Loading...
HomeMy WebLinkAboutPermit M92-0232 - INFINITI OF SEATTLEM92-0232 INFINITI OF SEATTLE 400 BAKER BOULEVARD HVAC I�1�(Nl1�l D� SetesTitE 94yqf T1thwili Address: 400 BAKER BL Location: Parcel #: 022310 -0075 Contractor License No: AIRSYE *229KN UMC Edition: 1991 Signature: �c1- ,a-- MECHANICAL PERMIT Print Name:__Ptv.022__/A0 &E Title: Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 Permit No: M92 -0232 Status: ISSUED Type: B -MECH Issued: 11/12/1992 Category: NRES Expires: 05/11/1993 TENANT INFINITI OF SEATTLE 400 BAKER BLVD, TUKWILA, WA 98188 OWNER TALLAKSON HASELWOOD ENTERPRISES Phone: 206 433 -1000 13201 SE 36TH ST, BELLEVUE.WA.98007... CONTRACTOR AIR SYSTEMS ENGINEERING Phone: 206 628 -9484 909 SOUTH 28TH.STREET, TACOMA, . WA 98409'. CONTACT HAMILTON DAN. Phone: 206 572 -9484 909 SOUTH. 28TH STREET, TACOMA, WA 98409 ********************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Description: INSTALL HVAC SYSTEM FOR NEW.ADDITION, 5 AND 10 -TON ROOFTOP.;'A /C UNITS. Valuation :. .31,500.00 Total Permit Fee: 82.50 ******* *** * * * * * * * * * * * * * * * * ** *' * * * * * * ** _ _ IL La-qQ Permit Center Authorized Signature Date I hereby..,'certi'fy that I `have read and examined this permit and know the same to 'be true and correct. All provisions of,.law and ordinances. governing this work will be complied with,'. whether specified herein or not The granting of this permit does not presume',to,.give authority to violate or cancel the provisions of any other :state or `�lo'cal laws regulating constructionor the performance of work. I'am authorized to sign'for and obtain this building permit. Date : // /2.-if..22 -' (206) 431 -3670 This permit shall become null and void if thework:Is not commenced within 180 days from the date of is f,or, cif > work is suspended or abandoned for a period of 180 days from . the last inspection. PERMIT NO. CONTACTED . n � DATE READY DATE NOTIFIED ( + 10 - qa BY: ,3n{,Z "�,[� PERMIT EXPIRES 2nd NOTIFICATION BY: (snit.) AMOUNT OWING '% • 3RD NOTIFICATION BY: init.) PLAN CHECK NUMBER Ma oa - 6a. INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. O FIRE BUILDING - initial review O PLANNING O OTHER BUILDING - final raviaw REVIEW COMPLETED I O- aq-ga INIT: INIT: INIT: INIT: (ROUTED) MECHANIC*. PERMIT APPLICATION TRACKING CONSULTANT: Date Sent - FIRE PROTECTION: n Sprinklers ❑ Detectors (l N/A FIRE DEPT. LETTER DATED: ZONING: SCREENING REQUIRED? REFERENCE FILE NOS.: UMC EDITION (year): RE' UIREM. ' `1'S' >`' < .' : : >. Date Approved - INSPECTOR: IBAR/LAND USE CONDITIONS? ( lYes (1 No Yes rl No SITE ADDRESS SUITE # 400 8a,eev 0l vi . VALUE OF CONSTRUCTION - $ /, _2 CV PROJECT NAME/TENANT LL Z 1 7 L it) - 6 F S:en �I Imo' O ')i n -- 0C) TYPE OF WORK: New /Addition 0 Modifications 0 Repair 0 Other: DESCRIBE WORK TO BE DONE: -►. S' L a `/ /1 5 54Cri/e.- - j �' / -6-64. - t mod / D fr7 - .:.: >;::.:::.... .;<..;:: HUtiAi3EA : :CFUNtY'5 < ::::: > ><:;;;;:<; ADDRESS ,e0 -e /c i - -f / D L9 / ZIP ���Qq WA. ST. CONT v s BUILDING USE (office, warehouse, etc.) A D/?tD4 Le. Stj1OG -//6 L.c` ( 9c-- NATURE, OF, BUSINESS: ✓`1 - 7 i` '1 4' 67 6e .c WILL THERE BE A CHANGE IN USE ?N0 0 Yes IF YES, EXPLAIN: WILL THERE EiE STOR E OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? LI No Yes IF YES, EXPLAIN: !4"U 07 0 ✓e C: z r'� t a- /.a PROPERTY OWNER kI(lS�/c,'G'(J 4 a ce -. / /3_J J , — riC . PHONE ADDRESS O (b a _ LJOC Baker' I3 I Vd v , / . / ,eGU� /a / U v a IZ IP 97,f6 CONTRACTOR 1� x . r , 5 S`- s Finjirluitrn PHONE ADDRESS TAtf Y ACT LICENSE # kt r te , 2 `A * • ZIP ���Qq WA. ST. CONT v s EXP. DATE a_OI ~�13 PHONE �72,c) 44%4. ARCHITECT - ADDRESS IZIP �. CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 PLAN CHECK / V t NUMBER Oa -oa3 APPLICATION MUST BE FILLED OUT COMPLETELY BUILDING OWNER OR AUTHORIZED AGENT SI R PRINT NAME \bail 0(1 ADDRESS 0 10 0 1 S -Eb CONTACT PERSON If you have any ques lease contact t DATE APPLICATION ACCEPTED OCT 2 9 1992 MECHA r AL PERMIT APPLICATION Mechanical Fee Worksheet must also be filled out and attached to this application. FEES (for staff use only) DESCRIPTION BASIC PERMIT FEE UNIT(S) FEE PLAN• CHECK'FEE. !:: OTHER: TOTAL: DATE O -02r, ? PHONE CITY/ZIP.- e 9t((o9 PHONE 5 ,,._ S44 APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. • The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. t our process or plan submittal requirements, / Communit Development at 433 -1849. DATE APPLICATION EXPIRES StfaMITTAL CHECK 1ST MECHANICAL El Completed mechanical permit application (one for each structure or tenant Two (2) sets of mechanical plans, which include: • Floor plan • layout • Elevations (for roof mounted equipment) Structural calculations stamped by a Washington State licensed engineer may be required if structural work is to be done (2 sets) Note: Hood and duct systems require a building permit for the duct shaft. Id T Vr ►NRYT ►LA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 206 433 -1849 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. INSTRUCTIONS • Complete the worksheet, Indicating the number of units being Installed in each category,: multiplied by the unit cost Then tally the subtotal column highlighted at the bottom of the worksheet At time of submittal, staff will calculate the renaming fees. DESCRIPTION UNIT COST NO. OF UNITS X TOTAL COST BASIC FEE $15.00 Installation or relocation of each forced -air gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu /h. $9.00 I X 2 Installation or relocation of each forced -air or gravity -type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu /h. $11.00 X 3 Installation or relocation of each floor furnace, including vent. $9.00 x 4 Installation or relocation of each suspended heater, recessed wall heater or floor- mounted unit heater. $9.00 X 5 Installation, relocation or replacement of each appliance vent installed and not included in an appliance permit. $4,50 X 6 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 X Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h. $ 9,00 X 8 Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu /h. $16.50 X 9 Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu /h to and including 1,750,000 Btu /h. $22,50 X 10 Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 X Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu/h. $56.00 X 12 Each air - handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) $6.50 X 13 Each air- ha'dlina unit over 10.000 cfm_ 0.11 . x0 v 14 Each evaporative cooler other than a portable type. $6.50 X 15 Each ventilation fan connected to a single duct. $4.50 5 x 16 Each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit. $6.50 X 17 Installation of each hood which is served by mechanical exhaust, including the ducts for such hood. $6.50 X 18 Installation or relocation of each commercial or industrial -type incinerator. $11.00 x 19 Installation or relocation of each commercial or industrial -type incinerator. $45.00 x 30 Each appliance or piece of equipment regulated by the code but not classed in other appliance categories, or for which no other fee is listed in this code. $6.50 X SUBTOTAL (unit foe) PLAN CHECK FEE ;aa; neAun TATA' MECHAF CAL PERMIT FEE WORKSHEET . ....- 7!***7 CITY OF TUKWILA, TRANSMIT ic TRANSMIT Number 92001291 Amount: 82.50 11112/92 11:48 Permit No: M92-0232 Type: B-MECH MECHANICAL PE11101t.192 Parcel No: 022310-0075 ite Address: 400 BAKER 8L Payment Method: CHECK Notation: AIR SYSTEMS INC 'nit: SLU ********* ** A* *************************************74************ 1 4 Account; Code Description Paid 000/345.830 PLAN CHECK NONRES 000/322.100 MECHANICAL NONRE8 Total ( This Payment). Total Fees: 82.50 ' Total All Payments: - Sal an e • 00 • • • • 0.* ...•••■■••••■ .. . . .. . . .•• GENERA 16.50 GENERA 66. 00 TOTAL 82.50 CHECK 82.50 CHANGE H 0.00 5192A0 0 0 16:05 _ _ r _ 4 . . - -- r Address: 400 BAKER BL Tenant: INFINITI OF SEATTLE Type: B -MECH Parcel #:,022310 -0075 ***********.********************************* * * * * * * * * * * * * * ** * * * * * * * * * * * * **** Permit Conditions: 1. No changes will be made to the plans unless approved by the 'Architect and the.Tukwila Building Division. 2. Plumbing permit shall be obtalne.d. .th.rough the Seattle -King County Department of Pub l i:c H ;a':1 th::' r3: P ,a'u•mb,i ; n,g will be inspected by that ag,e r °including a'1 °1" °gas :.p °ip,ing (296 -4722) . T;.: •••,, b;,ta:ined', through the 4 tilashAngton 3. Electrical pern'i ~tr :shall �i;,�a�o f State Divisio �j�°r`. Lab'ur raji* Ind'ustr•fe,s and-` ajl.;elect'rrical work will be by` that agency °(248`"6657), ' � � 4. All permits,,/ inspection record "s, ' and''approved .pl,ans shal be maintain l�Java.ilahl�e at. the ,fob ;site prior'Ito the start�o r . ; r �� any corl,•srucerttp. These documon'tsf. are to be 'mairi,ta'ined :`'t ;Y." avai labl,4' until final insp,ectIon approval is granted: 5. Read i iy', ;access i b l e acce"s t o; roof mounted equipment' requ r,ed riv . . .. . ., `' 6. Any , xpo lations ma•ter;ial shall have: a 'Flame ° >_, Spread!' R ting o' 25 or��`l ess,,,2a,nd material shall bear/ i f i c�a`t"ton howi the f ire. perfilrmance g thereof r :,'''''' ' 7. Eactik single P sy stem -x pro` Vi, ding.jhe'at.i•nq,`'ar;cool.1ng air i „n exc of 2000' Ct=t"!., n''°Gr� i u ` , _ `' ,' r ,- p' B, t'a'i v. s:i qn', L o�c "cupanc i es ti. s ,. .. . r , . i t. r r�' ��x sh I�� It .' be equi pped wi .a th ° i shutoff ?activated;; vatedr�; by "` "` smoke, dete 1 Smoke f. d � etec : t'prs shal, =rl.,.be J: 1n'stalled i•p the:,t; mat ',Tetu air du ct ` ahea , a =f \rany � outs44e e a°ir inlet or they may bte installed in°°ie or s pace t se�rve.d by the r ep,•)turn' air ,d �cti,. ;;. Qetectors shall also b i nsta ]`l e'd �-.irn the sup ducts do'Wnst eam of . the filters. i A'dt oft anv.' dete y a s hu t: downemote4iete'ctors shall be monttore4 by,et.U.L/. cert -, Bova l .:{6 f. plans, s4Aific#Apnvd computations con - : f l� 01 at n of any of*k,, of'thts?.codwroi- of any r �� ordinance o‘ jurisdiction. No permit o �.jg i v e authority or OiTate or canc4lethe'lrfOisions of s;,f`c o d e shall be valid. V: r• jr c CITY OF TUKWILA C Permit No: M92 -0232 Status: ISSUED Applied: 10/29/1992 Issued: 11/12/1992 COMMENTS: ' 0 4_ -f r - c. .,,J) • 64, ( - \ LL_ ( 9....„ ..L.:- ,— Address 0 1 4 , , 7 , Date Wanted: ..7 .3 .3- / 7- 93 rirn.J p.m. Requester: X le ry Phone No.: % , . , Project: 7 9. / Type of Inspection: / Address 0 1 4 , Da Called: - ') 3 Special Instructions: C bft...-ic— 4 1/471/1 Sf t• fu.S , Date Wanted: ..7 .3 .3- / 7- 93 rirn.J p.m. Requester: X le ry Phone No.: % INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431-3670 0 ..,Approved per applicable codes. ip Corrections required prior to approval. ED $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD( Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 C1 Approved per applicable codes. nspector: 'Y I ❑ Corrections required prior to approval. COMMENTS: Ou C, M - I p ) ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. PLO (206) 431 -3670 cadre • u A 41 of , Date Called: /!.. - ?3 �:'sr Sp Istructions: 4 bate Wanted: /u . + 3- / 7 `/3 .m. R equester: , / / Gw , e r 1 E- Phone No.; 1C'7 f INSPECTION RECORD( Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 C1 Approved per applicable codes. nspector: 'Y I ❑ Corrections required prior to approval. COMMENTS: Ou C, M - I p ) ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. PLO (206) 431 -3670 COMMENTS: I tAffdrt t'" Fie l( .DU ctS . i. C L I ,P o Yc.. Scr2 2.J O I F- FLA.Se 4.-S Try r;' ,21 d . 3 .44.4.4-14.1E Fa a— S itE ' - 7.s D l/ Aura- 1 , AG - I qN0 A C - 2 .- I.Amit us A r .X:1 i) - IAA oa o a-; 66-1 E NA uST 0 u cr'S . S) 6 6 1 - F , r1 f. t-c ( 9 . 0 . - A p.10 G A-c Pi p 1 iJG F.. W w-s . Date Wanted: ,,' 0 _ RJOE` W HAIL is. f•Ja W A 1'`PR -ova . Requester: rl�y' Phone No.: � ` -7' �� _ (" / t I ' Project T i ' 't / . ._ 7 0 T � t ype of Inspeotion Address: 16h � p I , I , I:, e Called; Special Instructions: Date Wanted: ,,' 0 _ am p.m. o Requester: rl�y' Phone No.: � ` -7' �� _ (" / t I ' C INSPECTION RECORD Retain a copy with permit `" i PY Pe CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431 -3670 ❑ Approved per applicable codes. j Corrections required prior to approval. Inspector: Date: -15_ / o — ❑ . $30.00 REINSPECTION FEE'REOUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. I . • r • - ' /?iCirr)4 ype o ns.: • ion: R ,6-C "'./d am.. Addr • --: Date Called: 21 Wl • • • . Instructions: '51.4 ow 12 otsvA 4 �A Date Wanted: "2-4(:3 eItN'. Re Phone No.: INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431 -3670 Approved per appiiCable codes. Corrections required prior to approval. COMMENTS: - Inspector: Date: 2 _2.4 D $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. a' COMMENTS: / / / d Sib / /' - - Ci7 Stu a_ d� 6 1 -..).•. , ate( - S - r c p c ruJr- . C— 46/1)/ L 0 / „ feL 4 - 1/v1. . 1t 41.t.cirs 12.�. •ozLok f '.'`` fnj . A A-AA.L.44.1-3 CL—k. A./*a_ t-LILA -- 1 - 6 Ott-Mg-LA.0 1-( . r" e (MI G ,g. vt�' —I-0 ,.- ' ,�-- i,,,..�. - .,- � f • c . c...- .-.. -....-, ,,1...4_.. "x" e,: ..— w1 /A-Gri . cKS.Lra A f /c..S CJLt.e '. f i .. - {,e /2 Phone No.: / a - ro - : ....• ' /7 , 4 , � / / / d Sib / /' ype o nspect ' n:_ f .. 46/1)/ L 0 / „ feL 4 - 1/v1. . Sp: 'a Instructions: r 1-t ht-- ' ate anted: . r" a • fie.... a p.m. Requester: r/e/ ... Phone No.: / a 0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. INSPECTION RECORD Retain a copy with permit ❑ Corrections required prior to approval. Date: /— ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. _.IAX1MUM GONE COOLING LUAU Location : Seattle -I :rna, wasningtoh� 1u -2u -92 Prepared By': Air Sys Ems Engineering 6100190202 Carrier Hourly Analysis Program Page 1 of 1 ** * * * * * * * * ** * * * ** * *** ****** * ** : ** : * **** * **** : ** * * * * * * ** * ** ** *** **** Sensible Load No. Month Hour (Tons) 1 Jun 1600 7.14 2 Jun 1500 7.12 3 Jul 1600 7.18 4 Jul 1500 .7.16 5 Jun 1700 6.99 6 JUl 1700 7.01 7 Jun 1400 6.89 8 Jul 1400 6.92 9 Aug 1600 6.82 10. Aug 1500 6.81 Zone Name : INFINITY SHOWROOM Total Load (Tons) 7.68 7.65 7.63 7.60 7.52 7.45 7.41 7.36 7.26 7.24 Supply Air (CFM) 3,62.1 3,577 3,593 3,549 3,603 3,568 3,479 3,449 3,396 3,358 I : NE DESIGN COOLING LOAD SUtrIC rC1 Location : Seattle coma, Washington 10 -20 -92 Prepared By : Air Syst ms Engineering 6100190202 Carrier Hourly Analysis Program Page 1 of 2 * * * ** ::r; ::****:**** * * *** *** ***** **** ** ** : * ** : * * * ** * ** * * * * * * *** * ** ** CALCULATION DATA: Zone Name : INFINITY SHOWROOM Caic Time: Jun 1600h Job Name : INFINITY OF SEATTLE Amb db /wb: 82.3/ 64.8 F **************:*****:*:************:***** * * * * * * * * * * * * * * * * * * * * * * * * * * * *: ** LOAD INFORMATION LOAD COMPONENT SOLAR LOAD GLASS.TRANSMISSION WALL TRANSMISSION ROOF TRANSMISSION PARTITION TRANSMISSION LIGHTING ( 1,188 W TOTAL) OIHER ELEC. ( 0 W TOTAL) PEOPLE ( 31.15 PEOPLE TOTAL) MISCELLANEOUS LOADS COOLING INFILTRATION PULLUOWN /WARM -UP COOLING SAFETY LOAD SUB- TOTALS NE1 VENTILATION LOAD ( SUPPLY FAN LOAD (BHP= WALL LOAD TO PLENUM ROOF LOAD TO PLENUM LIGHTING LOAD TO PLENUM 935 CFM) 0.5) SENSIBLE LATENT (BTU /hr) (B1U /hr) 34,643 3,154 2,035 2,808 350 26,519 0 /,621 0 U 0 U 17,130 7,265 1,342 U 0 0 0 0 U 0 0 0 U 6,386 U 0 U 0 6,386 -5 0 0 0 0 TOTAL COOLING LOADS 85,738 6,381 ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** COIL SELECTION PARAMETERS: COIL ENTERING AIR TEMP. (DB /WB) COIL LEAVING AIR TEMP. (DB/WB) COIL SENSIBLE LOAD COIL TOTAL LOAD COOLING SUPPLY AIR TEMPERATURE 1UTAL COOLING CFM (actual) TOTAL COOLING CFM (std. air) RESULTING ROOM REL. HUMIDITY COIL BYPASS FACTOR COIL APPARATUS UEWPOINT REHEAT REQUIRED *** * * ** ** ** * ** * * * ** * * * * * * ** *********** * * * * * * * * * * * * * * * * * * * * * * * * ** * * * ** GENERAL INFORMATION: TOTAL COOLING LOAD 76.9/ 63.0 deg F = 54.7/ 54.0 deg F = 85,738 BTU /hr 92,119 BTU/hr 55.0 deg F = 3,621 CFM 3,511 CFM 48.7 0.060 53.5 deg F 0 BTU /hr '/.68 ions 405.78 sgtt /"Ions IOIAL FLOOR AREA s,115.0u sgft OVERALL U- FACTOR - 0.146 BTU /hr /sqtt /F COOLING CFM /sgt't - 1 . 1 b CFM /sqtt * T ******************************** * * * *** * * * * * * ** * * * * * * * * * ** ** * *$* kNE DESIGN COOLING LOAD SUry AY Location : Seattl Tacoma, Washington ti 10-20-92 Prepared By : Air Sy Gems Engineering 61001 90202 Carrier Hourly Analysis Program Page 2 of 2 *** ** ** :******************************* *** * ** * * * * * * * ** * ** ** * * ** ** * * *** CALCULATION UAIA: Zone Name :. INF1N1'I Y SHOWROOM Ca lc lime: Jun 1600h Job Name : INFINITY OF SEA1TLE Amb db /wb: 82.3/ 64.8 F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** WALL AND GLASS LOAD BREAKDOWN LOAD COMPONEN1 AREA TRANSMISSION SOLAR LOAD (sqtt) (BFU /hr) (BTU /hr) GLASS LOADS:NE 0 0 0 E 624 1,356 16,947 SE U U U S 0 0 0 SW 0 0 U W 270 587 1 1 , 026 NW 0 0 0 N 558 1 , 21 2 6,669 H 0 0. . U WALL LOADS: NE 500. 071 E 1,026 1,191 SE 150 182 'S 0 U SW 0 0 W 106 59 NW 500 174 N 192 59 * * * * * * * * *** * * * * * * * * * * * *44* * * * * * *4.* * * * * * * ��a * * *.4..*..4..r; * *' ** * ** * *** 2( ,E DESIGN HEATING LOAD SUM(( 1 "•Location : Seattl Tacoma, Washington 1u -1u -92 Prepared By : Air Sy ms Engineering ; •61U019u202 Carrier Hourly Analysis Program • Page 1 of 1 * * * * * * * * * * ** *** ** : * *** * * * * ** ** *** * * * * ** * * * * * * *: * * * **** * * ***** :*:r;**** : CALCULATION DATA: Zone Name : 1NFINIIY SHOWROOM Calc Time: Winter design Job Name : INFINITY OF SEATTLE Amb db 21.0 F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** LOAD COMPONENT LOAD (BTU /her) WALL TRANSMISSION 6,301 ROOF TRANSMISSION 5,U3I GLASS TRANSMISSION 39,131 TRANSMISSION LOSS 10 UNCONL) . SPACES 460 INFILTRATION LOSS 0 SLAB FLOOR ,b,bbb HEAliNG SAFETY BTU /nr U SUB -TOTAL NET VEN1ILAIION LOSS TUTAL HEATING LOAD HEATING SUPPLY CFM HEA I ING SUPPLY AIR 1 EMPERAT URE HEATING VENTILATION AIR CFM HEATING 1HERMOSTAI SETNOlN1 TEMP 56,605 4t;, /6'I 10b,;3 /2 1,329 CFM 1 1 U . 0 aeg r- 935 CFM 7U.0 aeg I- ***************: r;*** * * * * * * ** * * * ** * * * * * * * * ** * * * * * **4 4'** * ** *** * * ** *** * * **4* p. MAXIMUM LONE COOLING LOAD Location Seattle- oma, Washington ` 10 -20 -92 • J. Prepared By : Air Systems Engineering 6100190202 Carrier Hourly Analysis Program Page 1 of 1 ****************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** , No.' Month Hour 1 Jun 1500 2 Jun 1600 3 Jul 1500 4 Jul 1600 5 Jun 1400 6 Jul 140U 7 Jun 1700 8 Jul 1700 9 Aug 1500 10 Aug 1600 Zone Name : INFINITY OFFICE Sensible Load (Tons) 4.38 4.36 4.41 4.39 4.30 4.33 4.28 4.30 4.29 4.26 Total Load (Tons) 4.84 4.83 4.82 4.80 4.77 4.74 4.74 4.71 4.69 4.67 Supply Air (CFM) 2,185 2,195 2,173 2,182 2,162 2,149 2,194 2,177 2,105 2,110 NE DESIGN COOLING LOAD SUMr. Y Location : Seattl aroma, Washington 10-2U -92 Prepared By : Air Systems Engineering 6100190202 Carrier Hourly Analysis Program Page 1 of 2 * ** *%4 *** : 1:%r: **** * * *%K:r:*:k***** Kok ** ** * * * * * * *** *** * * *** *** *** ** * * **: **** ** CALCULATION DATA: Zone Name : INFINITY OFFICE Calc Time: Jun 1500h Job Name : INFINITY OF SEATTLE Amb db /wb: 83.0/ 65.0 F *********************************** : * * * ** * * ** * * * * * * * * * * * * * * * * * * * ** *sic * * ** LOAD INFORMATION LOAD COMPONENT SENSIBLE (BTU /hr) LATENT (UTU /hr) SOLAR LOAD 5,498 0 GLASS 1RANSMISSION 1,043 0 WALL TRANSMISSION 108 0 ROOF TRANSMISSION 2,518 0 PARTITION TRANSMISSION 3,796 0 LIGHTING ( 7,663 W TO1AL) 26,089 0 OTHER ELEC. ( 0 W TOTAL) 0 0 PEOPLE ( 30.66 PEOPLE TOTAL) 7,498 6,283 MISCELLANEOUS LOADS 0 U COOLING INFILTRATION 0 0 PULLDOWN /WARM -UP 0 0 COOLING SAFETY LOAD 0 0 SUB- TOTALS 46,550 6,283 NET VENTILATION LOAD ( 613 CFM) 5,223 -754 SUPPLY FAN LOAD (BHP= 0.3) 81u 0 WALL LOAD 10 PLENUM 0 0 ROOF LOAD TO PLENUM 0 0 LIGHTING LOAD TO PLENUM 0 0 TOTAL COOLING LOADS 52,583 5,529 ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** COIL SELECTION PARAMETERS: COIL ENTERING AIR TEMP. (DB /WB) = 77.2/ 63.4 deg F COIL LEAVING AIR TEMP. (DB /WB) = 54.7/ 54.0 deg F COIL SENSIBLE LOAD = 52,583 BTU /hr COIL TOTAL LOAD = 58,112 BTU /hr COOLING SUPPLY AIR TEMPERATURE = 55.0 deg F TOTAL COOLING CFM (actual) = 2,185 CFM TOTAL COOLING CFM (std. air) = 2,155 CFM RESULTING ROOM REL. HUMIDITY - 50.0 % COIL BYPASS FACTOR = 0.050 COIL APPARATUS DEWPOINT = 53.5 deg F REHEAT REQUIRED = 0 B °IU /hr ****************************:********:*** * * * * * * * * * * * * * * * * * ** * * * * * * * * * *** GENERAL INFORMATION: TOTAL COOLING LOAD = 4.84 "Ions 632.91 sqtt/lons TOTAL FLOOR AREA - 6,065.00 sqtt OVERALL U-FAC1OR = 0.096 BTU /her /sgtt /F COOLING CFM/sqtt = 0.71 CFM /sqtt * * * * * * * * * *a * * * * * ** *** :* * * * ** : * * ** : ** * ** : * * * * * ** * * * * ** * ** ** **** *** L NE DESIGN COOLING LOAD SUILRY Location : Seattl acoma, Washington 10 -20 -92 Prepared By : Air Sys ems Engineering 6100190202 Carrier Hourly Analysis Program Page 2 of 2 ***************************************** * * * * * * * * * * * * * * * * * * * * * * ** * * * * * ** CALCULATION DATA: Zone Name : INFINITY OFFICE Caic Time: Jun 1500h Job Name : INFINITY OF SEATTLE Amb db /wb: 83.0/ 65.0 F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** WALL AND GLASS LOAD BREAKDOWN LOAD COMPONENT AREA TRANSMISSION SOLAR LOAD (sqtt) (BTU /hr) (BTU /hr) GLASS LOADS:NE 0 0 E 0 0 SE 0 0 S 0 0 SW 0 0 W 0 0 NW 0 0 N 458 1,043 H 0 U WALL LOADS: NE 0 .0 E 0 0 SE 0 0 S 0 0 SW 0 0 W 0 0 NW 0 0 N 458 108 0 0 U 0 C) 0 0 5,498 0 ***************************************** * * ** * * * ** ** * * * * * ** * * * * ** * * * * * ** 'JE DESIGN HEATING LOAD SUMCY Location : Seatti , acoma, Washington 10-2u -92 Prepared By : Air Sys ems Engineering 6100190202 Carrier Hourly Analysis Program Page 1 of 1 * * * * * * * * * * **** * *** ** ** * * * * * ** * * * * * ** ** * * * * * ** * * ** :: *** * ** * * *: * * * * * ** CALCULATION DATA: Zone Name : INFINITY OFFICE Cale Time: Winter design Job Name : INFINITY OF SEATTLE Amb db 21.0 F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** LOAD COMPONENT LOAD (BTU /hr) WALL TRANSMISSION 1,167 ROOF TRANSMISSION 4,95ti GLASS TRANSMISSION 12,343 TRANSMISSION LOSS TO UNCOND. SPACES 5,070 INFILTRATION LOSS 0 SLAB FLOOR 1,471 HEATING SAFETY BTU /hr 0 SUB -TOTAL NET VENTILATION LOSS 25,007 31,990 TOTAL HEATING LOAD 56,996 HEATING SUPPLY CFM HEATING SUPPLY AIR TEMPERATURE HEATING VENTILATION AIR CFM HEATING THERMOSTAT SETPOINT TEMP 587 CFM 110.0 deg F 613 CFM 70.0 deg F **********:*********** * * * * * * * * * * * * * * * * * * * * * ** * * * * * *** No. • Month. Hour lAXIMUM LUNE CUULINu LUAUS Location : beattle-1 ffla, Washington Prepared by . Air Systems Engineerinu Lurie Name : 1NFINIlY SIURAGE Sensible Load Total Load (Tuns) (lons) 10- i-92 6100190202 Carrier Hourly Analysis Program Page 1 01 1 Supply Air • (CHI) • 1 Jun 1800 0.88 0.93 422 2 Jun 1900 0.87 0.96 428 6 JUH 1/00 0.87 0.93 4.P.') 4 Jul 1800 0.88 0.96 420 5 Jul 1700 0.88 0.92 413 6 Jul 1900 0.88 0.92 4 7 jUH 2000 0.87 0.92 433 8 Jun 1600 0.87 0.92 40/ 9 Jul 1600 0.6/ 0.92 40c., 1U Jul 2000 0.87 0.92 46u CALGULAI1uN DAIA: Lune Ndwe : INF1N1Ji SlURAGE Job Ndwe : uh SLAIlLE r • NE DESIGN uUOLING LuAD SUM Location Sedttl Wa$ninyton '10 Prepared 13y ; it SyXiii Englneetirig 61001900'2. Cartier Hout ly Andlyeis Proyraw Pdge 1 or 2 Calk:: Time: Jun 1600h Awb dU/wb: /8.4/ 66.5 F ;44. 4.1 4: * 44* 4-4:44 .4.. #. * 4. 44 *. ;4y.p. 4: 4. ;4‘ LOAD iNFORMAliON LOADCumPONEN1 SENSIBLE • LAIENT (b1U/hr) (b4U/nr) SOLAR LOAD- 0 0 GLASS TRANSOISSIUN 0 U iWALL TRANSMISSION 391 0 ROC) 1RANSMISSION 1,069 0 PARTITION TRANSMISSION 0 0 L1UH1ING ( 2,390 W luiAL) 6,141 0 UTH.R ELEC. ( 0 W 10TAL) 0 0 PEOPLE ( 6.00 PELIPLL TUTAL) /34 615 MISCELLANEUUs LOADS 0 0 CUOL1NG 1NFILIRAI1UN 0 0 PULLUOWN/WANm-UP 0 u CUOL1Nu SAFE4.4 LUAU '0 o SUS-TOTALS 10,364 ' ' 615 NEI VENIILAIION LOAD ( 60 Cl-M) : 26 2t ':3UPPLY f LUAU (bHP;: u..1) 11)6 0 WALL LUAU 10 PLENUM 0 0 ROW- LUAU VU PLENUM 0 0 LiGHT1NU LUAU 10 PLENUM 0 . 0 AOTAL CUUL1NG LUAUS 10,516 +4 COIL SELECI1ON PARAME1ERS: • cbiL ENIERiNG AIR lEmP. “A:s/WIJ). ... 78.4/ 03deg P • (:01L LEAVING AIR TEMP. tjAii/Wbj -,. 54..7/ 54.0 degF. CUIL SENsiBLE LUAU 10,516 blUlhi COIL TOIL LUAU :::: 11,157 SAU/V11 OUOLINu SUP-L AIR TEMPERAIURE :.--- 5,50 deg lUTAL CUUL1N( CEM (actudl) 42.2 CI • 10AAL coULiNG UF• .(u. air) :-. 41b ,L1-• . RESULI1NG KuUM NEL. HUM1D11): ..... A6:5 CU1L biz FAcTUR , , : 0 -0'..Po:'.. CU1L APPARAlus 0EWpU1N1 . 56.4.0e,c).1', REHEAT REuUl i.L.0 • : .. 2 . • ..: , ,•. - . . 0 BiU/rir . GENLRAL INFORm01.1011; • I01AL.000,1Nu.'1.0AD 10iL rLUUN • ' Ve,Els01-1... Ur. • (Akji."11NCi: : U.93 roil • 4 .....1. ';i;4 t ('-'. PAQ/11(1 ::.0,;, ca ilit.;;( . , .4 ; 14. ;., ; :,...4.,.,.. -..„ 4.... ,i 4.., i. -4, 4 -; 4 ;-i I' •i , tv..4 ,i :1 ,.1. ;4:--?....t• 44 i- 4. ;T.:4. 4:...4 4 i ' 4 .4-:',.34 4. :1' + .4 ., i I ,■ .■i :i. ';', '; :.; ■• ..i‘ . ;i 4 : . „ . . . . , . ,kL ULt .L iN L:UUL:1rsi( LUi;u ;DUI` LuL:a'LiLPI 1 cti.:uiiia, Wat.r I.LH J Loil P.r by . Ail Lel'ii 'c•_nylr'leei lriy Carrier Houi ly i uo<;aram ti .4 %H**%I'•a *4,****. ***h•.***h. I ****** * �. i. 1 ********* *A.4.*** { '. (;ALCULA i 1 ON DA I i=+ . Lone Nainc : INr• IN'1" 1 Y STORAGE Genii. T'lliie . Jun ISOGI i Job Name : 1NF1.N11Y OF SEAI1.LE Hike; db /wb: 78.4/ 6643 F 1; :r:: : : 4.4.4.444::+.* * * * ** : + :r:*:E *** * ** * * ** *:r; *m:.;r:* r * * *h -:;r . :7 *:r*4.:r:***+ : r "+ *T WALL' AND GLASS LOAD BREAKDOWN LOAD COMI uNEN•I AREA 1 kANSM1SS1UN SULHk LUAD (sq . (ki1U /i'tr) (BIU /I'ir'j LOADS:NE 0. U SE • 0 0 •. b 0 0 SW . 0 0. W 0 0 NW 0 0 N 0 0. H 0: U WILL: LUi .)US: NE 0 v E U •. 0 ;:,E 0 0 0 0. 5W 0 0 750 0 . G 0 0 0 u U U 0 1 G1001u2Q2 Pc LE: 2 01 .2 .N • u 0 •• ' )41:. HLf. LUAD Location beatti : Wahington 10-41-9 Prepared by ; Air Sy.LLems Enylneellny o1001 Cirri Hourly Analysi Pcoyt'am Paye 1 ol 1 ******x.*****;r*****;r**4,4.44.4 CALCULA)ION DAIA: Lone Name 61uRAGE Calc ilme; job Name : INFINIIY OF sLAilLE Amb db O F *******4;*•*4'.************4.****.**4 LUAD COMPONEN) WALL TRANSMISSlON 1,911. RUOI- 1KANsMISsIUN GLASS 4RANsmISSIUN 0 TRANbmiSsIUN to UNcuND. SPACEs INFILIRAIIUN LOSS 0 SLAB FLOUR 1,206 HEAllNu SAFElY•LiTU/hr SUB-101AL NE I VENIILHI1U14 jOIAL HEAfiNG LUAU HEATJN SUPPLY CFm HEAlING SUPPLY AIR IEMPERAFURL HEAlING VEN11LAllON AIR CFM HEAI1NG IHERMUSFAT SEIPU1N) rEmP LUAU lbfUini) 11/V GFH • 110.0 dj F • 60 0 70.0 deg 1- .NE DESIGN HEATING LOAD SU .RY Location : Seattlk acoma, Washington 10 -20 -92 Prepared By : Air Systems Engineering 6100190202 Carrier Hourly Analysis Program Page 1 of 1 ******* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** : * *: * ** * * * * * ** : * * * * ** *: *** : * * *x:*:* CALCULATION DATA: Zone Name : INFINITY SERVICE GARAGE Calc Time: Winter design Job Name : INFINITY OF SEATTLE Amb db 21.0 F * * * * * * * * * * * * * * * * *** * * * * * * ** * * ** arc********* * * * * * ** * *** * ** * * * * * ** * * ** * * ** ** LOAD COMPONENT WALL TRANSMISSION ROOF TRANSMISSION GLASS TRANSMISSION TRANSMISSION LOSS TO UNCOND. SPACES INFILTRATION LOSS SLAB FLOOR HEATING SAFETY BTU/hr SUB-TOTAL NET VENTILATION LOSS TOTAL HEATING LOAD 239,944 HEATING SUPPLY CFM HEATING SUPPLY AIR TEMPERATURE HEATING VENTILATION AIR CFM HEATING THERMOSTAT SETPOINT TEMP LOAD (BTU /hr) 3,006 4,811 0 0 0 -777 0 7,039 232,905 120 CFM 110.0 deg F 6,432 CFM 55.0 deg F ***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * ** * ** il �. t (^; 1'. 1'i 1»1'11 L14 to t llh'SL . 9',. � 110 4J ' L '.:;rsi.L.it<:-- I „„,:i-t, Wra�,liL11,Ji.L.,1) L.Ui:d'G'1.��i't (71 e•,1VJJ.yCi'..:��'� W I epa f e.d by . rr:L r :: y .. LGI11:�. r i iy i t tee: i l i r�j i 1 U i 1 * 4 t'xral Mi 4 ly ftttll 4 }°1 U!II 11,111 :{: ; { :}::{: ;{:.:I, %F a'. ,{::}. %1• %} ;q. J!. ,i. ;} :} :F 1. i } i :} , {.r h 4. 4. 4. :4. 4.. ;F ,;` 4. a. k. ;} k h. ; }. k 1:. a', a. 4. 4 •i: ;}; ;{::i: 4. ;{, .{..♦, h.: {- . }..}..{• 4. 4. 4: n 'r k 4 - 4,1. ,}.. }.1. CF- ILUULi=s 1 1.UN U010:' i;dt I llil� : W1 t r LG l •t}i }i �Jr 1 •LUFte Nafit�: . ifvr 1141 1 `i 4iLi�Vll.1:. t�KJ. L I°.Ilil1J do : '21.0 F .Ju .1�d .Nt 11411 .i .UV . UL• i i i Lk . - -. .•... •� i• 1 i..t ;r, x.:+, ;I::4= ,}.:►. ; }..i. ;i. ;i. %+ ;}'. ;{. ;{. %F ,}• T T * 4'.:+• ;►.:} ::i; 4-. :{: %}• %It %}: %k, %K :1: * 4. ;I::{t :} %'r %k• h. T :i: ;}: ;I: h"" h ;{. ;{. ;i. %i.. i, ;i ' •�b 1°II j ' • • LU =� U UOOPUl% tN i : 10112.. HL I \/ Lhl 1 -i 1 i. JH L �u 101 10jAL L:i..INL: cLJPPL'i r {L�,I1NId ;;UWNL'i 1=iih 1LI''Ii t :.I'k1UrZL. hit.ril'11�G JLNi1L 1IU14 rl tl :r t1 Hin.ta 1 .LN6 .1 H 11u i H i cJL. i PUIN'I 3,aGU Wf'iLL 1 RHl4 r.11:.,::31UI' 3,726 0 RL 1 RANwriibbiLrt! C• LiLr=t::A.i I RriN::;l•i1 7�, , }S �' l leil:IN r?illoN. LU;;:: 10 UisiuuNL . ::;1JH Lb 1NF iL.`tkt-11 1014 LU bE> 0 $LMb FLOUR G ' HEH'i iNG SAI EI Y is 1 U/ 1 - I1 63,583 v 1,06L) L 1• r•1 110.0 isr i I U G F• r•1 LI ;i-1. ;1.:I,1• *' , {.:4. t. 4-.4 .i 4• T 4. 1 r• }: }. 4- ,}. 4 4. .i. Nt ;t �" { i �. ;I. X•. ,T..1 .a; 4 g. 4. %}• 4.4. }.4. ;{::}: :( ;I; k 4.4: 1• i. 4.:...i 1 l• 4 4 . 4 HVAC FLOOR PLAN SEPARATE PERMIT AND APPROVAL REQUIRED Date Permit Nei VICINITY MAP FILE COPY I understand that the Plan Check approvals are subject to errors and omissions and approval of plans does not authorize the violation of any adopted code or ordinance. 'Receipt of contractor's copy of cvproved plans acknowledge:A. LEGAL DESCRIPTION APPROVED THE NORM 489 FEET OF TRACT 7 ANDOVER INCOSTRAI. PARK N 2 ACCORDING TO PLAT AS RECORDED IN VOL 7 OF PIATS PAGES • Se AND 60 RECORDS OF KING COUNTY WASHINGTON RECEIVED Lennox " Rooftop Air Condi t 1 on i ng Unit Model 00CS16- 653.76, 400/3/60, HeAt t 5.0 Cooling f Cepacity e 8 MBH, SEER -14i0, Ht tinU Capacity =76. Mi l' Input., 68.0 MBH Output, AFUE a 78.4%, 2250 CFM a 0.6" E,S :p. , Provide: Roof Curb Model *RMF16- 66, ,Outside Air peinperp Model tOAD16 -65, Pleated Filters (1) 8 "x17"X1", (1) 20 "x28 "M1 ", Unit Weight 700 lbs. (1): "Lennox Rooftop Air Conditioning Unit Model et3CS18- •1353, 460/3/80, MCAz29.0 Cooling Capacity e 110 MBH, EER =8.9, Heating Capecity=170 Maki Input, 132.,6 MBH Output, AFUE M 80%, 4250 CFM 8 0.4" E . E3 . P.: ; Provide :. Roof Curb Model ORMF 16- 136, Eewtnomi Tar Damper Mosel *REMD1.6- 136, Exhaust Damper Model *0E016-96, pleated Filter- (4) 10 "x25 "k2 ",. (2) 16 "x26 "x1 ", Unit Weight 1260 lbs.. MUAel (1) "Sterling" Rooftop Make -up: Air Unit Model eRT400EBOS, 460/3/60, S HP, 7500 CFM eg 0.3" E.S.'P. , 960 RPM, Two Stage, Heating Capacity e 360 MBH Input, 280 Mali` Output, AFUE»80%, Provide: Stainless Steel Heat Exchanger 44098S, Pleated Filters (S) 20 "x20 "x1 ", Downflow Supply Plenum, Roof Curb and Outside Air Hood, Unit Weight a 1050 lbs.. Discharge Air T' e tact with Space Temperature Override. (1) "Sterling" Unit Heater Model sa3QVF -46; '118/1/60, 1.3 Amps, 130 HP, Heating Capacity W 45 MBH Input, 36.5 MBH Output, AFUE 81 %, 800 CFM, Spark Ignition, Unit Weight = 69 lbs. (1) UkL::2 (1) "Sterling Unit Heater Model eQVF--75, 115/1/60, 1.3 Amps, 1/30 HP, Heating Capacity = 76 MBH Input, 80.8 MBH Output, ' AFUE; = 80%, 1100 CFM, Spark Ignition,, unit Weight = 90 lbs. FL > ,.2 (3) 'Greenheck" Cei 1 ing Exhaust Fan Model �.. *SP--117, 116/1/60, 76 Watts, 1,0 Amps, 170 CFM 0 0.25 E.S.P. 2 (6) LD.-1 (4) 1.~..2 (4) SBA (4) HVA E UIPPOIENT .`'C _ VDU ' E "Green eek' • :RCpftep. r Xi1a> Uat •Fan Madill *GB- 180 -- -15, 230/1/80, 4809 CFM .0 0.25" E.S.P., 1 1/2 HP, 1336 AP1I, Provide Roof Curb & S&ckdraft Damper. N /1 Qreenheck Rooftop Exhaust Fan Model *GB- 200 -16, 230/1/00, 6600 CFM $ 0,26" E.S.P. 2 HP, 1125 RPM, Provide: roof Curb & Backdraft Damper. (15) "'rites" Ceiling Diffuser Model eTpC -A43, Round Neck, 23 '3/4 "x23 3/4" Louver Face, Steel, Standard White Finish, Lay-in Fixed Pattern, See Neck & Module Sizes Below, (7) 5" Round Neck, 6 "x8" Module. (3) 8" Round Heck, 9 "x9" Module'. (5) 10 Round Neck, 12 "x12" Module, "Titans" Cai 1 ing Diffuser Model eTDCA_. A43 , 10" found Neck, 12"x12" Module, 23 3/4 "x23 3/4" louver Face, Steel, Standard White Finish, Lay -in, Adjustable Pattern, „ Titus" Linear Skit. Diffuser Model $ML-- 38--3p (3) 3/4" Slots, Standard Finish, 24" Long, Concealed Mounted, Flanged Border Type e4, x °X End Border, Provide: Insulated Supply Plenum Model •MPI -38, 8" Round Neck. "Titus" Linear Slot Diffuser Model *ML- 38-3,. (3) 3/4 Slots, 9tendaard Finish, 36" Long, Concealed Mounted,• Flaaeged Border Type e4, X -X End Border, Provide: Insulated Supply Plenum Model #MPi-303, 10 Round Neck. "Titus Double Deflection Sidewall Register Model 0300f S -AG15, Opposed Blade Damper, 24 "x18 ", Standard Finish, ROOFJACK DETAIL NO SCALE "Titus" Linear Sldewal l Return Air Grille Model . $C`I' - &80, " 1 /2" Spacing, 1/8" Bars, . d degree' Deflection, 72 "x6 ", Border typo $11, Concealed Fastener Type C, Standard Finish, Provide 24" Wide Plenum.: Redd= . (6) "Titus" Ceiling Return Air Grille Model 60s ; 1 / "x1/2"x1/2" Squere Aluminum Face,' 22 "xis" Neck, Standard •Finish, Provides 24" High Plenum, harder $3. (1) ftAgz2 (2) . "Titus" Ceiling Return Air Grille Model 460F, 1/2 "x1/2 "x1/2" Square Aluminum Facet 22 "x22" Neck, Standard Finish, Provide: 24" High Plenum, Border 03. E :i (2) "Titus" Ceiling Exhaust Grille Model s 30RS, 30"x30", Surface Mount, 6tendard Finish, Provide 30 "x30 "x24" Plenum, Taper To 20 "x20" Duct Collar at Top, (1) "Enerstaat" Wall Mounted Thermostat Model *M9 -°1N, 7-day Programmable. T 1 T 2 (2) "Ener•sstee" Unii t. Heater Mounted Thermostat Model $ET- -62, T 3 ( 1 ) " Enerstat" W a l l Mounted Thermostat Model *K3WN, 1. Electrical contractor to furnish and install all wiring and conduit to interlock EF-4, EF--5, HUA-1, timeclock and space override there ocitat f'or service garage and drive areas -, 2. ASE/ to furnish timecloca and space' override thermostat, 3. Electrical contractor to furnish and install starters with overload .heaters As required for EF-4, EFe5, MUA-1. SMIF,S.L.11L,1911,0,HING DETAIL NO SCALE hT <' a al *_ r � y A S 1 r. s r s ..f - ."4 . f _is .1 • -' b4- Z •Vr r ,. .. I1I11111I1II 1IIIIIII1II1llII�lIIIIIIIIIIIIIIIIi�IIII 'III. :Y1 HIAT (,"IIIIIiIIIIi yI1III`fiili`II III iNIIIIIIIJ t tt 0 18 T143 INCH 1 3 4 5 6 7 $ NOTE: If the microfilmed document is less clear than this notice, it is due to the quality of the original document. oC 6Z 8Z LZ 9Z sZ 4 7Z r F.Z ZZ t7 0; 6t 8t Li 91. 9 he £l Zl tl 01, 6 I Ilii i III$II + 9 I 10 11 r,ADEINUil"" 12 L9 5 h IiIIIIIIIIIIi IIIiIiIIIIIIIIiIIIIIIIIIIIIIIIIIIHHIIIIIII {IllilllIII IUldlillb lUillIiI;I 0. 1i ll1il !1111111!II!1iiIllllil1111iJll 1111lllill1llll11! II1illllllll1! Ili1il! i1lll! L) Iiililllllilfiliillll! ilIlll611illl itl�! ili�l! i�I IIIIII{ iIIIIIIiIII�II! I�Ilil�illll {IiI,IIIiIIIII�IIIilllll�lll GENERAL HVAC NO ' oi S 1. All duct'liies ehe Wn area -:;let r 1ne'i4e 2, All duct gauges per table 10 -2 of 1991 UMC. 3. All duet supporter peer Table 10 -6 of 1991 UMC, 4. Sheet Metal supply and return ducts shall have 1 1/2" R-6' insulation, Ouctboard supply end return ducts , shall be 1 1/2" R-6. Rigid round ducts shall be "Snaplok" and shall have 2" R-5 wrap- -on insulation. with, Vapor barrier. Round flexible ducts shall be ,)PL Model $LAM, with P-B insulation and vapor barrier. Exhaust ducts not i nssu i oared . 5. Attach diffusers and grilles to. T -boar grid peer USC etrartdard 47- 18.14. 0. All supply and return grilles to be, Class I non combust i b l e . . 7. 8aai encing dampers are to be installed on 411 branch ducts tea diffusers, and on return system- when multiple returns eels utilized OSA duets to have ba l enci i>i9 dampen rs> . 8. Materials within ducts or plenums shall have a flame spread rating less than 26 and a flame smoke development ratvng less than 50, per EMC 1002 - A. • General contractor to cut and provide openings for all rooftop, ceiling, floor, and mall penetrations, including weatherproof sealing. 10. General contractor to verify penetration locations With ASEI before framing openings. 11. General contractor to provide framed openings where required for all mechanlca i penetrations, including headers i f requi read. 12. General contractor to provide service access per code to all mechanical equipment. 13. General contractor to level all factory curbs provided by ASEI, provide all cant strips and curb insulation, and sse:ai against leaks. 14. General contractor to undercut doors 1 where indicated on HVAC drawing. 15. General contractor to provide all .cutting of T --bar ceiling and extra material as 'required for HVAC installation. 16. Electrical contractor to provide all electrical connections , d i sconhectsa , and starters for meechan i call l equipment. 17. Electrical contractor to verify equipment seizes, loads :2g is with'ASEI mechanical plan and with field conditions, 18, Electrical contractor to interlock bathroom exhaaeet fans with light switch.. 19. Electrical contractor to provide 120v sservicee outlet within 25 feet of each piece of mechan'i c a l equi pMent . 20. ASEI to install all 24v low voltage wiring for . thermostat -. 21. Electrical contractor to install all lineveltegee wiring and conduit. 22. Plumbing contractor to offset vents 10 feet minimum from all HVAC fresh air intakes. 23. Plumbing contractor to .furnish and install all -gas piping required for mechanical ee uipmsnt incledin valves, sleeves, supports, meters, and preaeurQ reducing velvet. Gl I f OF lUl;WILA APPROVED NOv .ati 1 2 '• 'DING DIVISION PENWV CEICER