Loading...
HomeMy WebLinkAboutUtilities 2009-05-27 Item 3B - Contract Supplement #7 - Interurban Avenue South Waterline Construction Management with Anchor EnvironmentalCity of Tukwila INFORMATIONAL MEMORANDUM TO: Mayor Haggerton UTILITIES COMMITTEE From: Public Works Director Date: May 19, 2009 Subject: Interurban Ave South Waterline Pro Project No. 04 -WT02, Consultant Agreement 06 -049 Supplemental Agreement No. 7 for Construction Management Services ISSUE Approve Supplemental Agreement No. 7 to Consultant Agreement Number 06 -049. Attachment Supplemental Ag No. 7 of Consultant Agreement No. 06 -049 BACKGROUND Base contract No. 06 -049 with Anchor Environmental, LLC (now known as Anchor QEA, LLC) included on -call construction management (CM) services in support of any City- funded construction projects. On September 3, 2008, City Council approved the Interurban Ave S Waterline construction contract with Gary Merlino Construction Company, Inc. For additional CM and inspection support, Supplemental Agreement No. 6 in the amount of $53,978.00 was approved with Anchor QEA, LLC. DISCUSSION During the course of construction, the discoveries of existing system conditions that were not known at the time of design were encountered. Included was the discovery of a previously unknown 8" waterline, a waterline thought to be 8" was actually 12 additional efforts needed to connect existing water services and the encounter of a previously unknown connection requirement found at the north end of the project. Anchor QEA, LLC supplied additional support services to complete the construction project, as well as assisted staff to analyze and negotiate the construction change orders for a substantial savings to the City estimated at $70,000.00. Anchor QEA LLC's fee of $21,206.00 under Supplement No. 7 for additional construction management services has been determined to be reasonable. W \PW Eng \PROJECTS\+- WT Projects \04WT02 IU Waterline \Construction Phase\Anchor Environmental CM \Info Memo Sup #7 Anchor 5 -19 -09 Final doc Jim Haggerton, Mayor RECOMMENDATION The Council is being asked to approve and forward Supplemental Agreement No. 7 with Anchor QEA, LLC for the Interurban Ave S Waterline Project for consideration at the June 8, 2009 Committee of the Whole meeting and subsequent June 15, 2009 Regular Meeting. CITY OF TUKWILA Steven M. Mullet, Mayor SUPPLEMENTAL AGREEMENT NUMBER SEVEN TO CONSULTANT AGREEMENT NUMBER 06 -049 THIS SUPPLEMENTAL AGREEMENT SEVEN is entered into between the City of Tukwila, Washington, herein -after referred to as "the City and Anchor QEA, LLC (foiinerly Anchor Environmental L.L.C. Inc.) hereinafter referred to as "the Consultant in consideration of the mutual benefits, terms, and conditions hereinafter specified. The City desires to supplement the agreement entered into with the Consultant and executed on, April 17, 2006 and identified as Agreement No. 06 -049 and previously amended by supplements, the most recent being Supplement No. 6 dated November 7, 2008. All provisions in the basic agreement and the previous supplements remain in effect except as expressly modified by this Supplement No. 7. This supplement is an extension of services previously authorized under Supplement No. 6. The changes to the agreement as described as follows: 1. Scope of Services, is not changed but extended to continue the general scope of services and the specific scope of services as outlined in Exhibit A -6. 2. Payment, shall be amended as follows: See attached Exhibit B -7. Payment for the work provided by the Consultant as part of this supplement shall be made as outlined in the agreement and the total amount of payment to the Consultant for the work presented in this Supplement No. 7 shall not exceed $21,206.00 without express written modification of the Agreement signed by the City. This supplement is for extra work required beyond the limits of the previously authorized Supplement No. 6. 3. Time for Performance, shall be amended as follows: Supplement Six had an estimated duration of 90 calendar days. This amendment extends the estimated duration to 120 calendar days. DATED this day of CONSULTANT By: 2009. Printed Name: Ed Berschinski Title: Partner Staff Type Exhibit B -7 Summary of Costs City of Tukwila City Supplement Seven Interurban Ave. Water Main Replacement Rate Hours Total Office Senior Project Manager $63.10 25 1,578 Project Assistant $20.48 3 61 28 Total Hours Total Labor (DSC) 1,639 Office OH 171.86% x DSC 2,817 Subtotal Office Labor 4,456 Fee 15% of Office Labor subtotal 668 Total Office Labor 5,124 Field Senior Inspector $38.71 150 5,807 Field OH 140% 8,130 Subtotal Field Labor $13,937 Fee 15% of Field Labor subtotal 2,091 Total Field Labor 16,028 Total Labor 21,152 54 Total Expenses $21,206 Total Project