HomeMy WebLinkAboutPermit M92-0232 - INFINITI OF SEATTLEM92-0232 INFINITI OF SEATTLE
400 BAKER BOULEVARD HVAC
I�1�(Nl1�l D�
SetesTitE
94yqf T1thwili
Address: 400 BAKER BL
Location:
Parcel #: 022310 -0075
Contractor License No: AIRSYE *229KN
UMC Edition: 1991
Signature: �c1- ,a--
MECHANICAL PERMIT
Print Name:__Ptv.022__/A0 &E Title:
Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188
Permit No: M92 -0232 Status: ISSUED
Type: B -MECH Issued: 11/12/1992
Category: NRES Expires: 05/11/1993
TENANT INFINITI OF SEATTLE
400 BAKER BLVD, TUKWILA, WA 98188
OWNER TALLAKSON HASELWOOD ENTERPRISES Phone: 206 433 -1000
13201 SE 36TH ST, BELLEVUE.WA.98007...
CONTRACTOR AIR SYSTEMS ENGINEERING Phone: 206 628 -9484
909 SOUTH 28TH.STREET, TACOMA, . WA 98409'.
CONTACT HAMILTON DAN. Phone: 206 572 -9484
909 SOUTH. 28TH STREET, TACOMA, WA 98409
********************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Permit Description:
INSTALL HVAC SYSTEM FOR NEW.ADDITION, 5 AND 10 -TON
ROOFTOP.;'A /C UNITS.
Valuation :. .31,500.00
Total Permit Fee: 82.50
******* *** * * * * * * * * * * * * * * * * ** *' * * * * * * **
_ _ IL La-qQ
Permit Center Authorized Signature Date
I hereby..,'certi'fy that I `have read and examined this permit and know the
same to 'be true and correct. All provisions of,.law and ordinances.
governing this work will be complied with,'. whether specified herein or not
The granting of this permit does not presume',to,.give authority to violate
or cancel the provisions of any other :state or `�lo'cal laws regulating
constructionor the performance of work. I'am authorized to sign'for and
obtain this building permit.
Date : // /2.-if..22 -'
(206) 431 -3670
This permit shall become null and void if thework:Is not commenced within
180 days from the date of is f,or, cif > work is suspended or
abandoned for a period of 180 days from . the last inspection.
PERMIT NO.
CONTACTED
. n �
DATE READY
DATE NOTIFIED
( + 10 - qa
BY: ,3n{,Z
"�,[�
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(snit.)
AMOUNT OWING
'%
•
3RD NOTIFICATION
BY:
init.)
PLAN CHECK
NUMBER
Ma oa - 6a.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
O FIRE
BUILDING -
initial review
O PLANNING
O OTHER
BUILDING -
final raviaw
REVIEW COMPLETED
I O- aq-ga
INIT:
INIT:
INIT:
INIT:
(ROUTED)
MECHANIC*. PERMIT
APPLICATION TRACKING
CONSULTANT: Date Sent -
FIRE PROTECTION: n Sprinklers ❑ Detectors (l N/A
FIRE DEPT. LETTER DATED:
ZONING:
SCREENING REQUIRED?
REFERENCE FILE NOS.:
UMC EDITION (year):
RE' UIREM. ' `1'S' >`' < .' : : >.
Date Approved -
INSPECTOR:
IBAR/LAND USE CONDITIONS? ( lYes (1 No
Yes rl No
SITE ADDRESS SUITE #
400 8a,eev 0l vi .
VALUE OF CONSTRUCTION - $
/, _2 CV
PROJECT NAME/TENANT LL
Z 1 7 L it) - 6 F S:en �I Imo' O ')i n -- 0C)
TYPE OF WORK: New /Addition 0 Modifications 0 Repair 0 Other:
DESCRIBE WORK TO BE DONE:
-►. S' L a `/ /1 5 54Cri/e.- - j �' / -6-64. - t mod / D fr7
- .:.: >;::.:::.... .;<..;:: HUtiAi3EA : :CFUNtY'5 < ::::: > ><:;;;;:<;
ADDRESS
,e0 -e /c i - -f / D L9
/
ZIP ���Qq
WA. ST. CONT
v s
BUILDING USE (office, warehouse, etc.)
A D/?tD4 Le. Stj1OG -//6 L.c` ( 9c--
NATURE, OF, BUSINESS:
✓`1 - 7 i` '1 4' 67 6e .c
WILL THERE BE A CHANGE IN USE ?N0 0 Yes IF YES, EXPLAIN:
WILL THERE EiE STOR E OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? LI No Yes IF YES, EXPLAIN:
!4"U 07 0 ✓e C: z r'� t a- /.a
PROPERTY OWNER kI(lS�/c,'G'(J 4 a ce -. / /3_J J , — riC .
PHONE
ADDRESS O (b a _ LJOC Baker' I3 I Vd v , /
. / ,eGU� /a / U v a IZ IP 97,f6
CONTRACTOR
1� x . r , 5 S`- s Finjirluitrn
PHONE
ADDRESS
TAtf Y
ACT LICENSE # kt r te , 2
`A * •
ZIP ���Qq
WA. ST. CONT
v s
EXP. DATE a_OI ~�13
PHONE �72,c) 44%4.
ARCHITECT
-
ADDRESS
IZIP �.
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
PLAN CHECK / V t
NUMBER
Oa -oa3
APPLICATION MUST BE FILLED OUT COMPLETELY
BUILDING OWNER
OR
AUTHORIZED
AGENT
SI R
PRINT NAME \bail 0(1
ADDRESS 0 10 0 1 S -Eb
CONTACT PERSON
If you have any ques
lease contact t
DATE APPLICATION ACCEPTED
OCT 2 9 1992
MECHA r AL PERMIT
APPLICATION
Mechanical Fee Worksheet must also be filled out and attached to this application.
FEES (for staff use only)
DESCRIPTION
BASIC PERMIT FEE
UNIT(S) FEE
PLAN• CHECK'FEE. !::
OTHER:
TOTAL:
DATE O -02r, ?
PHONE
CITY/ZIP.- e 9t((o9
PHONE 5 ,,._ S44
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed information on application and plan submittal requirements. Application and
plans must be complete in order to be accepted for plan review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the
applicant. This figure is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitation. • The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
t our process or plan submittal requirements,
/ Communit Development at 433 -1849.
DATE APPLICATION EXPIRES
StfaMITTAL CHECK 1ST
MECHANICAL
El Completed mechanical permit application (one for each structure or tenant
Two (2) sets of mechanical plans, which include:
• Floor plan
• layout
• Elevations (for roof mounted equipment)
Structural calculations stamped by a Washington State licensed engineer may be
required if structural work is to be done (2 sets)
Note: Hood and duct systems require a building permit for the duct shaft.
Id T Vr ►NRYT ►LA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
206 433 -1849
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
INSTRUCTIONS • Complete the worksheet,
Indicating the number of units being Installed
in each category,: multiplied by the unit cost
Then tally the subtotal column highlighted at
the bottom of the worksheet At time of
submittal, staff will calculate the renaming fees.
DESCRIPTION
UNIT COST
NO. OF
UNITS
X
TOTAL
COST
BASIC FEE
$15.00
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu /h.
$9.00
I
X
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
X
3
Installation or relocation of each floor furnace, including vent.
$9.00
x
4
Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater.
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit.
$4,50
X
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
X
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$ 9,00
X
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
9
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu /h.
$22,50
X
10
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
X
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu/h.
$56.00
X
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
X
13
Each air- ha'dlina unit over 10.000 cfm_
0.11 . x0
v
14
Each evaporative cooler other than a portable type.
$6.50
X
15
Each ventilation fan connected to a single duct.
$4.50
5
x
16
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
X
17
Installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6.50
X
18
Installation or relocation of each commercial or industrial -type incinerator.
$11.00
x
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
x
30
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code.
$6.50
X
SUBTOTAL (unit foe)
PLAN CHECK FEE ;aa;
neAun TATA'
MECHAF CAL PERMIT
FEE WORKSHEET
. ....-
7!***7
CITY OF TUKWILA, TRANSMIT
ic
TRANSMIT Number 92001291 Amount: 82.50 11112/92 11:48
Permit No: M92-0232 Type: B-MECH MECHANICAL PE11101t.192
Parcel No: 022310-0075
ite Address: 400 BAKER 8L
Payment Method: CHECK Notation: AIR SYSTEMS INC 'nit: SLU
********* ** A* *************************************74************ 1 4
Account; Code Description Paid
000/345.830 PLAN CHECK NONRES
000/322.100 MECHANICAL NONRE8
Total ( This Payment).
Total Fees: 82.50 '
Total All Payments: -
Sal an e • 00
• •
•
• 0.* ...•••■■••••■ .. . . .. . . .••
GENERA 16.50
GENERA 66. 00
TOTAL 82.50
CHECK 82.50
CHANGE H 0.00
5192A0 0 0 16:05
_ _ r _ 4 . . - -- r
Address: 400 BAKER BL
Tenant: INFINITI OF SEATTLE
Type: B -MECH
Parcel #:,022310 -0075
***********.********************************* * * * * * * * * * * * * * ** * * * * * * * * * * * * ****
Permit Conditions:
1. No changes will be made to the plans unless approved by the
'Architect and the.Tukwila Building Division.
2. Plumbing permit shall be obtalne.d. .th.rough the Seattle -King
County Department of Pub l i:c H ;a':1 th::' r3: P ,a'u•mb,i ; n,g will be
inspected by that ag,e r °including a'1 °1" °gas :.p °ip,ing
(296 -4722) . T;.: •••,,
b;,ta:ined', through the 4 tilashAngton
3. Electrical pern'i ~tr :shall
�i;,�a�o f
State Divisio �j�°r`.
Lab'ur raji* Ind'ustr•fe,s and-` ajl.;elect'rrical
work will be by` that agency °(248`"6657), ' � �
4. All permits,,/ inspection record "s, ' and''approved .pl,ans shal be
maintain l�Java.ilahl�e at. the ,fob ;site prior'Ito the start�o
r . ; r ��
any corl,•srucerttp. These documon'tsf. are to be 'mairi,ta'ined :`'t ;Y."
avai labl,4' until final insp,ectIon approval is granted:
5. Read i iy', ;access i b l e acce"s t o; roof mounted equipment'
requ r,ed riv . . .. . ., `'
6. Any , xpo lations ma•ter;ial shall have: a 'Flame ° >_,
Spread!' R ting o' 25 or��`l ess,,,2a,nd material shall bear/ i
f i c�a`t"ton howi the f ire. perfilrmance g thereof r :,'''''' '
7. Eactik single P sy stem -x pro` Vi, ding.jhe'at.i•nq,`'ar;cool.1ng air i „n
exc of 2000' Ct=t"!., n''°Gr� i u ` , _ `' ,' r ,-
p' B, t'a'i v. s:i qn', L o�c "cupanc i es
ti. s ,. .. . r , . i t. r r�' ��x
sh I�� It .' be equi pped wi .a th ° i shutoff ?activated;; vatedr�; by "` "`
smoke, dete 1 Smoke f. d � etec : t'prs shal, =rl.,.be J: 1n'stalled i•p the:,t;
mat ',Tetu air du ct ` ahea , a =f \rany � outs44e e a°ir inlet or they
may bte installed in°°ie or s pace t se�rve.d by the r ep,•)turn'
air ,d �cti,. ;;. Qetectors shall also b i nsta ]`l e'd �-.irn the sup
ducts do'Wnst eam of . the filters. i A'dt oft anv.' dete
y a s hu t:
downemote4iete'ctors shall be monttore4 by,et.U.L/. cert -,
Bova l .:{6 f.
plans, s4Aific#Apnvd computations con - : f l�
01 at n
of any of*k,, of'thts?.codwroi- of any r ��
ordinance o‘ jurisdiction. No permit o �.jg i v e
authority or OiTate or canc4lethe'lrfOisions of s;,f`c o d e
shall be valid. V: r•
jr
c
CITY OF TUKWILA
C
Permit No: M92 -0232
Status: ISSUED
Applied: 10/29/1992
Issued: 11/12/1992
COMMENTS: '
0 4_ -f r - c. .,,J) • 64, (
- \
LL_ ( 9....„ ..L.:- ,—
Address 0 1
4 ,
,
7
,
Date Wanted: ..7 .3
.3- / 7- 93 rirn.J p.m.
Requester:
X le ry
Phone No.:
%
, .
,
Project: 7 9. /
Type of Inspection: /
Address 0 1
4 ,
Da Called:
- ') 3
Special Instructions:
C bft...-ic— 4 1/471/1 Sf t• fu.S
,
Date Wanted: ..7 .3
.3- / 7- 93 rirn.J p.m.
Requester:
X le ry
Phone No.:
%
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
(206) 431-3670
0 ..,Approved per applicable codes. ip Corrections required prior to approval.
ED $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
INSPECTION RECORD(
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
C1 Approved per applicable codes.
nspector:
'Y I
❑ Corrections required prior to approval.
COMMENTS:
Ou C, M - I p
)
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
PLO
(206) 431 -3670
cadre
• u
A 41 of ,
Date Called: /!.. - ?3 �:'sr
Sp
Istructions:
4
bate Wanted: /u . +
3- / 7 `/3 .m.
R equester: , / / Gw , e r
1 E-
Phone No.;
1C'7 f
INSPECTION RECORD(
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
C1 Approved per applicable codes.
nspector:
'Y I
❑ Corrections required prior to approval.
COMMENTS:
Ou C, M - I p
)
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
PLO
(206) 431 -3670
COMMENTS:
I tAffdrt t'" Fie l( .DU ctS .
i. C L I ,P o Yc.. Scr2 2.J O I F- FLA.Se 4.-S Try r;' ,21 d .
3 .44.4.4-14.1E Fa a— S itE ' - 7.s D l/ Aura- 1 ,
AG - I qN0 A C - 2 .- I.Amit us A r .X:1
i) - IAA oa o a-; 66-1 E NA uST 0 u cr'S .
S) 6 6 1 - F , r1 f. t-c ( 9 . 0 . - A p.10 G A-c Pi p 1 iJG F.. W w-s .
Date Wanted: ,,' 0 _
RJOE` W HAIL is. f•Ja W A 1'`PR -ova .
Requester:
rl�y'
Phone No.: � `
-7' �� _ (" / t I '
Project T i ' 't / . ._
7 0 T �
t ype of Inspeotion
Address: 16h � p I , I
, I:, e Called;
Special Instructions:
Date Wanted: ,,' 0 _
am p.m.
o
Requester:
rl�y'
Phone No.: � `
-7' �� _ (" / t I '
C INSPECTION RECORD
Retain a copy with permit `" i
PY Pe
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
(206) 431 -3670
❑ Approved per applicable codes. j Corrections required prior to approval.
Inspector:
Date: -15_ / o —
❑ . $30.00 REINSPECTION FEE'REOUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
I .
• r • - ' /?iCirr)4
ype o ns.: • ion: R ,6-C "'./d
am..
Addr • --:
Date Called:
21 Wl
• • • . Instructions:
'51.4 ow 12 otsvA 4
�A
Date Wanted:
"2-4(:3
eItN'.
Re
Phone No.:
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
(206) 431 -3670
Approved per appiiCable codes.
Corrections required prior to approval.
COMMENTS:
-
Inspector:
Date: 2 _2.4
D $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
a'
COMMENTS:
/ /
/ d Sib / /'
- - Ci7 Stu a_ d�
6
1 -..).•. , ate( - S - r c p c ruJr- . C—
46/1)/ L 0 /
„ feL 4
- 1/v1.
.
1t
41.t.cirs 12.�. •ozLok f '.'``
fnj .
A A-AA.L.44.1-3 CL—k. A./*a_ t-LILA -- 1 - 6 Ott-Mg-LA.0
1-(
. r"
e
(MI G ,g. vt�' —I-0 ,.-
'
,�-- i,,,..�. - .,- � f
• c . c...- .-.. -....-, ,,1...4_.. "x"
e,:
..—
w1 /A-Gri . cKS.Lra A f /c..S CJLt.e '. f i .. - {,e /2
Phone No.:
/ a
-
ro - : ....•
' /7 , 4 ,
�
/ /
/ d Sib / /'
ype o nspect ' n:_
f
..
46/1)/ L 0 /
„ feL 4
- 1/v1.
.
Sp: 'a Instructions:
r 1-t ht--
' ate anted:
. r"
a
• fie....
a p.m.
Requester:
r/e/
...
Phone No.:
/ a
0.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
Approved per applicable codes.
INSPECTION RECORD
Retain a copy with permit
❑ Corrections required prior to approval.
Date: /—
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
_.IAX1MUM GONE COOLING LUAU
Location : Seattle -I :rna, wasningtoh� 1u -2u -92
Prepared By': Air Sys Ems Engineering 6100190202
Carrier Hourly Analysis Program Page 1 of 1
** * * * * * * * * ** * * * ** * *** ****** * ** : ** : * **** * **** : ** * * * * * * ** * ** ** *** ****
Sensible Load
No. Month Hour (Tons)
1 Jun 1600 7.14
2 Jun 1500 7.12
3 Jul 1600 7.18
4 Jul 1500 .7.16
5 Jun 1700 6.99
6 JUl 1700 7.01
7 Jun 1400 6.89
8 Jul 1400 6.92
9 Aug 1600 6.82
10. Aug 1500 6.81
Zone Name : INFINITY SHOWROOM
Total Load
(Tons)
7.68
7.65
7.63
7.60
7.52
7.45
7.41
7.36
7.26
7.24
Supply Air
(CFM)
3,62.1
3,577
3,593
3,549
3,603
3,568
3,479
3,449
3,396
3,358
I : NE DESIGN COOLING LOAD SUtrIC rC1
Location : Seattle coma, Washington 10 -20 -92
Prepared By : Air Syst ms Engineering 6100190202
Carrier Hourly Analysis Program Page 1 of 2
* * * ** ::r; ::****:**** * * *** *** ***** **** ** ** : * ** : * * * ** * ** * * * * * * *** * ** **
CALCULATION DATA:
Zone Name : INFINITY SHOWROOM Caic Time: Jun 1600h
Job Name : INFINITY OF SEATTLE Amb db /wb: 82.3/ 64.8 F
**************:*****:*:************:***** * * * * * * * * * * * * * * * * * * * * * * * * * * * *: **
LOAD INFORMATION
LOAD COMPONENT
SOLAR LOAD
GLASS.TRANSMISSION
WALL TRANSMISSION
ROOF TRANSMISSION
PARTITION TRANSMISSION
LIGHTING ( 1,188 W TOTAL)
OIHER ELEC. ( 0 W TOTAL)
PEOPLE ( 31.15 PEOPLE TOTAL)
MISCELLANEOUS LOADS
COOLING INFILTRATION
PULLUOWN /WARM -UP
COOLING SAFETY LOAD
SUB- TOTALS
NE1 VENTILATION LOAD (
SUPPLY FAN LOAD (BHP=
WALL LOAD TO PLENUM
ROOF LOAD TO PLENUM
LIGHTING LOAD TO PLENUM
935 CFM)
0.5)
SENSIBLE LATENT
(BTU /hr) (B1U /hr)
34,643
3,154
2,035
2,808
350
26,519
0
/,621
0
U
0
U
17,130
7,265
1,342
U
0
0
0
0
U
0
0
0
U
6,386
U
0
U
0
6,386
-5
0
0
0
0
TOTAL COOLING LOADS 85,738 6,381
***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
COIL SELECTION PARAMETERS:
COIL ENTERING AIR TEMP. (DB /WB)
COIL LEAVING AIR TEMP. (DB/WB)
COIL SENSIBLE LOAD
COIL TOTAL LOAD
COOLING SUPPLY AIR TEMPERATURE
1UTAL COOLING CFM (actual)
TOTAL COOLING CFM (std. air)
RESULTING ROOM REL. HUMIDITY
COIL BYPASS FACTOR
COIL APPARATUS UEWPOINT
REHEAT REQUIRED
*** * * ** ** ** * ** * * * ** * * * * * * ** *********** * * * * * * * * * * * * * * * * * * * * * * * * ** * * * **
GENERAL INFORMATION:
TOTAL COOLING LOAD
76.9/ 63.0 deg F
= 54.7/ 54.0 deg F
= 85,738 BTU /hr
92,119 BTU/hr
55.0 deg F
= 3,621 CFM
3,511 CFM
48.7
0.060
53.5 deg F
0 BTU /hr
'/.68 ions
405.78 sgtt /"Ions
IOIAL FLOOR AREA s,115.0u sgft
OVERALL U- FACTOR - 0.146 BTU /hr /sqtt /F
COOLING CFM /sgt't - 1 . 1 b CFM /sqtt
* T ******************************** * * * *** * * * * * * ** * * * * * * * * * ** ** * *$*
kNE DESIGN COOLING LOAD SUry AY
Location : Seattl Tacoma, Washington ti 10-20-92
Prepared By : Air Sy Gems Engineering 61001 90202
Carrier Hourly Analysis Program Page 2 of 2
*** ** ** :******************************* *** * ** * * * * * * * ** * ** ** * * ** ** * * ***
CALCULATION UAIA:
Zone Name :. INF1N1'I Y SHOWROOM Ca lc lime: Jun 1600h
Job Name : INFINITY OF SEA1TLE Amb db /wb: 82.3/ 64.8 F
***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
WALL AND GLASS LOAD BREAKDOWN
LOAD COMPONEN1 AREA TRANSMISSION SOLAR LOAD
(sqtt) (BFU /hr) (BTU /hr)
GLASS LOADS:NE 0 0 0
E 624 1,356 16,947
SE U U U
S 0 0 0
SW 0 0 U
W 270 587 1 1 , 026
NW 0 0 0
N 558 1 , 21 2 6,669
H 0 0. . U
WALL LOADS: NE 500. 071
E 1,026 1,191
SE 150 182
'S 0 U
SW 0 0
W 106 59
NW 500 174
N 192 59
* * * * * * * * *** * * * * * * * * * * * *44* * * * * * *4.* * * * * * * ��a
* * *.4..*..4..r; * *' ** * ** * ***
2( ,E DESIGN HEATING LOAD SUM(( 1
"•Location : Seattl Tacoma, Washington 1u -1u -92
Prepared By : Air Sy ms Engineering ; •61U019u202
Carrier Hourly Analysis Program • Page 1 of 1
* * * * * * * * * * ** *** ** : * *** * * * * ** ** *** * * * * ** * * * * * * *: * * * **** * * ***** :*:r;**** :
CALCULATION DATA:
Zone Name : 1NFINIIY SHOWROOM Calc Time: Winter design
Job Name : INFINITY OF SEATTLE Amb db 21.0 F
***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
LOAD COMPONENT
LOAD (BTU /her)
WALL TRANSMISSION 6,301
ROOF TRANSMISSION 5,U3I
GLASS TRANSMISSION 39,131
TRANSMISSION LOSS 10 UNCONL) . SPACES 460
INFILTRATION LOSS 0
SLAB FLOOR ,b,bbb
HEAliNG SAFETY BTU /nr U
SUB -TOTAL
NET VEN1ILAIION LOSS
TUTAL HEATING LOAD
HEATING SUPPLY CFM
HEA I ING SUPPLY AIR 1 EMPERAT URE
HEATING VENTILATION AIR CFM
HEATING 1HERMOSTAI SETNOlN1 TEMP
56,605
4t;, /6'I
10b,;3 /2
1,329 CFM
1 1 U . 0 aeg r-
935 CFM
7U.0 aeg I-
***************: r;*** * * * * * * ** * * * ** * * * * * * * * ** * * * * * **4 4'** * ** *** * * ** *** * * **4*
p.
MAXIMUM LONE COOLING LOAD
Location Seattle- oma, Washington ` 10 -20 -92
• J.
Prepared By : Air Systems Engineering 6100190202
Carrier Hourly Analysis Program Page 1 of 1
****************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
, No.' Month Hour
1 Jun 1500
2 Jun 1600
3 Jul 1500
4 Jul 1600
5 Jun 1400
6 Jul 140U
7 Jun 1700
8 Jul 1700
9 Aug 1500
10 Aug 1600
Zone Name : INFINITY OFFICE
Sensible Load
(Tons)
4.38
4.36
4.41
4.39
4.30
4.33
4.28
4.30
4.29
4.26
Total Load
(Tons)
4.84
4.83
4.82
4.80
4.77
4.74
4.74
4.71
4.69
4.67
Supply Air
(CFM)
2,185
2,195
2,173
2,182
2,162
2,149
2,194
2,177
2,105
2,110
NE DESIGN COOLING LOAD SUMr. Y
Location : Seattl aroma, Washington 10-2U -92
Prepared By : Air Systems Engineering 6100190202
Carrier Hourly Analysis Program Page 1 of 2
* ** *%4 *** : 1:%r: **** * * *%K:r:*:k***** Kok ** ** * * * * * * *** *** * * *** *** *** ** * * **: **** **
CALCULATION DATA:
Zone Name : INFINITY OFFICE Calc Time: Jun 1500h
Job Name : INFINITY OF SEATTLE Amb db /wb: 83.0/ 65.0 F
*********************************** : * * * ** * * ** * * * * * * * * * * * * * * * * * * * ** *sic * * **
LOAD INFORMATION
LOAD COMPONENT
SENSIBLE
(BTU /hr)
LATENT
(UTU /hr)
SOLAR LOAD 5,498 0
GLASS 1RANSMISSION 1,043 0
WALL TRANSMISSION 108 0
ROOF TRANSMISSION 2,518 0
PARTITION TRANSMISSION 3,796 0
LIGHTING ( 7,663 W TO1AL) 26,089 0
OTHER ELEC. ( 0 W TOTAL) 0 0
PEOPLE ( 30.66 PEOPLE TOTAL) 7,498 6,283
MISCELLANEOUS LOADS 0 U
COOLING INFILTRATION 0 0
PULLDOWN /WARM -UP 0 0
COOLING SAFETY LOAD 0 0
SUB- TOTALS 46,550 6,283
NET VENTILATION LOAD ( 613 CFM) 5,223 -754
SUPPLY FAN LOAD (BHP= 0.3) 81u 0
WALL LOAD 10 PLENUM 0 0
ROOF LOAD TO PLENUM 0 0
LIGHTING LOAD TO PLENUM 0 0
TOTAL COOLING LOADS 52,583 5,529
***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
COIL SELECTION PARAMETERS:
COIL ENTERING AIR TEMP. (DB /WB) = 77.2/ 63.4 deg F
COIL LEAVING AIR TEMP. (DB /WB) = 54.7/ 54.0 deg F
COIL SENSIBLE LOAD = 52,583 BTU /hr
COIL TOTAL LOAD = 58,112 BTU /hr
COOLING SUPPLY AIR TEMPERATURE = 55.0 deg F
TOTAL COOLING CFM (actual) = 2,185 CFM
TOTAL COOLING CFM (std. air) = 2,155 CFM
RESULTING ROOM REL. HUMIDITY - 50.0 %
COIL BYPASS FACTOR = 0.050
COIL APPARATUS DEWPOINT = 53.5 deg F
REHEAT REQUIRED = 0 B °IU /hr
****************************:********:*** * * * * * * * * * * * * * * * * * ** * * * * * * * * * ***
GENERAL INFORMATION:
TOTAL COOLING LOAD = 4.84 "Ions
632.91 sqtt/lons
TOTAL FLOOR AREA - 6,065.00 sqtt
OVERALL U-FAC1OR = 0.096 BTU /her /sgtt /F
COOLING CFM/sqtt = 0.71 CFM /sqtt
* * * * * * * * * *a * * * * * ** *** :* * * * ** : * * ** : ** * ** : * * * * * ** * * * * ** * ** ** **** ***
L NE DESIGN COOLING LOAD SUILRY
Location : Seattl acoma, Washington 10 -20 -92
Prepared By : Air Sys ems Engineering 6100190202
Carrier Hourly Analysis Program Page 2 of 2
***************************************** * * * * * * * * * * * * * * * * * * * * * * ** * * * * * **
CALCULATION DATA:
Zone Name : INFINITY OFFICE Caic Time: Jun 1500h
Job Name : INFINITY OF SEATTLE Amb db /wb: 83.0/ 65.0 F
***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
WALL AND GLASS LOAD BREAKDOWN
LOAD COMPONENT AREA TRANSMISSION SOLAR LOAD
(sqtt) (BTU /hr) (BTU /hr)
GLASS LOADS:NE 0 0
E 0 0
SE 0 0
S 0 0
SW 0 0
W 0 0
NW 0 0
N 458 1,043
H 0 U
WALL LOADS: NE 0 .0
E 0 0
SE 0 0
S 0 0
SW 0 0
W 0 0
NW 0 0
N 458 108
0
0
U
0
C)
0
0
5,498
0
***************************************** * * ** * * * ** ** * * * * * ** * * * * ** * * * * * **
'JE DESIGN HEATING LOAD SUMCY
Location : Seatti , acoma, Washington 10-2u -92
Prepared By : Air Sys ems Engineering 6100190202
Carrier Hourly Analysis Program Page 1 of 1
* * * * * * * * * * **** * *** ** ** * * * * * ** * * * * * ** ** * * * * * ** * * ** :: *** * ** * * *: * * * * * **
CALCULATION DATA:
Zone Name : INFINITY OFFICE Cale Time: Winter design
Job Name : INFINITY OF SEATTLE Amb db 21.0 F
***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
LOAD COMPONENT
LOAD (BTU /hr)
WALL TRANSMISSION 1,167
ROOF TRANSMISSION 4,95ti
GLASS TRANSMISSION 12,343
TRANSMISSION LOSS TO UNCOND. SPACES 5,070
INFILTRATION LOSS 0
SLAB FLOOR 1,471
HEATING SAFETY BTU /hr 0
SUB -TOTAL
NET VENTILATION LOSS
25,007
31,990
TOTAL HEATING LOAD 56,996
HEATING SUPPLY CFM
HEATING SUPPLY AIR TEMPERATURE
HEATING VENTILATION AIR CFM
HEATING THERMOSTAT SETPOINT TEMP
587 CFM
110.0 deg F
613 CFM
70.0 deg F
**********:*********** * * * * * * * * * * * * * * * * * * * * * ** * * * * * ***
No. • Month. Hour
lAXIMUM LUNE CUULINu LUAUS
Location : beattle-1 ffla, Washington
Prepared by . Air Systems Engineerinu
Lurie Name : 1NFINIlY SIURAGE
Sensible Load Total Load
(Tuns) (lons)
10- i-92
6100190202
Carrier Hourly Analysis Program Page 1 01 1
Supply Air
• (CHI) •
1 Jun 1800 0.88 0.93 422
2 Jun 1900 0.87 0.96 428
6 JUH 1/00 0.87 0.93 4.P.')
4 Jul 1800 0.88 0.96 420
5 Jul 1700 0.88 0.92 413
6 Jul 1900 0.88 0.92 4
7 jUH 2000 0.87 0.92 433
8 Jun 1600 0.87 0.92 40/
9 Jul 1600 0.6/ 0.92 40c.,
1U Jul 2000 0.87 0.92 46u
CALGULAI1uN DAIA:
Lune Ndwe : INF1N1Ji SlURAGE
Job Ndwe : uh SLAIlLE
r • NE DESIGN uUOLING LuAD SUM
Location Sedttl Wa$ninyton '10
Prepared 13y ; it SyXiii Englneetirig 61001900'2.
Cartier Hout ly Andlyeis Proyraw Pdge 1 or 2
Calk:: Time: Jun 1600h
Awb dU/wb: /8.4/ 66.5 F
;44. 4.1 4: * 44* 4-4:44 .4.. #. * 4. 44 *. ;4y.p. 4: 4. ;4‘
LOAD iNFORMAliON
LOADCumPONEN1
SENSIBLE • LAIENT
(b1U/hr) (b4U/nr)
SOLAR LOAD- 0 0
GLASS TRANSOISSIUN 0 U
iWALL TRANSMISSION 391 0
ROC) 1RANSMISSION 1,069 0
PARTITION TRANSMISSION 0 0
L1UH1ING ( 2,390 W luiAL) 6,141 0
UTH.R ELEC. ( 0 W 10TAL) 0 0
PEOPLE ( 6.00 PELIPLL TUTAL) /34 615
MISCELLANEUUs LOADS 0 0
CUOL1NG 1NFILIRAI1UN 0 0
PULLUOWN/WANm-UP 0 u
CUOL1Nu SAFE4.4 LUAU '0 o
SUS-TOTALS 10,364 ' ' 615
NEI VENIILAIION LOAD ( 60 Cl-M) : 26 2t
':3UPPLY f LUAU (bHP;: u..1) 11)6 0
WALL LUAU 10 PLENUM 0 0
ROW- LUAU VU PLENUM 0 0
LiGHT1NU LUAU 10 PLENUM 0 . 0
AOTAL CUUL1NG LUAUS 10,516
+4
COIL SELECI1ON PARAME1ERS:
• cbiL ENIERiNG AIR lEmP. “A:s/WIJ). ... 78.4/ 03deg P
• (:01L LEAVING AIR TEMP. tjAii/Wbj -,. 54..7/ 54.0 degF.
CUIL SENsiBLE LUAU 10,516 blUlhi
COIL TOIL LUAU :::: 11,157 SAU/V11
OUOLINu SUP-L AIR TEMPERAIURE :.--- 5,50 deg
lUTAL CUUL1N( CEM (actudl) 42.2 CI
• 10AAL coULiNG UF• .(u. air) :-. 41b ,L1-• .
RESULI1NG KuUM NEL. HUM1D11): ..... A6:5
CU1L biz FAcTUR , , : 0 -0'..Po:'..
CU1L APPARAlus 0EWpU1N1 . 56.4.0e,c).1',
REHEAT REuUl i.L.0 • : .. 2 . • ..: , ,•. - . . 0 BiU/rir
.
GENLRAL INFORm01.1011; •
I01AL.000,1Nu.'1.0AD
10iL rLUUN •
' Ve,Els01-1... Ur.
• (Akji."11NCi:
: U.93 roil •
4
.....1. ';i;4 t
('-'. PAQ/11(1
::.0,;, ca ilit.;;(
. , .4 ; 14. ;., ; :,...4.,.,.. -..„ 4.... ,i 4.., i. -4, 4 -; 4 ;-i I' •i , tv..4 ,i :1 ,.1. ;4:--?....t• 44 i- 4. ;T.:4. 4:...4 4 i ' 4 .4-:',.34 4. :1' + .4 ., i I ,■ .■i :i. ';', '; :.; ■• ..i‘ . ;i 4 :
. „
. .
. . , .
,kL ULt .L iN L:UUL:1rsi( LUi;u ;DUI`
LuL:a'LiLPI 1 cti.:uiiia, Wat.r I.LH J Loil
P.r by . Ail Lel'ii 'c•_nylr'leei lriy
Carrier Houi ly i uo<;aram
ti .4 %H**%I'•a *4,****. ***h•.***h. I ****** * �. i. 1 ********* *A.4.*** { '.
(;ALCULA i 1 ON DA I i=+ .
Lone Nainc : INr• IN'1" 1 Y STORAGE Genii. T'lliie . Jun ISOGI i
Job Name : 1NF1.N11Y OF SEAI1.LE Hike; db /wb: 78.4/ 6643 F
1; :r:: : : 4.4.4.444::+.* * * * ** : + :r:*:E *** * ** * * ** *:r; *m:.;r:* r * * *h -:;r . :7 *:r*4.:r:***+ : r "+ *T
WALL' AND GLASS LOAD BREAKDOWN
LOAD COMI uNEN•I AREA 1 kANSM1SS1UN SULHk LUAD
(sq . (ki1U /i'tr) (BIU /I'ir'j
LOADS:NE 0.
U
SE • 0 0 •.
b 0 0
SW . 0 0.
W 0 0
NW 0 0
N 0 0.
H 0: U
WILL: LUi .)US: NE 0 v
E U •. 0
;:,E 0 0
0 0.
5W 0
0
750
0 .
G
0
0
0
u
U
U
0
1
G1001u2Q2
Pc LE: 2 01 .2
.N • u 0
••
'
)41:. HLf. LUAD
Location beatti : Wahington 10-41-9
Prepared by ; Air Sy.LLems Enylneellny o1001
Cirri Hourly Analysi Pcoyt'am Paye 1 ol 1
******x.*****;r*****;r**4,4.44.4
CALCULA)ION DAIA:
Lone Name 61uRAGE Calc ilme;
job Name : INFINIIY OF sLAilLE Amb db O F
*******4;*•*4'.************4.****.**4
LUAD COMPONEN)
WALL TRANSMISSlON 1,911.
RUOI- 1KANsMISsIUN
GLASS 4RANsmISSIUN 0
TRANbmiSsIUN to UNcuND. SPACEs
INFILIRAIIUN LOSS 0
SLAB FLOUR 1,206
HEAllNu SAFElY•LiTU/hr
SUB-101AL
NE I VENIILHI1U14
jOIAL HEAfiNG LUAU
HEATJN SUPPLY CFm
HEAlING SUPPLY AIR IEMPERAFURL
HEAlING VEN11LAllON AIR CFM
HEAI1NG IHERMUSFAT SEIPU1N) rEmP
LUAU lbfUini)
11/V GFH
• 110.0 dj F
• 60 0
70.0 deg 1-
.NE DESIGN HEATING LOAD SU .RY
Location : Seattlk acoma, Washington 10 -20 -92
Prepared By : Air Systems Engineering 6100190202
Carrier Hourly Analysis Program Page 1 of 1
******* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** : * *: * ** * * * * * ** : * * * * ** *: *** : * * *x:*:*
CALCULATION DATA:
Zone Name : INFINITY SERVICE GARAGE Calc Time: Winter design
Job Name : INFINITY OF SEATTLE Amb db 21.0 F
* * * * * * * * * * * * * * * * *** * * * * * * ** * * ** arc********* * * * * * ** * *** * ** * * * * * ** * * ** * * ** **
LOAD COMPONENT
WALL TRANSMISSION
ROOF TRANSMISSION
GLASS TRANSMISSION
TRANSMISSION LOSS TO UNCOND. SPACES
INFILTRATION LOSS
SLAB FLOOR
HEATING SAFETY BTU/hr
SUB-TOTAL
NET VENTILATION LOSS
TOTAL HEATING LOAD 239,944
HEATING SUPPLY CFM
HEATING SUPPLY AIR TEMPERATURE
HEATING VENTILATION AIR CFM
HEATING THERMOSTAT SETPOINT TEMP
LOAD (BTU /hr)
3,006
4,811
0
0
0
-777
0
7,039
232,905
120 CFM
110.0 deg F
6,432 CFM
55.0 deg F
***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * ** * **
il �. t
(^; 1'. 1'i 1»1'11 L14 to t llh'SL . 9',.
� 110 4J
' L
'.:;rsi.L.it<:-- I „„,:i-t, Wra�,liL11,Ji.L.,1)
L.Ui:d'G'1.��i't (71 e•,1VJJ.yCi'..:��'�
W I epa f e.d by . rr:L r :: y .. LGI11:�. r i iy i t tee: i l i r�j i 1 U i 1
* 4 t'xral Mi 4 ly ftttll 4
}°1 U!II 11,111
:{: ; { :}::{: ;{:.:I, %F a'. ,{::}. %1• %} ;q. J!. ,i. ;} :} :F 1. i } i :} , {.r h 4. 4. 4. :4. 4.. ;F ,;` 4. a. k. ;} k h. ; }. k 1:. a', a. 4. 4 •i: ;}; ;{::i: 4. ;{, .{..♦, h.: {- . }..}..{• 4. 4. 4: n 'r k 4 - 4,1. ,}.. }.1.
CF- ILUULi=s 1 1.UN U010:' i;dt I llil� : W1 t r LG l •t}i }i �Jr 1
•LUFte Nafit�: . ifvr 1141 1 `i 4iLi�Vll.1:. t�KJ. L I°.Ilil1J do : '21.0 F
.Ju .1�d
.Nt 11411 .i .UV . UL• i i i Lk
. - -. .•... •� i• 1 i..t ;r, x.:+, ;I::4= ,}.:►. ; }..i. ;i. ;i. %+ ;}'. ;{. ;{. %F ,}• T T * 4'.:+• ;►.:} ::i; 4-. :{: %}• %It %}: %k, %K :1: * 4. ;I::{t :} %'r %k• h. T :i: ;}: ;I: h"" h ;{. ;{. ;i. %i.. i, ;i
' •�b 1°II j '
• • LU =� U UOOPUl% tN i
: 10112..
HL I \/ Lhl 1 -i 1 i. JH L �u
101 10jAL L:i..INL:
cLJPPL'i
r {L�,I1NId ;;UWNL'i 1=iih 1LI''Ii t :.I'k1UrZL.
hit.ril'11�G JLNi1L 1IU14 rl tl :r t1
Hin.ta 1 .LN6 .1 H 11u i H i cJL. i PUIN'I
3,aGU
Wf'iLL 1 RHl4 r.11:.,::31UI'
3,726 0
RL 1 RANwriibbiLrt! C•
LiLr=t::A.i I RriN::;l•i1 7�, , }S �'
l leil:IN r?illoN. LU;;:: 10 UisiuuNL . ::;1JH Lb
1NF iL.`tkt-11 1014 LU bE> 0
$LMb FLOUR G
' HEH'i iNG SAI EI Y is 1 U/ 1 - I1
63,583
v
1,06L)
L 1• r•1
110.0 isr i I
U G F• r•1
LI
;i-1. ;1.:I,1• *' , {.:4. t. 4-.4 .i 4• T 4. 1 r• }: }. 4- ,}. 4 4. .i. Nt ;t �" { i �. ;I. X•. ,T..1 .a; 4 g. 4. %}• 4.4. }.4. ;{::}: :( ;I; k 4.4: 1• i. 4.:...i 1 l• 4 4 . 4
HVAC FLOOR PLAN
SEPARATE
PERMIT AND
APPROVAL
REQUIRED
Date
Permit Nei
VICINITY MAP
FILE COPY
I understand that the Plan Check approvals are
subject to errors and omissions and approval of
plans does not authorize the violation of any
adopted code or ordinance. 'Receipt of contractor's
copy of cvproved plans acknowledge:A.
LEGAL DESCRIPTION
APPROVED
THE NORM 489 FEET OF TRACT 7 ANDOVER INCOSTRAI. PARK N 2
ACCORDING TO PLAT AS RECORDED IN VOL 7 OF PIATS PAGES • Se AND 60
RECORDS OF KING COUNTY WASHINGTON
RECEIVED
Lennox " Rooftop Air Condi t 1 on i ng Unit
Model 00CS16- 653.76, 400/3/60, HeAt t 5.0
Cooling f Cepacity e 8 MBH, SEER -14i0,
Ht tinU Capacity =76. Mi l' Input., 68.0 MBH
Output, AFUE a 78.4%, 2250 CFM a 0.6"
E,S :p. , Provide: Roof Curb Model *RMF16-
66, ,Outside Air peinperp Model tOAD16 -65,
Pleated Filters (1) 8 "x17"X1", (1)
20 "x28 "M1 ", Unit Weight 700 lbs.
(1): "Lennox Rooftop Air Conditioning Unit
Model et3CS18- •1353, 460/3/80, MCAz29.0
Cooling Capacity e 110 MBH, EER =8.9,
Heating Capecity=170 Maki Input, 132.,6
MBH Output, AFUE M 80%, 4250 CFM 8 0.4"
E . E3 . P.: ; Provide :. Roof Curb Model ORMF 16-
136, Eewtnomi Tar Damper Mosel *REMD1.6-
136, Exhaust Damper Model *0E016-96,
pleated Filter- (4) 10 "x25 "k2 ",. (2)
16 "x26 "x1 ", Unit Weight 1260 lbs..
MUAel (1) "Sterling" Rooftop Make -up: Air Unit
Model eRT400EBOS, 460/3/60, S HP, 7500
CFM eg 0.3" E.S.'P. , 960 RPM, Two Stage,
Heating Capacity e 360 MBH Input, 280
Mali` Output, AFUE»80%, Provide: Stainless
Steel Heat Exchanger 44098S, Pleated
Filters (S) 20 "x20 "x1 ", Downflow Supply
Plenum, Roof Curb and Outside Air Hood,
Unit Weight a 1050 lbs.. Discharge Air
T' e tact with Space Temperature Override.
(1) "Sterling" Unit Heater Model sa3QVF -46;
'118/1/60, 1.3 Amps, 130 HP, Heating
Capacity W 45 MBH Input, 36.5 MBH
Output, AFUE 81 %, 800 CFM, Spark
Ignition, Unit Weight = 69 lbs.
(1)
UkL::2 (1) "Sterling Unit Heater Model eQVF--75,
115/1/60, 1.3 Amps, 1/30 HP, Heating
Capacity = 76 MBH Input, 80.8 MBH
Output, ' AFUE; = 80%, 1100 CFM, Spark
Ignition,, unit Weight = 90 lbs.
FL > ,.2 (3) 'Greenheck" Cei 1 ing Exhaust Fan Model
�.. *SP--117, 116/1/60, 76 Watts, 1,0 Amps,
170 CFM 0 0.25 E.S.P.
2 (6)
LD.-1 (4)
1.~..2 (4)
SBA (4)
HVA
E UIPPOIENT .`'C _ VDU ' E
"Green eek' • :RCpftep. r Xi1a> Uat •Fan Madill
*GB- 180 -- -15, 230/1/80, 4809 CFM .0 0.25"
E.S.P., 1 1/2 HP, 1336 AP1I, Provide
Roof Curb & S&ckdraft Damper.
N /1
Qreenheck Rooftop Exhaust Fan Model
*GB- 200 -16, 230/1/00, 6600 CFM $ 0,26"
E.S.P. 2 HP, 1125 RPM, Provide: roof
Curb & Backdraft Damper.
(15) "'rites" Ceiling Diffuser Model eTpC -A43,
Round Neck, 23 '3/4 "x23 3/4" Louver Face,
Steel, Standard White Finish, Lay-in
Fixed Pattern, See Neck & Module Sizes
Below,
(7) 5" Round Neck, 6 "x8" Module.
(3) 8" Round Heck, 9 "x9" Module'.
(5) 10 Round Neck, 12 "x12" Module,
"Titans" Cai 1 ing Diffuser Model eTDCA_.
A43 , 10" found Neck, 12"x12" Module, 23
3/4 "x23 3/4" louver Face, Steel,
Standard White Finish, Lay -in,
Adjustable Pattern,
„ Titus" Linear Skit. Diffuser Model $ML--
38--3p (3) 3/4" Slots, Standard Finish,
24" Long, Concealed Mounted, Flanged
Border Type e4, x °X End Border, Provide:
Insulated Supply Plenum Model •MPI -38,
8" Round Neck.
"Titus" Linear Slot Diffuser Model *ML-
38-3,. (3) 3/4 Slots, 9tendaard Finish,
36" Long, Concealed Mounted,• Flaaeged
Border Type e4, X -X End Border, Provide:
Insulated Supply Plenum Model #MPi-303,
10 Round Neck.
"Titus Double Deflection Sidewall
Register Model 0300f S -AG15, Opposed
Blade Damper, 24 "x18 ", Standard Finish,
ROOFJACK DETAIL
NO SCALE
"Titus" Linear Sldewal l Return Air
Grille Model . $C`I' - &80, " 1 /2" Spacing, 1/8"
Bars, . d degree' Deflection, 72 "x6 ",
Border typo $11, Concealed Fastener Type
C, Standard Finish, Provide 24" Wide
Plenum.:
Redd= . (6) "Titus" Ceiling Return Air Grille Model
60s ; 1 / "x1/2"x1/2" Squere Aluminum
Face,' 22 "xis" Neck, Standard •Finish,
Provides 24" High Plenum, harder $3.
(1)
ftAgz2 (2) . "Titus" Ceiling Return Air Grille Model
460F, 1/2 "x1/2 "x1/2" Square Aluminum
Facet 22 "x22" Neck, Standard Finish,
Provide: 24" High Plenum, Border 03.
E :i (2) "Titus" Ceiling Exhaust Grille Model
s 30RS, 30"x30", Surface Mount, 6tendard
Finish, Provide 30 "x30 "x24" Plenum,
Taper To 20 "x20" Duct Collar at Top,
(1) "Enerstaat" Wall Mounted Thermostat Model
*M9 -°1N, 7-day Programmable.
T 1
T 2 (2) "Ener•sstee" Unii t. Heater Mounted
Thermostat Model $ET- -62,
T 3
( 1 ) " Enerstat" W a l l Mounted Thermostat Model
*K3WN,
1. Electrical contractor to furnish and install all wiring
and conduit to interlock EF-4, EF--5, HUA-1, timeclock
and space override there ocitat f'or service garage and
drive areas -,
2. ASE/ to furnish timecloca and space' override
thermostat,
3. Electrical contractor to furnish and install starters
with overload .heaters As required for EF-4, EFe5,
MUA-1.
SMIF,S.L.11L,1911,0,HING DETAIL
NO SCALE
hT
<' a
al *_
r
� y
A S 1
r.
s
r
s
..f - ."4 . f _is .1 • -' b4- Z •Vr r ,. ..
I1I11111I1II 1IIIIIII1II1llII�lIIIIIIIIIIIIIIIIi�IIII 'III. :Y1 HIAT (,"IIIIIiIIIIi yI1III`fiili`II III iNIIIIIIIJ t tt
0 18 T143 INCH 1 3 4 5 6 7 $
NOTE: If the microfilmed document is less clear than this
notice, it is due to the quality of the original document.
oC 6Z 8Z LZ 9Z sZ 4 7Z r F.Z ZZ t7 0; 6t 8t Li 91. 9 he £l Zl tl 01, 6
I Ilii i III$II +
9 I 10 11 r,ADEINUil"" 12
L9 5 h
IiIIIIIIIIIIi IIIiIiIIIIIIIIiIIIIIIIIIIIIIIIIIIHHIIIIIII {IllilllIII IUldlillb lUillIiI;I 0. 1i ll1il !1111111!II!1iiIllllil1111iJll 1111lllill1llll11! II1illllllll1! Ili1il! i1lll! L) Iiililllllilfiliillll! ilIlll611illl itl�! ili�l! i�I IIIIII{ iIIIIIIiIII�II! I�Ilil�illll {IiI,IIIiIIIII�IIIilllll�lll
GENERAL HVAC NO ' oi S
1. All duct'liies ehe Wn area -:;let r 1ne'i4e
2, All duct gauges per table 10 -2 of 1991 UMC.
3. All duet supporter peer Table 10 -6 of 1991 UMC,
4. Sheet Metal supply and return ducts shall have 1 1/2"
R-6' insulation, Ouctboard supply end return ducts ,
shall be 1 1/2" R-6. Rigid round ducts shall be
"Snaplok" and shall have 2" R-5 wrap- -on insulation. with,
Vapor barrier. Round flexible ducts shall be ,)PL Model
$LAM, with P-B insulation and vapor barrier. Exhaust
ducts not i nssu i oared .
5. Attach diffusers and grilles to. T -boar grid peer USC
etrartdard 47- 18.14.
0. All supply and return grilles to be, Class I non
combust i b l e . .
7. 8aai encing dampers are to be installed on 411 branch
ducts tea diffusers, and on return system- when multiple
returns eels utilized OSA duets to have ba l enci i>i9
dampen rs> .
8. Materials within ducts or plenums shall have a flame
spread rating less than 26 and a flame smoke
development ratvng less than 50, per EMC 1002 - A.
• General contractor to cut and provide openings for all
rooftop, ceiling, floor, and mall penetrations,
including weatherproof sealing.
10. General contractor to verify penetration locations With
ASEI before framing openings.
11. General contractor to provide framed openings where
required for all mechanlca i penetrations, including
headers i f requi read.
12. General contractor to provide service access per code
to all mechanical equipment.
13. General contractor to level all factory curbs provided
by ASEI, provide all cant strips and curb insulation,
and sse:ai against leaks.
14. General contractor to undercut doors 1 where indicated
on HVAC drawing.
15. General contractor to provide all .cutting of T --bar
ceiling and extra material as 'required for HVAC
installation.
16. Electrical contractor to provide all electrical
connections , d i sconhectsa , and starters for meechan i call l
equipment.
17. Electrical contractor to verify equipment seizes, loads
:2g is with'ASEI mechanical plan and with field
conditions,
18, Electrical contractor to interlock bathroom exhaaeet
fans with light switch..
19. Electrical contractor to provide 120v sservicee outlet
within 25 feet of each piece of mechan'i c a l equi pMent .
20. ASEI to install all 24v low voltage wiring for .
thermostat -.
21. Electrical contractor to install all lineveltegee
wiring and conduit.
22. Plumbing contractor to offset vents 10 feet minimum
from all HVAC fresh air intakes.
23. Plumbing contractor to .furnish and install all -gas
piping required for mechanical ee uipmsnt incledin
valves, sleeves, supports, meters, and preaeurQ
reducing velvet.
Gl I f OF lUl;WILA
APPROVED
NOv .ati 1 2
'• 'DING DIVISION
PENWV CEICER