HomeMy WebLinkAboutUtilities 2008-04-07 Item 3D - Final Accetpance - South 129th Street Drainage by Brike Excavating and Underground Utilities INFORMATION MEMO To: From: Date: Subject: Mayor Haggerton Public Works Directo~ April 2, 2008 S 129th Street Drainage Project Project No. 07-DR04, Contract No. 07-162 Project Completion and Acceptance ISSUE Accept construction contract as complete and authorize release of retainage. BACKGROUND The Notice to Proceed for Contract No. 07-162 with Brike Excavating & Underground Utilities, LLC, of Renton, was issued January 7, 2008. This project provided a new drainage system to allow for the removal of a swale from private property. The new system carries the drainage across S. 129m Street to. an infIltration system within the Codiga Farms site, adjacent to the roadway. No piped drainage outfalls to the river exist in the area, so infIltration was the only available option to dispose of the roadway runoff. This contract was totally complete on January 22, 2008. Change Order No 1 was issued in the amount of$2,588.12 as compensation for additional asphalt concrete pavement thickness of 14", contrary to the expected 6" depth portrayed in the contract plans. Contract Award Amount Change Order No. 1 Total Amount Paid (including tax and retainage) $ 37,697.91 2.588.12 $ 40.286.03 RECOMMENDATION It is recommended that this contract be forwarded to the Tukwila City Council on the consent agenda for formal acceptance and authorize the release of retainage, subject to the standard claim and lien release procedures. Attachments: Notice of Completion of Public Works Contract Vicinity Map P:\PROJECTS\A- DR Projects\07-DR04 (5. 129th Street Drainage Modifications\lnfo Memo - Ooseout BRlKE - 5 129th Drainage.doc From: State of Washington Department of Revenue PO Box 47474 R EVENUE Olympia WA 98504 -7474 Contractor' s Registration No. (UBI No.) 601 979 516 Date 2/11/08 City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Description of Contract NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Name Address of Public Agenc Notice is hereby given relative to the completion of contract or project described below South 129 Street Drainage Modifications; Project #07 -DRO4 07 -162 Contractor's Name Telephone Number Brike Excavating Underground Utilities, LLC 425 271 8417 Contractor's Address 15620 SE Renton Issaquah Road, Renton, WA 98059 Date Work Commenced Date Work Completed Date Work Accepted 1/7/08 1/22/08 12/4/07 Surety or Bonding Company Insco Insurance Services, Bond 334733P Agent's Address Developer's Surety Indemnity Co., 17780 Fitch, Suite 200, Irvine, CA 92614 Contract Amount 37,697.91 Additions 2,588.12 Reductions 0.00 Sub Total 40,286.03 Amount of Sales Tax Paid at 0.0 0.00 (If various rates apply, please send a breakdown.) TOTAL 40,286.03 Comments: No additive sales tax paid per Rule 171 Finance Approval Assigned To Date Assigned Signature Type or Print Name Diane Jaber Phone Number 206 -433 -1871 Amount Disbursed Amount Retained Department Use; Oi Contract Number Liquidated Damages 0.00 TOTAL 40,286.03 isb using :officer Y 38,271.72 2,014.31 The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype (TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov. REV 31 0020e (6- 27 -01) South 129th Drainage Modifications Aerial Photo Map Existing Pipe to be Abandoned Existing Swale to be Abandoned Catch Basin Existing Proposed Closed Pipe Photo Date: April 2005