Loading...
HomeMy WebLinkAboutUtilities 2008-08-04 Item 3A - Bid Award - Ebenal General for Standby Power Upgrades Year One INFORMATION MEMO To: From: Date: Subject: Mayor Haggerton Public Works Directo~ July 28, 2008 Standby Power UPl!rades - Year One Project No. 06-BGOl Bid Award ISSUE Award the bid for the Standby Power Upgrades - Year One project. BACKGROUND Abacus Engineered Systems was selected and contracted for preliminary engineering and fmal design of Standby Power Upgrades - Year One. Year One projects were approved by City Council on May 21, 2007 to include City Hall and Fire Stations 52, 53 and 54. Year Two projects (George Long Shops, Community Center and 6300 Building) and Year Three projects have not yet been approved by Council to fund design and construction. ACTION TAKEN The design and bid documents were fmalized and advertised in June 2008 with two bids received and opened on July 24, 2008. The apparent low bid was received from Ebenal General, Inc. of Bellingham, WAin the amount of $523,200.00, including tax. The apparent second low bid was received from Stouder General Construction, LLC of Femdale WAin the amount of $545,000.00. The Engineer's Estimate was $763,000.00, including sales tax and contingency. References were checked for Ebenal General, Inc. and they have performed very well on similar size and type projects. BUDGET M1J) BID SUMMARY Bid Amount Sales Tax (9.0% Bid Total Contingency (10%) Total Bid Results $ 480,000.00 43.200.00 $ 523,200.00 52.320.00 $ 575.520.00 En2ineer's Estimate $ 763,000.00 Bud2et $ 764,000.00 $ 763.000.00 $ 764.000.00 RECOMl\1El\1J)ATION Award the base bid for the Standby Power Upgrades - Year One proj ect to Ebenal General, Inc. in the amount of $523,200.00. Attachments: City Clerk bid opening results - July 24, 2008 City Council Regular Meeting Minutes from May 21, 2007 P:\PROJECTSIA- BG Projecls\06BG01 Stand-by Power Upgrade\Design\lnfo Memo - Bid Award. Standby Power Ugrades Year One - Ebenal General.doc BIDDER NAME D AT E STAMP_OF_ RECEIPT Ebenal General, Inc. 7/24/08 7:45 AM Stouder General Construction, LLC 7/24/08 9:00 AM DATED this 24 day of July, 2008. CITY OF TUKWILA OFFICE OF THE CITY CLERK Christy O'Flahertv, CMC, City Clerk RTD nPFNTN( Standby Power Upgrades Year One 06 -BG01 July 24, 2008 10:00 A.M. SECURITY GRAND TOTAL ADDENDUMS BID .Including Sales ACKNOWLEDGED RECD.? Tax (None) Y 523,200.00 Y 545,000.00 /s/ Y Y APPARENT LOWEST BIDDER (RANK ORDER) 1 2 GINEE MAT The above figures appear as written within bid documents; and as read aloud at bid opening. THEY DO NOT however, REPRESENT ANY BID AWARD; apparent low, or otherwise. Christy O'Flaherty, City Clerk City ofTukwila Page 4 of 5 _ City Council ReQular Meetinq Minutes Mav 21. 2007 /e. Authorize the Mayor to begin implementation of the first phase of an Emergency Management initiative in the amount of $1,119,000.00 to include: - - . 1) Electrical upgrade design work for four City facilities -- City Hall, and Fire Stations 52, 53, 54 \./ ($125,000.00). ~ 2) Standby generators for the above City facilities ($764,000.00). 3) First Responder SupporflDisaster Emergency Response Trailer (DERT) ($100,000.00). 4) Improved public relations ($50,000.00). 5) Full-time staff person ($80,000.00). ) / MOVED BY HAGGERTON, SECONDED BY ROBERTSON TO AUTHORIZE THE MAYOR TO BEGIN IMPLEMENTATION OF THE FIR~T PHASE OF AN EMERGENCY MANAGEMENT INITIATIVE IN THE AMOUNT OF $1,119,000.00 TO INCLUDE: (1) ELECTRICAL UPGRADE DESIGN WORK FOR FOUR CITY FACILITIES -- CITY HALL, AND FIRE STATIONS 52,53,54 ($125,000.00); (2) STANDBY GENERATORS FOR THE ABOVE FACILITIES ($764,000.00); (3) FIRST RESPONDER SUPPORT/DISASTEREMERGENCY RESPONSE TRAILER <DERT> ($100,000.00); (4) IMPROVED PUBLIC RELATIONS ($50,000.00); (5) FULL-TIME STAFF PERSON ($80,000.00).* Council member Carter requested clarification as to how much money is expected to be expended in 2007. Jim Morrow, Public Works Director, explained approximately $250,000-$275,000 is anticipated to be utilized in 2007. The remaining funding for the initiative is to be included as part of the 2008 budget process. Rhonda Berry, City Administrator, provided a timeline for hiring of the Community Emergency Response Team (CERT) and Emergency Operations Coordinator positions. The Personnel Director is in the process of performing an analysis and creating position descriptions. The expectation is that the CERT staff member can be on board in mid-August, 2007 and the Emergency Operations Coordinator hired by mid-September, 2007. The Councilmembers expressed support for the initiative and also indicated the desire for continued discussion and Council involvement in the additional phases of the overall project. The Council thanked the staff for their efficiency and expediency in responding to the emergency management needs of the City. *MOTION CARRIED 7-0. REPORTS a. Mayor Mayor Mullet was not present due to his attendance at an economic development conference in Las Vegas, Nevada. b. Council Council member Duffie attended the Citizens' Police Academy on May 16, 2007. Council member Hernandez attended the Cascade Land Conservancy fundraiser breakfast and the Peace Officers' Memorial Ceremony on May 15, 2007. She a(so attended the Citizens' Police Academy and Tukwila Historical Society Meeting on May 16, 2007. Councilmember Carter attended the South County Area Transportation Board (SCA Tbd) meeting on May 15,2007. On May 16, 2007 she participated in the AWC Resolutions Committee meeting and the Regional Transit Committee meeting. Councilmember Haggerton attended the May 15,2007 Cascade Land Conservancy fundraiser breakfast where $635,000 was garnered for the organization. He reported on items discussed at the May 21, 2007 Finance and Safety Committee meeting to include a contract with the Museum of Flight and the Parks