Loading...
HomeMy WebLinkAboutPermit 0479-M - ARCTIC STAR0479-m 91-049 arctic star 17660 west valley highway . FEES . AMOUNT REC IPT fallf1111111Mg4 Gi I AT ' / '`) - Basic Permit Fee $15.00 1).50 Unit. Fee Check Fee 7.13 •. /II Ne- / . P lan Other: I hereby certify that I have read and examined this permit and know the same to be true and correct. AN provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. 1 am authorized to sign for and obtain this mechanical permit. • o,t r TQTAL 35.63 PHONE: :8 -0' t 1 , Plan Check No.: 91-049-M PROJECT INFORMATION : SITE ADDRESS: 17660 to Valley Hv SUITE NO. PROJECT NAMEJT N NT: Arctic Star VALUE OF WORK: $ 300.00 TYPE OF WORK: (x j Now /Addition J Modifications (D Repair Other: existing; ductwork. DESCRIPTION OF WORK' Add 3" e xhaust fan and 3 heat runs off 98104 CON RA • •' AD 10 - P; •P • • t ► ADDRF$S: : UMC EU • ). Y : ; : 1988 ■ • t 401 2nd Avenue : to c '. rk 'PHONE: SUED Soutli. Suite 200. Seal le, WA ]ZIP: 98104 CON RA • •' AD 10 - I hereby certify that I have read and examined this permit and know the same to be true and correct. AN provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. 1 am authorized to sign for and obtain this mechanical permit. • o,t r t ' PHONE: :8 -0' t 1 , ZIP: 98027 ;A • ' 1.• . COMMFA *225MU EXPIRATION DATE: 1 - 17 - 92 ;::... >: :... ; ; ... . , :, coop COMP _ IANCE .: : — UMC EU • ). Y : ; : 1988 F R_ PRO T .N' • ODotectors © N/A CSMPITIONS flier than nos0d_on_p pchesl to nern�l ps); 1 SUED x 1 - Rough- inNents /Ducts APPROVED FOR LA LI '" ISSUANCE BY: /.. (?,i't,i(,(' ..,'_l4•`/4 o , BUILDING OFFICIAL -- DATE: �-� - f; - en ' 575 I hereby certify that I have read and examined this permit and know the same to be true and correct. AN provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. 1 am authorized to sign for and obtain this mechanical permit. SIGNATURE: :1 re (. /7 'e' 1 ; c r DATE: ' / • '� f , COMPANY: ,: /i,,r . ,a, r/' PRINT NAME: 1= , ,, _...: : .'. + '• •' REQUIRED INSPECTIONS PHONE NO. APPROVED INSPECTOR CORRECTION NOTICE 1 SUED x 1 - Rough- inNents /Ducts 431 -3670 2 - Fire Final 575 -4407 3 • Planning Final 431 -3680 4- X 5 .. Mechanical Final 431-3670 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98 188 (206) 431 -3670 MECHANICAL PERMIT NO. D ATE ISSUED: 1 l� 1' 1 MECHACAL PERMIT (POST WITH PLANS IN A CONSPICUOUS LOCATION) - -'1NSP ON RECORD 'lcalt for inep t ns et /east.24 hogs In adrenael DATE , DATE(S) OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (298 -4732) Electrical - Washington State Department of Labor and Industries (277 -7272) This permit shall become null and void if the work is not commenced within 180 days from the date of issuance. orif the worl' ' • - usDended or abandoned for a period 01 180 days from the last inspection. PERMIT NO. CONTACTED Left DATE READY DATE NOTIFIED n 11,,,, 1 ate- Al Y: (ink1 oQ � PERMIT EXPIRES 2nd NOTIFICATION BY: (Ink.) AMOUNT OWING 3RD NOTIFICATION (( ) ,� - PR NAME TAI is Ot SITE ADDRESS rilaDo W Uaqey tt SUITE NO. PLAN CHECK NUMBER CU" 014 in INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. BUILDING - initial review O FIRE O PLANNING O OTHER BUILDING - finAl raviaw 3- q l REVIEW COMPLETED (ROUTED) INIT: INIT: INIT: or MECHANIC . PERMIT APPLICATION TRACKING y ZONING: UMC EDR'ON (year): INIT: V-9 }}.:_:+ �.• ls..: i{ isG•' u' v! 4: S: Si::: isisL ;42fir:1••.'::::ii: >:ii:i }" �'�''��i;' } :•: at FIRE DEPT. LETTER DATED: SCREENING REWIRED? Yes n No REFERENCE FLE NOS.: ate FIRE PROTECTION: n Sprinklers (1 Detectors L] N/A INSPECTOR: {f J IBARILAND USE CONDITIONS? (IYes j1 No WINO PROPERTY OWNER Nv'RTtt `) my plu.4 l pc„n t It)4 PHONE ZIP wC) ADDRESS L/ 1 j r"(2I ,UP. j . S L ,,. 4 2 00/ 5zud' /e CONTRACTOR CriW�NUICtc���� +� PHONE 3,_GC J 'c� ZIP ADDRESS / 5 9S - g ,, W/ / e7-,02,7 WA. ST. CONTRACTOR'S LICENSE # CL) . ill E A- AA z,5-lyl EXP. DATE ,._ i 7 _ 9, L PLAN CHECK NUMBER CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 1 APPLICATION MUST BE FILLED OUT COMPLETELY CONTACT PERSON (Ai/ 4 PRIN NAME CL A k ADDRESS � MECHAK.CAL PERMIT APPLICATION Mechanical Fie Worksheet must also be filled out and attached to this application. FEES (for staff use only) :. DESCRIPfi'ION BASIC PERMIT :FEE PLAN! CHECK> :SEE OTHER AMOUNT: RCPT $10.00 TOTAL'! • DATE SITE ADDRESS ? 6 C cJ . UM 1- € , / 1- 1 4 4-1 SUITE # PROJECT NAME/TENANT • A TYPE OF WORK: 0, New /Addition 0 Modifications 0 Repair 0 Other: DESCRIBE WORK TO BE DONE: ctcc 3" exfAA.tets k ec P- '5 ex/fi`n /LLrf • &-D VALUE OF CONSTRUCTION - $ 500 1 BUILDING USE (office, warehouse, etc.) NATURE OF BUSINESS: Tend v -1 WILL THERE BE A CHANGE IN USE? 0 No 0 Yes IF YES, EXPLAIN: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? IR" No 0 Yes IF YES, EXPLAIN: APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and clans must be complete in order to be accepted for clan review. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 431 -3670. DATE APPLICATION ACCEPTED DATE APPLICATION EXPIRE DATE PHONE cjS 3 -W5-7 CITY /ZIP f r j c75 Z PHONE (59.- -0275'7 08/1B/90 MITTAL CIiEC4IST MECHANICAL El Completed mechanical permit application (one for each structure or tenant) Two (2) sets of mechanical plans, which include: • Floor plan • System layout • Elevations (for roof mounted equipment) • Heat Loss Calculations ri Structural calculations stamped by a Washington State licensed engineer may be required if structural work is to be done (2 sets) Note: Hood and duct systems require a building permit for the duct shaft. DESCRIPTION UNIT COST NO. OF UNiTS X TOTAL COST BASIC FEE $15.00 SUPPLEMENT PERMIT FEE $4.50 1 Installation or relocation of each forced -air gravity -type fumace or bumer, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h. $9.00 2 Installation or relocation of each forced -air or gravity -type fumace or bumer, including ducts and vents attached to such appliance over 100,000 Btu /h. $11.00 x 3 Installation or relocation of each floor fumace, including vent. $9.00 X 4 Installation or relocation of each suspended heater, recessed wall heater or floor- mounted unit heater. $9.00 X 5 Installation, relocation or replacement of each appliance vent installed and not included in an appliance permit. $4.50 x 5 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 t X �� 7 Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h. $9,00 x 8 Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu/h. $16.50 X 9 Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu /h to and including 1,750,000 Btu/h. $22.50 X 10 Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 x 11 Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu /h. $56.00 X 12 Each air - handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) $6.50 X 13 Each air - handling unit over 10,000 cfm. $11.00 X 14 Each evaporative cooler other than a portable type. $6.50 X 15 Each ventilation fan connected to a single duct. $4.50 C X 4 16 Each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit. $6.50 X 17 installation of each hood which Is served by mechanical exhaust, including the ducts for such hood. $6.50 X 18 Installation or relocation of each commercial or industrial -type incinerator. $1 1.00 X 19 Installation or relocation of each commercial or industrial -type incinerator. $45.00 X 20 Each appliance or piece of equipment regulated by the code but not classed In other appliance categories, or for which no other fee is listed in this code. $6.50 X oe/,11oo SUBTOTAL a'E • 50 PLAN CHECK FEE su�aa q • i 3 GRAND TOTAL $ 5J".�3 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. MECHAN. ;AL PERMIT FEE WORKSHEET CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91-049-M: Arctic Star 17660 W Valley Hy ('HONE.' 4120814334890 Cary L. VanDwscn, kayo?. THE FOLLOWING COMMENTS APPLY TO AND BECOME PART Q HE APPROVED PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER 04 i i . 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277 - 7272). 3. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. . Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear, identification showing the fire performance rating thereof. All construction to be done •in conformance with approved. plans and requirements of the Uniform. Building Code •(1988. Edition), Uniform .Mechanical Code •1988 Edition),• Washington State Energy •Code (1990 • Edition), and Washington State Regulations•for Barrier Free. Facility (1990 Edition). Validity of Permit. The issuance•of a permit•or approval ••• • of :plans, specifications and•.computationa shall not be • ..construed to be a permit for , or an approval of, •any violation of any of the provisions of this 'code or of • any. :• ,other ordinance of -.the jurisdiction. No permit presuming: to give authority or violate.. or, cancel. the provisions. •of this: code Shall be valid. • PROJECT: y L' C a. PERMIT NO. 014-” SITE ADDRESS: I ' 7 LP t Q O P‘ WAN 'r W ` DATE CALLED: 7 ' �I "" G Z I TYPE OF INSPECTION: 71/1 �? DATE WANTED: 4 -2:..- of 1 SPECIAL INSTRUCTIONS: 1 C (�) 6, REQUESTER: T, (NL- PHONE NO.: - �� CAS INSPECTION RESULTS /COM TS: Lt... ) .. 1 INSPECTOR: 0 DATE: 17 ® INSPECTION RECORD CITY OF TUKWILA Dept. of Community Development - Building Dlvlslon Phone: (206) 431 -3670 6300 Southcenter Boulevard - #100 Tukwila Washington 98188 INUIENTSD teA Fog C� p 1 atk 4;- pma4Qlex I understand that the Plan Check approvals are subject to errors andomissions and approval of plans does not authorize the violation of any ��,,......,,,,�.,,rr adopted code or ordinance. Receipt of con - pritit Erl'! tractor'scopyof apprpved plans acknowledged. Date Z P t No. an • v X10 ;r tfltrieva I►4 t Geo t 4T 4- f11i. ots.itiT puT6.•Yd Ad•1% ( 1 QYj iZSi'.T ce `� . t 4 Rob 0 Teo MA r444 Owl — MIN. oiM. F r4 Li PAC 6j. 16v/t 69/ O't‘s.\\ (.5 6.0c:Agoallir Np�s NO 4TUWi/►C,1t r�( •� ttLAMM41bLQ MNTQI I{ _=J e TV O F TI 1KKWIIJ' PERMIT CRUMP PLAN CHECK #q O 1 -6MPROJECT AR C7 J TA (1 REQUIRED INSPECTIONS PLAN REVIEW COMMEN4 J No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. O Plumbing permit shell be obtained through the King County Health Department and plumbing will be Inspected by that agency, Including all gas piping (298- 4722). 7O All structural concretes to be epeeist! Inspected (Sec. 306, UBC). O All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). O All high- strength bolting to be special Inspected (Silo. 305, UBC). 0 Any new ceiling grid and light fixture Installation Is required to meet lateral bracing requirements for Seismic Zone 3. 0 Partition walls attached to ceiling grid must be laterally braced II over eight (8) feet In length. 0 Readily accessible access to roof mounted equipment Is required. 0 Engineereed trues drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. k-0/ 15. 0 A statement from the roofing contractor verifying fire relardancy of roof will be required prior to final inspection (see attached procedure). "CJ Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be Inspected by that agency (277 - 7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, Inspection records, and approved plans shall be posted at the job site prior to the start of any construction. When special Inspection is required either the owner, architect or engineer shell notify the Tukwila Building Division of appointment of the inspection agencies prior to the lust building inspection. Copies of ail special inspection reports shalt be submitted to the Building Division In a timely manner. Reports shell contain address, project name and permit number of the project being inspected. Any exposed Insulations banking material to have Flame Spread Rating of 25 or Tess, and materiel shall bear Identification showing the fire performance rating thereof, Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given In the soils report prior to final Inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1955 Edition), Unlonn Mechanical Code (1985 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department Inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desire Inspection date. On work requiring Health Department approval, i le the contractor's responsibility to have a set of plans approved by that agency on the job site, Fire retardant treated wood shall have a Name spread of not over 28. Ali materials shall bear Identification showing the fire performance rating thereof. Such Identification shall be Issued by an approved agency having a service for Inspection at the factory. Notify the City of Tukwila Building DNleton prior to placing any concrete. This procedure 1s in addition to any requirements for special inspection. 0 All spray applied fireproofing as required by U.B.G. Standard No. 43-8, shall be special Inspected. All wood to remain In placed concrete shall be treated wood. Ali structural masonry shall be special Inspected per U.B.C. Section 308 (s) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be sa petmlI for , or an apptovsl of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authodly or violate or cancel the provisions of this code shall be valid. 1 Footings 2 Foundation 3 Blab /Blab Insulation 4 Shear Nall Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 7 Framing 8 Insulation 9 Suspended Ceiling 10 Nall Board Fastening x11 6bf--1N 12 13 14 FIRE FINAL 15 PLANNING FINAL 16 PUBLIC KORRS FINAL x 17 BUILDING FINAL PLAN CHECK #q O 1 -6MPROJECT AR C7 J TA (1 REQUIRED INSPECTIONS PLAN REVIEW COMMEN4 J No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. O Plumbing permit shell be obtained through the King County Health Department and plumbing will be Inspected by that agency, Including all gas piping (298- 4722). 7O All structural concretes to be epeeist! Inspected (Sec. 306, UBC). O All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). O All high- strength bolting to be special Inspected (Silo. 305, UBC). 0 Any new ceiling grid and light fixture Installation Is required to meet lateral bracing requirements for Seismic Zone 3. 0 Partition walls attached to ceiling grid must be laterally braced II over eight (8) feet In length. 0 Readily accessible access to roof mounted equipment Is required. 0 Engineereed trues drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. k-0/ 15. 0 A statement from the roofing contractor verifying fire relardancy of roof will be required prior to final inspection (see attached procedure). "CJ Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be Inspected by that agency (277 - 7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, Inspection records, and approved plans shall be posted at the job site prior to the start of any construction. When special Inspection is required either the owner, architect or engineer shell notify the Tukwila Building Division of appointment of the inspection agencies prior to the lust building inspection. Copies of ail special inspection reports shalt be submitted to the Building Division In a timely manner. Reports shell contain address, project name and permit number of the project being inspected. Any exposed Insulations banking material to have Flame Spread Rating of 25 or Tess, and materiel shall bear Identification showing the fire performance rating thereof, Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given In the soils report prior to final Inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1955 Edition), Unlonn Mechanical Code (1985 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department Inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desire Inspection date. On work requiring Health Department approval, i le the contractor's responsibility to have a set of plans approved by that agency on the job site, Fire retardant treated wood shall have a Name spread of not over 28. Ali materials shall bear Identification showing the fire performance rating thereof. Such Identification shall be Issued by an approved agency having a service for Inspection at the factory. Notify the City of Tukwila Building DNleton prior to placing any concrete. This procedure 1s in addition to any requirements for special inspection. 0 All spray applied fireproofing as required by U.B.G. Standard No. 43-8, shall be special Inspected. All wood to remain In placed concrete shall be treated wood. Ali structural masonry shall be special Inspected per U.B.C. Section 308 (s) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be sa petmlI for , or an apptovsl of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authodly or violate or cancel the provisions of this code shall be valid.