Loading...
HomeMy WebLinkAboutUtilities 2009-01-13 Item 3B - Bid Award - Pacific Northwest Earthworks for Tukwila Village Northfield Car Wash Demolition City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee Public Works Directo~ January 7, 2009 Tukwila VillaQe Northfield Car Wash Demolition Project OO-BG22 Bid Award FROM: DATE: SUBJECT: ISSUE Award the Northfield Car Wash Demolition Project to Pacific NW Earthworks, LLC. BACKGROUND This project will demolish the Northfield Car Wash at the Tukwila Village site. The project was advertised for bids on November 24 and December 1,2008 and bids were opened on December 31, 2008. Twenty- one bids were received with the low bid of $35,109.33 from Pacific NW Earthworks, LLC. of Fall City, Washington. The low bid was in error by $0.01 in the calculation of sales tax and will be corrected to $35,109.34. This error does not affect the bid results. The Engineer's Estimate was $60,000.00. ANALYSIS The bids were reviewed and minor mathematical errors were found. The math errors did not affect the bidding outcome of the project. References indicate that Pacific NW Earthworks, LLC has done this type of work satisfactorily. BUDGET Construction Contingency (10%) Total BID RESULTS $35,109.34 3.510.93 $38.620.27 ESTIMATE $60,000.00 6.000.00 $66.000.00 BUDGET $40,000.00 0.00 $40.000.00 RECOMMENDA liON Award the Northfield Car Wash Demolition Project to Pacific NW Earthworks, LLC. in the amount of $35,109.34 and consider this item at the January 26, 2009 Committee of the Whole meeting and subsequent February 2,2009 Regular Meeting. Attachment: City Clerk Bid Opening Results Bid Tabulation P:\PROJECTSIA- BG ProjectslOObg22 TUK V1UAGEINorthlieJd Carwash Demo Bid Awanidoc CITY OF TUKWILA OFFICE OF THE CITY CLERK Christy O'Flahertv, CMC, City Clerk BID OPENING Foster Golf Links Reclaim Water Pipeline Extension 92-WT06 December 31, 2008 - 10:00 A.M. GRAND TOTAL ADDENDUMS APPARENT BIDDER NAME &. SECURITY Including Sales (4) LOWEST BIDDER DATE STAMP OF RECEIPT BID REC'O? Tax Acknowledged (Rank Order) Nordic Construction y $248,990.90 y 16 12/18/081:50 PM A & A Excavating Inc. y $125,241.00 y 4 12/19/088:15 AM Construct Co. y $396,736.02 y 17 12/19/08 8:35 AM Nor Tec Construction y $117,611.00 y 3 12/19/08 8:37 AM Lloyd Enterprises, Inc y $196,307.00 y 14 12/19/088:38 AM Swick & Son Enterprises, Inc. y $147,150.00 y 8 12/19/08 8:39 AM Higrade Bark, Topsoil and Rock, Inc. y $107,787.92 y 2 12/19/08 8:40 AM Specialized Landscaping, Inc. y $144,161.22 y 6 12/19/08 9:44 AM Precision Earthworks y $103,385.05 y 1 12/19/08 8:50 AM Kar-Vel Construction y $150,638.00 y 9 12/23/08 8:40 AM Talakai Construction y $214,730.00 y 15 12/23/08 1:16 PM Dennis R. Craig Construction, Inc. y $144,583.05 y 7 12/30/08 10:55 AM Shinstine Assoc. y $188,837.00 y 12 12/30/08 1 :45 PM VLS Construction Inc y $189,189.12 y 13 12/31/088:33 AM Archer Construction y $174,059.92 y 10 12/31/08 8:44 AM Washington Pipeline y $179,839.10 y 11 12/31/08 8:47 AM Reed Trucking & Excavating, Inc. y $125,350.00 y 5 12/31/08 8:47 AM ~ ~ iicTrn ..~.'.c >C_u'" . '. .' .~.. .~ C',' t .~' ., '. ~ , ~~ -~-'_ --:- -:->-: , "_ -,. -.,..- '.-, - - .'.---: .co___: ...:0___:,.'-_0_ - -:c.C'.~. _ -'.: - ~~.~;;;,: ~....~~i> ,'';'^ >L< ~ , 'ENGIN-EEI~!~~.stIMATE" ~~"".' Hj:;- c'-i ',..~~..... ~ .~~~ ,', ~ : . .~ " . .~..~.:~ .'.~~. -~:'~ .~.~~:'.:,~~ ,. ~~.~~;-~:~~~ .c-_-::_--.,_-.--',;::_-_-,.---." '. . .' ~~'~:~'- The above figures appear as written within bid documents; and as read aloud at bid opening. THEY DO NOT however, REPRESENT ANY BID AWARD; apparent low, or otherwise. DATED this 31st day of December, 2008. Christy O'Flaherty, CMC, City Clerk NORTHFIELD CAR WASH DEMOLITION BID RESULTS 00 -BG22 MIKE CUSICK, PE DEC 31,2008 CONTRACTOR 1 PACIFIC NW EARTH WORKS 2 MAYER CONSTRUCTION 3 CARMANS CONSTRUCTION 4 HIGRADE BARK TOPSOIL 5 ADVANCED UNDERGROUND 6 BRIKE CONSTRUCTION 7 BUCKLEY RECYLE CENTER 8 NORTEC CONSTRUCTION 9 3 KINGS ENVIRONMENTAL 10 REED TRUCKING 11 SLOANS ENTERPRISE 12 RW RHINE 13 PROVDENCE TRUCKING LLC 14 JUHL DEVELOPMENT 15 ESE CORPARATION 16 MIKE MCCLUNG 17 WESTEK FOREST LTD 18 GLOBAL DIVING 19 CUTTER INC 20 SHINSTINE ASSOC.,LLC 21 CONSTRUCT COMPANY TRENCH UNFORESEEN MISCELLANEOUS ALL WORK SYSTEM CONFLICT WORK $21,210.40 $1,000.00 $5,000.00 $5,000.00 $23,042.00 $1,000.00 $5,000.00 $5,000.00 $24,000.00 $450.00 $5,000.00 $5,000.00 $24,188.00 $700.00 $5,000.00 $5,000.00 $25,000.00 $1,000.00 $5,000.00 $5,000.00 $25,171.43 $1,500.00 $5,000.00 $5,000.00 $25,500.00 $2,000.00 $5,000.00 $5,000.00 $29,250.00 $150.00 $5,000.00 $5,000.00 $29,133.00 $500.00 $5,000.00 $5,000.00 $30,000.00 $500.00 $5,000.00 $5,000.00 $32,325.00 $800.00 $5,000.00 $5,000.00 $34,000.00 $0.00 $5,000.00 $5,000.00 $34,950.00 $800.00 $5,000.00 $5,000.00 $37,000.00 $500.00 $5,000.00 $5,000.00 $38,899.00 $920.00 $5,000.00 $5,000.00 $40,000.00 $500.00 $5,000.00 $5,000.00 $40,954.00 $1,000.00 $5,000.00 $5,000.00 $58,072.00 $2,710.00 $5,000.00 $5,000.00 $68,000.00 $1,000.00 $5,000.00 $5,000.00 $86,921.00 $1,000.00 $5,000.00 $5,000.00 $182,300.00 $1,000.00 $5,000.00 $5,000.00 SALES TAX BID SUBTOTAL 9.0% TOTAL $32,210.40 $2,898.94 $35,109.34 $34,042.00 $3,063.78 $37,105.78 $34,450.00 $3,100.50 $37,550.50 $34,888.00 $3,139.92 $38,027.92 $36,000.00 $3,240.00 $39,24000 $36,671.43 $3,300.43 $39,971.86 $37,500.00 $3,375.00 $40,875.00 $39,400.00 $3,546.00 $42,946.00 $39,633.00 $3,566.97 $43,199.97 $40,500.00 $3,645.00 $44,145.00 $43,125.00 $3,881.25 $47,006.25 $44,000.00 $3,960.00 $47,960.00 $45,750.00 $4,117.50 $49,867.50 $47,500.00 $4,275.00 $51,775.00 $49,819.00 $4,483.71 $54,302.71 $50,500.00 $4,545.00 $55,045.00 $51,954.00 $4,675.86 $56,629.86 $70,782.00 $6,370.38 $77,152.38 $79,000.00 __$7,110.00 $86,110.00 $97,921.00 $8,812.89 $106,733.89 $193,300.00 $17,397.00 $210,697.00 CONTRACTOR'S BID FROM P2 $35,109.33 $37,105.78 $37,550.50 $38,027.92 $39,240.00 $39,971.86 $40,875.00 $42,946.00 $43,199.97 $44,145.00 $47,006.25 $47,690.00 $49,867.50 $51,775.00 $54,302.71 $55,045.00 $56,629.86 $77,152.38 $86,110.00 $106,734.00 $210,697.00 CHANGE ($0.01) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ($270.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ($0.11) $0.00