HomeMy WebLinkAboutPermit 0458-M - BOEING #21-030458-m 91-027 boeing #21-03 3417 south 120th place
DATE
REQUIRED INSPECTIONS PHONE NO. APPROVED
INSPECTOR
CORRECTION
DATE(S)
NOTICE
ISSUED
ZIP: 98124-2207
10 1 - Rouah-inNents/Ducts
431-3670
000.00
y 2 - Fire Final
575-4407
'ZIP: 98020
'EXPIRATION DATE: 5-21-91
WA. V. CONTRACTOR'S LICENSE NO. NARDOMC152B2
ID 3 - Planning Final
431-3680
.
y 4 -
x 5- Mechanical Final
431-3670
:::.::::::i:::::::::::::::::!:;:li:::::::::::;:;:;:ii;i::::::::Milii:;;;;;;M::::;:;:;:iWii:M:i:::Iiii::::;:i:::::;:iiiii::::Mi:ii::;:::0:i::::::::::::iii:: - -(•. .::, ,
• ; iti. ,
'PHONE: 544-2975
SITE ADDRESS: 3417 S 120 P1
SUITE NO.
ZIP: 98124-2207
.;• ■ .:ti A N;,),, - Boein: 1/21-03
VALUE OF WORK: 5
000.00
higig4. A[11111 New/Addition Modifications
DESCRIPTION OF WORK: Add one AC unit.
slum. ff• Other:
'ZIP: 98020
'EXPIRATION DATE: 5-21-91
WA. V. CONTRACTOR'S LICENSE NO. NARDOMC152B2
PROPERTY OWNER:
Bo e in !
'PHONE: 544-2975
;,1111;
P.O. Box 3707 M/S 46-87, Seattle, WA
ZIP: 98124-2207
CONTRACTOR:
Nardone Mechanical
PHONE: 776-6200
ADDRESS;
21431 72nd Avenue West, Edmonds WA
'ZIP: 98020
'EXPIRATION DATE: 5-21-91
WA. V. CONTRACTOR'S LICENSE NO. NARDOMC152B2
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431-3670
MECHANICAL
PERMIT NO. 01-4 'j
DATE ISSUED:
I
..............................................
UMC EDITION (YEAR : 1988
FIRE PROTECTION: Sprinklers °Detectors (x) N/A
CONDITIONS (other than noted on or attached to permit/plans):
APPROVED FOR
ISSUANCE BY:
PRINT NAME:
(. 1••■.)
I hereby certify that I have read and examine this permit and know the same to be true and correct. AII provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit.
SIGNATURE: e-e..-c-r_t_
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732)
Electrical - Washington State Department of Labor and Industries (277-7272)
- .• . . • ::::::•. . . ::.:„•::: • •
• ...TN permit stiall become *land void ct ifthii . weit1c10 not commenced i the Oat
thei;•ioikis:6680 fdi'i 180 . the last inspec . tion. . •
MECHAK.CAL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
trrriTrinaMBM
•
maGros.1. snow
MagriMil
Plan Chock No.:
• .441• 1 1
UNV:
91
RECEI .
BUILDING
OFFICIAL
DATE:
DATE: _ _
COMPANY: 44 4
PERMIT NO.
...........................
n ;
.... .. .. .. ...
CONTACTED
&BUILDING -
initial review
a -13 -611
DATE READY
CONSIJLTAN l: Date Sent - Date App
pproved -
DATE NOTIFIED
2nd NOTIFICATION
3
(I n
(ink.)
BY:
(ink.)
PERMIT EXPIRES
FIRE DEPT. LETTER DATED: INSPECTOR:
)NIT:
AMOUNT OWING
( 0 I „ W
� �
3RD NOTIFICATION
ZONING: ISARILAND USE CONDITIONS? r]Yes [I] No
BY:
ink.
::.
... ..... . ..:.: :......
...........................
n ;
.... .. .. .. ...
• .C • :: v' riff •. •: }.' ..:.......:. r:.r'm.:::: }::.. :::.:.r::v::n :. :•:.r .. �:::.. 1:..•.• ::..•...•:..;,v; :; r.r.::•::.v.... r. /:: }:•: {:.: r. �:.......
&BUILDING -
initial review
a -13 -611
2- 15-1(
(ROUTED)
CONSIJLTAN l: Date Sent - Date App
pproved -
O FIRE
FIRE PROTECTION: [ ) Sprinklers (l Detectors (1 N/A
FIRE DEPT. LETTER DATED: INSPECTOR:
)NIT:
O PLANNING
ZONING: ISARILAND USE CONDITIONS? r]Yes [I] No
SCREENING REQUIRED? rive• ri No
INIT:
REFERENCE FLE NOS.:
O OTHER
INIT:
BUILDING -
final rAviaw
�VtS_� 1
Z- 15 -I, (
UMC EDITION (year):
ct CCs��
g E3.
INIT: CE (4
MECHANICAL PERMIT
APPLICATION TRACKING
v
E A E oln O1 -OJ3
SITE ADDRESS 51-fn S / ao f'I
SUITE NO.
PLAN CHECK
NUMBER
a i - oi - m
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" In box Indicates which departments need to review the project.
REVIEW COMPLETED
PROPERTY OWNER ' -
< ._ c� � vi
� ,�,)
IPHONE so
/1
PHONE `77
LI _ Z ?S
R Z I ‘10/2. - 2207
b (,
ADDRESS 0. R,•„( 7U l� /'S
(* S eci (p
CONTRACTOR AUA.( Do lYl i.-� 14
UNIT(S) FEE :.:
ADDRESS ,3lLi31 7'Z Ave ku.
tit)MDAII
LL.? li-�aN
ZII;f 3 )
WA. ST. CONTRACTOR'S LICENSE # R
� 5 ,
EXP. DATE J . _ 2 1— 9
CITY OF TUKWILA
DATE APPLICATION ACCEPTED
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
PLAN CHECK
NUMBER C l - O ��
APPLICATION MUST BE FILLED OUT COMPLETELY
MECHA GICAL PERMIT
APPLICATION
Mechanical Fie Worksheet must also be filled out
and attached to this application.
FEES (for staff use only)
SITE ADDRESS
SUITE #
PROJECT NAME/TENANT
0-M 0 Repair
TYPE OF)WORK: (] New /Addition
DESCRIBE WORK TO BE DONE:
VALUE CONSTRUCTION • $
Li Other:
BUILDING USE (office, warehouse, etc.)
NATURE OF BUSINESS:
WILL THERE BE A CHANGE IN USE? No 0 Yes IF YES, EXPLAIN:
WILL THERE E STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? 9No 0 Yes IF YES, EXPLAIN:
BUILDING OWNER
OR
AUTHORIZED
AGENT
CONTACT PERSON
MINED 3
M< . :PPM FC F
( .. .... ...
SIGNATURE
DATE �,
D —(3- 91
PRINT NAME C iA 0( � ,t v U
PHONE -2-7i,. G' 7c- , Z ,
ADDRESS i , L i
V LA)
1 rytyi C2S t,('i1 S CITY /ZI P Ebn1ak) 175 C 2(:
PHONE -77�� L. 2 L
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed information on application and plan submittal requirements. Application and
clans must be complete in order to be accented for plan review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation Is for the work covered by this permit and must be filled in by the
applicant. This figure Is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitation. The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
DATE APPLICATIO EXPIRES
I 3 -c1
0111111100
BASIC :PERMIT FEE
$1600
UNIT(S) FEE :.:
Tr
PLAN 'CHECK : FEE
OTHER: :
, > > <TOTAL w
j., ��j
: 0(o 1 T i .
.
CITY OF TUKWILA
DATE APPLICATION ACCEPTED
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
PLAN CHECK
NUMBER C l - O ��
APPLICATION MUST BE FILLED OUT COMPLETELY
MECHA GICAL PERMIT
APPLICATION
Mechanical Fie Worksheet must also be filled out
and attached to this application.
FEES (for staff use only)
SITE ADDRESS
SUITE #
PROJECT NAME/TENANT
0-M 0 Repair
TYPE OF)WORK: (] New /Addition
DESCRIBE WORK TO BE DONE:
VALUE CONSTRUCTION • $
Li Other:
BUILDING USE (office, warehouse, etc.)
NATURE OF BUSINESS:
WILL THERE BE A CHANGE IN USE? No 0 Yes IF YES, EXPLAIN:
WILL THERE E STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? 9No 0 Yes IF YES, EXPLAIN:
BUILDING OWNER
OR
AUTHORIZED
AGENT
CONTACT PERSON
MINED 3
M< . :PPM FC F
( .. .... ...
SIGNATURE
DATE �,
D —(3- 91
PRINT NAME C iA 0( � ,t v U
PHONE -2-7i,. G' 7c- , Z ,
ADDRESS i , L i
V LA)
1 rytyi C2S t,('i1 S CITY /ZI P Ebn1ak) 175 C 2(:
PHONE -77�� L. 2 L
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed information on application and plan submittal requirements. Application and
clans must be complete in order to be accented for plan review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation Is for the work covered by this permit and must be filled in by the
applicant. This figure Is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitation. The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
DATE APPLICATIO EXPIRES
I 3 -c1
0111111100
MECHANICAL
Completed mechanical permit application (one for each structure or tenant)
Two (2) sets of mechanical plans, which include:
• Floor plan
• System layout
• Elevations (for roof mounted equipment)
• Heat Loss Calculations
ri Structural calculations stamped by a Washington State licensed engineer may be
" required if structural work is to be done (2 sets)
Note: Hood and duct systems require a building permit for the duct shaft.
S6BMI'TTAL CHECILIST
DESCRIPTION
UNIT COST
NO OF
UNITS
X
TOTAL
COST
$15.00
BASIC FEE
SUPPLEMENT PERMIT FEE
$4.50
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu/h.
$9.00
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
X
3
Installation or relocation of each floor furnace, including vent.
$9.00
X
4
Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater.
$9.00
X
S
Installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit.
$4.50
X
S
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
7
installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9.00
X
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
x
9
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu/h.
$22.50
x
10
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
x
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu /h.
$56,00
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
13
Each air- handling unit over 10,000 ctm.
$11.00
x
14
Each evaporative cooler other than a portable type.
$6.50
x
15
Each ventilation fan connected to a single duct.
$4.50
x
15
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
X
17
Installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6,50
18
Installation or relocation of each commercial or industrial -type incinerator.
$11.00
x
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
x
20
!
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code.
$6.50
X
ONINO
SUBTOTAL
I .
PLAN CHECK PEE Nl
GRAND TOTAL
$
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
MECHANC ,AL PERMIT
FEE WORKSHEET
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188
Plan Check #91- 027 -M: Boeing #21 -03
3417 S 120 P1
4. Any exposed insulations
Spread Rating of 25 or
identification showing
thereof.
PHONE # (2061433.1800
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART O "� FTHE APPROVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (277-
7272).
3. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
backing material to have Flame
less, and material shall bear
the fire performance rating
5. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washington State Energy Code (1990 Edition), and
Washington State Regulations for Barrier Free Facility
(1990 Edition).
6. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
Gary L. VanDusen, Mayor
PROJECT: , 7 -2 2 / — f:%'
PERMIT NO. 0 4 / c5 e `-!A
SITE ADDRESS: 3
7 `
1. Z.
DATE CALLED: '3 — — cr
DATE WANTED: ,' ,' --
,� _ _
TYPE OF INSPECTION: ,7-9c,--/
REQUESTER. �G c-Q Ve ! : ,-�< 7t,�_
'
SPECIAL INSTRUCTIONS:
2;0c /' c.�j
_ ---
PAW NO.:
--
_
INSPECTION RESULTS /COMMENTS: "
',-,
� A>r
INSPECTOR: _ _ .r �.
DATE:
CITY OF TUIKW LA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
w....r...w...«r . wx■la:nw«.44 cMUTRnvlw,a+araleiti ns.:F.x...nn0n,n..g?n+a ..
111444k x mu on+r.tmrear nsNrwmrritrom eueiy.
INSPECTION RECORD
6300 Southcenter Boulevard - #100
Tukwila Washington 98188
■
CITY OF =MLA
Dept. of Community Development - Building Division
Phone: (206) 431.3670
•••∎■■ kYXYMYULiAtitW�SyaF .nuM+trvAV1.wvM tL
( INSPECTIOCI RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PROJECT: I Q.2. 9j r- I (7 3 10 !�
SITE ADDRESS: -2,4 ) ) l)
TYPE OF INSPECTION: `1
SPECIAL INSTRUCTIONS:
PERMIT NO. O fc- M
DATE CALLED: 3r /7-el
DATE WANTED:
REQUESTER: 11..A '--12 Q4L 09 epti •
_ PHONE NO.: 776-6,00n
INSPECTION RESULTS /COMMENTS: / p_,
INSPECTOR:
DATE:
PLAN REVIEW COMMENTC
PLAN CHECK il '<>2..") M PROJECT N 441.2 � b3
REQUIRED INSPECTIONS
7O All structural concrete to be special Inspected (Sec. 306, UBC).
O All structural welding to be done by WAB.O. certified wilder and special
Inspected (See. 306, UBC).
9O All high-strength bolting to be special inspected (See. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral bracing
requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet
In length.
0 Readily accessible access to roof mounted equipment is required.
0 Engineereed trues drawings and calculations shall be on site and available to the
building Inspector for inspection purposes. Documents shall bear the seal and
signature of a Washington State Professional Engineer.
ta.
0 A statement from the roofing contractor verifying fire retardancy of roof will be
required prior to final Inspection (see attached procedure).
No changes will be made to the plans unless approved by the Architect and the
Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health Department
and plumbing will be inspected by that agency, Including all gas piping (298-
4722).
Electrical permit shall be obtained through the Washington State Division of Labor
and industries and all electrical work will be Inspected by that agency (277. 7272).
All mechanical work shall be under separate permit through the City of Tukwila.
All permits, inspection records, end approved plans shall be posted at the job site
prior to the start of any construction.
When special Inspection is required either the owner, architect or engineer shall
notify the Tukwila Building Division of appointment of the inspection agencies
prior to the first building inspection. Copies of all special inspection reports shall
be submitted to the Building Division In a timely manner. Reports shall contain
address, project name and permit number of the project being Inspected.
Any exposed Insulations backing material to have Flame Spread Rating of 25 or
less, and material shalt bear Identification showing the fire performance rating
thereof.
Subgrade preparation Including drainage, excavation, compaction, end fill
requirements shall conform strictly with recommendations given In the soils report
prior to final Inspection (see attached procedure).
All construction to be done in conformance with approved plans and requirements
of the Uniform Building Cods (1988 Edition), Uniform Mechanical Code (1986
Edition), Washington State Energy Code (1990 Edition), and Washington State
Regulations for Barrier Free Facility (1990 Edition).
All food preparation establishments must have King County Hesih Department
sign-off prior to opening or doing any food processing. Arrangements for final
Health Department inspection should be made by calling King County Health
Department, 296.4787, at least three working days prior to desire inspection date.
On work requiring Health Department approval, it is the contractor's responsibility
to have a set of plans approved by that agency on the job site.
Fire retardant treated wood shall have a flame spread of not over 26. All materials
shall bear identification showing the fire performance rating thereof. Such
Identification shall be issued by an approved agency having • service for
inspection at the factory.
O Notify the City of Tukwila Building Division prior to placing any concrete. This
procedure Is In addition to any requirements for special Inspection.
0 All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be
special inspected.
All wood to remain In placed concrete shall be treated wood.
All structural masonry shall be special inspected per U.B.C. Section 308 (a) 7.
Validity of Permit. The issuance of a permit or approval of plane, specifications
and computations shall not be construed to be a permit for , or an approval of,
any violation of any of the provisions of this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or violate or cancel the
provisions of this code shall be valid.
1 Footings
2 Foundation
3 Slab /Slab Insulation
4 Shear Wall Nailing
5 Roof Sheathing Nailing
6 Masonry Chimney
7 Framing
8 Insulation
9 Suspended Ceiling
K125.00614
10 Mall Board Fastening
- r 3
12
13
14 FIRE FINAL
15 PLANNING FINAL
16 PUBLIC NORM FINAL
17 BUILDING FINAL
PLAN REVIEW COMMENTC
PLAN CHECK il '<>2..") M PROJECT N 441.2 � b3
REQUIRED INSPECTIONS
7O All structural concrete to be special Inspected (Sec. 306, UBC).
O All structural welding to be done by WAB.O. certified wilder and special
Inspected (See. 306, UBC).
9O All high-strength bolting to be special inspected (See. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral bracing
requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet
In length.
0 Readily accessible access to roof mounted equipment is required.
0 Engineereed trues drawings and calculations shall be on site and available to the
building Inspector for inspection purposes. Documents shall bear the seal and
signature of a Washington State Professional Engineer.
ta.
0 A statement from the roofing contractor verifying fire retardancy of roof will be
required prior to final Inspection (see attached procedure).
No changes will be made to the plans unless approved by the Architect and the
Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health Department
and plumbing will be inspected by that agency, Including all gas piping (298-
4722).
Electrical permit shall be obtained through the Washington State Division of Labor
and industries and all electrical work will be Inspected by that agency (277. 7272).
All mechanical work shall be under separate permit through the City of Tukwila.
All permits, inspection records, end approved plans shall be posted at the job site
prior to the start of any construction.
When special Inspection is required either the owner, architect or engineer shall
notify the Tukwila Building Division of appointment of the inspection agencies
prior to the first building inspection. Copies of all special inspection reports shall
be submitted to the Building Division In a timely manner. Reports shall contain
address, project name and permit number of the project being Inspected.
Any exposed Insulations backing material to have Flame Spread Rating of 25 or
less, and material shalt bear Identification showing the fire performance rating
thereof.
Subgrade preparation Including drainage, excavation, compaction, end fill
requirements shall conform strictly with recommendations given In the soils report
prior to final Inspection (see attached procedure).
All construction to be done in conformance with approved plans and requirements
of the Uniform Building Cods (1988 Edition), Uniform Mechanical Code (1986
Edition), Washington State Energy Code (1990 Edition), and Washington State
Regulations for Barrier Free Facility (1990 Edition).
All food preparation establishments must have King County Hesih Department
sign-off prior to opening or doing any food processing. Arrangements for final
Health Department inspection should be made by calling King County Health
Department, 296.4787, at least three working days prior to desire inspection date.
On work requiring Health Department approval, it is the contractor's responsibility
to have a set of plans approved by that agency on the job site.
Fire retardant treated wood shall have a flame spread of not over 26. All materials
shall bear identification showing the fire performance rating thereof. Such
Identification shall be issued by an approved agency having • service for
inspection at the factory.
O Notify the City of Tukwila Building Division prior to placing any concrete. This
procedure Is In addition to any requirements for special Inspection.
0 All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be
special inspected.
All wood to remain In placed concrete shall be treated wood.
All structural masonry shall be special inspected per U.B.C. Section 308 (a) 7.
Validity of Permit. The issuance of a permit or approval of plane, specifications
and computations shall not be construed to be a permit for , or an approval of,
any violation of any of the provisions of this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or violate or cancel the
provisions of this code shall be valid.
__ . __________
INDEX OF DRAWINGS
.... mmilOW.ft Am*
INCLUDED
IN
SET
NO.
SHEET NO.
DRAWING TITLE
REV
DATE
DRAWING
GI
COVER SHEET
A
1J.29.90
§ 21.03-GI
P LAN
Ei 121-003-1015
12 1 -003-1013
A-1
LOWER FLOOR PLAN -- EAST HALF (REFERENCE ONLY)
P
10.01,90
121-003-1014
A-!
FLOOR PLAN REFERENCE ONLY)
B
B
05.17.89
05.17.89
03 22 89
_
A-I
FLOOR (REFERENCE ONLYL
121-003-1016
121-003-1017
A-1
FLOOR PLAN REFERENCE ONLY' •
A-I
PROVIDE SECURED AREA (REFERENCE ONLY)
03.22.90
.21.03-Al
Al
FLOOR PLANS
A
11.29.90
2I.03-A2
A2
SCHEDULES
A
11.29.90
2I.03-A3
A3
DETAILS
11.29.90
40
21 03-M1
MI
HVAC PLAN DETAIL & SCHEDULE
11.29.90
f)
21.03-M2
M2
PIPING AND FIRE PROTECTION PLANS
11.29.90
. 411
2103--El
El
ELECTRICAL 208Y/120 VOLT POWER
11.29.90
40
21.03-E2
E2
LIGHTING & POWER PLANS
11.29.90
. •■•••••MWANNOWYMMI.10 ••7110•10111Al
CO\S RUC \\AR LAB AV')
LOCAT \VR OFF CF S
3, LD \C;
EAST MARG WAY CORPORATE PARK
3445 SOUTH 120TH PLACE
TUKWILA, WA 98168
iELL,tkipE
GENERAL NOTES/CODE SUMMARY
CODE SUMMARY
EXISTING
EXISTING BASE ZONING
EXISTING CONSTRUCTION TYPES
EXISTING BUILDING AREA
TOTAL 291,494 S.F.
EXISTING OCCUPANCY GROUPS B-2 •
EXISTING FIRE PROTECTION SPRINKLED (ENTIRE BUILDING)
, , •
NEW I MPRO,VEPIENT S
- ',BASE ' ON I,NG
•
t3U I LD NG CODt." ..„ „
tONSTRUCT I OW TYPES . , ,
.
B,U I Lb ENG 'AREA 4PROVED-:: .
. .
"I •(:)14'
§ 14,WVe PYPOOM
FI RE PROTECT i Qtf.
. .
CvisSTROC S OF 0 ;:: REV :• , .
--- tiltti '14 tAMPO' 4 0* : ::41TYE
10 :'
1.4. BE ": 90: SATE:411R PQNSTOUQT100,
rtROOT ABOVE kitNt 1 1V?
0:4) AL L ME N$101§::PR1 (V ).
ti,'RR EX 1 STli ..
oitsfoN$....TT ,;APORNEO'
ROF OSED
keftiligAi6
MH-P
TYPE V-IHR, TYPE V-N
FIRST FLOOR 252,089 S.F.
SECOND FLOOR 39,405 S.F.
4
0.1■11111.•••■•■■•••■■■•rummaMONNY.!0■104.■
..•••••••••••■••■•■■
. - ,,,, ,..,..,.. , - ., ,... ,,;.„,...,„:„. „ :-, ...... : - c .,- 3,;,- '„ ,,,, -, ......i..;,,... ..., - h.,74o''',44;34`..4442itUit.'s.'. V • . i' ',..3;: : ' . ' - ' ''. .;ilfr'r.‘TC. ..d, *4W ;;I:' ; ' '''' 7,?.." ' ; Ji..6' ' ' . , ,;:'..i;.. ir ';' '''' ' ,z, ' 6-.-1. : ''.1.;.4.t '''.
r l i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I f 1111 [ 111
1j 1'1111 III wi ll ) N 111 171 111 1 il if il 1 1 ` 1 1111111111 1117 R i r,,i 1
-' 1 , ,,,;(,47,1 1 -1Tr i c ti dr, , , ,,, ,tc,
, IR ?HS INCH 1 2 3 4 5 6 7 8 9 10 11 W IN GERMANY 12
NOTE: If the microfilmed document is less clear than this
N notice, it is due to the quality of the original document.
0 IR ?HS INCH 1
OE 6e Be Le. 9e Se 47.?, ce L (K7, 61. 81 LI 91 GI 71 C1 el. 11 01. 6 8 L 9 G 7 C L"
1111111111 IIIIIM11111111111111111111111ndllidlill111;11111/11114411!!!!!ffilliffiliffillildilli IIIIIIIIIIIIII/INIIIIIIIIIIIIIIIIIIIIIIIIIIIIHI611111611111111111111111111111111111:11111111111111111111111111111111111111111111116111111111111111111111111111111111111111IIIIIII
construction notes
floor plans
construct nmr lab
office floor plan
lab floor plan
fan coil mounting detail
partial floor plan hvac
fan coil unit schedule
exhaust fan schedule
lighting plan
power plan
volt power
construct nmr lab