Loading...
HomeMy WebLinkAboutPermit 0460-M - ARTIFICIAL INTELLIGENCE0460-m 91-025 artitifical intelligence hvac 340 upland drive ii1:::M ' Toiliimogg:00:10:::iii:imft: UMC EDITION (YEAR). 1988 FIRE PROTECTION: (x)Sprinklers ()Detectors n N/A CONDITIONS (other than_noted on or attached to permit/plans): ISSUED TYPE OF WORK: New/Addition C) Modifications 0 'Repair Iij 1 - Rough-in/Vents/Ducts I APPROVED FOR BUILDING .14_6 OFFICIAL DATE: ;?---,,? 0 _ I hereby certify that I have read and examined this permit and know the same to be true and correct. AU provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit. SIGNATURE:. 4 4-4 , ... -......, t DATE: a - ./ • PRINT NAME: t ttl. K 14•2A o ki e COMPANY: comw)"4.,,t/ a I I{ ii1:::M ' Toiliimogg:00:10:::iii:imft: DATE REQUIRED INSPECTIONS PHONE NO. AppRovep INSPECTOR CORRECTION DATE(S) NOTICE ISSUED TYPE OF WORK: New/Addition C) Modifications 0 'Repair Iij 1 - Rough-in/Vents/Ducts 431-3870 1720 Pike Street N.W. #3, Auburn, WA _ 2 - Fire Final 575-4407 3- Planning Final 431-3880 4 - 5 - Mechanical Final 421 -2671 :1:.:1•::1:1::;:;:i::::::.ipigii::;:i:;:i1::::::::::0:1:::;1::::::::::::i::::::Ni::5ii:;:::::100:::i::::0::0:::::::::::::::::;::;::::::::::i:::::::::::::pROJECuiNFoRmienCIN:::::::::::::'::::::i:::!:;;;:iii:;i:::::::;:::::::::!:ii:;:::::::iii1:::::;:imilimm::::::::::;:::;:;:::::mimiim:::::i:iiiiii:::::::::ii.::;m: SITE ADDRESS: 340 Upland Dr SUITE NO. PROJECT NAME/T N NT: Artificial Intelligence r vALUE OF WORK: $ 9,000.00 TYPE OF WORK: New/Addition C) Modifications 0 'Repair ( Other: DESCRIPTION OF WORK: Ing_tall one 6i ton as pac and related ductwork. 1720 Pike Street N.W. #3, Auburn, WA PROPERTY OWNER: Architectural Engineering 1PHONE: 285-4300 ADDRESS' 701 Dexter Avenue North, Seattle, WA Commercial Aire Inc. 'zip: 98109 'PHONE: 931-8299 CONTRACTOR: ADDRESS: 1720 Pike Street N.W. #3, Auburn, WA IZIP: 98001 WA. ST. CONTRACT092 LICENSE NO. COMMEAI124D,5 1EXPIRATION DATE: 3 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431-3670 MECHANICAL PERMIT NO. OW (00 DATE ISSUED: ■ MECHAN.CAL PERMIT (POST WITH PLANS IN A CONSPICUOUS LOCATION) UnitFee '4WliMMMRUN:00 • Wgf, Plan Check No.: Ii1:1AMOUNTV: 15:go'at 91 PT'S :• DATE S. OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732) Electrical - Washington State Department of Labor and Industries (277-7272) pe rmit ils ..41.1401:' . ' . :i• the dat. of •,,. "'••• • • .:r41;#9,#0.41CO:1480:40it PERMIT NO. ... ....: •: ... i:v;• } } }r':: {.::•: .:: :: •. : } { CONTACTED C -0A — IV t) Ikn5t.u.i2 r DATE READY BUILDING - nitial review DATE NOTIFIED BY: - coo -• q) (IMO - ,..e PERMIT EXPIRES L Date Sent - Dat• v ed - 2nd NOTIFICATION CO aerlraa Co rfiadBY: Tha6le rCorr*. (2 -al - gl ink � AMOUNT OWING /�. " l I . ao 3RD NOTIFICATION BY: (ink.) •}•::: o<•,,:: }:iSS:22;S >.•rS:yy;S. } ; r. } ; {•:•SSS :: ...:. :....:.: •}}}}>•}}}•,:, aY:• :S: ?SS•S:r,;SY:;SS:SS:S:< i :........ .. ../ .. ... ....: •: ... i:v;• } } }r':: {.::•: .:: :: •. : } { •::.:: r:: :': >r{ < >: :. } •: .f. ;.r.;:. ::. �::;;.. r: ........ : .. Y..♦ {:•x;•.,:: .; ...,.�:::::: w:•::::: •: r: f.. .:..,rv:,'+, :;r,:i:CV +:..... .n.:. .. Y. •. f ,{, 4 ,C, n� : }wrrf . ;.. ,•.• r J •i'. �• ' { fi•): }}Y•x, {:aY }'4:0 }:• {•: •. <i > {i ...airy.}::: •f :.{:.f•: . . . ......................,...... ...... ..................::. NYY ;4Y: 4:4YY } }i:JC {•Y jf:::::i {{ {a: BUILDING - nitial review ���� I 2 - lv� (ROUTED) L Date Sent - Dat• v ed - l FIRE • Z _ ( - Z ( ic-1 - I FIRE PROTECTION: r Sprinkl•rs (ij Detectors 1 I N/A FIRE DEPT. LETTER DATED: a, — /y/ 9) INSPECTOR: r,J�, • INIT: � O PLANNING ZONING: • IBAR .ND USE CONDITIONS? ( Yes [] No SCREENING REQUIRED? fly.. fl No INIT: REFERENCE FLE NOS.: O OTHER INIT: X BUILDING - final rAViAw q -out Z.- ( ct.,*T( UMC EDmON (year): 'cts g INIT: rCL,A_ PROJECT NA k (--1-kA SITE ADDRESS C ( 44/-(-e-t' tG� C 2.. 11f910x)d �►' SUITE NO. PLAN CHECK NUMBER i -ozg- rn it MECHANICS. PERMIT APPLICATION TRACKING INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. REVIEW COMPLETED PROPERTY OWNER A Re. id i TtLiu Rr EtJ 6, PHONE L q..307.,, I ` IP 98 /o Y ADDRESS 701 AE wrER At/F t.1 . 3e . CONTRACTOR Y,,t rh 1 L K � PHONE q 3 EXP. DATE — 45vZ 7 7 ZIP 900 1 3 -ZS _q ADDRESS 1'720 pi 14� T. N. v,if .>e# 3 WA. ST. CONTRACTOR'S LICENSE #t Cool wl Qq ii z 4 () S - CITY OF TUKWILA Department of Community Development - Building 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK q I _ �h '" / d NUMBER APPLICATION MUST BE FILLED OUT COMPLETELY SUITE #I SITE ADDRESS 3 in U PL Anna PROJECT NAME/TENANT R'T I F IC I i4 L i rj rI ' i_) TYPE OF WORK: 0 New /Addition 0 Modifications BUILDING USE (office, warehouse, etc.) Ot`FICE NATURE OF BUSINESS: WILL THERE BE A CHANGE IN USE? (23, No 0 Yes IF YES, EXPLAIN: BUILDING OWNER OR AUTHORIZED AGENT CONTACT PERSON ADDRESS t 74" pl l{F s NO."` 3 MECHArCAL PERMIT APPLICATION Mechanical Fee Worksheet must also be filled out and attached to this application. Division FEES (for staff use only) RIPTION AMOUNT<;; RCPT C BASIC PERMIT. FEE $1.00 UNITIS)' FEE :: f : tab PLAN CHECK FEE OTHER TOTAL, + (,,:y 0 Repair VALUE OF CONSTRUCTION - $ 70 00 If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 431 -3670. WILL THERE BE STORAGE OR I )SE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? CR No 0 Yes IF YES, EXPLA :: 0 Other: Th IN kN'r- DESCRIBE WORK TO BE DONE: R K' 1.141 Z- u, P . / CITY /ZIP u t a 2. Al PHONE ? 3C1�,�3 �+ 1r APPLICATION SUBMITTAL In order to en re that your applicatkn e aee�te on reVi nfae , e ase tn�a &irb�8 fIII out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete In order to be accepted for plan review. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of tit Mechanical Code (current edition). No application shall be extended more than once. CVN r FEB 2w.,i ocaMIT CENTER DATE APPLICATION ACCEPTED DATE APPLICATION EXPIRES ovwao SISBMITTAL CHECI&IST MECHANICAL E] Completed mechanical permit application (one for each structure or tenant) El Two (2) sets of mechanical plans, which include: • Floor plan • System layout • Elevations (for roof mounted equipment) • Heat Loss Calculations Note: Hood and duct systems require a building permit for the duct shaft. Structural calculations stamped by a Washington State licensed engineer may be required if structural work is to be done (2 sets) DESCRIPTION UNIT COST NO. OF UNITS X TOTAL COST 815.00 BASIC FEE SUPPLEMENT PERMIT FEE 84.50 1 Installation or relocation of each forced -air gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h. 89.00 2 Installation or relocation of each forced -air or gravity -type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu /h. $11.00 X 3 Installation or relocation of each floor furnace, including vent. 89.00 X 4 Installation or relocation of each suspended heater, recessed wall heater or floor- mounted unit heater. 89.00 X 5 Installation, relocation or replacement of each appliance vent installed and not Included in an appliance permit. 84.50 6 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 X 7 Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h. 89.00 8 Installation or relocation , f eacl boiler or compressor over three horsepower to and including 15 horsepower, or eaon absorption system over 100,000 Btu /h and including 50Q000 Btu /h. $1 R.50 X 9 Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu /h to and including 1,750,000 Btu/h. $22.50 X 10 Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 x 11 installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu /h. $56.00 x 12 Each air - handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) 86.50 X 13 Each air - handling unit over 10,000 cfm. 811.00 x 14 Each evaporative cooler other than a portable type. 86.50 X 15 Each ventilation fan connected to a single duct. 84.50 X 16 Each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit. $6.50 X 17 Installation of each hood which is served by mechanical exhaust, including the ducts for such hood. $6.50 X 18 Installation or relocation of each commercial or industrial - type incinerator. 811.00 x 19 Installation or relocation of each commercial or industrial -type incinerator. 845.00 X 20 I Each appliance or piece of equipment regulated by the code but not classed in other appliance categories, or for which no other fee is listed in this code. $6.50 X RECEIVED c m OFTUKW FEB 1 2 199i ...- nRArr retaER 011111110 SUBTOTAL 00 PLAN CHECK s- %.(a5 GRAND TOTAL $1-0.0/5 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431-3670 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. 19 . Complete the worksheet, 1 th n of units being ea ca tegory. At time of stall will calculate the fees.: MECHAI•rCAL PERMIT FEE WORKSHEET I . 9TRLIC ' CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91- 025 -M: Artificial Intelligence 340 Upland Dr PHONE H (206) 433.1800 THE FOLLOWING COMMENTS APPLY TO AND BECOME PART ,OF �THF� APPROVED PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER -1 /r 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4722). 3. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 4. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 5. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 6. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition) Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Cary L. VanDusen, Mayor City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Fire Department Review Control #91 -025 -M (513) February 15, 1991 Re: Artificial Intelligence - 340 Upland Drive Dear Sir: Gary L. VanDusen, Mayor The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. H.V.A.C. units rated at 2,000 cfm require auto- shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. Central Station supervision is required. 2. Refrain from blocking sprinker coverage with shelving. NFPA Standard #13 states that any shelving or decks in excess of 4 feet in width will require the installation of sprinklers thereunder. (UFC 10.302) (This also applies to ducts which obstruct sprinkler protection) All sprinkler drawings shall be prepared by companies licensed to perform this type of work. Drawings shall first be approved by the Washington Survey & Rating Bureau, Factory Mutual Engineering or Industrial Risk Insurers, then by the Tukwila Fire Department. No sprinkler work shall commence without approved drawings. (City Ordinance #1528 & NFPA 13, 1 -9.1) (UFC 10.305) PROJECT: 4 ,,.,L, (, �- , '.,, / Z,., 9// 7 „ PERMIT NO. 0 il t O A, SITE ADDRESS: 3 i 4" y (Jrl lr�,,. O, ? .■, � DATE CALLED: c "S —7— 9 / TYPE OF INSPECTION: ,}�,�, DATE WANTED: REQUESTER: fir -yl , a ' m ' i ra l ,ij /� ,L z, )2 SPECIAL INSTRUCTIONS: Z% ly L U L ,,,,rte PH ONE NO.: INSPECTION RESULTS /COMMENTS: IA till , INSPECTOR. ,, L 3— Z____ DATE. .3 I^ `k 1 a;1Qd�k�tavetxxrna�:.+m CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTIOSr RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: o X) , A "l it !t P _. PERMIT NO. ()ALPD — A SITE ADDRESS: � � , I �� � � � ,l �? , DATE CALLED: _ ,� l , g / TYPE OF INSPECTION: 1. / . a _ „ . , _, r DATE WANTED: 6 •n„ SPECIAL INSTRUCTIONS: REQUESTER: PHONE NO.: '7 °" 0 7 - ) INSPECTION RESULTS /COMMENTS: cAA---Lt -- ft, A.,rirt-- • +�6�4 ( 1-� '�M ✓� , M I r / �� A-- / / Imo. INSPECTOR: C J.) Z -- DATE: / ect f 'Tl 1 CITY OF TUKW1LA Dept. of Community Development - Building Division Phone: (206) 431-36 0 INSPECTIOSd RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PLAN REVIEW COMMENTS PLAN CHECK I-02 N1 PROJECT Ali Ft ct A c.. r.y a Lu Gew REQUIRED iNSPEC1ONS Ner No changes will be made to the plans unless approved by the Architect and the �/ Tukwila Building Division. ( (�t') Plumbing permit shall be obtained through the King County Health Department �/ and plumbing will be inspected by that agency, including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be Inspected by that agency (277- 7272). O All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the Job site prior to the start of any construction. When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the Inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division In a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7O. All structural concrete to be special Inspected (Sec. 308, UBC). Q All structural welding to be done by W.A.B.O. certified welder and special Inspected (Sec. 306, UBC). O All high - strength bolting to be special Inspected (Sec. 308, UBC). 0 Any new ceiling grid and light fixture Installation is required to meet lateral bracing requirements for Seismic Zone 3. 0 Partition walls attached to ceiling grid must be laterally braced If over eight (8) feet In length. 0 Readily accessible access to roof mounted equipment is required. 0 Engineereed truss drawings and calculations shall be on site and available to the building Inspector for inspection purposes. Documents shall bear the seal end signature of a Washington State Professional Engineer. 1 .81/ 1 S. Any exposed insulations backing material to have Flame Spread Rating of 28 or less, and material shall bear Identification showing the fire performance rating thereof. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given In the soils report prior to final inspection (see attached procedure). 0 A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final Inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Cods (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). All food preparation establishments must have King County Health Department sign-off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desire inspection date. On work requiring Health Department approval, It Is the contractor's responsibility to have a set of plans approved by that agency on the job site. Fire retardant treated wood shall have a flame spread of not over 28. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having • service for inspection at the factory. 0 Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is In addition to any requirements for special inspection. 0 All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be special Inspected. O All wood to remain in placed concrete shall be treated wood. O All structural masonry shall be special Inspected per U.B.C. Section 308 (a) 7. 1 Validity of Permit. The issuance of • permit or approval of plane, speolflcatfons and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this oode Grog any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 1. Footings 2 Foundation 3 Slab /Slab Insulation 4 Shear Nall Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 7 Framing 8 Insulation 9 Suspended Ceiling 10 Board Fastening .J � ( N a ll 11 `Q ° 11.t ` 12 13 X 14 FIRE FINAL 15 PLANNING FINAL 16 PUBLIC BOMB FINAL 17 BUILDING FINAL PLAN REVIEW COMMENTS PLAN CHECK I-02 N1 PROJECT Ali Ft ct A c.. r.y a Lu Gew REQUIRED iNSPEC1ONS Ner No changes will be made to the plans unless approved by the Architect and the �/ Tukwila Building Division. ( (�t') Plumbing permit shall be obtained through the King County Health Department �/ and plumbing will be inspected by that agency, including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be Inspected by that agency (277- 7272). O All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the Job site prior to the start of any construction. When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the Inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division In a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7O. All structural concrete to be special Inspected (Sec. 308, UBC). Q All structural welding to be done by W.A.B.O. certified welder and special Inspected (Sec. 306, UBC). O All high - strength bolting to be special Inspected (Sec. 308, UBC). 0 Any new ceiling grid and light fixture Installation is required to meet lateral bracing requirements for Seismic Zone 3. 0 Partition walls attached to ceiling grid must be laterally braced If over eight (8) feet In length. 0 Readily accessible access to roof mounted equipment is required. 0 Engineereed truss drawings and calculations shall be on site and available to the building Inspector for inspection purposes. Documents shall bear the seal end signature of a Washington State Professional Engineer. 1 .81/ 1 S. Any exposed insulations backing material to have Flame Spread Rating of 28 or less, and material shall bear Identification showing the fire performance rating thereof. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given In the soils report prior to final inspection (see attached procedure). 0 A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final Inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Cods (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). All food preparation establishments must have King County Health Department sign-off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desire inspection date. On work requiring Health Department approval, It Is the contractor's responsibility to have a set of plans approved by that agency on the job site. Fire retardant treated wood shall have a flame spread of not over 28. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having • service for inspection at the factory. 0 Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is In addition to any requirements for special inspection. 0 All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be special Inspected. O All wood to remain in placed concrete shall be treated wood. O All structural masonry shall be special Inspected per U.B.C. Section 308 (a) 7. 1 Validity of Permit. The issuance of • permit or approval of plane, speolflcatfons and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this oode Grog any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. CITY OF TUKW LA Dept. of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: A T( tcAL . .L.kl'T&Lt GEM c ADDRESS: 3 L4 0 UPL.Al-lb DATE: "t 2E .414 +k V A. C. PLAN REVIEW 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 2 C'r M - 7'Le.sC 1Qcu t �v..1 A K1 1) COMMS MT _ PLAN CHECK NUMBER gi -o2sM