Loading...
HomeMy WebLinkAboutUtilities 2009-07-28 Item 3C - Final Acceptance - Infiltration and Inflow 2009 Side Sewer Installation at 13906 51st Avenue South by Duane Cameron BulldozingCity of Tukwila TO: Mayor Haggerton Utilities Committee INFORMATIONAL MEMORANDUM ISSUE Accept contract as complete and authorize for release of the retainage. Jim Haggerton, Mayor FROM: Public Works Director DATE: July 22, 2009 SUBJECT: Infiltration and Inflow (I &I) 2009 Side Sewer Installation at 13906 51 Ave S Project Project No. 09 -SW02, Contract No. 09 -057 Project Completion and Acceptance BACKGROUND The Notice to Proceed for Contract No. 09 -057 with Duane Cameron Bulldozing, Inc., of Enumclaw, Washington was issued April 1, 2009 for construction of the Side Sewer Installation at 13906 51 Ave S Project. ANALYSIS This contract was completed on April 21, 2009. One Change Order was issued during construction. A new stub had to be installed and the sewer main was found to be 18 feet deep. This was an extraordinary depth that was not expected and required a significant cost increase. Council approved Change Order No. 1 for $28,317.28 on July 6, 2009. Contract Award Amount Unit Price Underruns Sales Tax (N /A) Total Amount Paid (incl. retainage) 11,582.31 28,317.28 3.790.46 43.690.05 RECOMMENDATION The Council is being asked for formal acceptance and retainage release authorization, subject to standard claim and lien release procedures, for the contract with Duane Cameron Bulldozing in the amount of $43,690.05 and consider this item on the consent agenda of the August 3, 2009 Regular Meeting. Attachment: Dept of Revenue Notice of Completion W: \PW Eng \PROJECTS\A- SW Projects \09sw02 13906 51 Ave S SSS \INFO MEMO Closeout 7 -22 -09 gl.doc From: 1 State of Washington Department of Revenue �/A'. PO Box 47474 REVENUE Olympia WA 98504 -7474 Contractor's Registration No. (UBI No.) 601 227 683 Date 7/13/09 City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Comments: NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Name Address of Public Agency V o \p Assigned To Date Assigned Notice is hereby given relative to the completion of contract or project described below Contract Number Description of Contract I I 2009 Side Sewer 13906 51 Ave S 09 -SW02 i 09 -057 Telephone Number Contractor's Name Duane Cameron Bulldozing 360 825 -3989 Contractor's Address PO Box 274, Enumclaw WA 98022 Date Work Commenced Date Work Completed Date Work Accepted 4/1/09 4/21/09 Surety or Bonding Company West American Insurance Company Agent's Address Hentschell Associates, Inc., 621 Pacific Ave Ste 400, Tacoma WA 98402 Contract Amount 11,582.31 Additions 28,317.28 Liquidated Damages 0.00 Reductions 0.00 Sub -Total 39,899.59 Amount Disbursed 41,695.08 Amount of Sales Tax Paid at 9.5 3,790.46 Amount Retained 1,994.97 (If various rates apply, please send a breakdown.) TOTAL 43,690.05 TOTAL 43,690.05 S ignature Type or Print Name Diane Jaber Phone Number 206 433 -1871 Disbursing Officer Department Use Only The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 3217. Teletype (TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov.