HomeMy WebLinkAboutUtilities 2008-08-18 Item 3B - Bid Award - Gary Merlino Construction Company for Interurban Avenue South Waterline INFORMATION MEMO To: Mayor Haggerton Public Works Direc~ August 12, 2008 Interurban Avenue S Water Line Project No. 04-WT02 BID AWARD From: Date: Subject: ISSUE Award the Interurban Avenue South Water Line to Gary Merlino Construction Co. BACKGROUND This project will replace a 40+ year old 12" cast iron water line along Interurban Avenue South from 4200 Avenue South to 48th Avenue South in front of Shell Oil, Jack In The Box, and Starbucks. The project was advertised for bid on July 14 and 21 and bids were opened on Friday, August 8, 2008. Eight bids were received with the low bid of $338,990.00 from Gary Merlino Construction Co., Inc. The Engineer's Estimate was $395,647.31, including tax. ANALYSIS The bids were reviewed and no mathematical errors were found. Gary Merlino Construction Company did not sign the addendum as required with their bid documents; however once contacted, they immediately turned in the addendum acknowledgement form to the City. The second low bidder submitted a bid protest demanding that Gary Merlino Construction Co. bid be rejected as non- responsive. The contract specifications allow the City to waive any immaterial irregularities such as an addendum that is not acknowledged. References indicate that Gary Merlino Construction Co. has performed this type of work for the City of Tukwila in the past and their work has been satisfactory. BUDGET Construction Contingency (10 %) BID RESULTS $ 338,990.00 33.899.00 $ 372.889.00 ESTIMATE $ 395,647.31 39.564.73 $ 435.212.04 BUDGET $ 400,000.00 $ 400.000.00 RECOMMENDATION Waive the immaterial bid irregularity and award the Interurban Avenue S Water Line Project to Gary Merlino Construction Company in the amount of $338,990.00. Attachment: Bid Opening Results (Lump sum bid) MC:lw P:PROJECTS/A-WT Projects\04WT02 ill Waterline\Info Memo Interurban Ave Water Line Bid Award.doc BIDDER'S NAME AND DATE STAMPED AND RECEIVED Dumford & Sons Construction Company, Inc., PO Box 7530, Bonney Lake WA 98391 Dennis R. Craig Construction, Inc., Cont. Lie. #DENNII*201D4, PO Box 595, Redmond WA 98073 Construct Company, 1621 Pease Avenue, Sumner WA 98390 OMA Construction, Inc., PO Box 3705 Seattle WA 98124 Archer Construction, Inc., 7855 So. 206th Street, Kent WA 98032 Gary Merlino Construction Co., Inc., 9125 10th Ave. S., Seattle WA 98108 McCann Construction Enterprises, Inc., PO Box 481, Renton WA 98055 Kar-Vel Construction, PO Box 58275, Renton WA 98058 CITY OF TUKWILA OFFICE OF THE CITY CLERK Christy O'Flaherty, CMC, City Clerk BID OPENING Interurban Ave. S. Waterline Project No. 04-WT02 August 8, 2008 - 10:00 A.M. GRAND ADDENDUMS ApPARENT TOTAL OF BID (INCLUDING ACKNOWLEDGED LOWEST BIDDER SALES TAX (NONE) (RANK ORDER) Y $397,305.00 y 2 Y $434,812.12 y 5 y $450,933.00 y 6 y $423,887.92 y 4 Y $670,009.92 y 8 y $338,990.00 Clear ack. of 1 #1 not here y $398,919.29 y 3 y $524,290.00 y 7 -- ~%';~l~~J~:r' --- -- _.- - -.- - ~ - - - - The above figures appear as written within bid documents; and as read aloud at bid opening. THEY DO NOT, however, REPRESENT ANY BID AWARD; apparent low, or otherwise. DATED this 8th day of August, 2008. Christy Q'Flaherty, CMC, City Clerk C:\DOCUME-l \scott-k\LOCALS-l \Temp\XPGrpWise\Project No. 04- wr02 #2.doc