Loading...
HomeMy WebLinkAboutUtilities 2009-05-27 Item 3D - Bid Award - Green River Construction for 2009 Small Drainage ProgramTO: Mayor Haggerton UTILITIES COMMITTEE FROM: Public Works Director Q1'S� DATE: May 22, 2009 SUBJECT: 2009 Small Drainage Proaram Project No. 09 -DR01 BID AWARD ISSUE BACKGROUND City of Tukwila INFORMATIONAL MEMORANDUM Award the bid for construction of the 2009 Small Drainage Program. This project will provide drainage improvements at six locations listed on Page 2 of this memo. The project was advertised for bids on May 7 and 14, 2009 for four base bid items and two additive items. The specific basis of award which determines the lowest bidder is the base bid amount for the four base projects. Five bids were received and opened on May 22, 2009. The bids were checked, corrected, and tabulated. Green River Construction is the low bidder with a base bid of $486,351.50. The engineer's base bid estimate was $675,225. ANALYSIS BUDGET AND BID SUMMARY (All amounts include sales tax.) Bid Results Estimate Budg Construction (Base Bid) $486,351.50 $675,225.00 Additive Items 1,2 84,835.00 122,205.00 Subtotal $571,186.50 $797,430.00 SDP (2009,2010) Construction Budget (pg 146) $600,000.00 Private Storm Budget (pg 147) 200,000.00 Contingency (15 85,677.98 119.614.50 0.00 Total $656.864.48 $917.044.50 $800.000.00 Jim Haggerton, Mayor The bids were reviewed and tabulated. One error was found and corrected in the base bids. Green River Construction has successfully worked for the City on past projects. Since favorable bids were received, the two additive items can be awarded and constructed within budget. *Includes construction funds from the Private Storm System Adoption Program for project No. 4 RECOMMENDATION The Council is being asked to award the construction of the 2009 Small Drainage Program including two Additive Alternates to Green River Construction in the amount of $571,186.50 for consideration at the June 8, 2009 Committee of the Whole meeting and subsequent June 15, 2009 Regular Meeting. Attachments: Project Location Map Bid Tabulations CIP Sheets Annual Small Drainage Program and Private Storm System Adoption W \PW Eng PROJECTS \A- DR Protects \09 -DRO1 (2009 SDP) \Info Memo Bid Award 2009 SDP doc INFORMATIONAL MEMO Page 2 The 2009 Small Drainage Program includes: Site 1) South 146 Street Site 2) South 133 Street Site 2A) South 131 Street (Additive Item No. 1) Site 3) West Marginal Place Site 4) 33 rd Ave S to 34 th Ave S (Private Storm System Adoption Project) Site 5) South 143 Street Outfall (Additive Item No. 2) 2009 Small Drainage Program Bid Results Base Bide Schedule A $486,351.50 Additive Item No. 1 $80,835.00 Additive Item No. 2 4,000.00 Total $486,835.00 $84,835.00 W 1PN! Eng1PROJECTSIA DR Projects109 DRO1 (2009 SDP)1Info Memo Bid Award 2009 SDP doc $571.186.50 S 148 St S 150 St 152 Stri Triland 0 S 180 St Trec Dr a m mi Conorate D, N Corpo ate D S o er Blvd Ni l Et Upland Ur Midland Dr Cosa Site 3 S 86 Site 2A Site 4 Site 1 PI 2009 Annual Neighborhood Drainage Program Map Site 2 8 Site 5 a CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS 2009 Small Drainage Program Bid Tab Project No. 09 -DR01 Item Section No. No. 'ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 19 20 21 22 23 24 25 2 -09 26 7 -01 27 7 -04 28 7 -04 29 7 -04 30 7 -04 31 7 -04 32 7 -04 33 7 -04 34 7 -04 35 7 -04 36 7 -04 37 7 -08 38 7 -05 39 7 -05 40 7 -05 41 7 -05 42 7 -05 43 7 -05 44 7 -05 45 7 -05 46 7 -05 47 7 -05 48 7 -09 49 7 -20 50 8 -15 51 8 -31 52 8 -31 Item 1 -09 Mobilization 1 -07 Temporary Water Pollution Erosion Control 1 -09 Resolution of Utility Conflicts 1 -10 Project Temporary Traffic Control 2 -02 Clearing and Grubbing 2 -02 Pavement Removal 2 -02 Removal of Concrete Sidewalk and Driveway 2 -02 Removal of Concrete Curb and Gutter 2 -03 Unsuitable Foundation Excavation Incl. Haul 2 -03 Gravel Borrow Including Haul 4 -04 Crushed Surfacing Top Course 5 -04 HMA 1/2 PG 64 -22 5 -04 HMA Thickened Edge 5 -04 Cement Concrete Curb and Gutter 8 -06 'Cement Concrete Driveway 8 -06 'Cement Concrete Sidewalk ITRA CONTROL DEVICES 17 1 8 -22 'Replace Existing Channelization 18 1 8 -22 'Thermoplastic Catch Basin Marking ROADSIDE DEVELOPMENT 8 -01 8 -01 8 -01 8 -02 8 -02 8 -02 'STORM DRAINAGE Topsoil Hydroseed Erosion Control Blanket Property Restoration Remove and Replace Decorative Metal Fence Remove and Replace Multi- Resident Mailbox Shoring or Extra Excavation Class B Drain Pipe, 6" PVC Storm Drain Pipe, 12" PVC Storm Drain Pipe, 12" Ductile Iron Storm Drain Pipe, 12" HDPE Storm Drain Pipe, 18" PVC Storm Drain Pipe, 18" Ductile Iron Storm Drain Pipe, 60" x 46" Arch Pipe Storm Drain Pipe, 36" Ductile Iron Remove /Abandon Existing Storm Drain Pipe Remove /Abandon Drainage Structure Streambed Gravel Connect to Existing Drainage Structure Catch Basin, Type 1 Catch Basin, Type 1L Catch Basin Type 2, 48 inch Catch Basin Type 2, 60 inch Catch Basin, Type 2, 72 inch Arch Pipe Riser, Frame, and Grate Overflow Structure Inlet, 60" Diameter Construct Outfall Storm Drain Frame and Grate Ladder for Existing Catch Basin Type 2 Water System Modification Temporary Water Bypass System Rock for Channel Protection Temporary Utility Pole Support Franchise Utility Coordination i by: )ate: )st 30.001 30.001 30.001 30.001 30.001 50.001 25.001 75.001 25.001 50.001 30.001 00.001 20.001 30.001 50.001 50.001 20.001 15.001 40.001 30.001 30.001 30.001 TOT/10.0011 TOTAL (SCHED25.0011 TOTAL (SCHED190.001 TOTAL BID PRICE (BASE 35.0011 00.0011 D0.0011 30.0011 00.0011 50.0011 00.0011 50.0011 00.0011 00.001 00.001 00.001 80.001 00.001 50.001 00.001 00.001 00.001 00.001 30.001 90.001 00.001 00.001 00.001 00.001 00.001 00.001 30.001 00.001 K Kar -Vel Construction Unit Cost $85,000.00 $20,000.00 $60,000.00 $6,500.00 $4,000.00 $4.10 $5.80 $40.00 $25.00 $17.00 $17.00 $130.00 $3.50 $50.00 $85.00 $100.00 00.0011 $2,300.00 30.0011 $70.00 $40.00 $5.00 $30.00 $30,000.00 $80.00 $2,000.00 $2,000.00 $40.00 $63.00 $67.00 $73.00 $80.00 $100.00 $430.00 $340.00 $1.00 $600.00 $60.00 $1,200.00 $1,400.00 $1,500.00 $2,600.00 $5,000.00 $7,000.00 $5,000.00 $5,000.00 $6,000.00 $1,500.00 $1,200.00 $3,500.00 $2,000.00 $25.00 $1,000.00 $2,000.00 Total Cost $85,000.00 $20,000.00 $60,000.00 $6,500.00 $4,000.00 $3,403.00 $493.00 $600.00 $375.00 $1,462.00 $18,190.00 $45,500.00 $4,742.50 $750.00 $5,950.00 $1,800.00 $2,300.001 $1,960.001 $1,520.00 $1,525.00 $2,400.00 $30,000.00 $3,200.00 $2,000.00 $2,000.001 $4,800.001 $11,970.001 $40,200.00 $15,330.00 $70,400.00 $11,000.00 $38,700.00 $15,300.00 $1,575.00 $10,800.00 $420.00 $4,800.00 $15,400.00 $9,000.00 $23,400.00 $5,000.001 $7,000.001 $10,000.001 $5,000.001 $6,000.001 $1,500.00 $1,200.00 $3,500.00 $2,000.00 $1,000.00 $1,000.00 $2,000.00 $623,965.501 $134,235.0011 $17,000.0011 $775,200.5011 2009 2014 Capital Improvement Program PROJECT: Annual Small Drainage Program LINE ITEM: 412.02.594.38 .09 PROJECT NO. Varies DESCRIPTION: Select, design, and construct small drainage projects throughout the City. JUSTIFICATION: Provide drainage corrections for existing /ongoing drainage problems throughout the City, including culvert replacements, drain extensions, and pavement upgrades. STATUS: Annual program is taken from Small Drainage Project List. MAINT. IMPACT: Reduces maintenance. Ongoing project, only one year actuals shown in first column. Construction expenses may occur over two COMMENT: calendar years. CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2009 to 2014 FINANCIAL Through Estimated (in $000's) 2007 2008 2009 2010 2011 2012 2013 2014 BEYOND TOTAL EXPENSES Design 114 60 60 60 60 60 60 80 80 634 Land(R/W) 0 Const. Mgmt. 8 40 40 40 40 40 40 50 50 348 Construction 657 300 300 300 300 300 300 370 370 3,197 TOTAL EXPENSES 779 400 400 400 400 400 400 500 500 4,179 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 779 400 400 400 400 400 400 500 500 4,179 TOTAL SOURCES 779 400 400 400 400 400 400 500 500 4,179 Project Location: Entire System 146 GS PROJECT: DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: FINANCIAL (in $000's) EXPENSES Design Land(R/W) Const. Mgmt. Construction TOTAL EXPENSES FUND SOURCES Awarded Grant Proposed Grant Mitigation Actual Mitigation Expected City Oper. Revenue TOTAL SOURCES Private Storm System Adoption and Rehabilitation Program LINE ITEM: 412.02.594.38 .30 PROJECT NO. 06 -DR03 Adopt and repair existing piped private systems throughout the City that convey public stormwater. Numerous private drainage systems exist that connect to the City's system. Failure of these private systems may lead to flooding and property loss that would be the City's responsibility. Maintenance has surveyed existing private systems and developed a list of 25 sites that need to be adopted and repaired. Some of these storm drain pipes are located under structures. Additional storm systems will require additional maintenance, however the City will have a more reliable system and rerouting the existing sites will improve maintenance access. In 2007, coordinated 3 projects with the Small Drainage Program. Over the next two years, these projects will also be combined with the Small Drainage Program. Through Estimated 2007 2008 2009 Project Location: Entire System CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2009 to 2014 38 30 155 45 200 38 30 400 2009 2014 Capital Improvement Program 0 0 0 0 38 30 400 300 0 0 0 0 0 768 38 30 400 300 0 0 0 0 0 768 2010 2011 2012 2013 2014 BEYOND TOTAL 223 0 25 70 275 475 300 0 0 0 0 0 768 147