HomeMy WebLinkAboutPermit 0443-M - FATIGUE TECHNOLOGY0443-m fatigue technology 150 andover park west
,:::::i1M:::::iMiigign::::!:::::Mi:ii:::::::::M:::::::::::i;i:iM;M:Miiiiiiii::::O:::::::::::2 -. ;Ls.' ..,::: A ,,1.• ; . . •;., :::::mui.smintoi:::::::::m.imummii::::::!::::miliii:::mininggoi::::ni:::::::::::;m:
SITE ADDRESS: 150 Andover Pk W SUITE NO.
- : • . .: „ A N. • Fati:ue Technolo: VALUE OF WORK:
1 : : 1 s
TYPE OF WORK: • New/Addition Modifications Repair x Other: Replacement
CONDITIONS (other than noted on or attached to permWplana):
DESCRIPTION OF WORK: Replace 10 split system heat pump.
• .
APPROVED FOR 1 1/4 ; ' BUILDING
ISSUANCE BY: /1/4 /1'4 ,/ / t : . 'k/ OFFICIAL
mi:::::0:::.:i::::::::::::::10:::_ii::!::::::mia::::::;0:::1::::::::i tANcri:;:;:::::::::::::::::::::1::::::::,:::;:::::::;::::;:::::::low::::::::mi:::1:::::;1:::::pi:41:::::::::00i.:00:::0:::::m%:::::1
UMC EDITION 148e
SUED
FIRE PROTECTION: Sprinklers rratectors x N/A
CONDITIONS (other than noted on or attached to permWplana):
• .
APPROVED FOR 1 1/4 ; ' BUILDING
ISSUANCE BY: /1/4 /1'4 ,/ / t : . 'k/ OFFICIAL
DATE: ).- 37 - /
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating const ctlon or the performance of work. I am authorized to sign for and obtain this mechanical permit.
A
SIGNATUR :IP ' 0 I
DATE: //;/// /
PRINT NAME: /100 tivdr
COMPANY:
isi;::::::;:goii;;;;;I:::;m:::;:;:::::00:::::iti:MSPECTION:11ECOADiikielltifttliltitiMettoilitaUlifit2CINHitSilladVa illaigiaMmamsffig;
DATE DATE(S)
REQUIRED INSPECTIONS PHONE NO. APPROVED INSPECTOR CORRECTION NOTICE I
SUED
IN 1 - Rough-inNents/Ducts
431-3670
all 2 - Fire Final
575-4407
• 3 - Planning Final
431-3680
x 5- Mechanical Final
431-3670
•
•
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431-3670
MECHANICAL
PERMIT NO. 43 -in
DATE ISSUED:
MECHANr,AL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
FrrTrUrni
MAIM Ntingtrilai
111111111111
REC I DATE
. •
Plan Chock No.: 91
N16
" 7 . • ' • I k
Fati:ue Technolo:
;
150 Ando er ,
• 1.
• ;
Tee Mechanical
8441 154th N.E. Redmond
I • •
TECMESC143BA
PHONE:
I - I I
gallerfr111111111111111
PHONE:
4I i:rsa
EXPIRATION DATE: -s
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (298-4732)
Electrical - Washington State Department of Labor and Industries (277-7272)
This permit *hall become null and void work is not mme.p.O*00104010:405jk001ht d ate of
issuance, orf the work is suspended or abandoned for a period of 180 dave from the last inspectio
07/17AKI
s PERMIT NO.
i }:.:: �• }:::::::•: }: h: {?
.... ....................:
"::
} }:��� }:q:
CONTACTED
BUILDING -
initial review
r ��
� ° �` j
r
� 3�l
(ROUTED)
LTANT: Date Sent - Date Appro -
DATE READY
DATE NOTIFIED
1 i _
, _ q 1
"l
BY: 4f3
PERMIT EXPIRES
2nd NOTIFICATION
SCREENING REQUIRED? ny.. (l No
BY:
(Ink.)
AMOUNT OWING
v1-7
, 5
3RD NOTIFICATION
INIT:
BY:
(roil.)
:: .�::::::.: �:::::::: ::::.: �:::: r.�.
.............. ..............................
i }:.:: �• }:::::::•: }: h: {?
.... ....................:
"::
} }:��� }:q:
■��a
}'{::•,•;:::•:{{,},;};.:;:{ r..: �.}:.:< : .:< :; . {<{:.:.:{:,:<.}}::. } {;{ { . x{;{ rr::.. r,:{}:,,r.::;;•.5}: v:•: 4 }::;i:•.' } ; .• }:'<. }}:•:.:•:: r:::::::.:> :•::� }::u.>::% { {'t. 'v`•: ,•: � ti':
1.:. }:•''i >•:8} . .. {.............. r......... ............. •Y'i.r,... r. •:
BUILDING -
initial review
r ��
� ° �` j
r
� 3�l
(ROUTED)
LTANT: Date Sent - Date Appro -
O FIRE
FIRE PROTECTION: [l Sprinklers ( 1 Detectors [) N/A
FIRE DEPT. LETTER DATED: INSPECTOR:
INIT:
O PLANNING
ONING: IBARIAND USE CONDITIONS? (lYss [ ] No
SCREENING REQUIRED? ny.. (l No
INIT:
REFERENCE FLE NOS.:
O OTHER
INIT:
N( BUILDING -
finAI raviAw
I - 0- - 1, t
(- 3c j
UMC EDITION (yaw):
1 (8p3
INIT: tom.►.
MECHANICAL' PERMIT
APPLICATION TRACKING
PR E T NAME
F a fi 9u -� '(- echnal0,o
EN .
SITE ADDRESS
P l OvJ Y Pk ( )
PLAN CHECK
NUMBER
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" In box Indicates which departments need to review the project.
REVIEW COMPLETED
SITE ADDRESS SUITE 8 V
VALUE OF CONSTRUCTION -
PHUI't =HTY OWNER k (x';11.') t Jig: 1 r r ,1 \( )l - -t )(.1 ( 'PHONE „2/4(0 2 - U\ 0
ADDRESS 15?) /�.rr`',( -01 :: ' ' - y). i,.�A .. ZIP
CONTRACTOR --T-L„,,,,_, (A{_( \l`1 - ,1 r.,l, _ _ PHONE «( 2.47
ADDRESS e .- -h l l.'_ 1 - 1�+. t,ti_-- '( -- SG 4\1;_:PZ.:D 1 rii - T ZIP 9E3:7;7
WA. ST. CONTRACTOR'S LICENSE # "7 • �,}�.- :=. _.11� ,- 5T-5�� �f EXP. DATE { i Uj
: °:' 0 R ' • ;Y.;:::: f, RCPT. : DA i : .r. .
SIC: PERI411t'.Y':til -p, >< ..:,.... ; : tewrs nn . >:;:...,.
,AII: - �I� E�� °d • ;;fit;
CHECK:': FEE.:Y'i r;:" 'Y'". fir;" .•; ii` ';.; :.
I Ti N "BY Eft iF; T. 1t .E O EXi INEp =' jQ' ht ' (.0A' CN:�:...Lt<KH. 1►�f: ;: : SAMErT, • BE. I 2.
U=.nrw4 u�nrti.c�.i .r�t±r t. tirts.aT it3,.. € lAtP :1::.i~•V : < €i'tIC h'.:M�d 11:siT;:`::- ::;: >r ::: .. .
BUILDING OWNER SIGNATURE 1 v.„,, -G\; 1/J � •!t; DATE { )` I ,
OR
AUTHORIZED PRINT NAME �l 1 \ - �
P HONE / 7
i�1C . ' - I��i { - } t_}(� . ',� +`� ��l >
AGENT ADDRESS �, 1 `-�' -0 1 . , CITY/ZIP � �':� ir,t Stir .> (-r'. . 7;
roc =r
CONTACT PERSON s\t C.-k- NA - -- L j 1 t e . PHONE -.1T- .zfrI - 7
01.2.1. 01 IU:uv FAX 206 431 3665
r
Mechanics' roe Worksheet must also b. tilled out
CITY OF TUKWILA and attached to this Vicafan.
rh ,,s #mcn1 iS 1%:•m: p yriih/ fle,,e/nn norg _ 0..il4:ww A: . .iwlww
�. . .... - . T �rrrlrrrrr., w v-Y•Y ' r .11V 1.• M11M111& VI / IWIVI 1
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
[LAN CHECK
NUMBER
NUMacn
DA I L APPLICAT ACCEPTED
APPLICATION MUST BE FILLED OUT COMPLETELY
TUK PUB WORKS
MECHANICAL PERMIT
APPLICATION
ME Mei .
IN 11.0,0 ; imago %mu Oro: j)
APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to till
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet' must accompany this permit application. Handouts are available at the Building
counter which provide more detailed Information on application and plan submittal requirements. Application and
plans must be comolete In order to be accented for elan review.
BUILDING OWNER / AUTHORIZED AGENT If the appl Is other t~ar;• :he -0ma , rogiaterod•ar illect engirnaar; or
contractor licensed by the State of Washington, a notarized letter from the properly owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation Is for the work covered by this permit and must be filled in by the
applicant. This figure Is used for budget reporting purposes only and not to calculate your fees..
EXPIRATION OF PLAN REVIEW Applications for which no permit Is Issued within 180 days following the date of
application shall expire by limitation: The Building Official may extend the lime for action by the applicant for a
porkod not axon ding 100 days upon written reque61 by MO applicant its ifniiiidtil iit 3iluiiuil 304(0) ui thy Uiiiiuiiit
Mechanical Code (current edition). NO application shall be extended more than once.
ll you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
C 0' "X - IRE
1
".i ow.
: °:' 0 R ' • ;Y.;:::: f, RCPT. : DA i : .r. .
SIC: PERI411t'.Y':til -p, >< ..:,.... ; : tewrs nn . >:;:...,.
,AII: - �I� E�� °d • ;;fit;
CHECK:': FEE.:Y'i r;:" 'Y'". fir;" .•; ii` ';.; :.
I Ti N "BY Eft iF; T. 1t .E O EXi INEp =' jQ' ht ' (.0A' CN:�:...Lt<KH. 1►�f: ;: : SAMErT, • BE. I 2.
U=.nrw4 u�nrti.c�.i .r�t±r t. tirts.aT it3,.. € lAtP :1::.i~•V : < €i'tIC h'.:M�d 11:siT;:`::- ::;: >r ::: .. .
BUILDING OWNER SIGNATURE 1 v.„,, -G\; 1/J � •!t; DATE { )` I ,
OR
AUTHORIZED PRINT NAME �l 1 \ - �
P HONE / 7
i�1C . ' - I��i { - } t_}(� . ',� +`� ��l >
AGENT ADDRESS �, 1 `-�' -0 1 . , CITY/ZIP � �':� ir,t Stir .> (-r'. . 7;
roc =r
CONTACT PERSON s\t C.-k- NA - -- L j 1 t e . PHONE -.1T- .zfrI - 7
01.2.1. 01 IU:uv FAX 206 431 3665
r
Mechanics' roe Worksheet must also b. tilled out
CITY OF TUKWILA and attached to this Vicafan.
rh ,,s #mcn1 iS 1%:•m: p yriih/ fle,,e/nn norg _ 0..il4:ww A: . .iwlww
�. . .... - . T �rrrlrrrrr., w v-Y•Y ' r .11V 1.• M11M111& VI / IWIVI 1
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
[LAN CHECK
NUMBER
NUMacn
DA I L APPLICAT ACCEPTED
APPLICATION MUST BE FILLED OUT COMPLETELY
TUK PUB WORKS
MECHANICAL PERMIT
APPLICATION
ME Mei .
IN 11.0,0 ; imago %mu Oro: j)
APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to till
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet' must accompany this permit application. Handouts are available at the Building
counter which provide more detailed Information on application and plan submittal requirements. Application and
plans must be comolete In order to be accented for elan review.
BUILDING OWNER / AUTHORIZED AGENT If the appl Is other t~ar;• :he -0ma , rogiaterod•ar illect engirnaar; or
contractor licensed by the State of Washington, a notarized letter from the properly owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation Is for the work covered by this permit and must be filled in by the
applicant. This figure Is used for budget reporting purposes only and not to calculate your fees..
EXPIRATION OF PLAN REVIEW Applications for which no permit Is Issued within 180 days following the date of
application shall expire by limitation: The Building Official may extend the lime for action by the applicant for a
porkod not axon ding 100 days upon written reque61 by MO applicant its ifniiiidtil iit 3iluiiuil 304(0) ui thy Uiiiiuiiit
Mechanical Code (current edition). NO application shall be extended more than once.
ll you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
C 0' "X - IRE
1
".i ow.
I Ti N "BY Eft iF; T. 1t .E O EXi INEp =' jQ' ht ' (.0A' CN:�:...Lt<KH. 1►�f: ;: : SAMErT, • BE. I 2.
U=.nrw4 u�nrti.c�.i .r�t±r t. tirts.aT it3,.. € lAtP :1::.i~•V : < €i'tIC h'.:M�d 11:siT;:`::- ::;: >r ::: .. .
BUILDING OWNER SIGNATURE 1 v.„,, -G\; 1/J � •!t; DATE { )` I ,
OR
AUTHORIZED PRINT NAME �l 1 \ - �
P HONE / 7
i�1C . ' - I��i { - } t_}(� . ',� +`� ��l >
AGENT ADDRESS �, 1 `-�' -0 1 . , CITY/ZIP � �':� ir,t Stir .> (-r'. . 7;
roc =r
CONTACT PERSON s\t C.-k- NA - -- L j 1 t e . PHONE -.1T- .zfrI - 7
01.2.1. 01 IU:uv FAX 206 431 3665
r
Mechanics' roe Worksheet must also b. tilled out
CITY OF TUKWILA and attached to this Vicafan.
rh ,,s #mcn1 iS 1%:•m: p yriih/ fle,,e/nn norg _ 0..il4:ww A: . .iwlww
�. . .... - . T �rrrlrrrrr., w v-Y•Y ' r .11V 1.• M11M111& VI / IWIVI 1
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
[LAN CHECK
NUMBER
NUMacn
DA I L APPLICAT ACCEPTED
APPLICATION MUST BE FILLED OUT COMPLETELY
TUK PUB WORKS
MECHANICAL PERMIT
APPLICATION
ME Mei .
IN 11.0,0 ; imago %mu Oro: j)
APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to till
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet' must accompany this permit application. Handouts are available at the Building
counter which provide more detailed Information on application and plan submittal requirements. Application and
plans must be comolete In order to be accented for elan review.
BUILDING OWNER / AUTHORIZED AGENT If the appl Is other t~ar;• :he -0ma , rogiaterod•ar illect engirnaar; or
contractor licensed by the State of Washington, a notarized letter from the properly owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation Is for the work covered by this permit and must be filled in by the
applicant. This figure Is used for budget reporting purposes only and not to calculate your fees..
EXPIRATION OF PLAN REVIEW Applications for which no permit Is Issued within 180 days following the date of
application shall expire by limitation: The Building Official may extend the lime for action by the applicant for a
porkod not axon ding 100 days upon written reque61 by MO applicant its ifniiiidtil iit 3iluiiuil 304(0) ui thy Uiiiiuiiit
Mechanical Code (current edition). NO application shall be extended more than once.
ll you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
C 0' "X - IRE
1
".i ow.
01.2.1. 01 IU:uv FAX 206 431 3665
r
Mechanics' roe Worksheet must also b. tilled out
CITY OF TUKWILA and attached to this Vicafan.
rh ,,s #mcn1 iS 1%:•m: p yriih/ fle,,e/nn norg _ 0..il4:ww A: . .iwlww
�. . .... - . T �rrrlrrrrr., w v-Y•Y ' r .11V 1.• M11M111& VI / IWIVI 1
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
[LAN CHECK
NUMBER
NUMacn
DA I L APPLICAT ACCEPTED
APPLICATION MUST BE FILLED OUT COMPLETELY
TUK PUB WORKS
MECHANICAL PERMIT
APPLICATION
ME Mei .
IN 11.0,0 ; imago %mu Oro: j)
APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to till
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet' must accompany this permit application. Handouts are available at the Building
counter which provide more detailed Information on application and plan submittal requirements. Application and
plans must be comolete In order to be accented for elan review.
BUILDING OWNER / AUTHORIZED AGENT If the appl Is other t~ar;• :he -0ma , rogiaterod•ar illect engirnaar; or
contractor licensed by the State of Washington, a notarized letter from the properly owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation Is for the work covered by this permit and must be filled in by the
applicant. This figure Is used for budget reporting purposes only and not to calculate your fees..
EXPIRATION OF PLAN REVIEW Applications for which no permit Is Issued within 180 days following the date of
application shall expire by limitation: The Building Official may extend the lime for action by the applicant for a
porkod not axon ding 100 days upon written reque61 by MO applicant its ifniiiidtil iit 3iluiiuil 304(0) ui thy Uiiiiuiiit
Mechanical Code (current edition). NO application shall be extended more than once.
ll you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
C 0' "X - IRE
1
".i ow.
bE3CRlPT10N
UNIT COST
UNITS
oTA
$15.00
4.50
I BASIC
FEE
SUPPLEMENT PERMIT FEE
1
Installation or relocation of each forced -air gravity-type furnace or
burner, including ducts and vents attached to such appliance, up to and
Including 100,000 Btu/h.
$9.00
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, Including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
X
3
Installation or relocation of each floor furnace, Including vent.
$9.00
X
4
Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater,
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not Included in an appliance permit.
$4.50
X
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
X
T
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu/h.
$9.00
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
1
I
X
1(0.5)
9
Installation or relocation of each boiler or compressor over 16
horsepower to and including 30 horsepower, or each •absorption system
over 500,000 Btu /h to and including 1,750,000 Btu/h.
$22.50
X
10
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,780,000 Btu/h.
$33.50
x
11
installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu/h.
$56.00
X
12
Each air - handling unit to and including 10,000 cubic test per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air-handling unit which is a portion of a factory - assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit Is
required elsewhere In this code.)
$16.50
/
X
/_
(0 .5p
13
Each air - handling unit over 10,000 dm.
11.00
14
Each evaporative cooler other than a portable type.
6
X
15
Each ventilation fan connected to a single duct.
$4.50
18
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.$0
17
Installation of each hood which Is served by mechanical exhaust, including
the ducts for such hood.
$i6.50
18
Installation or relocation of each commercial or industrial -type incinerator,
$11.00
19
20
1
Installation or relocation of each commercial or Industrial -type incinerator.
$45.00
x x I
— —
%, oc)
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code,
$0 50
SUiTOTAL
p ' ECK FU �uaa.0
c f •5o
euND To
it
01 /23 »dl 16:36
FAX 206 431 3665
TUK PUB WORKS
CITY OF TUKWILA
Department of Community Development - Building Division IN
6300 Southcenter Boulevard, Tukwila WA 98188 ,, ,,
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
MECHAN PERMIT
FEE WORKSHEET
la {.f03
Ifyth►llllcula t ttie ls;
' :7 �
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188
Plan Check #91- 013 -M: Fatigue Technology
150 Andover Pk W
PHONE N (206) 433.1800
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER F? - [
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (277-
7272).
3. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
4. Readily accessible access to roof mounted equipment is
required.
5. Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
6. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washington State Energy Code (1990 Edition), and
Washington State Regulations for Barrier Free Facility
(1990 Edition).
7. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
Gary L. VanUusen, Mayor
PROJECT: 7=z; 7-, - ,,, . 3 r 4,, -- /.,
�{
-\
PERMIT NO. (r) 1-/4/ 3-/ ./
SITE ADDRESS: I, 'I ,,,A, /
4
/
`� (i���
DATE CALLED:
TYPE OF INSPECTION: J- `-,6.,.
- �
DATE WANTED: ' Z_ Z6 — e / ti
REQUESTER:
SPECIAL INSTRUCTIONS: `'`�
PHONE NO.:
INSPECTION RESULTS /COMMENT_$ :.__
-.---- - --- --
- _._______
-°
INSPECTOR: �� /�., ,
■
DATE:
_ -2-6 -- /
pitadmosiziastetowwwis
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431.3670
NSPECTIQL RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
CITY OF TUKW1u
Dept. of Co unity 6 e - Building Division
INSPECTION RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PROJECT: 1: r( ,Q, '112,{')A Oq l
SITE ADDRESS: ( 50 pdp
TYPE OF INSPECTION: 1.1 (it ( ��
INSPECTION RESULTS /COMMENTS: ,/,
i Ji T, 4 �n 5 O( !zj�'� /_ ✓,
PERMIT NO. d tt 3 _,
DATE CALLED: 2 — (I — 9
DATE WANTED: '17" cgi
REQUESTER:
SPECIAL INSTRUCTIONS:
PHONE NO.: S
PLAN REVIEW COMMENTS
PLAN CHECK 419 l%t) > IA PROJECT - FA i1We kerAwbLO(
REQUIRED INSPECTIONS
Electrical permit shall be obtained through the Washington State Division of Labor
and Industries and all electrical work will be inspected by that agency (277.7272).
O All mechanical work shall be under separate permit through the City of Tukwila.
`"CJ All permits, Inspection records, and approved plans shall be posted at the Job site
prior to the start of any construction.
O When special inspection is required either the owner, architect or engineer shall
notify the Tukwila Building Division of appointment of the inspection agencies
prior to the first building Inspection. Copies of all special inspection reports shall
be submitted to the Building Division in a timely manner, Reports shall contain
address, project name and permit number of the project being inspected.
O All structural concrete to be special inspected (Sec. 306, UBC).
O All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
All high-strength bolting to be special inspected (Sec. 306, UBC).
0 Any new ceiling grid and light fixture installation Is required to meet lateral bracing
requirements for Seismic Zone 3.
Partition walls attached to ceiling grid must be laterally braced if over eight (6) feet
In length.
11.
15.
1e.
No changes will be made to the plans unless approved by the Architect and the
Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health Department
and plumbing will be inspected by that agency, including all gas piping (296-
4722).
Readily accessible access to roof mounted equipment Is required.
Engineereed truss drawings and calculations shall be on she and available to the
building inspector for inspection purposes. Documents shall bear the seal and
signature of a Washington State Professional Engineer.
Any exposed insulations backing materiel to have Flame Spread Rating of 25 or
less, and material shall boar identification showing the fire performance rating
thereof.
Subgrade preparation including drainage, excavation, compaction, and fill
requirements shall conform strictly with recommendations given in the soils report
prior to final inspection (see attached procedure).
A statement from the roofing contractor verifying fire retardancy of roof will be
required prior to final inspection (see attached procedure).
All construction to be done In conformance with approved plans and requirements
of the Uniform Building Code (1966 Edition), Uniform Mechanical Code (1966
Edition), Washington State Energy Code (1990 Edition), and Washington State
Regulations for Barrier Free Facility (1990 Edition).
18. All food preparation establishments must have King County Health Department
sigrnofl prior to opening or doing any food processing. Arrangements for final
Health Department Inspection should be made by calling King County Health
Department, 2964787, at least three working days prior to desire inspection date.
On work requiring Health Department approval, It Is the contractor's responsibility
to have a set of plans approved by that agency on the job site.
Firs retardant treated wood shall have • flame spread of not over 25. All materials
shall bear identification showing the fire performance rating thereof. Such
identification shall be issued by an approved agency having a service for
Inspection at the factory.
Notify the City of Tukwila Building Division prior to placing any concrete. This
procedure is in addition to any requirements for special inspection.
All spray applied fireproofing as required by U.B.C. Standard No. 434, shall be
special Inspected.
O All wood to remain in placed concrete shall be treated wood.
All structural masonry shall be special Inspected per U.B.C. Section 306 (y 7.
kiV Validity of Permit The Issuance of a permit or approval of plans, specifications
and computations shall nof be oonslrued to be a permit for or an approval of,
any violation of any of the prov alone of No code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or violate or cancel the
provisions of this code shall be valid.
1 Footings
2 Foundation
3 Slab /Slab Insulation
4 Shear Wall Nailing
5 Roof Sheathing Nailing
6 Masonry Chimney
7 Framing
8 Insulation
9 Suspended Ceiling
10 Wall Board Fastening
X 11
fgj G7 —I 0
.
14
13
14 FIRE FINAL
15 PLANNING FINAL
16 PUBLIC WORKS FINAL
17 BUILDING FINAL
PLAN REVIEW COMMENTS
PLAN CHECK 419 l%t) > IA PROJECT - FA i1We kerAwbLO(
REQUIRED INSPECTIONS
Electrical permit shall be obtained through the Washington State Division of Labor
and Industries and all electrical work will be inspected by that agency (277.7272).
O All mechanical work shall be under separate permit through the City of Tukwila.
`"CJ All permits, Inspection records, and approved plans shall be posted at the Job site
prior to the start of any construction.
O When special inspection is required either the owner, architect or engineer shall
notify the Tukwila Building Division of appointment of the inspection agencies
prior to the first building Inspection. Copies of all special inspection reports shall
be submitted to the Building Division in a timely manner, Reports shall contain
address, project name and permit number of the project being inspected.
O All structural concrete to be special inspected (Sec. 306, UBC).
O All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
All high-strength bolting to be special inspected (Sec. 306, UBC).
0 Any new ceiling grid and light fixture installation Is required to meet lateral bracing
requirements for Seismic Zone 3.
Partition walls attached to ceiling grid must be laterally braced if over eight (6) feet
In length.
11.
15.
1e.
No changes will be made to the plans unless approved by the Architect and the
Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health Department
and plumbing will be inspected by that agency, including all gas piping (296-
4722).
Readily accessible access to roof mounted equipment Is required.
Engineereed truss drawings and calculations shall be on she and available to the
building inspector for inspection purposes. Documents shall bear the seal and
signature of a Washington State Professional Engineer.
Any exposed insulations backing materiel to have Flame Spread Rating of 25 or
less, and material shall boar identification showing the fire performance rating
thereof.
Subgrade preparation including drainage, excavation, compaction, and fill
requirements shall conform strictly with recommendations given in the soils report
prior to final inspection (see attached procedure).
A statement from the roofing contractor verifying fire retardancy of roof will be
required prior to final inspection (see attached procedure).
All construction to be done In conformance with approved plans and requirements
of the Uniform Building Code (1966 Edition), Uniform Mechanical Code (1966
Edition), Washington State Energy Code (1990 Edition), and Washington State
Regulations for Barrier Free Facility (1990 Edition).
18. All food preparation establishments must have King County Health Department
sigrnofl prior to opening or doing any food processing. Arrangements for final
Health Department Inspection should be made by calling King County Health
Department, 2964787, at least three working days prior to desire inspection date.
On work requiring Health Department approval, It Is the contractor's responsibility
to have a set of plans approved by that agency on the job site.
Firs retardant treated wood shall have • flame spread of not over 25. All materials
shall bear identification showing the fire performance rating thereof. Such
identification shall be issued by an approved agency having a service for
Inspection at the factory.
Notify the City of Tukwila Building Division prior to placing any concrete. This
procedure is in addition to any requirements for special inspection.
All spray applied fireproofing as required by U.B.C. Standard No. 434, shall be
special Inspected.
O All wood to remain in placed concrete shall be treated wood.
All structural masonry shall be special Inspected per U.B.C. Section 306 (y 7.
kiV Validity of Permit The Issuance of a permit or approval of plans, specifications
and computations shall nof be oonslrued to be a permit for or an approval of,
any violation of any of the prov alone of No code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or violate or cancel the
provisions of this code shall be valid.
7 JA -D -4
July 1990
Split System Heat Pumps
7 through 20 Ton
Air Handlers
5 through 20 Ton
RECEIVED
CITY OF TUKWILA
JAN 2 5 1991
PERMIT CENTER
•
Odyssey Split Systems represent a
totally new approach to designing
products for the Trane Company, The
design team's mission is "...to bring a
system to the marketplace that will
meet your job requirements every
time"... And at a competitive price.
Split . System Heat Pump Units . .
Designed With Your Needs In Mind.
Trane's experienced design team used
the newest computer technology and
an entirely new manufacturing process
to develop a new standard in split
systems, Couple the Trane reputation
for quality and reliability in split system
air conditioners with improvements in
efficiency, flexibility and installation
ease. and you have systems that will
give you "Simply The Best Value,"
l
Features
and Benefits. C
THE BEST VALUE SM
Manufacturing Control
Trane's exclusive control over the
design and manufacturing of all major
components is unique in the industry.
This approach assures us total control
over both the quality and reliability of
these components. And allows us to
custom match components to deliver
the best in split system performance.
Designing the Details
Careful attention was given to
designing the details — from control
wiring to the access panels. Odyssey
units feature time - saving colored and
numbered wiring and removable panels
which allow complete access to all
major components and controls. All
outdoor units feature external high and
low pressure switches for easy
diagnosing and servicing of the unit.
And on the 7 1/2 and 10 -ton single
compressor units service valves with
gauge ports are provided.
Standardized Cabinets
In addition all cabinets have been
standardized; so when you are
servicing an outdoor unit or an air
handler all components are in the same
location from unit to unit.
Filters
The 6, 71/2 and 10 ton air handlers are
supplied with 1" throwaway filters as
standard. The filter racks were
designed to easily convert for
Installation of 2" filters. The 15 and 20
ton air handlers have 2" filters as
standard.
UL Usted and CSA Certified
Trane meets or exceeds all nationally
recognized agency safety and design
standards. Each condensing unit Is UL
designed, approved and labeled in
accordance to UL Standards: UL 465
for central cooling air conditioners and
UL 303 for refrigeration and air
conditioning condensing and
compressor units. Each air handler is
designed, approved and labeled in
accordance to UL 465 and UL 559
standard for heat pumps. Each unit is
certified in accordance with ARI
Standard 210 and 270. All units are
CSA certified under Canadian
Standards: C22.2 No. 119
C22.2 No. 186.1
C22.2 No. 23
i
i Lntents
Features and Benefits
Model Number Description
General Data
Heat Pumps
Air Handlers
Application Considerations
Selection Procedure
Performance Data
System
Heat Pump
Evaporator Fan
Electrical Data
Jobsite Connections
Controls
Typical Wiring Diagrams
Dimensional Data
Weights
Mechanical Specifications
Heat Pumps
Air Handlers
6
8
10
26
30
30
31
36
46
47
Condensing Units Options
The 7 1 /2 and 10 -ton single
compressor models feature single
refrigeration circuitry lowering job
installation costs by requiring only one
set of refrigerant lines. These units are
ideal for either the low cost, new
construction jobs as well as renovation
and replacement buildings.
Features
and Benefits
Trane split systems have been specified
in thousands of applications and you'll
find Oydessy will win you even more
jobs with it's smaller, more manageable
cabinet. This lighter, compact design
will save time and money for rigging
and installation. And the compactness
will permit Trane's unit to replace
almost any unit — effortlessly.
In addition, Odyssey includes a 15 and
20 -ton dual compressor units to give
true stand -by protection; if one
compressor fails, the second will
automatically start-up. Also, the first
compressor can be serviced without
shutting down the unit since the
refrigerant circuits are independent.
Dual compressors are not Just for
protection, they also save energy costs.
Most buildings are designed for the
peak load requirements yet the building
usually operates at less than peak load.
During light load conditions only one
compressor functions to maintain the
space comfort thus reducing the need
for energy. For instance, the EER of the
15 ton unit at ARI conditions is 9.0 and
at part load conditions it is 10.0.
Low Ambient Cooling Operation
Each heat pump unit can operate to
35° F as standard in the cooling mode.
An accessory Head Pressure Control
gives you the capability to operate to
0° F.
All heat pumps offer these accessories:
• Head Pressure Control
• Coil Guard Kits
• isolators both Rubber -in -Shear
and Spring Type
• Anti -Short-Cycle kit
• Time Delay Relay
Air Handlers Offer More
Flexibility
Flexibility is a key to meeting changing
market requirements. Odyssey split
sytems offer not only heat pumps but
also convertible air handlers. The air
handlers can be installed either
vertically in a mechanical room or
horizontally above a ceiling. And it
doesn't require any removal of panels
or reconfiguration of the drain pan to
make either airflow application work.
All the air handlers feature factory
installed belt drive and ball bearing
evaporator fans with adjustable
sheaves for maximum airflow
performance. In fact, the standard
motor on the 10 -ton air handler will
deliver 4000 cfm at 1.0 ESP. Plus
oversized motors are available for
higher static applications.
Odyssey air handler versatility is further
increased by a complete line of
accessories designed to match and
install smoothly:
• Discharge Plenum and Grille
• Return Grille
•Subbase
• Electric Heaters
• High Static Evaporator Motor
• Isolators both Rubber -in -Shear
and Spring Type
• A Full Line of Thermostats
• Outdoor Tmermostat
+. -.Ir. f•�IF
Odyssey -- A Complete
Split System
Odyssey delivers the flexibility to select
a complete system that meets your
particular job requirements. Air
handlers are designed, tested, and
rated with outdoor units to let you
select the proper match between
capacity and load. Heat pumps can also
be matched with Trane built -up air
handlers. Also, these matched systems
can be quickly engineered for specific
applications using Trane's
computerized selection and load
programs.
Odyssey Lowers
Installation Costs
Your installation costs are reduced with
Odyssey. Both outdoor units and air
handlers are factory packaged and
assembled so jobsite installation is
quick and easy. You get a complete unit
with all the components, controls and
the internal wiring factory ready for a
smooth jobsite start -up.
Unlike some competitive models the
following components are factory
installed in Trane air handlers:
• Single Point Power Entry
• Blower wheel and housing
• Evaporator motor with
sheaves and pulleys
• Low Voltage Terminal Board
• Transformer
• Contactor
• Fan relay
• DX Coil with complete
refrigeration circuitry
• Expansion Valve and
Check Valves
There's no need to install components
and put together the air handler on the
job. This provides you with less labor
cost and fewer chances for installation
errors which cause callbacks. All this
means saving you money both in
replacement and new construction
applications.
, MANE" t C
•
General
• Data
Table 7 -1 General Data - Heat Pumps
Refrigerant Charge (lbs of R -22)
71/2 Ton •10 Ton
Single Compressor Single Compressor
TWA090A3, A4, AW TWAl20A3, A4, AW
15 Ton
Dual Compressor
20 Ton
Dual Compressor
TWA18083, B4, BW TWA240B3, B4, 8W
Cooling Performance'
Gross Cooling Capacity
Matched Alr Handler 90,700 123,000 181,500 241,000
Heat Pump Only 86,300 127,000 178,000 241,000
ARI Net Cooling Capacity 88,000 119.000 176,000 234,000
ER'
Matched Air Handler 8.6 8.7 9.0 8.5
Heat Pump Only 9,3 9.9 9.9 9.4
Integrated Part Load Values - - 10.00 9.10
System /Condensing Unit Power (Kw) 10.23/9.28 13.88/12.80 19.65/17.90 27.53/25.60
Heating Performance'
ARI Heating with Matched Air Handler
High Temperature Capacity 86,000 120,000 172,000 234,000
System Kw /COP 8.30/3.00 11.70/3.00 16.16/3.12 22.86/3.00
Low Temperature Capacity 44,000 64,000 90,000 122,000
System Kw /COP 6.38/2,02 8.53/2.20 11.88/2.22 17.88/2.00
Compressor
No./Type 1 /Trane H 1/Trans H 2/Trane H 2/Trane H
No. Speeds 1 1 1 1
No. Motors /HP 1/7.6 1/10 2/7.5 2/10
Motor Rpm 3450 3450 3450 3450
ARI Sound Rating (BELS) 8.8 8.8 8.8 8.8
System Data'
No. Refrigerant Circuits • 1 1 2 2
Suction Line (in,) OD 1.3/8 1.3/8 1.3/8 1 -3/8
Liquid Une(In.) OD 1/2 1/2 1/2 1/2
Outdoor Coil - Type Plate Fin Plate Fin Plate Fin Plate Fin
Tube Size (in.) OD .376 .376 .375 .375
Face Area (sq. ft.) 19.8 28.0 38.5 . 50.9
Rows /FPI 2/15 2/15 2/15 2/15
Refrigerant Control Expansion Valve Expansion Valve Expansion Valve Expansion Valve
Outdoor Fan - Type Propeller Propeller Propeller Propeller
No. Used /Diameter (in.) 1/26 1/28 2/26 2/28
Drive Type /No. Speeds Direct /1 Direct /1 Direct /1 Direct /1
Cfm' 8300 8800 12,600 17,800
No. Motors /HP 1/.50 1/1.00 2/.60 2/1.00
Motor Rpm 1100 1100 1100 1100
21.4 25.6 40.8 484
NOTES:
1. Rated In accordance with ARI Standard 240. Gross capacity don not Include the effect of fan motor heat. ARI capacity is net and includes the effect of tan motor hest. Use 1% derate
for 208 volt operation.
2. At conditions of 45° F saturated suction temperature and 96° F ambient.
3. Net cooling capacity is calculated with matched blower coil end 26 sq. ft. of 114. OD Interconnecting tubing.
4. Rated at API conditions and in accordance with DOE test procedure.
5. At 80 °F ambient. 80 °F entering dry bulb, 67 °F entering wet bulb and nominal Cfm listed. Rated in accordance with ARI Standard 340.
8. Rated in accordance with ARI Standard 270.
7. Maximum linear length BO ft., Maximum lift: suction 60 h., liquid 80 ft. For greater length, refer to refrigerant piping applications manual.
8. Standard air•dry coil condition.
9. Operating charge fa for heat pump (all circuits) with matching blower coil and 25 ft. of Interconnecting refrigerant lines.
Table 8 -1 General Data — Air Handlers
General
Data
TWE060A1, A3 TWE060B1,
A4. AW 83, B4 TWE090A1 TWE090A3t, AW TWE120A1 TWE120A3t, AW
System Data
No. Refrigerant Circuits 1 2 1 1 1 1
Suction Lino (in.) OD 1 1 /8 1 1/8 1 3/8 1 3/8 1 3/8 1 3/8
Liquid Line (In.) OD 3/8 3/8 1/2 1/2 1/2 1/2
Indoor Coil - Type Plate Fin Plate Fin Plate Fin Plate Fin Plate Fin Plate Fin
Tube Size (In.) .375 .375 .376 .375 .375 .375
Face Area (sq. h.) 5.0 5.0 8.1 8.1 11.2 11.2
Rows /FPI 3/12 3/12 3/12 3/12 3/12 3/12
Refrigerant Control Expansion Valve Expansion Valve Expansion Valve Expansion Valve Expansion Valve Expansion Valve
Drain Connection Size (In.) 3/4 PVC 3/4 PVC 3/4 PVC 3/4 PVC 3/4 PVC 3/4 PVC
Filters • Type /Furnished
(No.) Size Recommended
5 Ton 6 Ton 71/2 Ton 10 Ton
Single Circuit Dual Circuit Single Circuit Single Circuit
Indoor Fan - Type Centrifugal Centrifugal Centrifugal Centrifugal Centrifugal Centrifugal
No, Used/Diameter x Width (In.) 1/12x12 1/12x12 1/15x15 1/16x15 1/15X15 1/15x16
Drive Type/ No. Speeds Belt/Adjustable Beh /Adjustable Beh /Adjustable Beh /Adjustable Beh /Adjustable Belt/Adjustable
Cfm 2000 2000 3000 3000 4000 4000
No. Motors 1 1 1 1 1 1
Motor HP • Standard /Oversized .75/1.00 .75/1.00 1.50/2.00 1.50/2.00 2.00/3.00 2.00/3.00
Motor Rpm 1726 1725 3460 1725 3450 1725
Motor Frame Size 58 58 58 58 58 58
Throwaway/Yes Throwaway/Yes Throwaway/Yes Throwaway/Yes Throwaway/Yes Throwaway/Yes
(1)18x20x1 (1)18x20x1 (3)18x25x1 (3)18x25x1 (4)18x25x1 (4)16x25x1
(1)20x20x1 (1)20x20x1
ARt certified with various heat pumps per ARI Standard 240. Refer to Performance Data section In this catalog.
NOTE:
1. Ships wired for 208.230/3/60. Field convertible to 460/3/60.
Table 8 -1 (Continued) General Data — Air Handlers
Filters - Type /Furnished
(No.) Size Recommended
TWE12081
10 Ton
Dual Circuit
TWE12003'
TWE1208W
ARI certified with various heat pumps per ARt Standard 240. Refer to Performance Data section in this catalog
NOTE;
I. Ships wired for 208.230 /3 /60..Field convertible to 460/3/60.
15 Ton
Dual Circuit
20 Ton
Dual Circuit
TWE18083, 84, BW TWE24083, 04, BW
System Data
No. Refrigerant Circuits 2 2 2 2
Suction Line (in.) OD 1 1/8 1 1/8 1 3/8 1 3/8
Liquid Line (in.) OD 3/8 3/8 1/2 1/2
Indoor Coil • Type Plate Fin Plate Fin Plate Fin Plate Fin
Tube Size (in.) .376 .375 .375 .375
Face Area (sq. ft.) 11.2 11.2 18.3 21.8
Rows /FPI 3/12 3/12 3/12 3/12
Refrigerant Control Expansion Valve Expansion Valve Expansion Valve Expansion Valve
Drain Connection Size (In.) 1 PVC 1 PVC 1 PVC 1 PVC
Indoor Fan • Type Centrifugal Centrifugal Centrifugal Centrifugal
No. Used /Diameter x Width (In.) 1 / 15 x 15 1 / 15 x 15 2 / 15 X 15 2 / 15 X 15
Drive Type/ No. Speeds Belt /Adjustable Beh /Adjustable Belt /Adjustable Belt /Adjustable
Cfm 4000 4000 8000 8000
No, Motors 1 1 1 1
Motor HP • Standard /Oversized 2.00/3.00 2.00/3.00 3.00/5.00 5.00/7.50
Motor Rpm 1725 1725 1748 1750
Motor Frame Size 58 or 145T 58 or 145T 182T 184T
Throwaway /Yes Throwaway/Yes Throwaway/Yes Throwaway/Yes
(4)18x25x1 (4)16x25x1 (8)15)1 20x2 14)18x25 x2
(4)18x20x2
Airflow
(F)
MBh
SHC MBh
SHC
MBh
SHC
MBh
SHC
MBh
SHC
MBh
SHC
MBh
SHC
MBh
SHC
MBh
SHC
MOM
SHC
MBh
SHC
MBh
SHC
SHC
75
86.7
68.0 96.3
61.4
104.2
34.1
81.8
68.0
90.0
49.5
98.3
37.3
77.0
64.1
84.7
47,8
92.5
30.3
72.1
82.3
79.4
46.7
88.8
28.2
2703
80
85
86.7
88.7
80.8 95.3
85.1 96.3
61.5
71.9
104.2
104.2
48.9
59.8
81.8
81.8
78.8
81.2
90.0
90.0
62.3
75.1
98.3
98.3
45.3
68.1
77.0
77.1
74.8
77.1'
84.7
847
80.4
73.2
925
92 5
43.0
58.0
72.1
72.9
71.3
72.9'
79.4
79.4
58.5
71.3
88.8
80.8
41.3
63.9
4400
90
88.6
88.5' 96.3
87.2
104.2
72.8
84.3
84.3'
90.0
87.6
98.3
71.9
80.4
80.4'
88.0
86.0'
92.5
68.6
76.4
78.4'
81.0
81.0'
86.8
64.1
75
80
85
90
75
87.4
71.2 98.1
53.8
106.0
35.7
82.5
89.1
90.7
51.9
99.1
39.0
77,6
87.1
85.3
50.0
93.3
31.7
72.7
65.2
80.0
47.8
87.5
29.6
3000
90
85
87.4
89.1
84.6 96.1
89.1' 96.1
64.4
75.2
108.0
106.0
49.1
82.4
82.5
85.0
82.5'
85.0'
90.7
90.7
65.2
78,8
99.1
99.1
47,5
60.8
78.4
80.7
78.4'
80.7'
85.3
85.3
63.2
76.6
93.3
933
46.0
68.7
74.7
78.3
74.7'
76.3'
80.0
80.0
61.3
74.6
87.6
87.6
43.2
68.4
90
92.8
92.8' 98,1
91.3
106.0
76.3
88.3
88.3'
91.8
91,6'
99.1
75.3
84.2
84.2'
90.0
90.0'
93.3
71.8
90.0
90.0'
84.8
84.8'
87.6
57.1
75
88.1
74.4 98.9
68.2
105.9
37.3
83.2
72.2
91.4
64.2
99,9
40.8
732
70.1
88,0
52.2
94.0
33.1
73.3
68,1
80.8
49.9
88.2
30.9
3300
BO
85
88.3
93.1
88.3' 98.9
93,1' 96.9
67.2
78.5
106,9
106.9
51.2
85,1
86.1
88.7
86.1'
88.7'
91.4
91.4
68.1
82.1
99.9
99.9
49,8
63.6
81.8
84.3
81.8'
84.3'
88,0
88.0
66.0
80.0
94.0
94.0
47.0
81.2
77.9
79.7
77.9'
79,7'
80.6
80.8
84.0
77.9
68.2
88.2
46.1
58.9
90
96.7
98.7' 101.3
101.3'
106.9
79.6
92.2
92.2'
96.0
96.0'
99.9
78.6
87.9
87.9'
90.9
90.9'
94.0
76.0
83.6
83.5'
85.9
85.8'
88.2
70.1
75
88.8
77.8 97.6
68.6
106,7
38.9
83.8
76.3
922
66.5
100.7
42.5
78.8
73,1
86,7
64.5
94.7
34.5
73.9
71.0
81.3
521
88.9
32.2
3800
80
86
92.1
96.1
92.1 97.6
95.1' 97.6
70.1
81.9
108.7
106.7
63.4
68.0
89.8
91.1
999.8'
91.1'
92.2
92.2
71,0
86.6
100.7
100.7
61.7
68.3
85.4
88,1
86.4'
88.1'
86.7
88.7
88.9
83.5
94.7
94.7
49.0
63.9
79.7
80.2
79.7'
80.2'
81.3
81.3
68.7
813'
88.9
88.9
47.1
81.5
90
100.0
100.9
103.8'
108,7
83.1
98.1
96.1'
98.4
98.4
100.7
92.0
91.7
91.7'
93.2
93.2'
94.7
78.2
87.1
87.1'
88.0
88.0'
88.9
73.1
Airflow
(F)
MBh
SHC
MBh
SHC
MBh
SHC
MBh
8HC
MBh
SHC
MOM
SHC
MBh
SHC
MBh
SHC
MBh
SHC
MBh
SHC
MBh
SHC
MBh
SHC
3600
75
80
85
90
114.8
114.8
114.8
117.2
90.1
107.0
112.8
117.2'
128.8
128.8
128.8
128.6
88.2
81.6
96.4
116.8
139.0
139.0
139.0
139.0
45.5
62.5
79.6
97.1
110.7
110.7
110.7
114.0
89.3
106.8
109.8
114.0'
122.0
1220
122.0
122.0
87.2
84.5
101.8
118.8
133.9
133.9
133.9
133.9
60.8
81.8
79.2
98.0
106.8
106.6
108..7
111.3
88.8
103.6
108.7'
111.3'
117.5
117.5
119.3
66.3 128.8
63.8128.8
101.5 126.8
119.3' 128.8
42.2
69.9
78.0
96.5
102.6
102.5
103.8
108.5
86.6
101.3
103.6'
108.6'
112.9
112.9
112.9
115.2
85.0
63.2
101.4
116.2'
123.8
123.8
123.6
40.2
68. 8
788
91,3
40D0
76
80
85
90
115,7
115.7
118.1
122.7
94.3
112.0
11E11'
1227'
127.8
127.8
127.8
127.8
71.6
85.6
99.9
121.2
140.1
140.1
140.1
140.1
47,6
65.4
83.2
101.7
111.6
111.8
114.9
119.4
93.5 123.0
111.8
114.9' 123.0
119.4' 124.2
70.4
88.4
108,8
124.2'
135.0
135.0
135.0
135.0
53.2
64.7
82.9
1028
107.4
108.5
111,7
118.8
92.9
108.6'
111.7'
116.6'
118.4
118.4
118.4
124.9
89.4
87.7
106.3
124.9'
129.8
129.8
129.8
129.8
44.1
62.7
81.7
100.0
103.3
106.1
108.5
113.8
92.7 113.8
106.1' 113.8
108.6
113.8' 120.6
88.1
87.2
106.2
120.8'
12413
124.8
124.6
124.8
42.1
81.8
80.4
95.6
4400
76
80
85
90
118.7
117.0
123.3
128.1
98.5
117.0'
123.3'
128.1'
128.8
128.6
128.8
134.7
74.8
89.3
104.3
134,7'
141.2
141.2
141.2
141.2
49.7
68.3
88.9
108.2
112.5
116.5
120.0
124.7
97.8 124.0
116.5' 124.0
120.0'124.0
124.7' 130.4
73.5
92.3
111,3
130.4'
138.1
138.1
138.1
138.1
55.5
67.5
88.5
107.1
108.3
113.3
118,7
121.7
97.0
113.3'
118.7'
121.7'
119.3
119.3
119.3
126.3
724130.9
91.6 130.9
111.0 130.9
128.3' 130.9
48.1
66.6
85.3
104.4
104.1
110.8
113.2
118.8
96.7
110.8'
113.2'
118.6'
114.7
114.7
114.7
122..1
71.0
91.0
110.8
122.1'
126.6
125.8
126,8
125.6
44.0
64.3
83.9
99.8
4800
75
80
85
90
117.6
122.0
128.0
133.6
102.7
122.0'
126.0'
133.5'
129,6
129.6
129.6
138.0
77.8
93.1
108.8
138.0'
142.3
142.3
142.3
142.3
61.9
71.2
90.8
110.8
113.4
121.5
123.3
130.0
101,8 125.0
121.5' 125.0
123.3
130.0' 133.6
78.6
98.3
116.1
133.8'
137.2
137,2
137.2
137.2
67.9
70.4
90.3
111.7
109.2
118.2
119.3
127.0
101.2
118.2'
119.3'
127.0'
120.3
120.3
120.3
129.4
75.5
95.6
115.8
129.4'
131.9
131.9
131.9
131.9
48.1
88.3
88.9
106,9
106.0
113.2
114.0
123.7
1C0.9
113.2'
114.0'
123.7'
115.8
115.6
115.6
125.2
74.1
94.9
115.8
125.2'
128.8
126,8
128.8
128.8
45.9
67.0
87.5
104.1
MANE"
-
Table 11 -1 Gross Cooling Capacities (MBh) 71 Ton TWA090A Heat Pump With 71/2 Ton TWE090A Air Handler
Enter.
Dry
All temperatures are in degrees F.
All capacities shown era gross end have not considered Indoor fan haat. To obtain net cooling capacities subtract Indoor Ian heat.
MBh • Total Gross Cooling Capacity
SHC • Sensible Heat Capacity
NOTES:
1. Dry Coil Condition. Total gross capacity (MBh) shown to the left I. not applicable. In this case the Sensible Heat Capacity (SHC► Is the total capacity.
Table 11 -2 Gross Cooling Capacities (MBh) 10 Ton TWAl20A Heat Pump With 10 Ton TWE120A Air Handler
Enter.
Dry
61
86
( Performance
Data
95
Ambient Temperature
Entering Wet Bulb
81 87 73 81 87 73 81
85
96
Ambient Temperature
Entering Wet Bulb
87 73 61 87 73 61
1
106
67 73 81 .
106
67
73
All temperatures are In degrees F.
All capacities shown are gross and have not considered Indoor Ian heat. To obtain net cooling capacities subtract indoor tan heat.
MOM • Total Gross Coding Capacity
SHC • Sensible Heat Capacity
NOTES:
1. Dry Coil Condition. Total gross capacity (MBh) shown to the left Is not applicable. In this case the Sensible Heat Capacity (SHC) is the total capacity.
61
115
67
115
87
73
73
- Performance
Data
Table 21 -1 Evaporator Fan Performance 10 Ton TWE120A3, AW; TWE120B3, BW - Air Handler
am
3200
3400
3600
3800
4000
4200
4400
4800
4800
External Static Pressure (Inches of Water Gauge)
.10" .20" .30" .40" .50" .80" .70" .80" .90"
RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP
563
681
600
616
632
648
684
508
.88 588
.79 606
.90 624
1.02 840
1.14 666
1.27 878
1.40 698
.86
.74
.88
.97
1.09
1.22
1.36
1.49 1
575
594
613
631
649
682
875
701
727
Data includes pressure drop due
Fan motor heat (MBh is 3.15 X B
Trans's factory supplied motors,
Uelng the full horsepower range
effected.
NOTE;
1. Field supplied low static drive (see Table 21.2)
.62 002
.71 620
.81 839
.92 864
1.04 870
1.18 688
1.29 703
1.43' 728
1.68 753
1.00" 1,20"
RPM RPM RPM RPM
2 HP Std. Motor i Field Supplied Low Static Orlve' 2 HP Std. Mato & Sheaves
.68 629 .74 656 .80 676 .88 706 .93 736 1.00 771 1.06 819 1.16
.78 648 .84 670 .91 694 .97, 723 1.04 762 1.10 782 1.16 829 1.26
.87 664 .94 886 1.02 713 1.08 741 1.14 788 1.20 793 1.26 840 1.37
.99 679 1.06 702 1.14 729 1.20 767 1.26 784 1.32 811 1.38 864 1.62
1.11 695 1.18, 719 1.25 745 1.32 773 1.38 801 1.44 828 1.49 889 1.68
1.241 712 1.32 740 1.39 766 1.48 791 1.51 816 1.58 841 1.86 883 1.83
1.37 730 1.48 760 1.54 786 1.60 808 1.64 831 1.72 853 1.82 698 2.00
1.52 747 1.89 781 1.68 807 1.78 831 1.83 846 1.91 866 2.00 909 2.17
1,67 783 1.73 801 1,83 828 1.92 864 2.01 - - - - 921 2.35
to wet coil and 1" fitter.
hp.
in commercial equipment, are definite purpose motors, specifically designed and tested to operate reliably and continuously at all cataloged conditions.
of our fan motors es shown in our tabular data will not result In nuisance tripping or premature motor failure. Our product's warranty will not be
Table 21 -1 (Continued) Evaporator Fan Performance 10 Ton TWE120A3, AW;
TWE12003, BW - Air Handler
External Static Pressure (Inches of Water Gauge)
1.40" 1,80" 1.80" 2.00" 2.20" 2.40"
Cfm RPM BHP RPM SHP RPM BHP RPM BHP RPM BHP RPM SHP
3200
3400
3600
3800
4000
4200
4400
4600
490
2 HP Std. Moto & thews
874 1.28 923 1.43
862 1.42 934 1.64
891 1.65 946 1.68
900 1,67. 966 1.79
910 1.90 967 1,93
931 1.99 964 2.10
952 2.13 1002 2.28
964 2.33 1012 2.49
976 2.52 1022 2.70
910
989
998
1007
1016
1033
1061
1019
1067
1.64
127
1.79
1.93
2.06
2.25
2.43
2.66
2.87
3 HP OvwMnd Motor & shaves
1034 1.68
1042 1.79
1060 1,92
1067 2.06
1065 2.20
1083 2.39
1100 2.69
1107 2.81
Motor Sheave
Turns Open
0 .
1
.
5
1088
1096
1101
1108
1114
1132
1150
1164
1.78
1.92
2.06
2.18
2.34
2.54
2.74
2.98
1142
1147
1153
1168
1183
•1.91
2.06
2.18
2.33
2.47
Data includes pressure drop due to wet coil and 1" filter,
Fan motor heat (MBh) • 3.15 X Shp.
Trani s factory supplied motors, in commercial equipment, are definite purpose motors, specifically designed and tested to
operate reliably and continuously at all cataloged conditions.
Using the full horsepower range of our fan motors is shown In our tabular data will not result in nuisance tripping or
premature motor failure. Our product's werrenty will not be effected
NOTE:
1. Field supplied low static drive Sae Table 21.2)
Table 21-2 Low Static Fan Drive
10 Ton
TWE120A3, AW;
TWE12003, 6W
Air Handler'
Nominal
RPM
746
708
888
827
688
649
NOTE:
1: Field supplied components required:
(flower Sheave: Fixed Pitch 18.8 Inch Pitch Diameter),
'1.0Inch Bore. Single Groove.
"A" Beh.
•
MANE"'
Figure 38 -1 - 7 And 10 Ton TWA090 And 120A Hest Pumps
All dimensions are in inches.
TOP DISCHARGE AREA SHOULD BE VERTICALLY —
UNRESTRICTED FOR 100" MINIMUM. UNIT
SHOULD BE PLACED SO ROOF RUNOFF WATER
DOES NOT POUR DIRECTLY ON UNIT.
1 DIAMETER
HOLE
( II (HIGH VOLTAGE)
1% DIAMETER
UFTING HOLE
(4 PLACES)
Yi DIAMETER
(CONTROL WRING)
MINIMUM CLEARANCE FOR PROPER OPERATION
IS 36 INCHES FROM WALLS, SHRUBBERY, \ r r
PRIVACY FENCES, ETC. MINIMUM CLEARANCE 1% DIAMETER
BETWEEN ADJACENT UNITS IS 72 INCHES. / EXTRUDED HOLE
r r
Tons MaMI No, A
7/16 DIA. ISOLATOR
MOUNTING HOLES
(INSIDE HOLES - 4 PLACES)
P. DIAMETER-.
EXTRUDED HOLE
Table 38.1 ' Heat Pump Unk Dimensions (in.)
B C 0 E
Dimensional
Data
RECOMMENDED
SERVICE CLEARANCE
FOOTPRINT (BOLT DOWN
PATTERN)'
F G H
J
L M
71 TWA090A 38.11/16 33.16/16 41.3/16 1.16/16 3.6/16 9.13/18 12.3/4 2941/10 30.3/10. 34-3/4 1- 13/16.21.11/16
10; ..e1WAl20A.`' 42-3/4 37.16/18 61.3/16 1.3/18 3.6/16 12.16/18 9 -16/16 33.3/4 34 -3/16 44-13/10 3-13/16 25-11/16
Figure 38 -1 • 5, 7 And 10 Ton TWE060,090,120A; TWE060,1208 Air Handlers
All dimensions are in inches.
FILTER
REMOVAL
... "••.. • \ BOTH ENDS
Table 38-1 Air Handler Dimensions (In.)
Dimensional
Data
MIN.
H '
ACCESS
PANEL
Table 38.1 (Continued) Air Handler Dimensions (In.)
3/4 FEMALE SCHED 40
PVC PIPE DRAIN
CONNECTION
(4 PLACES)
38
DUCT
16 1/1-6 OPENING >-
E
P
2" DIA. KNOCKOUT
(FOR SUCTION UNE • BOTH ENDS)
7/8 DIA. KNOCKOUT
HEATER VENTILATION
7/8 DIA BUSHING
LOW VOLTAGE
ENTRANCE
7/8 DIA. KNOCKOUT!
HIGH VOLTAGE
ENTRANCE
7/B DIA. KNOCKOUT
HEATER CONTROL
AND SINGLE POWER
ENTRY WIRES
7/8 DIA. KNOCKOUT
(FOR LIQUID LINE • BOTH ENDS)
DUCT
FLANGE
— 1/2" PANEL DEPTH
(TYP. ALL PANELS)
Tons Model No. A B C D E F G H
5 TWE060A 66 38 22 7-15/16 13/16 1-3/8 20.1/8 26
1WE0608 56 38 22 7.15/16 13/16 1.3/8 20-1/8 26
71/2 1WE090A 59-15/16 47.1/2 25 11-13/16 13/16 1 -5/16 22-3/4 22
10 TWE120A . 59-16/16 83.1/2 25 19.13/16 13/18 1 -1/8 22.3/4 22
TWE1208 59-15/16 63-1/2 25 19.13/16 13/16 1.1/8 22-3/4 22
Tons Model No. J K I. M N P 0 R S
6 TWE060A 14-1/2 7 1-15/16 1.3/8 2 44 — — 36.13/16
1WE0808 12-3/8 7 1-15/16 1.3/8 3/4 44 8.3/4 17.13/16 36.3/16
71/2 TWE090A 14.3/4 6.15/16 2.1/16 1 -3/16 1•11/16 47.1/4 — — 40.1/16
10 TWE120A 14.3/4 5.15/16 2.1/16 1.3/16 1.11/16 47-1/4 — — 40.1/16
TWE1208 14-3/4 5.15/16 2.1/16 1.3/16 1.11/18 47.1/4 8.3/4 17-3/4 .40.1/16
• T
•
# 1
#4
Service Access
7 And .10 Ton
TWA090A,120A
•112
#3
Wei h
9 ts
#1
#4
Table 44 -1 Unit and Corner Weights (Lbs.)
Unit Shipping Net Corner Weights
Tons Model No. Maximum (lbs.) Maximum (lbs.) #1 . #2 #3 #4
7' TWA090A 415 388 126 107 62 73
10 TWAl20A 498 442 153 124 74 91
15 1WA1808 ' 826 760 159 161 217 213 • 20 TWA2408 991 906 177 179 278 274
Table 44 -2 Accessory Weights (Net Lbs.)
Unit HIS Steel Spring Anti Short Coll L ow
Tons Model No. Isolators Isolators Cycle Timer Guard Thermostats Ambient
71/2 TWA090A 2 12 1 8 1 23
10 TWAl20A 2 12 1 11 1 23
15 TWA1808 2 12 1 22 1 23
20 TWA2408 2 12 1 34 1 23
Service Access
18 And 20 Ton
TWA180B,240B
#2
#3
Table 45 -1 Unit And Corner Weights (Lbs.)
Unit
Tons Model No.
5
10
TWE060A
TWE0608
71/2 TWE090A
TWE120A
TWE1208
16 TWE1808
20 TWE2408
NOTE:
1. If application requires steam or hot water heating coils, field supplied isolators must be utilized.
Table 45 -2 Accessory Weights (Net Lbs,)
RIS Steel Spring
Discharge Electric RIS Isolator Steel Spring Isolator
Unit Plenum Return Heat Oversized Isolator Suspended Isolator Suspended Control
Tons Model No, And Grille' Air Grille Min. /Max, Subbase Motor Floor Mount Mount Floor Mount Mount Transformer
5 TWE060A,8 68 3 32/43 14 31 2 9 12 6 —
7'/e TWE090A 73 6 27/46 19 48 2 6 12 6 4
10 TWE120A8 92 7 27/45 23 60 2 7 12 6 4
16 TWE1808 124 10 79/100 27 80 2 s 7 12 6 —
20 TWE2408 145 12 79/100 31 88 2 9 12 8
NOTE:
1. For use when no supplemental heat is supplied.
# 1 #2 #1
#4
5, 7% And 10 Ton #3
TW E060A,090A,120A
TWE080B,120B
Vertical
Shipping Net Corner Weights — Vertical Corner Weights — Horizontal
Maximum (lbs.) Maximum (lbs.) #1 #2 #3 #4 A 8 C D
298 262 65 86 66 66 68 69 83 72
388 346 87 87 86 88 93 85 80 88
473 419 104 106 106 103 102 111 108 98
764 690 176 176 170 170 170 190 156 174
886 820 208 214 207 206 205 230 190 210
•
#4
Weights
Air Flow
5, 7 And 10 Ton
TW E080A,090A,120A
TWE0808,1208
Horizontal
46
C
15 And 20 Ton
TWE180B,240B
Vertical
A
* Airflow *
15 And 20 Ton
TWE180B,240B
Horizontal
J
#2
#3
General
Units shall be assembled on heavy
gauge steel mounting /lifting rails and
shall be weather proofed Unit shall
include a hermetic reciprocating
compressor(s), plate fin condenser coil,
fans and motors, controls and holding
charge of R -22. Operating Range shall
be between 116° F and 35° F in
cooling as standard from factory. Units
shall be UL listed, C.S.A. certified and
rated in accordance with ARI Standard
240 and 270.
Casing
Unit casing shall be constructed of 18
gauge zinc coated heavy gauge,
galvanized steel. Exterior surfaces shall
be cleaned, phosphatized and finished
with a weather - resistant baked enamel
finish. Units surface shall be tested 500
hours in salt spray test. Units shall
have removable end panels which
allow access to all major components
and controls.
Refrigeration System — Single
Compressor
TWA090A, TWAl20A units shall have
a single refrigeration circuit. Each
refrigeration circuit has an integral
subcooling circuit. A refrigeration filter
drier, expansion valve and check valves
shall be provided as standard. The
7WA090A, TWAl20A units shall have
both a liquid line and suction gas line
service valve with gauge port.
TWA090A, TWAl20A units shall have
one direct drive hermetic reciprocating
compressor with centrifugal oil pump
providing positive lubrication to moving
parts. Motor shall be suction gas - cooled
and shall have a voltage utilization
range of plus or minus 10 percent of
nameplate voltage. Crankcase heater,
temperature and current - sensitive
motor overloads shall be included for
maximum protection. Shall have
internal spring isolation and sound
muffling to minimize vibration
transmission and noise. External high
Mechanical
Specifications
and low pressure cutout devices shall
be provided. Evaporator defrost control
provided in indoor blower coil unit shall
prevent compressor slugging by
temporarily interrupting compressor
operation when low evaporator coil
temperatures are encountered.
Refrigeration System — Dual
Compressor
TWA180B, TWA240B units shall have
two separate and independent
refrigeration circuits. Each refrigeration
circuit shall have an integral subcooling
circuit. A refrigeration filter drier shall
be provided as standard.
TWA180B, TWA2408 units shall have
two Trans direct drive hermetic
reciprocating compressors with
centrifugal oil pump and provide
positive lubrication to all moving parts.
Motor shall be suction gas - cooled and
shall have a voltage utilization range of
plus or minus 10 percent of nameplate
voltage. Crankcase heater, internal
temperature and currentsensitive motor
overloads shall be included for
maximum protection. Shall have
internal spring isolation and sound
muffling to minimize vibration
transmission and noise. External high
and low pressure cutout devices shall
be provided. Evaporator defrost control
provided in indoor blower coil shall
prevent compressor slugging by
temporarily interrupting compressor
operation when low evaporator coil
temperatures are encountered.
Condenser Coil
Coils shall be internally finned or
smooth bore 3/8" copper tubes
mechanically bonded to configured
aluminum plate fin as standard. Coil
shall be factory pressure and leak
tested to 375 psig air pressure. Metal
grilles with PVC coating for coil
protection is optional.
Condenser Fan And Motor(S)
Direct - drive, statically and dynamically
balanced 26 or 28 inch propeller fangs)
with aluminum blades and electro-
coated steel hubs shall be used in
draw - through vertical discharge
position. Either permanently lubricated
totally enclosed or open construction
type motors shall be provided and shall
have built in current and thermal
overload protection. Motor(s) shall have
be either ball or sleeve bearing type.
46
Controls
Heat pump units shall be completely
factory wired with necessary controls
and contactor pressure lugs or terminal
block for power wiring. Control wiring
shall be 24 -volt control circuit which
includes fusing and control
transformer. Units shall provide
external location for mounting a fused
disconnect device. Time delay timers to
prevent compressors in dual
compressor units from simultaneous
start-up and anti - recycle timers are
available as optional accessories.
Defrost Controls
Electronic timed initiated, temperature
terminated defrost system with choice
of 50, 70, or 90 minute cycle. Timed
override limits defrost cycle to 10
minutes.
Low Ambient Operation
Standard units shall start and operate
to approximately 35° F when matched
with Trane air handlers and coils.
Optional head pressure control
accessory permits operation to 0° F.
Accessories
Low Ambient Head Pressure Control
— Shall modulate the RPM of unit
outdoor fan motor in response to
outdoor ambient temperatures and unit
head pressure. Accessory provides unit
cooling operation to outdoor
temperatures of 0° F.
Vibration Isolation Packages — Shall
reduce transmission of noise and
vibration to building structures,
equipment and adjacent spaces.
Packages shall be available in either
neoprene -in -shear or spring -flex types.
Time Delay Relay — Shall prevent
compressors in dual compressor unit
from coming on line simultaneously.
Timer shall be 24 -volt, 60 cycle, with
four minute timing period.
Anti - Short -Cycle Timer — Shall
prevent rapid on -off compressor cycling
in light load conditions by not allowing
compressor to operate for 6 -7 minutes
upon shutdown. Shall consist of a solid
state timing device, 24 -volt, 60 cycle
with either 5 or 7 minute fixed -off
timing period.
Condenser Coil Guard — Metal grille
with PVC coating shall be provided to
alleviate coil damage.
Mechanical
General
Air handler units shall be completely
factory assembled including coil,
condensate drain pan, fan motor(s),
filters and controls in an insulated
casing that can be applied in either
vertical or horizontal configuration.
Units shall be rated and tested in
accordance with ARI standard 210,
Units shall be UL listed and labeled in
accordance with UL 465 and 559 for
indoor blower coil units, All units shall
be CSA certified for Canadian
application.
Casing
Unit casing shall be constructed of zinc
coated, heavy gauge, galvanized steel.
Exterior surfaces shall be cleaned,
phosphatized and finished with a
weather - resistant baked enamel finish.
Casing is completely insulated with fire -
retardant, permanent, odorless glass
fiber material. Knockouts shall be
provided for unit electrical power and
refrigerant piping connections. Captive
screws shall be standard on all access
panels.
Refrigeration System
The TWE090A, TWE120A units shall
have a single refrigeration circuit and
the TWE060B, TWEI208, TWO 80B,
TWE240B units shall have dual
refrigeration circuits. Each refrigeration
circuit is controlled by a factory
installed thermal expansion valve.
Evaporator Coil
Configured aluminum fin surface shall
be mechanically bonded to 3/8"
internally enhanced copper tubing and
factory pressure and leak tested at 375
psig. Coil is arranged for draw - through
airflow and shall provide condensate
drain pan constructed of PVC plastic
and provide external connections on
either side of the unit.
Evaporator Fan
Double inlet, double width, forward
curved, centrifugal -type fans) with
adjustable belt drive shall be standard.
Thermal overload protection shall be
standard on motor. Fan and motor
bearings shall be permanently
Specifications
lubricated. Oversized motors shall be
available as an option for high static
application,
Controls
Magnetic evaporator fan contactor, low
voltage terminal strip, check valve(s),
and single point power entry shall be
included. All necessary controls shall
be factory- installed and wired.
Evaporator defrost control shall be
included to prevent compressor
slugging by temporarily interrupting
compressor operation when low
evaporator coil temperatures are
encountered.
Filters
One inch, throw -away filters shall be
standard on TWE060A, TWE090A,
7WE060B and TWE120B model air
handlers. Filters shall be accessible
from the side coil access panel. Filter
rack can be field converted to two inch
capability. Two inch, throw -away filters
shall be standard on TWE180B and
TWE240B models.
Accessories
Electric Heaters — UL and CSA
approved electric heat modules shall be
available for installation directly on fan
discharge. Electric Heaters shall be
available in a wide range of capacities
with one or two stage control, single -
point electric power connection and
terminal strip connections. Electric
heater efaments shall be constructed of
heavy -duty nickel chromium elements
internally wye connected on 480/800
volt, three phase and delta connected
on 208/240 volt, three phase. Each
208/240 volt heater shall have pilot
duty with secondary backup fuse links
for automatic reset of high limit
controls. Each 480/600 volt heater
shall have automatic line break high
limit controls.
Discharge Plenums and Grilles —
Accessory discharge plenums shall be
available for vertical, free discharge
applications. Plenums shall be
constructed of heavy- gauge, zinc
coated galvanized steel finished with
baked enamel to match the air handler
unit. Grilles shall be satin finished
aluminum and have four -way
adjustable louvers.
Return Air Grilles — Accessory return
air grille shall be provided for vertical
front, free return applications. Grilles
shall be installed in place of the front
lower side panel. Grille shall be satin
finished aluminum with non - adjustable
louvers. '
Mounting Subbase — Available for
vertical floor mount configurations,
Subbase shall be constructed of heavy
gauge, zinc coated galvanized steel
with baked enamel finish to match air
handler unit. Subbase is required in the
vertical air flow application for
condensate drain trapping and when
isolators are required.
Vibration Isolators — Shall reduce
transmission of noise and vibration to
building structures, equipment and
adjacent spaces. Packages shall be
available in either neoprene -in shear or
spring -flex types in floor or suspended
mountings.
Oversized Motors Field installed
oversized motors shall be available for
high static pressure applications.
Control Options
Standard Indoor Thermostats — Two
stage heating and cooling operation or
one stage heating and cooling
thermostats shall be available in either
manual or automatic changeover.
Programmable Electronic Night
Setback Thermostat — Shall provide
heating setback and cooling setup with
7 -day programming capability.
Outdoor Thermostat — Shall provide
staging control of electric heaters based
on a set outdoor temperature.
fatigue technology
tec mechanical
unit duct elevation
curb detail
partial roof plan