Loading...
HomeMy WebLinkAboutUtilities 2009-06-09 Item 3B - Change Order #1 - Side Sewer Installation at 13906 51st Avenue South with Duane Cameron BulldozingCity of Tukwila INFORMATIONAL MEMORANDUM To: Mayor Haggerton Utilities Committee From: Public Works Director(`( Date: May 26, 2009 Q' Subject: Side Sewer Installation at 13906 51 Avenue South Project No. 09 -SW02, Contract 09 -057 Change Order No. 1 ISSUE Approve Change Order No. 1 to Contract Number 09 -057. BACKGROUND Jim Haggerton, Mayor Duane Cameron Bulldozing was awarded the construction contract for side sewer installation at 13906 51 Avenue South for $11,582.31, plus sales tax. Council approval was not necessary for the original contract as it was under the $25,000.00 approval threshold. The Notice to Proceed was issued March 31, 2009. ANALYSIS The additional work in Change Order No. 1 is the result of extra labor, equipment and materials required to install side sewer to the house at 13906 51 Avenue South. The as- built plans show a side sewer stub out to the house. However, after many hours of video inspection and excavation, a sewer stub was not found. A new stub had to be installed and the sewer main was found to be 18 feet deep. This is an extraordinary depth that was not expected. This change order will add $28,317.28 to the original contract for a new total contract amount of $39,899.59 (plus tax). Remaining budget is available for this change order from the $75,000 Sewer Infiltration Inflow (I &I) Project (page 122, 2009 CIP). RECOMMENDATION The Council is being asked to approve Change Order No. 1 for the Side Sewer Installation at 13906 51 Ave S Project with Duane Cameron Bulldozing in the amount of $28,317.28 for consideration at the June 22, 2009 Committee of the Whole meeting and subsequent July 1, 2009 Regular Meeting. Attachment: Change Order No. 1 W:1PW Eng101d P drive\PROJECTSIA- SW Prolects109sw02 13906 51 Ave S SSS \Info Memo Change Order 1.doc CHANGE: ACCEP D Date: 5 /x'/0 c l B y: /1 Change Order lads CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 1 DATE: 05/20/09 BUDGET NO. 402.02.594.353.63.05 PROJECT NO. 09 -SW02 CONTRACT NO. 09 -057 PROJECT NAME: Side Sewer Installation at 13906 51st Avenue South TO: You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the 'Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, is subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C. All claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders.. The contractor excavated in the marked location and did not locate the side sewer stub. The City of Tukwila sewer video truck data for the location of existing side sewer was in error by ten (10) feet. The contractor then had to dig 18 feet down to the existing sewer line to make the connection to the sanitary sewer line. Contractor: 6.4 v.tl, ticn� Title: (bL,,..c.k_ a Original Contract (without tax) $11,582.31 APPROVED BY THE CITY OF TUKWILA Previous Change Order Date: This Change Order 28,317.28 By: Mayor REV. CONTRACT AMOUNT 39,899.59 ORIGINAL: City Clerk (1 of 2) cc: Finance Department (w /encumbrance) Contractor (2 of 2) Construction Inspector Construction Engineer file: Sheet 1 of 1