- . � ^' 84- is Date Called: r rucarts: Date Wanted: Requester ((TW Pr rt Type Inspepog Add r � ^' 84- is Date Called: r rucarts: Date Wanted: Requester ((TW Phone No.: h X) k — R LI R p • spect 4- rL/ _ ' 2 Cl $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 k Approved per applicable codes. INSPECTION RECORD Retain a copy with permit C m cI3 ooa PERMIT N0. (206) 431-3670 ❑ Corrections required prior to approval. structural calculations turner and associates framing at canopy drift wall Transmittal To e/V be* /v&1✓uWr DATE c l PROJECT Z c. M -0U2:1 ATTENTION WE ARE ENCLOSING: PRINTS' ORIGINALS SHOP DRAWINGS CALCS OTHER DESCRIPTION REMARKS COPY TO cex-e /v -i-satti �'e' 4A/" RSP NUMBER C. file"�� C `7yf.� v,V e R A T T I SWENSON PER B I X • svoi�c•z' r . RECEIVED D'n/ 8 1993 TY DEVL.1.0 r''i' +,ii.._NT Ratti Swenson Pubis, Inc, 1411 Pout* Avenue Building, Suite 500 Seattle, Washington 98101 Phone 206.624.8687, Fax 206,624.8268 structural calculations R A T T I SWENSON PERBIX 1411 4th Avenue Building Suite 500 Seattlt, Wa, 98101 206-624-8687 date 4A design check FAX 206-624-8268 framing at canopy gee &moL 7 Z S.1/0a Aviv 540PE LNG 44 •4/ . 19,47 SIDES eta / id fl' Rome" 3 y✓ict. rAT ,QF M DEO. alegt4e. 7/7/ 00' Eec .w.) 60/04 1<l`• art/ 406 S 14444 ZOPs Wion4 s h - o' riu..5 L► L, o ✓ ,z. cv 5,o6- kt/Ata..t Pero i?i✓ . p . 035(i`9C I Esa." elo6E73,.,144.1 12� . c3sCZO) t• OS = .7544/, � � 1�,4 �_ .O3? �o) •01 00) 0,05 = , Sv'7� 4, /l (. M.- C 2' /4 -91` ill= are' b • R A T T I SWENSON P E R B X client ti /O A 2.$ 2 a) 4,7G L .2. zo C /.1() =2,53 a%o,s. ✓_ jzs, .-' A _ .S4" _ % z. o .. check /lk, W ELL r D ✓EJ�. yx �t7 i5Z hboKiN aT j/i&.J te.m0 C '4i f: � j►OE W4a0S KILL, Arklir/% WNW/8 filCck emit a r . - ..,. i .-.. N 8 1993 COM M ! 'i rye' .. DE VE_:l-.C.. PiLiENT %' 4 '10 ro ect date rsp no. -V.- _ , mss - s desig sheet 1411 4th Avenue Building Suite 500 Seattle, Wa. 98101 206- 624 -8687 FAX 206- 624 -8268 A L „ MAXIMUM ZCCJ COOLING LOADS Location s Tukwila, Washington 11 -12 -92 .Prepared By : Path Engineers, Inc. 6063092204 _Carrier Hourly Analysis Program Page 1 of 1 ****************************************** * * * * * * * # * * * * * * * * * * * * * * * * * * * * * ** No. Month Hour •INIAMID GIMP 1 Jun 1600 2 Jul 1600 3 Jun 1700 4 Jun 1500 5 Jul 1700 6 Jul 1500 7 Aug 1600 8 Jun 1800 9 Aug 1500 10 Aug 1700 I' Zone Name : cc retail south Sensible Load Total Load Supply Air (Tons) (Tons) (CFM) 11.40 14.07 5,145 11.57 14.02 5,117 11.26 13.91 5,246 11.27 13.90 5,002 11.43 13.86 5,217 11.44 13.86 4,975 11.16 13.57 4,916 10.81 13.43 5,296 11.03 13.42 4,776 11.00 13.41 5,010 CXIMUM ZONE COOLING LOADS % Location : Tukwila, Washington 11 -12 -92 Prepared By : Path Engineers, Inc. 6063092204 Carrier Hourly Analysis Program Page 1 of 1 * * * * * * * * * * * ** * * * * * * * * * * * ** ************** * * * * ** * ** * * * * ** ** ** * * * *** * * * * ** No. Month Hour 1 Jun 1600 2 Jul 1600 3 Jun 1500 4 Jun 1700 5 Jul 1500 6 Jul 1700 7' Aug 1600 8 Jun 1400 9 Jun 1800 10 Jul 1400 Zone Name : cc retail north Sensible Load Total Load (Tone) (Tons) 11.05 11.19 10.94 10.91 11.08 11.04 10.69 10.47 10.47 10.61 13.70 13.61 13.56 13.54 13.48 13.45 13.08 13,08 13.07 12.99 Supply Air (CFM) 4,978 4,931 4,847 5,076 4,802 5,028 4,691 .4,697 5,134 4,653 AL.3 `4.AXIMUM ZONE COOLING LOADS Location : Tukwila, Washington 11 -12 -92 Prepared.By : Path Engineers, Inc. 6063092204 Carrier Hourly Analysis Program Page 1 of 1 ***************,************************** * * * * * * * * * * * * *** * * * * * * * * * * * * * * ** Zone Name : cc west perimeter Sensible Load Total Load Supply Air No. Month Hour (Tone) (Tons) (CFM) OM Ilia MO 1 Jun 1700 2. Jul 1700 3 Jun 1800 4 Jul 1800 5 Jun 1600 6 Jul 1600 7 Jun 1900 8 Jul 1900 9 Jun 1500 10 Jul 1500 7.05 7.11 7.04 7.09 6.99 7.05 6.94 6.99 6.86 6.92 8.25 3,344 8.23 3,333 8.23 3,427 8.21 3,416 8.19 3,253 8.17 3,243 8.14' 3,492 8.12 3,478 8.05 3,167 8,03 • 3,156 AG MAXIMUM ZCaa COOLING LOADS 'Location s Tukwila, Washington 02 -15 -93 Prepared By $ Path Engineers Inc. 6063092204 Carrier Hourly Analysis Program Page 1 of 1 ****************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** No. Month Hour Zone Name $ cc east perimeter Sensible Load Total Load (Tons) (Tons) Supply Air (CFM) 1 Jun 1600 5.28 6.66 2,384 2 Jun 1500 5.28 6.65 2,358 3 Jul 1600 5.33 6.64 2,373 4 Jul 1500 5.34 6.63 2,347 5 Jun 1700 5.18 6.55 2,401 6 Jun 1400 5.15 6.53 2,325 7 Jul 1700 5.24 6.52 2,391 8 Jul 1400 5.21 6.50 2,314 9 Aug 1600 5.19 6.49 2,306 10 Aug 1500 5.20 6.48 2,281 fa G y S • f. `AAXIMUMZONE COOLING LOADS Location : Tukwila, Washington 11 -12 -92 Prepared By : Path Engineers, Inc. 6063092204 Carrier Hourly Analysis Program Page 1 of 1 ,._*********************** * * * * * * * * * * * * * * ** * * * ** * * * * * * **** * * * * * * * * * * * * * * * * * ** Zone Name : cc receiving Sensible Load Total Loud Supply Air No. Month Hour (Tons) (Tons) (CFM) 1 Jun 1600 2.92 3.79 1,348 2 Jul 1600 2.95 3.77 1,342 3 Jun 1500 2.91 3.76 1,326 4 Jun 1700 2.89 3.75 1,362 5 Jul 1500 2.94 3.75 1,320 6 Jul 1700 2.92 3.74 1,356. 7 Jun 1400 2.82 3.68 1,299 8 Aug 1600 2.86 3.67 1,295 9 Jul 1400 2.85 3.66 1,293 10 Jun 1800 2.80 3,66 1,368 ZONE DESIGN COOLING LOAD SUMMARY Location : Tukwila, Washington Prepared By : Path Engineers, Inc. Carrier Hourly Analysis Program ************ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ALCULATION DATA: Zone Name : cc retail south Job Name s computer city ************ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** LOAD INFORMATION LOAD COMPONENT SOLAR LOAD GLASS TRANSMISSION WALL TRANSMISSION ROOF TRANSMISSION PARTITION TRANSMISSION LIGHTING ( 17,400 W TOTAL) OTHER ELEC. 4,500 W TOTAL) PEOPLE ( 75.00 PEOPLE TOTAL) MISCELLANEOUS LOADS COOLING INFILTRATION PULLDOWN /WARM -UP COOLING SAFETY LOAD SUB- TOTALS NET VENTILATION LOAD ( SUPPLY FAN LOAD (BHP= WALL LOAD TO PLENUM ROOF LOAD TO PLENUM LIGHTING LOAD TO PLENUM 2610 CFM) 0.6) TOTAL COOLING LOADS 136,785 32,018 ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** COIL SELECTION PARAMETERS: COIL ENTERING AIR TEMP. (DB /WB) COIL LEAVING AIR TEMP. (DB /WB) COIL SENSIBLE LOAD' COIL TOTAL LOAD COOLING SUPPLY AIR TEMPERATURE TOTAL COOLING CFM (actual) TOTAL COOLING CFM (std. air) RESULTING ROOM REL. HUMIDITY COIL BYPASS FACTOR COIL APPARATUS DEWPOINT REHEAT REQUIRED ******** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** GENERAL INFORMATION: TOTAL COOLING LOAD TOTAL FLOOR AREA OVERALL U- FACTOR COOLING CFM /e ft ******** * * * * * * ** * * * * * * * * * * * * * * * * * * * * * ** * * * * * * * * * * * * * ** Calc Times Arab db /wbs * * * * * * * * * * * * * ** SENSIBLE (BTU /hr) 1,921 2,554 28,608 0 59,252 15,345 18,350 0 0 0 0 126,028 9,173 1,584 0 0 0 = 79.7/ 65,3 = 54.7/ 54.1 = 136,785 = 168,804 = 55.0 = 5,145 = 5,074 = 45.3 = 0.050 = 53.4 0 * * * * * * * * * * * ** *fir ** 11 -12 -92 6063092204 Page 1 of 2 * * * * * * * * * * * * ** Jun 1600h 81.3/ 66.8 F * * * * * * * * * * * * ** LATENT (BTU /hr) 0 0 0 0 0 0 0 15,375 0 0 0 0 15,375 16,643 0 0 0 0 deg F deg F 8TU /hr BTU /hr deg F CFM CFM deg F BTU/hr * * * * * * * * * * * * * * ** = 14,07 Tons = 618.47 ogft /Tone = 8,700.00 aqft = 0.131 8TU /hr /agft /F 0.59 CFM /sggft * * * * * * * * * * * * * * * * * * * * * ** * * * * * * * ** GLASS LOADS:NE E SE S SW W NW N H WALL LOADS: NE E SE S SW W NW N r Z O DESIGN COOLING LOAD S Location : Tukwila, Washington Prepared By : Path Engineers, Inc. Carrier Hourly Analysis Program *************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** :ALCULATION DATA: Zone Name s cc retail south • Job Name s computer city *************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** WALL AND GLASS LOAD BREAKDOWN LOAD COMPONENT AREA TRANSMISSION (sgft) (BTU /hr) 0 0 0 80 0 0 0 0 0 0 0 0 2,270 0 0 0 0 0 0 0 - 2 0 0 0 0 0 0 0 0 2,554 0 0 0 0 y 11 -12 -92 6063092204 Page 2 of 2 * * * * * * * * * * * * * * * * * * * * * * * * ** Calc Time; Jun 1600h Amb db /wbs 81.3/ 66.8 F * * * * ** *fir ** * * * * * * * * * * * * * * ** SOLAR LOAD (BTU /hr) 0 0 0 1,921 0 0 0 0 0 ***************************************** * * * * * * * * ** * ** * * * * * * * * * * * * * * * * ** ZO a DESIGN HEATING LOAD summLi Location s Tukwila, Washington 11 - 12 - 92 Prepared By s Path Engineers, Inc. 6063092204 Carrier Hourly Analysis Program Page 1 of 1 ,-***************************************** * * * ** * * * * * * * ***** * * * * * * * * * * * * ** .ALCULATION DATA: Zone Name : cc retail south Calc Time: Winter design Job Name $ computer city Amb db $ 24.0 F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** LOAD COMPONENT LOAD (BTU /hr) WALL TRANSMISSION 8,354 ROOF TRANSMISSION 56,028 GLASS TRANSMISSION 2,134 TRANSMISSION LOSS TO UNCOND. SPACES 0 INFILTRATION LOSS 0 SLAB FLOOR 0 HEATING SAFETY BTU /hr 0 SUB -TOTAL NET VENTILATION LOSS TOTAL HEATING LOAD 194,381 HEATING SUPPLY CFM HEATING SUPPLY AIR TEMPERATURE HEATING VENTILATION AIR CFM HEATING THERMOSTAT SETPOINT TEMP 66,516 127,665 1,561 CFM 110.0 deg F 2,610 CFM 70.0 deg F ************************* * * * * * * * * * * * * * * * * **** *** * * * *+kll * * * * * * * * * * * * * * * * ** ZO L DESIGN COOLING LOAD SUMMLY Location : Tukwila, Washington Prepared By : Path Engineers, Inc. Carrier Hourly Analysis Program ************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** .ALCULATION DATA: Zone Name : cc retail north Job Name : computer city ************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** LOAD INFORMATION LOAD COMPONENT SOLAR LOAD GLASS TRANSMISSION WALL TRANSMISSION ROOF TRANSMISSION PARTITION TRANSMISSION LIGHTING ( 17,400 W TOTAL) OTHER ELEC. ( 4,500 W TOTAL) PEOPLE ( 75.00 PEOPLE TOTAL) MISCELLANEOUS LOADS COOLING INFILTRATION PULLDOWN /WARM -UP COOLING SAFETY LOAD SENSIBLE (BTU /hr) 11 -12 -92 6063092204 Page 1 of 2 * * * * * * * * * * * * * * * * * * * * * * * * * * ** Calc Time: Jun 1600h Amb db /wb: 81.3/ 66.8 F * * * * * * * * * * * * * * * * * * * * * * * * * * ** 0 0 372 28,608 0 59,252 15,345 18,350 0 0 0 0 SUB- TOTALS 121,927 NET VENTILATION LOAD ( 2610 CFM) 9,173 SUPPLY FAN LOAD (BHP= 0.6) 1,533 WALL LOAD TO PLENUM 0 ROOF LOAD TO PLENUM 0 LIGHTING LOAD TO PLENUM 0 LATENT (BTU /hr) TOTAL FLOOR AREA = 8, OVERALL U- FACTOR COOLING CFM /sgft ******************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** 0 0 0 0 0 0 0 15,375 0 0 0 0 15,375 16,372 0 0 0 0 TOTAL COOLING LOADS 132,632 31,747 ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** COIL SELECTION PARAMETERS: COIL ENTERING AIR TEMP. (DB /WB) COIL LEAVING AIR TEMP..(DB /WB) COIL SENSIBLE LOAD COIL TOTAL LOAD COOLING SUPPLY AIR TEMPERATURE TOTAL COOLING CFM (actual) COOLING CFM (std. air) RESULTING ROOM REL. HUMIDITY COIL BYPASS FACTOR COIL APPARATUS DEWPOINT REHEAT REQUIRED ***************************************** * * * ** * * * * * * * * * * * * * * * * * * * * * * * * ** GENERAL INFORMATION: TOTAL COOLING LOAD = 79.7/ 65.4 deg F = 54.7/ 54.1 deg F = 132,632 BTU /hr = 164,379 BTU /hr = 55.0 deg F = 4,978 CFM 4,908 CFM = 45.4 % = 0.050 = 53.4 deg F = 0 BTU /hr _ 13.70 Tons 635.12 sgft /Tons 700.00 agft 0.128 BTU /hr /sgft /F 0.57 CFM /agft * * * * * * * * * * * * * * * * * * * * ** • al DESIGN COOLING LOAD SUMML1 Location : Tukwila, Washington Prepared By : Path Engineers, Inc. Carrier Hourly Analysis Program ********,****************** * * * * * * ** * * * * * * * * * * * * * * * * * * * *# ** :ALCULATION DATA: Zone Name : cc retail north Calc Time: Job Name : computer city Amb db /wb: *************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** WALL AND GLASS LOAD BREAKDOWN LOAD COMPONENT AREA TRANSMISSION SOLAR LOAD (sgft) (BTU /hr) (BTU /hr) 11 -12 -92 6063092204 Page 2 of 2 * * * * * * * * * * * * ** Jun 1600h 81.3/ 66.8 F * * * * * * * * * * * * ** GLASS LOADS:NE 0 0 E 0 0 SE 0 0 S 0 0 SW 0 0 W 0 0 NW 0 0 N 0 0 H 0 0 WALL LOADS: NE 0 0 E 0 0 SE 0 0 S 0 0 SW 0 0' W 0 0 NW 0 0 N 2,270 372 ************************** **r* * * * * * * * „* * * * * * * * * * * * * * * * * * 0 0 0 0 0 0 0 0 ZONE DESIGN HEATING LOAD C. Location : Tukwila, Washington Prepared By : Path Engineers, Inc. Carrier Hourly Analysis Program 11 -12 -92 6063092204 Page 1 of 1 .- ***************************************** * * * * * * * ** * *** * ** * * * * * * * * * * ** * ** :ALCULATION DATA: Zone Name : cc retail north Calc Time: Winter design Job Name : computer city Amb db : 24.0 F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** LOAD COMPONENT SUB -TOTAL NET VENTILATION LOSS TOTAL HEATING LOAD HEATING SUPPLY CFM HEATING SUPPLY AIR TEMPERATURE HEATING VENTILATION AIR CFM HEATING THERMOSTAT SETPOINT TEMP LOAD (BTU /hr) WALL TRANSMISSION 8,354 ROOF TRANSMISSION 56,028 GLASS TRANSMISSION 0 TRANSMISSION LOSS TO UNCOND. SPACES 0 INFILTRATION LOSS 0 SLAB FLOOR 0 HEATING SAFETY BTU /hr 0 64,382 127,865 192,247 1,511 CFN 110.0 deg F 2,610 CFM 70.0 deg F ***************************************** * * * * * * * * * * * * ** * * * * * * * * * * * * * * * ** ZOs DESIGN COOLING Location : Tukwila, Washington Prepared By : Path Engineers, Inc. Carrier Hourly Analysis Program -******** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** :ALCULATION DATA: Zone Name : cc west perimeter Job Name : computer city ******** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** LOAD INFORMATION LOAD COMPONENT SOLAR LOAD GLASS TRANSMISSION WALL TRANSMISSION ROOF TRANSMISSION PARTITION TRANSMISSION LIGHTING ( 6,000 W TOTAL) OTHER ELEC. ( 11,000 W TOTAL) PEOPLE ( 40.00 PEOPLE TOTAL) MISCELLANEOUS LOADS COOLING INFILTRATION PULLDOWN /WARM -UP .COOLING SAFETY LOAD SUB- TOTALS NET VENTILATION LOAD ( SUPPLY FAN LOAD (BHP= WALL LOAD TO PLENUM ROOF LOAD TO PLENUM LIGHTING LOAD TO PLENUM 900 CFM) 0.4) LOAD SUMMi 11 -12 -92 6063092204 Page 1 of 2 ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Calc Time: Jun 1700h Amb db/wb; 79.8/ 66.3 F ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** SENSIBLE (BTU /hr) 0 0 3,550 10,617 0 20,435 37,511 9,787 0 0 0 0 81,900 1,725 1,029 0 0 0 TOTAL COOLING LOADS 84,655 *******************,***** * * * * * * * * * * * * * * * * * * * * * * * * * * * **** COIL SELECTION PARAMETERS: COIL ENTERING AIR TEMP. (DB /WB) = 78.5/ 64.4 COIL LEAVING AIR TEMP. (DB /WB) = 54.7/ 54.1 COIL SENSIBLE LOAD = 84,655 COIL TOTAL LOAD = 99,048 COOLING SUPPLY AIR TEMPERATURE = 55.0 TOTAL COOLING CFM (actual) = 3,344 TOTAL COOLING CFM (std. air) = 3,297 RESULTING ROOM REL. HUMIDITY = 44.7 COIL BYPASS FACTOR = 0.050 COIL APPARATUS DEWPOINT = 53.5 ***************************** * * * * * * * * * * * * * * * * *** * * * * * * * ***** GENERAL INFORMATION: TOTAL COOLING LOAD = 8.25 = 363.57 TOTAL FLOOR AREA = 3,000.00 OVERALL U- FACTOR 0.107 COOLING CFM /sqft = 1.11 ************************* * * * * * * * * * * * * * * * * * * * * * * * ** * * * * ** • LATENT (BTU /hr) 0 0 0 0 0 0 0 8,200 0 0 0 0 8,200 6,163 0 0 0 0 14,363 * * * * * * * * * * * * * * ** deg F deg F RTU /hr BTU /hr deg F CFM CFM deg F BTU /hr * * * * * * * * * * * * * * ** Tons agft /Tons sgft BTU /hr /sgft /F CFM /sgft * * * * * * * * * * * * * * ** e ZOR DESIGN COOLING LOAD S :il Location : Tukwila, Washington 11 -12 -92 Prepared By s Path Engineers, Inc. 6063092204 Carrier Hourly Analysis Program Page 2 of 2 ._ * * ** * * * ** * ** * * * *, ************************ * * *** * * * * * * * * ** * * * * * * * * * * * * * * ** ' :ALCULATION DATA: Zone Name : cc west perimeter Calc Times Jun 1700h Job Name : computer city Amb db /wbs 79.8/ 66.3 F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** WALL AND GLASS LOAD BREAKDOWN LOAD COMPONENT AREA TRANSMISSION SOLAR LOAD (waft) (BTU /hr) (BTU/hr) GLASS LOADS:NE 0 0 0 E 0 0 0 SE 0 0 0 S 0 0 0 SW 0 0 0 W 0 0 0 NW 0 0 0 N 0 0 0 H 0 0 0 WALL LOADS: NE 0 0 E 0 0 SE 0 0 S 0 0 SW 0 0 W 3,780 3,550 NW 0 0 N 0 0 ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Z.:. DESIGN HEATING LOAD SUMILY Location : Tukwila, Washington Prepared By : Path Engineers, Inc. Carrier Hourly Analysis Program ********************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** :ALCULATION DATA: Zone Name : cc west perimeter Calc T Job Name : computer city Amb db ********************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** LOAD COMPONENT WALL TRANSMISSION ROOF TRANSMISSION GLASS TRANSMISSION TRANSMISSION LOSS TO UNCOND. SPACES INFILTRATION LOSS SLAB FLOOR HEATING SAFETY BTU /hr SUB -TOTAL NET VENTILATION LOSS TOTAL HEATING LOAD HEATING SUPPLY CFM HEATING SUPPLY AIR TEMPERATURE HEATING VENTILATION AIR CFM HEATING THERMOSTAT SETPOINT TEMP LAD (BTU /hi) 13,910 19,320 0 0 0 0 33,230 44,091 11 -12 -92 6063092204 Page 1 of 1 *+* * * * * * * * * * * * * * * * * ** ime: Winter design s 24.0 F * * * * * * * * * * * * * * * * * * ** 77,322 780 CFM 110.0 deg F 900 CFM 70.0 deg F ***************************************** * * * * * * * * * * ** * * * * * * * * * * * * * * * * * ** ZONE DESIGN COOLING LOAD SUMMAkY Location : Tukwila, Washington 02 -15 -93 Prepared By : Path Engineers Inc. 6063092204 Carrier Hourly Analysis Program Page 1 of 2 ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** CALCULATION DATA; Zone Name : cc east perimeter Calc Time: Jun 1600h Job Name • computer city Amb db/wbs 81.3/ 66.8 F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** LOAD INFORMATION LOAD COMPONENT SENSIBLE LATENT (BTU /hr) (BTU /hr) SOLAR LOAD 0 0 GLASS TRANSMISSION 0 0 WALL TRANSMISSION 2,712 0 ROOF TRANSMISSION 6,505 0 PARTITION TRANSMISSION 0 0 LIGHTING 4,120 W TOTAL) 14,030 0 OTHER ELEC. ( 6,000 W TOTAL) 20,460 0 PEOPLE ( 60.00 PEOPLE TOTAL) 14,680 12,300 MISCELLANEOUS LOADS 0 0 COOLING INFILTRATION 0 0 PULLDOWN /WARM -UP 0 0 COOLING SAFETY LOAD 0 0 SUB - TOTALS 58,387 12,300 NET VENTILATION LOAD ( 900 CFM) 3,163 4,297 SUPPLY FAN LOAD (BHP= 0.7) 1,767 0 WALL LOAD TO PLENUM 0 0 ROOF LOAD TO PLENUM 0 0 LIGHTING LOAD TO PLENUM 0 0 TOTAL COOLING LOADS 63,317 16,597 ***************************************** * *** * * ** * ** ** * ** * * * * * * * * * * * * * ** COIL SELECTION PARAMETERS: COIL ENTERING AIR TEMP. (DB /WB) = 79.2/ 65.3 deg F COIL LEAVING AIR TEMP. (DB /WB) = 54.3/ 53.7 deg F COIL SENSIBLE LOAD = 63,317 BTU /hr COIL TOTAL LOAD = 79,914 BTU /hr COOLING SUPPLY AIR TEMPERATURE = 55.0 deg F TOTAL COOLING CFM (actual) = 2,384 CFM TOTAL COOLING CFM (std. air) = 2,351 CFM RESULTING ROOM REL. HUMIDITY = 46.9 % COIL BYPASS FACTOR = 0.050 COIL APPARATUS DEWPOINT = 53.0 deg F REHEAT REQUIRED = 0 BTU /hr ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** GENERAL INFORMATION: TOTAL COOLING LOAD = 6.66 Tons 309.33 sgft /Tons TOTAL FLOOR AREA = 2,060.00 :Kit OVERALL U- FACTOR = 0.102 BTU /hr /sgft /F COOLING CFM /sgft = 1.16 CFM /sgft ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ZOE DESIGN COOLING LOAD SU� Location : Tukwila, Washington 02 -15 -93 Prepared By : Path'Engineers Inc. 6063092204 Carrier Hourly Analysis Program Page 2 of 2 ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** CALCULATION DATA: Zone Name : cc east perimeter Calc Time: Jun 1600h Job Name : computer city Amb db /wb: 81.3/ 66.8 F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** WALL AND GLASS LOAD BREAKDOWN LOAD COMPONENT AREA TRANSMISSION SOLAR LOAD (sqft) (BTU /hr) (BTU /hr) GLASS LOADS :NE 0 0 0 E 0 0 0 SE 0 0 0 S 0 0 0 SW 0 0 0 W 0 0 0 NW 0 0 0 N 0 0 0 H 0 0 0 WALL LOADS: NE 0 0 E 2,270 2,712 SE • 0 0 S 0 0 SW 0 0 W 0 0 NW 0 0 0 0 ******************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** *fir * * ** * * * * * * * * * * * * * ** ZONE DESIGN HEATING LOAD Location : Tukwila, Washington Prepared By s Path Engineers Inc. Carrier Hourly Analysis Program ************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** CALCULATION DATA: Zone Name : cc east perimeter Job Name s computer city ************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** WALL TRANSMISSION ROOF TRANSMISSION ,GLASS TRANSMISSION TRANSMISSION LOSS TO UNCOND. SPACES 'INFILTRATION LOSS SLAB FLOOR HEATING SAFETY BTU /hr SUB -TOTAL NET VENTILATION LOSS TOTAL HEATING LOAD HEATING SUPPLY CFM HEATING SUPPLY AIR TEMPERATURE HEATING VENTILATION AIR CFM HEATING THERMOSTAT SETPOINT TEMP SUMMARY LOAD COMPONENT LOAD (BTU /hr) 02 -15 -93 6063092204 Page 1 of 1 * * * * * * * * * * * * * * * * * * * * * * * * * * ** Calc Times Winter design Amb db s 21.0 F * * * * * * * * * * * * * * * * * * * * * * * * * * ** 7,564 14,132 0 0 0 0 21,695 31,311 53,006 340 CFM 130.0 deg F 600 CFM 70.0 deg F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ZOC. DESIGN COOLING LOAD Location : Tukwila, Washington Prepared By : Path Engineers, Inc. Carrier Hourly Analysis Program ************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ALCULATION DATA: Zone Name : cc receiving Job Name : computer city ************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** LOAD INFORMATION LOAD COMPONENT SOLAR LOAD GLASS TRANSMISSION WALL TRANSMISSION ROOF TRANSMISSION PARTITION TRANSMISSION LIGHTING ( 3,120 W TOTAL) OTHER ELEC. ( 2,800 W TOTAL) PEOPLE ( 10.00 PEOPLE TOTAL) MISCELLANEOUS LOADS COOLING INFILTRATION PULLDOWN /WARM -UP COOLING SAFETY LOAD SUB - TOTALS NET VENTILATION LOAD ( SUPPLY FAN LOAD (BHP= WALL LOAD TO PLENUM ROOF LOAD TO PLENUM LIGHTING LOAD TO PLENUM 33,014 468 CFM) 1,645 0.2) 415 0 0 SENSIBLE (BTU /hr) * * * * * * * * * * * * ** Calc Times Amb db /wbs * * * * * * * * * * * * ** 0 0 2,469 5,130 0 10,625 9,548 5,243 0 0 0 0 1,560.00 sgft OVERALL U- FACTOR 11 -12 -92 6063092204 Page 1 of 2 * * * * * * * * * * * * ** Jun 1600h 81.3/ 66.8 F * * * * * * * * * * * * ** LATENT (BTU /hr) 0 0 0 0 0 0 0 9,250 0 0 0 0 9,250 1,115 0 0 0 0 TOTAL COOLING LOADS 35,074 10,365 ***************************************** * * * * * * * * * * * * * * * ** * * * * * * * * * * * * ** COIL SELECTION PARAMETERS: COIL ENTERING AIR TEMP. (DB /WB) = 79.1/ 65.7 deg F COIL LEAVING AIR TEMP. (DB /WB) = 54.7/ 54.1 deg F COIL SENSIBLE LOAD = 35,074 BTU /hr COIL TOTAL LOAD = 45,439 BTU /hr COOLING SUPPLY AIR TEMPERATURE = 55.0 deg F TOTAL COOLING CFM (actual) = 1,348 CFM TOTAL COOLING CFM (std. air) = 1,329 CFM RESULTING ROOM REL. HUMIDITY = 49.4 % COIL BYPASS FACTOR = 0.050 COIL APPARATUS DEWPOINT = 53.4 deg F REHEAT REQUIRED == 0 BTU /hr ***************************************** * * * * * * * * * * * * ** * * * * * * * * * * * * * * * ** GENERAL INFORMATION: TOTAL COOLING LOAD - 3.79 Tons = 411.98 sgft /Tons TOTAL FLOOR AREA = 0.108 BTU /hr /sgft /F COOLING CFM /s ft = 0.86 CFM /sgft ****************************,************ * * ** * * * * * * * * * * * * * ** * * * * ** * * * * ** ZOC DESIGN COOLING LOAD S .Z Location s Tukwila, Washington 11 -12 -92 Prepared By s Path Engineers, Inc. 6063092204 Carrier Hourly Analysis Program Page 2 of 2 :-************************,**************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** :ALCULATION DATA: Zone Name : cc receiving Calc Times Jun 1600h Job Name : computer city Amb db /wbs 81.3/ 66.8 F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** WALL AND GLASS LAD BREAKDOWN LOAD COMPONENT AREA TRANSMISSION SOLAR LOAD (sgft) (BTU /hr) (BTU /hr) GLASS LOADS:NE 0 E 0 SE 0 s 0 SW 0 W 0 NW 0 N 0 H 0 WALL LOADS: NE 0 E 1,470 SE 0 S 260 SW 0 W 0 NW. 0 N 0 ***************************************,* * * * * * * ** * * * * ** * * * * * * * * * * * * * * * ** 0 0 0 0 0 0 0 0 0 0 2,176 0 293 0 0 0 0 0 0 0 0 0 0 0 0 e 11 -12 -92 Prepared By : Path Engineers, Inc. 6063092204 Carrier Hourly Analysis Program Page 1 of 1 **,************************************** ** * * * * * * * * * * * * * * * * * * * * * * * * * * * ** :ALCULATION DATA: Zone Name : cc receiving Calc Time: Winter design Job Name : computer city Amb db : 24.0 F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Location : Tukwila, Washington LOAD COMPONENT WALL TRANSMISSION ROOF TRANSMISSION GLASS TRANSMISSION TRANSMISSION LOSS TO UNCOND. SPACES INFILTRATION LOSS SLAB FLOOR HEATING SAFETY BTU/hr SUB -TOTAL NET VENTILATION LOSS TOTAL HEATING LOAD HEATING SUPPLY CFM HEATING SUPPLY AIR TEMPERATURE HEATING VENTILATION AIR CFM HEATING THERMOSTAT SETPOINT TEMP ZOL DESIGN HEATING LOAD SUMMAl. LOAD (8TU /hr) 6,366 10,046 0 0 0 0 0 16,413 22,928 39,340 385 CFM 110.0 deg F 468 CFM 70.0 deg F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** February 22, 1993 City of Tukwila Dan Hamilton Air Systems Engineering 909 S. 28th St. Tacoma, WA 98409 Dear Hamilton: Sincerely, Ken Nelsen Plans Examiner John W Rants, Mayor Department of Community Development Rick Beeler, Director RE: Computer City Mechanical Permit Application Plan check number M93 -0027 After an ,initial review of subject project, it has been determined that additional structural information is required to verify that the roof will support all proposed roof mounted equipment. This verification must be done by a Structural Engineering licensed in Washington State. I have passed this file on to the Tukwila Fire Prevention Division to help avoid any delays in our permit system. Please confirm you have received these comments by contacting this office and /or submit revisions within ten working days. Feel free to call me if there are any questions, 8:30 a.m. to 4:30 p.m. at 431 -3670. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 4313665 (7 ... (A CITY OF TUKWILA Id: ACTP125 Keyword: UACT User: 1677 Activity Table Processing Permit No: M93 -0027 Tenant: COMPUTER CITY Status: PENDING Address: 404 STRANDER BL Base Information Parcel No: 022320 -0020 Owner: FIDELITY ASSOCIATES Validated By: SAO Plan Ck Approved: / / Status: PENDING Applied: 2/19/1993 Issued: / / Active /Inactive: A Completed: / / To Expire: / / Nature of Work: INSTALL NEW HEATING & AIR CONDITIONING SYSTEM Location: Category: NRES (RES, NRES, STOV) Inspector Area: Valuation: 48,000.00 UMC Edition (Yr): 1991 Fire Protection: SPRINKLERED Use Change (Y /N): Y Storage of Flammable /Hazardous Materials:NONE F7= Update, F2= Previous Line, ESC = Cancel Update CITY OF TUKWILA Id: ROUT130 Keyword: UACT User: 1677 02/22/93 Activity document routing maintenance. MECHANICAL PERMIT Permit No: M93 -0027 Route: 1 Current Route Line: 2 of 5 Packet Units Description Station Status Received Assigned Complete aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Packet Units Action Station Initials Status Received Assigned Completed MECH 01 01 C BLDG KEN Passed 02/22/93 .. /.. /.. 02/22/93 Priority (0 /low..9 /high): 0 Regular hours (HH.MM): .00 Overtime Hours(HH.MM): Comments 1[LETTER SENT 2/22/93 2[ ] 3[H.V.A.C..; over 2,000: C.F:M. requires; auto:; shut= off 5[FIRE please: review and comment. ] 6[ ] 7[ 8[ 9[ ] 10[ aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa F1 =Help, ESC =Exit current screen. Type: B -MECH Vers: 9101 Screen: 01 02/22/93 MECHANICAL PERMIT hvac floor plan hvac equipment schedule general hvac notes