Loading...
HomeMy WebLinkAboutPermit 0459-M - SOUTHCENTER MALL - KITCHEN AND COMPANY0459-m 91-023 kitchen and company 660 southcenter mall 00 I UMQ EDITION (YEAR): 1988 FIRE PROTECTION: )Sprinkiers ()Detectors 00N/A . CONDITIONS (other than noted on or attached to permit/plane): VALUE OF WORK: . 3,000.00 fl 1 - Rough-in/Vents/Ducts 431-3670 APPROVED FOR , BUILDING ISSUANCE BY: /01,47 e , / ,..„ e ..,,,_, OFFICIAL DATE: ,2 - J$ - 575-4407 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating constructio or the performance of work. I am authorized to sign for and obtain this mechanical permit. ai SIGNATURE: pe__J IV 0/41flk DATE: /i'4/0 "0, /97/ PRINT NAME: eAteezr...s7). f1e-y4/624/ i COMPANY: :;:ii:;:: DATE REQUIRED INSPECTIONS PHONE NO. APPROVED INSPECTOR CORRECTION DATE(S) NOTICE ISSUED VALUE OF WORK: . 3,000.00 fl 1 - Rough-in/Vents/Ducts 431-3670 DESCRIPTION OF WORK: Install fire dampers, new diffusers, 2- Fire Final 575-4407 WA. ST. CONTRACTOR'S LICENSE NO. SEATTMI1090S 'EXPIRATION DATE: 9 1 3 • Planning Final 431-3680 III 4 - 'X 5- Mechanical Final 431-3670 PROPERTY OWNER: Jacobs Visconsi Jacobs PHONE: 216 SITE ADDRESS: 660 Southcenter Mall SUITE NO. • ; • ■ .:. „ I :, ), • Kitchen & Comian VALUE OF WORK: . 3,000.00 TYPE OF WORK: New/Addition X Modifications Repair Other: DESCRIPTION OF WORK: Install fire dampers, new diffusers, and replace section of duct. 98108 WA. ST. CONTRACTOR'S LICENSE NO. SEATTMI1090S 'EXPIRATION DATE: PROPERTY OWNER: Jacobs Visconsi Jacobs PHONE: 216 ADDRESS: 25425 Center Ridge Road, Cleveland, OH 'ZIP: 44145 CONTRACTOR: Seattle Mechanical PHONE: 328-5447 ADDRESS: 2305 South Norman. Seattle. WA !ZIP: 98108 WA. ST. CONTRACTOR'S LICENSE NO. SEATTMI1090S 'EXPIRATION DATE: 9 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431-3670 MECHANICAL PERMIT NO. ()Ling-1Y) DATE ISSUED: MECHAICCAL PERMIT (POST WITH PLANS IN A CONSPICUOUS LOCATION) DA. F.77417111M1 MMMIDIUMELM.Oirolffi Ujilt Fee -- • • . • ' I. MiN9oomt 06 TOTAL 30.00 Plan Chock No.: 91 OTHER AGENCIES: Plumbing/Gas Piping • King County Health Department (296-4732) Electrical - Washington State Department of Labor and Industries (277-7272) This 10909. ,.. .::::,1004**Oic0.:#10.0:1*****P000#40.t..4.00.N.1.900.0 /Pt PERMIT NO. :. :::: CONTACTED r rr 0.. -- -• • `2 -12 1( ( ROUTED ) L ' DATE READY DATE NOTIFIED I � a`la9'on G rit. BY: (Ink.) & PERMIT EXPIRES 2nd NOTIFICATION AMOUNT OWING `: 0 ` 00 3RD NOTIFICATION BY: lint.) '.:•. ��i�R o- ;•: ::.::A.1. :. :::: .:.F•:x.. ta:.:r..: :.. :.::::« .:,r•.,•:�:::...::::.:•:• :: .,.x:;• C BUILDING - initial review 0.. -- -• • `2 -12 1( ( ROUTED ) 0 [....1i I1 : D ate I�e • • •y • O FIRE FIRE PROTECTION: ( ] Sprinklers [ 1 Detectors [1 WA FIRE DEPT. LETTER DATED: INSPECTOR: INIT: O PLANNING ZONING: IBARILAND USE CONDITIONS? ryes ( 7 No SCREENMIG REQUIRED? °Yes (1 No INIT: REFERENCE FLE NOS.: O OTHER INIT: ( BUILDING - final rAviAw s_ ti � i 2 —12 -q L UMC EDITION (year): (8 INIT: tti SITE ADDRESS �Q WQ O o0 t r Mod I PLAN CHECK NUMBER °I t' Oa?-in INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N/A ". DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. REVIEW COMPLETED fr MECHANICAL PERMIT APPLICATION TRACKING PROJECT NAME Kitc.hg_n COrnp SU44 NO. a 17ho SITE ADDRESS SUITE a N.) 0 6e) X17 1 ( - 1 -6 nr-- ;_ /114'1-1: VALUE OF CONSTRUCTION - S 3, ion , 00 PROJECT NAME/TENANT k, -rc.H ( k 1c, Ccymp Awl 0 Other: TYPE OF WORK: 0 New /Addition gModifications 0 Repair DESCRIBE WORK TO BE DONE: ,I "TA CA.... 6P ' bi'tmP .s /.1ct W 7)t F i i;9 OF bMc: I .::. ._,.TYPE _;, : : :::::.::::: .::�:::: > <: >::::;.:<;::;:::::_> ��� >::: �':RATINQ/ !zE >:.:::;;; >.::: .: N ....: M ER' I PHONE,pg ADDRESS _5, , 1Jore p/\1 5 694,7 e, BUILDING USE (office, warehouse, etc.) TA 1 L, �.cre)(2 L3 „f NATURE OF BUSINESS: Y�-rr cr - ce..1J i n ti-ieivr A e-4-e 0 pa 6 7 WILL THERE BE A CHANGE IN USE? No 0 Yes IF YES, EXPLAIN: WILL THERE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER p-< , ‘ , / .sc. X11,4 S I <_ 0t nL lJ,�l_6/4 001(1 PHONE / L gap.. ,,i.,.,.yCXJ ZIPq{y/ifs- 5-t I ADDRESS /( eF.,etlr- RIC -g R4, CONTRACTOR Iik , c9 - 6 e fliv o i e A I PHONE,pg ADDRESS _5, , 1Jore p/\1 5 694,7 e, ZIP / .. WA. ST. CONTRACTOR'S LICENSE # .� F, , r EXP. DATE q- 4 - CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK NUMBER APPLICATION MUST BE FILLED OUT COMPLETELY MECHAL CAL PERMIT APPLICATION EAD ..ND EXAMINED THOAIZED. -::PLY BUILDING OWNER OR AUTHORIZED AGENT PRINT NAMF{',th4r, L t; ADDRESSS,b � , T', 1 o/-i nh 570/4 Mechanical FN Workshoot must also be rifled out and attached to this application. FEES (for staff use only) i 1. ..11:a it irs:lizemistautui zusradia SIETIMM MEMO MEMO EMBEINEMin ..igp' ...... ..... . MINE ASIC PERMIT: FEE UNITS ,. 0 TOTAL DAT PHONE ,. 31/(/7 CITY i ,. gr /Ar CONTACT PERSON ,,,% ay.,/pgecoi C_ ho q- 1 PHONE ±,,,s, /T APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and Plans must be complete in order to be accepted for plan review. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. • The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 431-3670. DATE APPLICATION ACCEP ED DATE APPLICATION EXPIRE 01111190 Yi SI aMITTAL CHECI&IST MECHANICAL El Completed mechanical permit application (one for each structure or tenant) Two (2) sets of mechanical plans, which include: • Floor plan • System layout • Elevations (for roof mounted equipment) • Heat Loss Calculations Note: Hood and duct systems require a building permit for the duct shaft. fl Structural calculations stamped by a Washington State licensed engineer may be required if structural work is to be done (2 sets) DESCRIPTION UNIT COST NO OF UNITS X TOTAL COST I BASIC FEE $15.00 SUPPLEMENT PERMIT FEE $4.50 1 Installation or relocation of each forced -air gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h. $9.00 X 2 Installation or relocation of each forced -air or gravity -type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu /h. $11.00 X 3 Installation or relocation of each floor furnace, including vent. $9.00 X 4 installation or relocation of each suspended heater, recessed wall heater or floor- mounted unit heater. $9.00 X 5 Installation, relocation or replacement of each appliance vent installed and not included in an appliance permit. $4.50 x 6 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 I x ""'r a 00 7 Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h. $9.00 X 8 Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu /h. $16.50 x 9 Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu /h to and including 1,750,000 Btu/h. $22.50 X 10 Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 X 11 Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu /h. $56,00 x 12 Each air - handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) $6.50 X 13 Each air - handling unit over 10,000 cfm. $11.00 x 14 Each evaporative cooler other than a portable type. $6.50 X 15 Each ventilation fan connected to a single duct. $4.50 x 16 Each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit. $6.50 X 17 Installation of each hood which is served by mechanical exhaust, including the ducts for such hood. $6.50 X 18 installation or relocation of each commercial or industrial -type incinerator. $11.00 x 19 Installation or relocation of each commercial or Industrial -type incinerator. $45.00 x 20 Each appliance or piece of equipment regulated by the code but not classed in other appliance categories, or for which no other fee is listed In this code. $6.50 x ovum SUBTOTAL ol-i nD IQ . OD PLAN CHECK FEB t w it stal GRAND TOTAL ='n.ab CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. MECHAN SAL PERMIT FEE WORKSHEET IN8T1RUCTIO C orn lr dlc ltlhg . _ CITY OF TUKWILA 6200 SOUT!ICRNT R BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91- 023 -M: Kitchen & Company 660 Southcenter Mall PIIONIi H (206) d 33.1800 THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER PART, . 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 3. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 4. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 5. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code 11990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Goy l.. VanInsrn, Mayor — " . 1908 City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Gary L. VanDusen, Mayor C TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORK Project Name /e7 t Address t.• ,;, ;t • Suite # Retain current inspection schedule Needs shift inspection Approved without correction notice ' Approved with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre -Fire: Permits: FINALAP T.F Form F.P. 85: Authorized Signature' r f' Control No.`s Permit No. ' Date PROJECT: L l ,D4VJ PERMIT NO. 5 _ AI SITE ADDRESS: V&' (") , , � ' ' ' , I ATE CALLED: - c ,2 -- q 1 TYPE OF INSPECTION: ��''1/j a SPECIAL INSTRUCTIONS: ATE WANTED:, - ._ Gi I REQUESTER: • an PHONE NO.: c - /a 7 INSPECTION RESULTS /COMMENTS: 16--- ,73 ______D , INSPECTOR: (- , -_.."2.'- DATE: ? fad / I 9r19RCMJ5b'd45,�x'tJ'Btx CRY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431-3670 it S ^t °J :"9�tikv+ V�;Rrd'l't161kT,:lR 40111.:ifuti[vkk • 3 3lwt..' INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: ..,: ' 1)I t J 4 PERMIT NO. 'S/ � r � I SITE ADDRESS: / °1�l %�I��i.� DATE CALLED: - --- • / __, TYPE OF INSPECTION: ' ' / l ivi es tc__,2) DATE WANTED: - a I -9 : ::: REQUESTER: (� (� J JL y PHONE NO.: c� • 0 - Z '7 SPECIAL INSTRUCTIONS: INSPECTION RESULTS /COMMENTS: • 41 Ar ; ) •( - ,, J� r te ! � �" ' A1.-,. '/v, --, -'r `L ._C 2 et,2 � 1 �'A �7 n o 4-m , /-2-i _ . j 7 . INSPECTOR: ,,..e.,-...e' - E ar • -r DATE: Z-- 2/--17 CITY OF TUKW1u - Dept. of Community Development - Building Division Phone: (206) 431 -3670 6300 Southcenter Boulevard - #100 Tukwila Washington 98188 4r PLAN REVIEW COMMEN PLAN CHECK #9S`023M PROJECT VI-Mk-IN) & Cc W A Jkj `''V No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. REQUIRED INSPECi1ONS 0 Plumbing permit shell be obtained through the King County Health Department and plumbing will be Inspected by that agency, including ell gas piping (296 - 4722). "C.J Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). O All mechanical work shall be under separate permit through the City of Tukwila. All permits, Inspection records, and approved plans shall be posted at the Job site prior to the start of any construction. ) All structural concrete to be special Inspected (Sec. 308, UBC). 6\ ! All structural welding to be done by WAB.O. certified welder and special inspected (Sec. 308, UBC). 9U All high - strength bolting to be special inspected (Soo. 308, USC). 0 Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to calling grid must be laterally braced if over eight (8) feet in length. 0 Readily accessible access to roof mounted equipment is required. 13. Engineereed trues drawings and calculations shall be on site and available to the building Inspector for Inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. t5. 0 A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shell contain address, project name and permit number of the project being Inspected. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and materiel shall bear Identification showing the fire performance rating thereof. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). All construction to be done In conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1986 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department Inspection should be made by calling King County Health Department, 2964787, at least three working days prior to desire Inspection date. On work requiring Health Department approval, k is the contractor's responsibility to have a set of plane approved by that agency on the job site. Fire retardant treated wood shall have • flame spread of not over 25. All materials shall bear Identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for Inspection at the factory. O Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special Inspection. 21. All spray applied fireproofing as required by U.B.C. Standard No. 438, shall be special inspected. All wood to remain In placed concrete shall be treated wood. All structural masonry shall be special inspected per U.B.C. Section 308 (a) 7. Validity of Permit The issuance of a permit or approval of plane, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this °ode or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid, 1 Footings 2 Foundation 3 Slab /Slab Insulation 4 Shear Well Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 7 framing 0 Insulation 9 Suspended Ceiling 10 Nall Board Fastening iZ 13 14 FIRE FINAL 15 PLANNING FINAL 16 PUBLIC NORM FINAL 17 BUILDING FINAL 4r PLAN REVIEW COMMEN PLAN CHECK #9S`023M PROJECT VI-Mk-IN) & Cc W A Jkj `''V No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. REQUIRED INSPECi1ONS 0 Plumbing permit shell be obtained through the King County Health Department and plumbing will be Inspected by that agency, including ell gas piping (296 - 4722). "C.J Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). O All mechanical work shall be under separate permit through the City of Tukwila. All permits, Inspection records, and approved plans shall be posted at the Job site prior to the start of any construction. ) All structural concrete to be special Inspected (Sec. 308, UBC). 6\ ! All structural welding to be done by WAB.O. certified welder and special inspected (Sec. 308, UBC). 9U All high - strength bolting to be special inspected (Soo. 308, USC). 0 Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to calling grid must be laterally braced if over eight (8) feet in length. 0 Readily accessible access to roof mounted equipment is required. 13. Engineereed trues drawings and calculations shall be on site and available to the building Inspector for Inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. t5. 0 A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shell contain address, project name and permit number of the project being Inspected. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and materiel shall bear Identification showing the fire performance rating thereof. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). All construction to be done In conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1986 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department Inspection should be made by calling King County Health Department, 2964787, at least three working days prior to desire Inspection date. On work requiring Health Department approval, k is the contractor's responsibility to have a set of plane approved by that agency on the job site. Fire retardant treated wood shall have • flame spread of not over 25. All materials shall bear Identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for Inspection at the factory. O Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special Inspection. 21. All spray applied fireproofing as required by U.B.C. Standard No. 438, shall be special inspected. All wood to remain In placed concrete shall be treated wood. All structural masonry shall be special inspected per U.B.C. Section 308 (a) 7. Validity of Permit The issuance of a permit or approval of plane, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this °ode or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid,