Loading...
HomeMy WebLinkAboutUtilities 2009-11-24 Item 3E - Report - 2009 3rd Quarter Report: City Council / Parks and RecreationCITY COUNCIL City of Tukwila BUDGET PROGRAM GOALS THIRD QUARTER REPORT TO COUNCIL July 1 September 30, 2009 Prepared for Utilities Committee Jim Haggerton, Mayor 1. Seek out opportunities for Councilmembers to further their knowledae. experience and awareness of the different cultures represented within the Tukwila community: Assigned to Community Affairs Parks Committee for implementation and /or follow -up. No activity to report during third quarter. 2. Support oroarams and services that provide a sense of stability. community and unity throughout Tukwila's residential neiahborhoods: Assigned to Community Affairs Parks Committee for implementation and/or follow -up. Councilmembers continue sponsoring a monthly Coffee Chat in the Tukwila community. 3. Work toaether in cooperation with nearby cities to address common problems in the Hiahwav 99 corridor and Military Road: Assigned to Finance Safety Committee for implementation and/or follow -up. Mayors from Tukwila and SeaTac have been communicating regarding the possibility of a joint meeting between the two city councils. Due to an increased workload, Tukwila City Council was not able to commit to a specific meeting date during third quarter. 4. Provide legislative support and encouragement to Tukwila residents livina in rental communities throuah oroarams that hold owners and /or property managers accountable for orovidina safe places to live throuah the implementation of a rental licensing Droaram: Assigned to Community Affairs Parks Committee for implementation and /or follow -up. Tukwila Councilmembers actively opposed HB 1296/SB 5495 which provided for limitations on rental housing inspections. Relative legislation was deferred this legislative session. Department of Community Development staff continues to move forward with developing a rental housing licensing program for Tukwila. 5. Approve and implement standard operatina Drocedures for the Council. Review and update procedures on a reaular basis: Not currently assigned to a specific committee. During third quarter, the Legislative Analyst continued to research, gather information and prepare draft materials relative to Council standard operating procedures. 6. Support the implementation of City endorsed programs (i.e. Walk Roll Plan. Fire Master Plan. Parks Recreation Open Space Plan) through policy related decisions not associated with direct program funding: Assigned to Community Affairs Parks Committee for implementation and /or follow up. No activity to report during third quarter. 7. Ensure a commitment to continued human services fundino in relation to the cost of livina through consistent review of reaional. state and federal budgets affectina human services oroarams and services: Assigned to Community Affairs Parks and Finance Safety Committees for implementation and /or follow -up. This item will be scheduled for Committee review as budget reviews deem appropriate. 8. Study the feasibility and implementation of televised City Council meetinas: Assigned to Utilities Committee for implementation and/or follow -up. Information Technology staff has conducted preliminary research on this topic, which will be scheduled for Committee discussion during the third quarter. 9. Continue to foster relationships within local, reaional and state entities that encourage opportunities for ioint partnership and outreach: Assigned to Utilities Committee for implementation and/or follow -up. Councilmembers serves as representatives and alternates on local, regional and state boards, committees and commissions including but not limited to: SCATBd, SKEDI, WRIA 9, AHAB, Suburban Cities Association, Association of Washington Cities, Highline Forum and Cascade Water Alliance. 9 2009 Third Quarter Report Prepared for Utilities Committee Page 2 10. Formulate an Adoot -a- Neighborhood oroaram that will provide Councilmembers the opportunity to become more familiar with the chanaina faces of communities and neiahborhoods throughout the City: Assigned to Community Affairs Parks Committee for implementation and /or follow -up. This item was not scheduled for Committee review during the third quarter. 11. Research the viability of soonsorina a City -wide Citizens' Academy: Assigned to Community Affairs Parks and Finance Safety Committees implementation and /or follow -up. This item was not scheduled for Committee review during the third quarter. 12. Establish a process to provide updates to Council on issues that are brouaht forward at Council meetinas durina citizen comment opportunities: Assigned to Transportation Committee for implementation and /or follow -up. This item was not scheduled for Committee review during the third quarter. PUBLIC WORKS DEPARTMENT 3 QUARTER SIGNIFICANT ISSUES The Howard Hanson Dam seepage problem continues, despite Corp of Engineers work to install a temporary fix that may or may not allow additional water to be stored behind the dam. Staff participated in numerous local and regional planning and outreach meetings. Council passed Resolution No. 1689 declaring a local emergency due to increased flood potential because of dam's lower storage capacity. Notice to Proceed issued for Surface Water's Storm Lift Station No. 18 Upgrade and Gilliam Creek Basin Stormwater Overflow. BUDGET PROGRAM GOALS Public Works Administration 1. Prepare and present a comprehensive City Facilities Upgrade and Replacement Plan: Has been placed on -hold until a financing plan is adopted. 2. Evaluate future arant fundina options available and propose a course of action to fund transportation p_roiects: Staff will continue to seek funding opportunities. 3. Implement the Emeraencv Manaaement Community Disaster Education (CDEI Program: In progress. Preparedness briefings are part of the Outreach Program for the Howard Hanson Dam planning effort. Council approved Resolution 1689 declaring a local emergency due to flood control capabilities of the Howard Hanson Dam. 4. Provide quarterly reports on emeraencv management issues: Ongoing, Mayor and Council are being regularly updated on all issues. 5. Hold auarterly community informational meetings: Ongoing. Emergency Management has held 7 public outreach briefings to date with several hundred people in attendance. Water Utility /Maintenance Operations General: 1. Track backflow prevention compliance for the annual Department of Health report using the City's cross connection data oroaram: Data updates complete and DOH reports have been sent. 2. Continue the remaining phase of the automatic meter read program in the residential areas: Remaining area, Allentown, nearing completion. 3. Implement a oroaram to test the accuracy of water meters 2- inches and laraer into standard preventative maintenance procedures: Testing meters to resume in the fourth quarter. 4. Monitor Water Use Efficiency efforts and provide an annual report: Report sent to Washington State Department of Health. Performance: 1. Install new water meters within 48 hours of the hook -uo request: Goal being met. 2. Resoond to water quality concerns within 24 hours: No requests received this quarter. 3. Test chlorine residual level bi-monthlv: Goal being met as scheduled. 10 2009 Third Quarter Report Prepared for Utilities Committee Page 3 4. Test coliform levels bi-monthlv: Goal being met. 5. Achieve 10 percent water savinas to meet Water Efficiency Goals established by the Municipal Water Law: Completed 10% for 2008 and evaluating 2009 as consumption figures come in. 6. Regular testing of fire hydrants: Completed for 2009. General Engineering Services Water 1. Complete construction of Andover Park East Water main Reolacement Project: Potholing and survey work underway. Design completion scheduled by fourth quarter. Sewer Maintenance Operations General: 1. Evaluate system -wide conditions for possible replacement and /or upgrade: Assessment completed with Infiltration Inflow work. 2. Review results of video loos to identify damaaed areas and locations of possible infiltration /inflow: Repairs have been made as needed based on inspection logs. 3. Implement a system for remote monitorino of lift stations response and corrective action can be achieved from a laptop computer: New software installed and further fine tuning is needed. Performance: 1. TV inspect 20.000 LF of pioe annually: Approximately 50% complete, will begin again in October. 2. Clean 183.000 LF of pipe annually: Approximately 50% complete. 3. Clean and maintain 730 manholes annually: Approximately 500 manholes completed. 4. Weekly monitorina of 10 sewer lift stations for pump hours. start counts. and generator operation: Routine scheduled monitoring along with cleaning of wet wells. General Engineering Services Sewer 1. Complete construction of the Interurban Ave S Gravity Sewer Project: Potholing and survey work are being coordinated with Interurban Ave S roadway improvements. If the roadway improvement project is delayed, an overflow pipe will be constructed in 2010. Surface Water Maintenance General: 1. Participate in development of a multi -year small drainaae project list: Design review completed. 2. Provide field support to Enoineerina for GIS inventory: Continuing for Area 5 with Area 6 next. 3. Investigate through usaae of TV. GIS and flushino tasks to find unmapped systems: Efforts are underway to begin TV work in areas that still need additional mapping. Performance: 1. TV inspect 15.000 LF of pipe: Completed. 2. Maintain /clean 3.500 LF of ditches and four laroe water aualitv ponds: 2,800 LF completed. 3. Clean 1.400 catch basins. manholes and stormceotors: 1,000 catch basins cleaned. 4. Maintain /clean 15.000 LF of storm lines: Completed inspection efforts. 5. Conduct weekly monitorina of five storm lift stations for pump hours, start counts. and generator operation: Routine scheduled monitoring. Surface Water General Engineering Services 1. Complete small drainaoe proiects identified on the approved list for 2009 -2010: Construction for 2009 contract is nearly complete. 2. Continue adoption and repair of the private storm systems that have been identified: Consultant will complete design of 5 other sites in the 4" quarter for future construction. 3. Continue develooment of the GIS as- builts of city infrastructure that complies with NPDES: Area 5 inventory complete. Area 6 presented to UC to begin in 4" quarter. 11