HomeMy WebLinkAboutUtilities 2009-07-28 Item 3E - Report - 2009 2nd Quarter Report: City Council / Public WorksCity of Tukwila
0
CITY COUNCIL
2nd QUARTER SIGNIFICANT ISSUES
BUDGET PROGRAM GOALS
SECOND QUARTER REPORT TO COUNCIL
Prepared for Utilities Committee
April 1 June 30, 2009
Jim Haggerton, Mayor
1. Seek out opportunities for Councilmembers to further their knowledge, experience and awareness of
the different cultures represented within the Tukwila community: Assigned to Community Affairs
Parks Committee for implementation and /or follow -up. Councilmembers had the opportunity
to attend Somali Culture 101: Truth Fiction at New Holly Gathering Hall on June 11, 2009.
2. Support proarams and services that provide a sense of stability. community and unity throughout
Tukwila's residential neighborhoods: Assigned to Community Affairs Parks Committee for
implementation and /or follow -up. Councilmembers continue sponsoring a monthly Coffee
Chat in the Tukwila community.
3. Work together in cooperation with nearby cities to address common problems in the Hiahwav 99
corridor and Military Road: Assigned to Finance Safety Committee for implementation and/or
follow -up. Mayors from Tukwila and SeaTac have been communicating regarding the
possibility of a joint meeting between the two city councils. Due to an increased workload,
Tukwila City Council was not able to commit to a specific meeting date during second quarter.
4. Provide legislative support and encouraoement to Tukwila residents living in rental communities
throuah proarams that hold owners and /or orooerty manaaers accountable for providing safe places
to live throuah the implementation of a rental licensing oroaram: Assigned to Community Affairs
Parks Committee for implementation and /or follow -up. Tukwila Councilmembers actively
opposed HB 1296/SB 5495 which provided for limitations on rental housing inspections.
Relative legislation was deferred this legislative session. Department of Community
Development staff continues to move forward with developing a rental housing licensing
program for Tukwila.
5. Approve and implement standard operating procedures for the Council. Review and uodate
procedures on a regular basis: Not currently assigned to a specific committee. During second
quarter, the Legislative Analyst continued to research, gather information and prepare draft
materials relative to Council standard operating procedures.
6. Support the implementation of City endorsed proarams (i.e. Walk Roll Plan, Fire Master Plan, Parks,
Recreation Ooen Space Plan) through policy related decisions not associated with direct oroaram
funding: Assigned to Community Affairs Parks Committee for implementation and /or follow
up. This item was not scheduled for Committee review during the second quarter.
7. Ensure a commitment to continued human services funding in relation to the cost of living throuah
consistent review of reaional. state and federal budgets affectina human services proarams and
services: Assigned to Community Affairs Parks and Finance Safety Committees for
implementation and /or follow -up. This item will be scheduled for Committee review as budget
reviews deem appropriate.
8. Study the feasibility and implementation of televised City Council meetinas: Assigned to Utilities
Committee for implementation and /or follow -up. Information Technology staff has conducted
preliminary research on this topic, which will be scheduled for Committee discussion during
the third quarter.
9. Continue to foster relationships within local. regional and state entities that encouraae opportunities
for joint partnership and outreach: Assigned to Utilities Committee for implementation and /or
follow -up. Councilmembers serve as representatives and alternates on local, regional and
state boards, committees and commissions including but not limited to: SCATBd, SKEDI,
2009 Second Quarter Report
Prepared for Utilities Committee
Page 2
WRIA 9, AHAB, Suburban Cities Association, Association of Washington Cities, Highiine
Forum and Cascade Water Alliance.
10. Formulate an Adoot -a- Neiahborhood program that will provide Councilmembers the opportunity to
become more familiar with the chancing faces of communities and neiahborhoods throuahout the
City: Assigned to Community Affairs Parks Committee for implementation and /or follow -up.
This item was not scheduled for Committee review during the second quarter.
11. Research the viability of sponsoring a City -wide Citizens' Academy: Assigned to Community
Affairs Parks and Finance Safety Committees implementation and /or follow -up. This item
was not scheduled for Committee review during the second quarter.
12. Establish a orocess to provide updates to Council on issues that are brought forward at Council
meetings during citizen comment opportunities: Assigned to Transportation Committee for
implementation and /or follow -up. This item was not scheduled for Committee review during
the second quarter.
PUBLIC WORKS DEPARTMENT
2009 2nd QUARTER SIGNIFICANT ISSUES
Tukwila's risk of experiencing flooding in the upcoming winter season has been significantly increased
due to problems at the Howard Hansen Dam. Staff has been participating in the regional planning efforts
to coordinate evacuation, warning notification, flood fighting techniques, mass care and sheltering, and
water rescue.
Notice to Proceed issued for Tukwila International Blvd Phases II III, 2009/2010 Overlay Repair
Program, 2009 Small Drainage Program, and Foster Golf Reclaimed Water Line Extension Project.
BUDGET PROGRAM GOALS
Public Works Administration
1. Prepare and present a comprehensive City Facilities Upgrade and Replacement Plan: Has been
placed on -hold until a financing plan is adopted.
2. Evaluate future arant funding options available and propose a course of action to fund transportation
proiects: The Klickitat Project did not receive the grant during the recent PSRC process for the
Regional Competition. Staff will continue to seek other opportunities.
3. Implement the Emeraencv Manaaement Community Disaster Education (CDE) Proaram: In
progress. Preparedness briefings are part of the Outreach Program for the Howard Hanson
Dam planning effort. Staff has made five briefings to the community, both residents and
businesses, and numerous briefings to individual businesses.
4. Provide auarterly reports on emeraencv manaaement issues: Ongoing. Mayor and Council are
being regularly updated on all issues.
5. Hold auarterlv community informational meetinos: Ongoing. Emergency Management has held
five public outreach briefings to date with a total of 267 people in attendance.
Business Services
1. Create a more effective. cost efficient deoartment— oroiectina and monitorina department costs:
seekina more cost effective ourchasina agreements with vendors; oreoarina the department's
operation. maintenance and capital facilities budaet usina a "needs- basis" approach: Ongoing.
2. Review the feasibility of usina Council- approved Local Improvement Districts (LIDs' as a means of
financina street improvement oroiects for residential and commercial areas: TUC Access (Klickitat)
Project will be the first LID project since 1989.
3. Review "rate model" for establishing appropriate rates for water, sewer and surface water enterprise
funds. Investigate the feasibility of a consumption -based sewer rate: Ongoing.
2009 Second Quarter Report
Prepared for Utilities Committee
Page 3
Water Utility /Maintenance Operations
General:
1. Track backflow prevention compliance for the annual Department of Health report usina the City's
cross connection data program: Data updates complete and DOH reports have been sent.
2. Continue the remainina phase of the automatic meter read program in the residential areas:
Remaining area, Allentown, is scheduled for the third quarter.
3. Implement a program to test the accuracy of water meters 2- inches and larger into standard
preventative maintenance procedures: Testing meters to resume in the fourth quarter.
4. Monitor Water Use Efficiency efforts and provide an annual report: Report sent to Washington
State Department of Health.
Performance:
1. Install new water meters within 48 hours of the hook -up request: Goal being met.
2. Respond to water auality concerns within 24 hours: No requests received this quarter.
3. Test chlorine residual level bi-monthlv: Goal being met as scheduled.
4. Test coliform levels bi-monthlv: Goal being met.
5. Achieve 10 percent water savinas to meet Water Efficiency Goals established by the Municipal Water
Law: Completed 10% for 2008 and evaluating 2009.
6. Reaular testing of fire hydrants: 50% scheduled for the third quarter.
General Engineering Services Water
1. Complete construction of Andover Park East Water main Replacement Proiect: Potholing and
survey work underway. Design completion scheduled by fourth quarter.
Sewer Maintenance Operations
General:
1. Evaluate system -wide conditions for possible replacement and /or upgrade: Assessment completed
with Infiltration Inflow work.
2. Review results of video loas to identify damaaed areas and locations of possible infiltration /inflow:
Repairs have been made as needed based on inspection logs.
3. Implement a system for remote monitorina of lift stations response and corrective action can be
achieved from a laptop computer: New software for updates will be ordered next quarter.
Performance:
1. TV inspect 20.000 LF of pipe annually: Approximately 50% complete.
2. Clean 183.000 LF of pipe annually: Approximately 40% complete.
3. Clean and maintain 730 manholes annually: Approximately 500 manholes completed.
4. Weekly monitorina of 10 sewer lift stations for pump hours, start counts, and Generator operation:
Programmatically accomplished on a regular schedule.
General Engineering Services Sewer
1. Complete construction of the Interurban Ave S Gravity Sewer Proiect: Potholing and survey work
being coordinated with Interurban Ave S Roadway Improvements.
Surface Water Maintenance
General:
1. Participate in development of a multi -year small drainaae proiect list: Design review completed.
2. Provide field support to Enaineerina for GIS inventory: Continuing for Area 5.
3. Investigate throuah usaae of TV. GIS and flushina tasks to find unmapped systems: Efforts are
underway to begin TV work in areas that still need additional mapping.
Performance:
1. TV inspect 15.000 LF of pipe: 10,420 LF have been completed.
2. Maintain /clean 3.500 LF of ditches and four laroe water quality ponds: 2,150 LF completed.
3. Clean 1.400 catch basins. manholes and stormceotors: 583 catch basins cleaned.
4. Maintain /clean 15.000 LF of storm lines: Will be performed with inspection efforts.
2009 Second Quarter Report
Prepared for Utilities Committee
Page 4
5. Conduct weekly monitorina of five storm lift stations for pump hours, start counts. and aenerator
operation: Being accomplished on a regular schedule.
Surface Water General Engineering Services
1. Complete small drainaae Droiects identified on the approved list for 2009 -2010: Construction
contract awarded to Green River Construction Co. of Tukwila. Construction to begin in the
third quarter.
2. Continue adoption and repair of the private storm systems that have been identified: Site 4 (13028
33 Ave S vicinity) is included in the 2009 Small Drainage contract.
3. Continue development of the GIS as- builts of city infrastructure that comolies with NPDES: Area 5
inventory and mapping to be presented to Utilities Committee by the fourth quarter.