HomeMy WebLinkAboutPermit M92-0189 - OFFICE TECHNICAL SYSTEMSm92-0189 office technical systems hvac
13035 gateway drive
.
city of 71thwilh-
Community Development / Public Works • 6300 Southcenter Boulevard; Suite 100 • Tukwila, Washington 98188
Address: 13035 GATEWAY DR
Location:
Parcel #: 000480 -0015
Contractor License No: PACAII *15482
TENANT
OFFICE TECHNICAL SYSTEMS
13035 GATEWAY DRIVE, TUKWILA, WA 98168
KAISER DEVELOPMENT CO Phone: (206)241 -1103
BEDFORD PROPERTIES,INC.,;12720.GATEWAY, TUKWILA WA 98168
PAC -AIRE, INC. Phone: 206 395 -4004
1702 PIKE STREET NW SUITE 1, AUBURN, WA "98001
******************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Permit Description :
OWNER
Permit No: M92 -0189
Type: B -MECH
Category: NRES
CONTRACTOR
INSTALL 3-TON.AIR CONDITIONING UNIT, EXHAUST FANS
DUCTWORK ,AND `'UNIT HEATER.
UMC Edition:. 1991
******************************************** * * * * * * * * * * * * * * * * * * * * * * *' * * * * * **
C ` - ra
Permit Center Authorized 'Signature (Date'
I hereby certify that I have read., and'examined this permit and know the
same to'be true and correct. All provisions of'law and ordinances:`:
governingthis work will be complied with, whether specified herein or not
The granting,of this permit does not 'presume to give authority to . violate
or cancel :.the provisions of any other. state., or local laws regulating
construction or he performance of work. I am authorized to sign for and
obtain thisb 1 . , r,nit.
Signature:
MECHANICAL PERMIT
Date:
•
Valuation:
`Total Permit Fee:
Status: ISSUED
Issued: 09/24/1992
Expires: 03/23/1993
(206) 431 -3670
500.00
38.13
Print Name: Title:•..
This permit shall become null and void if the work is : not ' "commenced within
180 days from the date of issuance, or if the work is suspended or
abandoned for a
period of .180 days from the last inspection.
PERMIT NO.
CONTACTED
Bab
DATE READY
DATE NOTIFIED
q cj Q
"1 � '� �� �!
BYlini: �Q
t.� -+lJ��
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(init.)
AMOUNT OWING
3 C� , L3
3RD NOTIFICATION
BY: (init.)
PLAN CHECK
NUMBER
—o VV L
O FIRE
O PLANNING
REVIEW COMPLETED
PROJECT NAME
SITE ADDRESS
INIT:
INIT:
O OTHER
INIT:
BUILDING - 6 1/32/1 2, C ZZleta UMC EDITION (year):
final rAviaw INIT: 1 II
MECHANICA" PERMIT
APPLICATION TRACKING
C_o.■ 5l £'
S ENO.
130 5 a r
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
BUILDING - e /qz e _ CONSULTANT: Date Sent - Date Approved
initial review �✓° �a�ROUI'ED)
FIRE PROTECTION: - - Sprinklers (Detectors — 17 N/A
FIRE DEPT. LETTER DATED:
ZONING:
SCREENING REQUIRED?
REFERENCE FILE NOS.:
INSPECTOR:
!BAR/LAND USE CONDITION )Yes () No
nYes n No
SITE ADDRESS SUITE N
13035 GATEWAY DRIVE BUILDING 9
VALUE Or CONSTRUCTION - $
$4,500.00
CONTRACTOR PAC —AIRE, INC.
PHONE 395 -4004
PROJECT NAME/TENANT
OFFICE TECHNICAL SYSTEMS
jZIP 98001
WA. ST. CONTRACTOR'S LICENSE I PACAII *154B2
TYPE OF WORK: 0 New /Addition jX Modifications 0 Repair 0
DESCRIBE WORK TO BE DONE:
HVAC
: ., .• .J. .r :::,: /: ' :n:�.:: .: .....: <x: r. r ... . .. 0
�� : :. v . }:.: �:.} : ii: i l r. ...: 'C.`:!4•:,S:. ..: ..:...; :•. � � � :! ?.i.�.: :: tr.. ..: .. ..�.... .. x.., .. . '���
GASJELECTRIC 3 TON
���:.
. :
ii
..
BUILDING USE (office, warehouse, etc.
•
OFFICE
NATURE OF BUSINESS:
RETAIL
WILD THERE BE A CHANGE IN USE? gli No ■ Yee IF YES, EXPLAIN:
WILL THERE 13„E, STOGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? 9L4 No U Yes • IF YES, EXPLAIN:
PROPERTY OWNER BEDFORD DEVELOPMENT COMPANY PHONE 241 -1103 -.
ADDRESS P.O. BOX 60000 SAN FRANSICO CA 94160 -1862 IP
CONTRACTOR PAC —AIRE, INC.
PHONE 395 -4004
ADDRESS 1702 PIKE STREET NW SUITE 1 AUBURN, WA
jZIP 98001
WA. ST. CONTRACTOR'S LICENSE I PACAII *154B2
EXP. DATE
I, CITY OF TUKWILA "
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431.3670
PLAN CHECK m
NUMBER
APPLICATION MUST BE PILLED OUT COMPLETELY
•
IN ..
yr
r V
-1 i':' Pi viiir
• .• nr
AND. • RRECT :AND :.I AM,
SIGNATURE
BUILDING OWNER
OR
AUTHORIZED
CONTACT PERSON
f1 •�
PRINT NAME 1 1 - ..J
ADDRESS/J
r� c
MECHANICAL PERMIT
APPLICATION
Mochonlaal Fie Wotteheet must also be Mod out
and soothed to this oppiJcation.
FEES (for staff use only)
DATE
CITY/ZIP/.
PHONE
PHONE ' C,
'rT�:x'•• veep < ^.;r.�!;rr{:
17, cJ c./
It b(.4 -r• t 1 A`&) /
APPLICATION SUBMITTAL In order 13 ensure that your application is aooapted for plan review, pleas: melee sum to fig
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completer
'Mechanical Pemit Fee Worksheet' must accompany this permit application. Handouts are available Si the Bulldinq
counter which provide more detailed Information on application and plan submittal requirements. Application and
clans must be complete in order to be wowed for elan review.
BUILDING OWNER I AUTHORIZED AGENT If the applicant Is other than the owner, registered architectlergk»er, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OR CONSTRUCTION The valuation is for the work covered by this permit and must be Med in by the
applicant. This figure Is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applcations for which no permit is issued within 100 days following the date of
application shall expire by limitation. The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined In Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 191 -3670.
I DATE APPLICATION ACCEPTED �� \ I DATE APPLICATION EXPIRES �,h
DESCRIPTION
UNIT COST
NO OF
UNITS
TOTAL
CQ .ST�
$15.00
$4.50
BASIC FEE
SUPPLEMENT PERMIT FEE
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
Including 100,000 Btu/h.
$9.00
X
2
Installation or relocation of each forced -alr or gravity-type furnace or
burner, Including ducts and vents attached to such appliance over
100,000 Btu/h.
$1 1.00
X
3
Installation or relocation of each floor furnace Including vent
$9.00
X
4
installation or relocation of each suspended heater, recessed wall heater
orfloor- mounted unit heater.
$9.00
X
ss
Installation, relocation or replacement of each appliance vent Installed and
not included in an appliance permit.
$4.50
X
8
Repak of, alteration of, or addAbn to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, Including Installation of
controls regulated by this Dods.
$9.00
X
7
Irnefallation or relocation of each holier or compressor to and Including
three horsepower, or each absorption system to and including 100,000
Btu/h.
$x.00
X
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system '
over 100,000 Btu/h and including 600,000 Btu/h.
$16.50
X
9
Installation or relocation of each boiler or compressor over 15
horsepower to and Including 30 horsepower, or each absorption system
over 500,000 Btu/h to and inckding 1,750,000 Btu/h.
$22.50
X
10
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu/h to and including 1,750,000 Btu/h.
$33.50
X
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu/h.
$56,00
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for Which a permit 18
required elsewhere In this code.)
$6.50
'
X
13
Each air- handling unit over 10,000 dm.
$11.00
14
Each evaporative cooler other than a portable type. .
$6.50
":
X
I S
Each ventilation fan connected to a single dud.
$4.50
.�
18
Each ventilation system which Is not a portion of any heating or
0- conditioning system authorized by a permit.
$8. .
X
t
Installation of each hood which Is served by mechanical exhaust, including
the ducts for such hood.
$
X
18
Installation or relocation of each commercial or industrial -type incinerator.
$11.00
X
18
Installation or relocation of each commercial or Industrial -type Incinerator.
$45.00
X
t
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee Is listed In
this code.
$6.50
X
.
SUBTOTAL
PLAN CHECK FEB MI
CITY OF TUKWILA
Department of Community Development • Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
MECHANI JAL PERMIT
FEE WORKSHEET
IN RUC ON ' » Comp lete the: worksheer
Indicating the number of Units;
Installed In each.;categofy.. At time of
'staff':will'oalculate the fees.
4.4c** 4, iglicic4i * * *k <' * *f: ** it ' *4c4., * *, 4,*:* ** * * ** * * * *i iia. *; ilk * *10.:
CITY 0: TUKWILA, WA TRANSMIT.
**** r**' h* s4�t' tF* k***1 �** *' *. *1! *tM, *,14ik ** *tk * * **4,..4vi' •* *1k * *t� * * tk,
'TRANSMITNumber:.22001032 Amounte. 38.13.0.9/24/92 12:01::
Permit • `No: "M92- 0189.. ' Type :., b -MECH MECHANICAL 'PERM.IT '
Parcel 'Nos...000480 -0015 ;
Site Addres 13035, QATEWAY I)a.
Payment Method: CHECK Notatian: PAC -AIRS' INC. , Ini ?�
*: ******:*, k***,********* �t
'. **** **
. *****"*'*, k*
* * ' **** *`**r * * * * * **F* **r*** *irk
Account Code ; D.e cr I pt i an Paid :
0.00/3.45.880 PLAN'.CHECK - NONRES 7.63:
000/322..100 ':'' , MECHANICAL. - ',NONIREB`' ,..30.:50
'Total '..(TM.i a Payment) t 3843
Total :Fees ii '38.
atal ,_All . Payments a ' .•`38
GENERA ; • 7.00
GENERA 28.00
GENERA; 7.63.
GENERA :. 30.50
TOTAi. ' 73.13
CHECK,: 73.13:
CHANGE. ': 0.00
3692A000 16.16
Hal ai�ca Q
Address: 13035 GATEWAY DR
Tenant: OFFICE TECHNICAL SYSTEMS
Type: B -MECH
Parcel If: 000480 -0015
CITY OF TUKWILA
Permit No: M92 -0]89
Status: ISSUED
Applied: 09/22/1992
Issued: 09/24/1992
** k*******• k***************************** * * ** * *•k * * *•k * * * * * ** * *** *•k * * **
Permit Conditions:
1. No changes will be made to the plans unless approved by the
Architect and the Tukwila Building Division.
2. Plumbing permit shall be obtai„na, the Seattle -King
County Department of •`h
P ic�,,He.�.�l�th � Pr�l�u`j�b�;ng w i l l be
inspected by that age'n.cy:` '- incl�ud l°
fi i g al"ga.s��'`p�i,p,ing
(296 -4722) . >:r .,,, ,,
3. Electrical perm: G rshai 1, be 'obta`i ned' through the fa$hin ton
oK o
State Divisi ` f Labor < n .x. ttt-i e ,s and d 2) 1 e' cal
, g
�* I'pdustr;'i
work will beK inspected ; by that agency'''(248- 6`6 i e 1 ec 57) , �~; ;,
4. All permi�,tis,°d' ins.pecti records, and'''approved slid "l -1: \be
maintai l "ebl.e at job$ prior Ito the start' ,,
any cox} { t t i'o
uctn . These documents dare to be 'ma i n;ta`ji ne.,d
until final ins ec't1ion appf,oval is ranie'd, ;
5. All co trtic•tion ,to be con
d dnel n formance with
�� r� �, �� p, ;�, i, f ppro� led' � �
plane °nd requ i reinents of the` Un i.f`orm Building Coda ('`19.91'
1 �Y��' •.�'. �> ��. ra•` Lt k Edition) , byT,:the Washington State Building Co.de ; ,
Uni o-X ;m Mechanical Code °' "`(1.99.1 'Editi,pn�), and Washington State ‘TI
Ene.' Codex (1x991 any vi
Seoor;d -- r Edi 1 trion) .r ,"'° �.' ;
6. Va11d1ty of Permit��.' The. issuance, o`f'T P ' , . f
;q, a permit or appr,ova'i'' "'of
s, specifi;cat,ions ''and co,mputataions, not be con ,,,on
r ;
st i d e fto =be a permit - r. , o' an ,� app "tova =1"�'o ;, olati
eli ,
of (Nny t'he ` � prov ' i s i o " of"° , t• il s 'dd4.5 ^ of any other , ,.
ke, c,f the uris No
perm,it give
aut :y,or violatlf4P1 ' F\e,i of. this. cc de "'4
sha bell, viii d`" 1� ' .w t '
V \
tb x1 :?
0
0
•
�d�
Project: 0 rs
Type ofinspe
Address: 13 a3e, s . e „..... ;,4
Date Called:
Date Wanted:
212..../2,..
fi 9--/ 3' --
2.....
Special Inductions:
Requester:
Phone No.:
fr
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 981
ci
PERMIT NO.
(206) 431-3670H
Approved per aj
COMMENTS: '
IMF LiP
0 $30.00 REINSPEC ION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
nspector:
Corrections required prior to approval.
Project: T.
`
'lam
Type of Inspection : , in
f
Address:
r
l� 0.tP U) Q
Date Called:
�!
Special Instructions:
�k�
j
"t\ •
Date Wanted:
" �
Q ��.�' '- (IQ
n 1� amP
Requester:
b o b
Phone No.:
.0 ! t ON
! r
INSP CTION F# ,CORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
COMMENTS:
I Recent No.:
Approved per applicable codes.
O Corrections required prior to approval.
0 K'" REINSPECTION F REQUIRE! Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
I Date:
FROM HUDSON 206-324-6248 C 9.21.1992 C 126
RICHARD HUDSON & ASSOCIATES, INC. JOB 1:2*°°? VP Um 5
CONSULTING ENGINEERS
1805 12TH AVENUE • SUITE 18 CALCULATED BY C
SEATTLE, WASHINGTON 98122
206-324.6160
STANDARD LOAD OUTPUTS
Company Name: PAC-AIRE, INC. 09-22-92
Block Load v1.0 Page 1 of 2
Zone Name: 0.T.S.
City Name
Latitude (deg):
Elevation (ft):
Indoor -Summer:
-Winter:
SEATTLE
Heating Load (Btuh)= 0 Winfil.=
ORIENTATION OF BUILDING . N S •E W RF
TRANSMISSION FACTORS 0.08 0.08 0.08 0.08 0.08
Glass Fac.:0.55 Lights Fluorescent? Y Shade Fac.:0.63 Floors: 1
Length: 22 Width:, 36 Height: 10 Vent Air Percent: 7 t ,
Number of people
Total lights
Other electrical
Area of N glass
Area of S glass
Area of E glass
Area of W glass
Total glass area
Area of N wall
Area of S wall
Area of h wall
Area of W wall
Total wall area
Area of roof •
Safety factor
Supply fan hp
Ventilation cfm
•
TEMP TOTAL .TONS RSH TONS
10
1,346
' *792
200
0
0
0
20 C)
50 RH
20
220
360
360
960
792
20%
0.98
79
1‹., WASHINGTON
1.88
1.80
• 1.72
2.00
Sensible people load
Lighting load
Other electrical
North glass solar
South solar
East glass solar
West glass solar'
Total .glass solar
Total glass trans.
N •wall load
S wall load
E wall load
W wall load
Total Wall trans.
Roof load
Safety load
Fan heat gain (DT)
Vent sensible•load
Vent latent load
People .latent load
Total latent load •
Total cfm-std air= 1,136
Room sensible 21,239 Room latent
P)enum return exhaust credit =. 0
GRAND TOTAL LOAD = 28,271 Btu/hr or
Load run for 7. JUN at:
Ventilation load =
Glass heat load =
Ififiltration load=
Slab heating 104d=
Weight -
(1b/scift)
Color -
1.37
1.34
1..27
1.46
1.59
1.75
1.77
0
876
861
81.1.3
937
1,023
1,121
1,136
Airflow=
Wall: 70
Roof 40
Bldg: 70 '
Wall: MEDIUM
Roof: MEDIUM
CFM •
2,426
5,744
2,703
2,460
• 0
0
: 0
2,460
1,289,
. • • 11
.373
306
rx. 507
1,196
. 1,8aa:
3;540
2,991
=, .1,021
990
2029
.3,020
= 2,029
2•.36 tons <
4 P.M.. •
0 cfm
O .' Roof 1 load . = • ' -0 •• ,,• , -
C) - Wall •heatthg load•••, = : • ,i0.•
O 1.4ar'm -up load .. ..• ::::: :. . _ , : b •
C) Heat 'with Vent • = ..- ',C
, ,
I understand fhafithe' ';an Check apps
subject to errors and omission:; and app
plans does` not authorize the VicIatiori of
adopted code Or i dinence. Receipt of c
FILE COY
RECEIVED
CITY OF TUKWILA
SEP 2 2 1992
PERMIT CENTER
exhaust fan
equipment
warehouse unit height
hvac improvements