HomeMy WebLinkAboutPermit 0481-M - SOUTHCENTER MALL - TOPKAPI0481-m 91-053
topkapi 876 southcenter mall
TOPKM I
PROPERTY OWNER:
Jacobs Visconsi Jacobs
PHONE: 216- 892 -2300
ADDRESS:
25425 Center Ridge Road, Cleveland,
011 ZIP: 44145
CONTRACTOR:
Clark Mechanical
(PHONE: 246 -8585
ADDRESS:
13130 44th Avenue South, Tukwila, WA
(ZIP: 98168
WA. ST. CONTRACTOR'
S CENSE NO. CLARKM 1099CL
LI
EXPIRATION DATE: 3- 13 -92'
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
MECHANICAL
PERMIT NO. O \` )
DATE ISSUED:
PROJECT INFORMATION
SITE ADDRESS: 876 Southcenter Mall SUITE NO.
PROJECT NAME/TENANT: Topkapi VALUE OF WORK: $ 4,500.00
TYPE OF WORK: New /Addition (x] Modifications C - ) Repair ( Other:
DESCRIPTION OF WORK: Remove old unit and replace with new unit and ductwork.
1 - Rough - in/Vents /Ducts
2 - Fire Final
3 - Planning Final
4-
5 - Mechanical Final
DATE
PHONE NO. APPROVED
431 -3670
575 -4407
431 -3680
431 -3670
DATE(S)
INSPECTOR CORRECTION NOTICE IS
REQUIRED INSPECTIONS
MECHAIsiCAL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
FEES
Basic Permit Fee
AMOUNT
$15.00
Unit Fee
Plan Check Fee
Other:
�. 40
TOTAL
Plan Check No.:
30.00
91 - 053 - M
RECEIPT
DATE
SUED
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296 -4732)
Electrical - Washington State Department of Labor and Industries (277 -7272)
This permit shall become null and void If the work Is not commenced within 180 days from the date of
issuance. or If the work is suspended er abandoned for a nedod of 180 days from tha lest inspection:
UMC EDITION (YEAR) : 1988
FIRE PROTECTION: ( )Sprinklers Detectors X N/A
CONDITIONS (other than noted on or attached to permit /plans)
APPROVED FOR �' . BUILDING
ISSUANCE BY: s, 1, r ` OFFICIAL
DATE: I �,
I /
•
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or tlhe performance of work. I am authorized to sign for and obtain this mechanical permit.
SIGNATURE: ' �, ,- G
-' i
DATE: /
�J
PRINT NAME: % , - /. /c /
COMPANY: f" ---, , , i •T /7 -ecL r • /
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
MECHANICAL
PERMIT NO. O \` )
DATE ISSUED:
PROJECT INFORMATION
SITE ADDRESS: 876 Southcenter Mall SUITE NO.
PROJECT NAME/TENANT: Topkapi VALUE OF WORK: $ 4,500.00
TYPE OF WORK: New /Addition (x] Modifications C - ) Repair ( Other:
DESCRIPTION OF WORK: Remove old unit and replace with new unit and ductwork.
1 - Rough - in/Vents /Ducts
2 - Fire Final
3 - Planning Final
4-
5 - Mechanical Final
DATE
PHONE NO. APPROVED
431 -3670
575 -4407
431 -3680
431 -3670
DATE(S)
INSPECTOR CORRECTION NOTICE IS
REQUIRED INSPECTIONS
MECHAIsiCAL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
FEES
Basic Permit Fee
AMOUNT
$15.00
Unit Fee
Plan Check Fee
Other:
�. 40
TOTAL
Plan Check No.:
30.00
91 - 053 - M
RECEIPT
DATE
SUED
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296 -4732)
Electrical - Washington State Department of Labor and Industries (277 -7272)
This permit shall become null and void If the work Is not commenced within 180 days from the date of
issuance. or If the work is suspended er abandoned for a nedod of 180 days from tha lest inspection:
PERMIT NO.
CONTACTED
L k \ Y
o.&
DATE READY
DATE NOTIFIED
.- a� - C )
BY: „gyp
(Ink. )-4C9
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(ink.)
AMOUNT OWING
50 ..0 Q
3RD NOTIFICATION
BY:
(Init.)
PROJE T NAME KO-P1
SITE ADDRESS
(D Souk' )rat -e fl oL1\
SUITE NO.
PLAN CHECK
NUMBER
BUILDING
final rAViAw
REVIEW COMPLETED
It MECHANIC.L PERMIT
APPLICATION TRACKING
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" In box Indicates which departments need to review the project.
:TT-TIP •
O OTHER
O PLANNING
JROUTED
SCREENING REQUIRED? f Yes
No
CTION: Spr nklars Detectors N/A
FIRE DEPT. LETTER DATED: INSPECTOR:
at ant
REFERENCE FILE NOS.:
rov
SITE ADDRESS ---cam- '-) (C SUITE #
VALUE OF CONSTRUCTION - $
ADDRESS 4 v0U "rx:G(z d' },.,1,(, , �out..ra.>,r..,.t.
ZIP 9g / 6','4:r'
PROJECT NAME/TENANT
7-72 %F...' /1:,.///`'-. : /
PHONE qtr .,(7),,,:,-,—p. �—
ADDRESS J --;.?/ ? 0 ,,.// ' / ''4 ,,-/ , ■ „ -l:,•, / > ,. 7 r r ,e.i < ....1
TYPE OF WORK: (] New /Addition ❑ Modifications [] Repair Other: /,„,,,41-,../E-_;-",.-:,7 . ()
ZIPC / J 1
3� ; z
WA. ST. CONTRACTOR'S LICENSE # L /,:cy- �9 / 0 c� l Cam-
DESCRIBE WORK TO BE DONE:
,7f- " lit(/ %/1(• rrt._o /1 /..:!..'. (/ /v / 7 :f- /9 C 7----
ap
RATiNGiSIZE .. . ' :::: >;. > : >:::;:.: ::: >: ;.: >. >;:: :. : >::::<; ::< ;.:::N : ;:
::;
.. >;;
,-- s > . / ,°- — ‘/ ! ; ,ter
OTHER:
: TOTAL
;
... ice .(jd. ;
BUILDING USE (office, warehouse, etc.)
NATURE OF BUSINESS: , ,l
* 1i: 7' U.. — CGe? 'r' /¢- // CJ6
WILL THERE BE A CHANGE IN USE ? N o ❑ Yes IF YES, EXPLAIN:
WILL THERE B TORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? p ❑ Yes IF YES, EXPLAIN:
PROPERTY OWNER 0U7 ..., :) , / / :ii,E. ( J e w a.17 (....,,077)oe.F
P HON E2v _ (7iv23
ADDRESS 4 v0U "rx:G(z d' },.,1,(, , �out..ra.>,r..,.t.
ZIP 9g / 6','4:r'
CONTRACTOR r z ,„ /..„.;? ("' ,,,./ /' e / .,,.,,) i'i ( : r�
PHONE qtr .,(7),,,:,-,—p. �—
ADDRESS J --;.?/ ? 0 ,,.// ' / ''4 ,,-/ , ■ „ -l:,•, / > ,. 7 r r ,e.i < ....1
EXP. DATE
ZIPC / J 1
3� ; z
WA. ST. CONTRACTOR'S LICENSE # L /,:cy- �9 / 0 c� l Cam-
DESCRIPTION.
NT.
RC
; DATE .::
BASIC' PERMIT FEE :
:'•$15.00
UN IT(S) ' FEE
ap
PLAN CHECK FEEp
OTHER:
: TOTAL
;
... ice .(jd. ;
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
PLAN CHECK 9 l i
NUMBER
APPLICATION MUST BE FILLED OUT COMPLETELY
CONTACT PERSON
MECHANICAL PERMIT
APPLICATION
Mechanical Fee Worksheet must also be filled out
and attached to this application.
FEES (for staff use only)
PHONE z � /G • < .
CITY /ZIP
PHONE
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed information on application and plan submittal requirements. Application and
plans must be complete in order to be accepted for plan review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation Is for the work covered by this permit and must be filled in by the
applicant. This figure is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitation.. The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
DATE APPLICATION ACCEPT DATE APPLI TION EXPIR
u -o lr > l
06/18/90
SU N MITTAL CHECKLIST
MECHANICAL
El Completed mechanical permit application (one for each structure or tenant)
Two (2) sets of mechanical plans, which include:
• Floor plan
• System layout
• Elevations (for roof mounted equipment)
• Heat Loss Calculations
Structural calculations stamped by a Washington State licensed engineer may be
required if structural work is to be done (2 sets)
Note: Hood and duct systems require a buik ing permit for the duct shaft.
d
DESCRIPTION
UNIT COST
NO OF
UNITS
X
TOTAL
COST
$15.00
BASIC FEE
SUPPLEMENT PERMIT FEE
$4.50
1
Installation or relocation of each forced -air gravity -type furnace or
bumer, including ducts and vents attached to such appliance, up to and
including 100,000 Btu/h.
$9.00
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
x
3
Installation or relocation of each floor furnace, including vent.
$9.00
X
4
Installation or relocation of each suspended heater, recessed wall heater
or floor - mounted unit heater.
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit.
$4.50
x
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
4
x
Cfs00
7
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9,00
X
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
9
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu/h.
$22.50
x
10
installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
x
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu /h.
$56.00
X
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This foe shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
X
13
Each air - handling unit over 10,000 cfm.
$11.00
x
14
Each evaporative cooler other than a portable type.
$6,50
X
15
Each ventilation fan connected to a single duct.
$4.50
X
16
Each ventilation system which is not a portion of any heating or
air- conditioning system authorized by a permit.
$6.50
X
17
Installation of each hood which is served by mechanical exhaust, including
the ducts for such hood,
$6.50
X
18
Installation or relocation of each commercial or Industrial -type incinerator.
$1 1.00
x
19
Installation or relocation of each commercial or industrial -type Incinerator.
$45.00
x
20
I
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code.
$6.50
X
oeItenuo
SUBTOTAL
014.00
PLAN CHECK FEE ( of
subtotal)
�0
GRAND TOTAL
—
$ 30. 00
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
MECHANICAL PERMIT
FEE WORKSHEET
IN STRUCTI ONS - Complete the worksheet,
ind the n umber of units tieing
lnstal each ca tegory.. At time of
submittal, staffwill calculate the .f ees.
CITY OF TUKWILA
6200 SOUTHCRNTER BOULEVARD, TUKWILA, WASHINGTON 98188
Plan Check 191- 053 -M: Topkapi
876 Southcenter Mall
PHONE # 13001.133.1800
Carry L. VanMoen, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER QA K�- kvi .
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (277-
7272).
3. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
4. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition) , Uniform Mechanical Code (1988 Edition),
Washington State Energy Code (1990 Edition).
S. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
PROJECT: 7
PERMIT NO. 0 4 3 1- r''\
SITE ADDRESS: zg ..$. C. /lt
DATE CALLED: -,...g,
TYPE OF INSPECTION: /✓
DATE WANTED: " < 11.m'
REQUESTER: .b a ,
SPECIAL INSTRUCTIONS:
PHONE NO.: 2 / - Pe 0
INSPECTION RESULTS /COMMENTS:
INSPECTOR: ( -- DATE:
//cy T
� l l
CITY OF TUKW1L,A
D e. f Commun
43 ii y Development - Building Division
INSPECTIOA RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PROJECT: ; a �..
SITE ADDRESS: : i _/yeti _'I! �.� li
PERMIT NO. A j�i
TYPE OF INSPECTION: , i
DATE WANTED: f R - cf / o
SPECIAL INSTRUCTIONS:
Iv-�^ - s=-
REQUESTER: 117
PHONE NO.: )m.i_■
U
INSPECTION RESULTS /COMMENTS:
It
( b
W
INSPECTOR: �c ..
DATE: a' " mil' l
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
INSPECTION . RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
key plan
MAR 2 b 1991
PEFtMIT CM TER
RECEIVED
CITY FTUKWILA '
hvac unit replacement
general fire sprinkler notes
all condition general notes
plumbing fixture schedule
air conditioning legend
air conditioning unit schedule
air distribution schedule
part plan
part plan
air distribution schedule
plumbing plan fire sprinkler plan
hvac plan
W J1 J(411 (b VWl ffO i�t) 1If /Vt ll•t l IC.nn lv N4w
��teCR ML T'II TMR LANDLORt) i �� LOCAL ITATR� AR'ts �A " tAR11�11 ' M ' ;''Ir1 p ` �t l v� i i
.f. iii..
M �
• LARDIARD.
•1T T'0 PI USE `USTIN* ?t1IPieRT, CONDUIT, OR PIPI$C, IRCLUDING RUT NOT LUNITA!' TO ANT ROOF , •
'1T, T'IRART SHALL AT MART'S EXPENSE REMOVE SUCH PARTS Of TOE SYS7'E14 AND EQUIPMENT NO? BEIRC
•'C CURS2 Alb OTt{.tre amen 10 AUCN tQU1PP1<RT. TENANT SHALL PRRPORN ALL R ►CtSSARY REPAIRS TO
'TEN *D /OR IreSACRR? 1OIISTINI1T!O11 Ell AIIt1It•IIe+1Iwy 11t'ItI AIR 1rIMr1A1RnA 111tTRRts ANN TM1r1Itt41 tW ?fe ,,h
,
1T MRE 111► V'M 1
'KAM R 1 USt , ODIIT11BC71N M ALL PROVIDE LANDLORD VIM WRITTEN VERtVTCATtON
1c (#1b' 11flRESERTA ?t n Of 1RE II/ITALIAN) 11rAC RQUUPINWT PI/mow/yin TWAT ?PIP !RSTALLAD NVAC
1 4 INITA&&fl AND OPRRATtNO IN ACCORDANCE MITII 7111 £QUIP1eWT NANUPACTVRUR' S PECONPERDAT1ONS. 1N
t,ANDUN D RTERNIWIS INDAPT' S ) ,RWAC RQI1IPIRNT If NOT MIAMI: tN ACCORDANCE VIT11 711E
*1t' S AWC01MS 11$
NDAtI0, COWIDA IAIALL, VITRIN ►1PTR1N (IS) GAYS PROP LANDLORD'! 11R1TTER NOTICE
'`A CONTRACTOR 0► SAM, conic? MICR OPERATIONAL. Dt►tetE11Ct
- 0R TO REPORT TO A U11ITIl LABORATORIES LISTED CENTRAL '
TOR. CONSULT THE TURN' A !'IRE PREVENTION BUREAU POR
.ST OP APPROVED CENTRAL STATION MONITORS.
u. u.a . L. . • f 1
Y do 17. /'
%ce N '7f i. '' ', /'
- 2'/, r #9 , ii % % // / % / A• . Z,
fa /// ► /1r4 i . r / ///
31111FM 1110111: /). IMP MEM IMO
•1 % / % //' ''' % %'W', --' — /li'/ /'i/r'4;'/1'; %:-
/ //i /:may ; /, %'; M %` /�'%/% ;,' // 2WO % / / / //;
OPIPOg ' •MAl MrAI.
AN meg NI. _ w1A•
1.A...1•+.10011
MOOR • Tl
PPICCT Illm'!• ..
.
• rill...
•
c cAL M1Aflewef •1AMA'WAS 'tear I
Iftio
wow
rnAwt•ert WALL
nunlike INNA
1d eA1t I M
k
PT ►AA/ •. A.
,EIRE tomb
e riet C111
m1L •.A. WAD
� . f of AL tt411t00
nAte1IMA
Mit
Atl1111011t•
Posovraelvoni von
1111 YAWN
Witt
VAC CALCULAT1ONS
mies, me Non po r 600,irove of mot aI•nlesn rem M Prow PP NPM ell via
PI
►1 '
mirO tltt•
rri? .MAEIM • 1
rt! . _1140 •
. $.b. �,�r,,,.•.t.1• 1 •t .t.a.1� 3,■,,.;�•r. �. S•
r w l 1 r+
•
�_�Arw1•i 1! floats.
•
{ ' P IM" ' AMto ih�','
i • ••
f
c.
t•
t
,. , ,, ..;
`... •
.., t • • T ; ,, • ii.•e
•
.n
v
PLAN REVIEW COMME S
•
Plan Check No.: 91--05 M Project: 11,C2ghAP
REQUIRED INSPECTIONS
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296 - 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be Inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
Job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
Inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
14. Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given In the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
AM construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition),
- .Ivry•
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the Job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be Issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
1.
Footings
2.
Foundation
3.
Slab /Slab Insulation
4.
Shear Wall Nailing
5.
Roof Sheathing Nailing
6.
Masonry Chimney
7.
Framing
8.
Insulation
9.
Suspended Ceiling
10.
Wall Board Fastening
11.
12.
13.
14.
Fire Final
15.
Planning Final
16.
Public Works Final
X
17.
Building Final
PLAN REVIEW COMME S
•
Plan Check No.: 91--05 M Project: 11,C2ghAP
REQUIRED INSPECTIONS
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296 - 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be Inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
Job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
Inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
14. Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given In the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
AM construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition),
- .Ivry•
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the Job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be Issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
plumbing plan
fire sprinkler plan
hvac plan