Loading...
HomeMy WebLinkAboutUtilities 2011-02-15 COMPLETE AGENDA PACKET AA Distribution: 4� "I.-�wg City of Tukwila D Quinn A. Le D. Robertson S. Kerslake k Utilities Committee K. Hougardy C. Parrish G) A. Ekberg B. Arthur Mayor Haggerton Clerk File Copy ■A\ De'Sean Quinn, Chair S. Lancaster 2 Extra Dennis Robertson K. Mate] e-mail to: C. O'Flaherty, B. Giberson F Iriarte D Almberg Dideon, Kathy Hougardy R. Tischmak B. Saxton, S. Norris, G. Labanara M. Hart, S Kirby AGENDA TUESDAY, FEBRUARY 15, 2011 Time: 5 :00 PM Place: Conference Room #1 Item Recommended Action 1 Page 1. PRESENTATION(S) 2. BUSINESS AGENDA a. APW /APE Sewer Repair Feb 2011 a. Forward to 2/28/11 C.O.W. Pg. 1 Resolution Declaring an Emergency and 3/7/11 Regular b. Storm Lift Station No. 15 Improvements b. Forward to 2/28/11 C.O.W. Pg. 5 Consultant Recommendation and Agreement and 3/7/11 Regular c. 2010 Fourth Quarter Reports c. Information only Pg. 17 3. ANNOUNCEMENT(S) 4. MISCELLANEOUS Future Agendas: Next Scheduled Meeting: Tuesday, March 1, 2011 Committee Goals: Study the feasibility and implementation of televised City Council meetings. Continue to foster relationships within local, regional, and state entities that encourage opportunities for joint partnership and outreach. The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206- 433 -0179 for assistance. �ILA j, ss T City of Tukwila a Jim Haggerton, Mayor 90a INFORMATIONAL MEMORANDUM TO: Mayor Haggerton UTILITIES COMMITTEE 902— FROM: _1 Public Works Director DATE: February 9, 2011 SUBJECT: APW /APE Sewer Repair Feb 2011 Project No. 91140202 Resolution Declaring an Emergency ISSUE Approve Resolution declaring an emergency that authorizes City staff to expedite repair of the APW /APE (Andover Park W /Andover Park E) Sewer Repair Feb 2011 Project. BACKGROUND On February 3, 2011, a break in a 12 -inch waterline was discovered on Andover Park West just south of Upland Drive. After the waterline was repaired, sanitary sewer manholes were inspected and it was determined that the 12 -inch sewer system had also been damaged. Repair of the broken sewer main was attempted, but due to the presence of wet, sandy soils the repair was not able to be completed. The poor soils caused an existing manhole to shift, which damaged two additional sewer pipes that were connected to it as well as undermining the pavement on Andover Park West. Andover Park West had to be completely closed to traffic for the duration of the repairs. ANALYSIS Approve the Resolution which declares an emergency and authorizes Public Works to immediately construct repairs to the damaged water and sewer system by a construction contract exempt from competitive bidding. This project has grown in size and complexity and repairs are being constructed over the next week. Dewatering is required for two days before deep excavation for the sewer system can begin. The first step will be to reset the sewer manhole and then replace up to 60 feet of sewer main in each direction. A new manhole will also need to be installed behind the sidewalk on the sewer line to the east. Minor repairs at Sewer Pump Station #2 will be necessary along with pavement restoration. RECOMMENDATION The Council is being asked to approve the Resolution declaring an emergency for the APW /APE Sewer Repair Feb 2011 Project and consider this item at the February 28, 2011 Committee of the Whole meeting and subsequent March 7, 2011 Regular meeting. Attachment: Draft Resolution W: \PW Eng PROJECTS \A- SW Projects \91140202 APW APE Sewer Repair Feb 2011 \Info Memo APW Emergency Sewer Repair.doc 1 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DECLARING AN EMERGENCY IN RESPONSE TO DAMAGES TO PUBLIC PROPERTY DUE TO A COLLAPSED SANITARY SEWER. WHEREAS, it has been determined that a sanitary sewer has collapsed in the 1000 block of Andover Park West; and WHEREAS, the break has resulted in damage to the sanitary sewer and the break poses a significant risk to existing gas lines, storm drains, and water utilities; and WHEREAS, the repairs to the sanitary sewer are required immediately; and WHEREAS, RCW 39.04.280 provides for emergency declarations and competitive bidding exemptions; and WHEREAS, the Mayor of Tukwila has declared an emergency in order to allow City forces to respond with appropriate resources to restore damages and prevent further impacts to public and private property; and WHEREAS, the City Council wishes to provide their support and endorsement of the Mayor in his action to declare an emergency and for the City's efforts to respond to the emergency; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: The City Council supports the Mayor in his declaration of emergency and authorizes the execution of contracts or agreements due to damages and the need for protective actions brought about by a failed sanitary sewer, and hereby authorizes City forces to respond in the most effective and expedient manner, without regard for the procedures and formalities that would otherwise govern the assignment of duties, procurement of materials, and contracting of services. This situation is an emergency as defined in RCW 39.04.280(3). W:1Word Processing \Resolutions\ Emergency- Sanitary Sewer on APW.doc MC:bjs Page 1 of 2 2 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of 2011. ATTEST /AUTHENTICATED: Christy O'Flaherty, City Clerk Allan Ekberg, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Shelley M. Kerslake, City Attorney W:\Word Processing\Resolutionsl Emergency- Sanitary Sewer on APW.doc MC:bjs Page 2 of 2 3 4 J�.tJILA ,4".4%, City of Tukwila Jim Haggerton, Mayor 2 7 90= INFORMATIONAL MEMORANDUM TO: Mayor Haggerton UTILITIES COMMITTEE FROM: Public Works Director DATE: February 9, 2011 SUBJECT: Storm Lift Station No. 15 Improvements Project No. 91041203 Consultant Recommendation and Agreement ISSUE Approve a Consultant Agreement with PACE Engineers, Inc. to design pump station improvements. BACKGROUND Storm Lift Station No. 15 drains approximately 200 acres of the northern portion of the Tukwila South Development. The station was built in 1977, has four pumps, a total capacity of 43.7 cfs and is the largest pump station in the City. The electrical controls and pumps are located below ground and the station does not have generator backup power. The Tukwila South Project will construct the north storm pond with a total capacity of approximately 15 acre -feet of storage. This pond will then be connected to Storm Lift Station No. 15 through a 36" storm pipe. Development of the Tukwila South Project will significantly increase the discharge to this station. ANALYSIS Failure and flooding at Storm Lift Statiofi No. 15 could result from a power failure or storm flows over the station capacity. Flooding of the station would result in the loss of the station and significant costs due to damaged electrical panels, controls, and pumps. Planned improvements to reduce these risks are: Installation of a back -up power generator to run all or a portion of the pumps Installation of an electronically activated gate that reduces discharge to the station during flood events Sealing the dry portion of the station so that stormwater cannot enter through drains connected to the wet well The current Consultant Roster was reviewed and three firms were short- listed to perform this design. The firms were: KPG, PACE Engineers and Parametrix. PACE, Inc. was selected as the firm that best met the requirements for this type of project as PACE has performed similar work for other cities. PACE also completed the Drainage Study for this pump station in 2010. Staff met with the proposed Project Manager and developed a scope of work that includes design upgrades to the station. BUDGET SUMMARY This project will be funded through the 412 Surface Water Fund. Cost Budci PACE Engineers, Inc. 59,839.00 60,000.00 RECOMMENDATION The Council is being asked to approve a Consultant Agreement with Pace Engineers, Inc. in the amount of $59,839.00 for consideration at the February 28, 2011 Committee of the Whole meeting and subsequent March 7, 2011 Regular Meeting. Attachments: Page 146, 2011 CIP Consultant Selection Score Sheet Consultant Agreement W: \PW Eng PROJECTS \A- DR Projects \91041203 (Storm Lift Station No 15 Improvements) \Info Memo Design PACE.doc 5 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2011 to 2016 PROJECT: Storm Lift Station No. 15 Improvements Project No. 91041203 DESCRIPTION: Upgrade Storm Lift Station No. 15 to provide an on -site generator and gates to protect station from damage due to power or pump failure. JUSTIFICATION: The Tukwila South development will significantly increase storm flows to Lift Station #15. STATUS: New project for 2011 2016 CIP. A drainage study with improvement recommendations was completed in 2010. MAINT. IMPACT: Potential for station failure will be reduced. COMMENT: FINANCIAL Through Estimated (in $000's) 2009 2010 2011 2012 2013 2014 2015 2016 BEYOND TOTAL EXPENSES Design 14 60 74 Land (R/W) 40 40 Const. Mgmt. 40 40 Construction 362 362 TOTAL EXPENSES 0 14 100 402 0 0 0 0 0 516 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 14 100 402 0 0 0 0 0 516 TOTAL SOURCES 0 14 100 402 0 0 0 0 0 516 a Project Location <o;� 6166 St 8 5119 ����T�. a is I 6 16 t: 6 16051 �C Pkwy 1 z j 2Q D I' j761 .-0 T S e I -00 u a Tre t ck Dr t a f 1 8 I raider H. 0 N eo upiane or 2 1 A o roves. W E Se w1 e e 8 r a low i f '5it I ,a f: Z.: a GIS 2011 2016 Capital Improvement Program 146 6 CONSULTANT SELECTION Pump Station 15 Design KPG PACE x Parametrix Project Manager 1 1 1 Stormwater Pump Station Experience 3 1 2 Firm Expirence General 1 1 1 Working with Tukwila? Program Knowledge 1 1 5 3 .,n Familiarity with Tukwila South P Drainage Basin 2 1 3 PS &E Experience with Tukwila 3 v 4 TOTALS 9 6.5 13 Score consultant 1 to 4, with 1 being highest and 4 being lowest. Lowest score is consultant ranked highest. CONSULTANT AGREEMENT FOR DESIGN SERVICES THIS AGREEMENT is entered into between the City of Tukwila, Washington, herein -after referred to as "the City and PACE Engineers, Inc., hereinafter referred to as "the Consultant in consideration of the mutual benefits, terms, and conditions hereinafter specified.. 1. Project Designation. The Consultant is retained by the City to perform Design services in connection with the project titled Stormwater Pump Station No. 15 Improvements. 2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and supplies. 3. Time for Performance. Work under this contract shall commence upon the giving of written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement prior to December 31, 2011, unless an extension of such time is granted in writing by the City. 4. Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibit "B" attached hereto, provided that the total amount of payment to the Consultant shall not exceed $59,839.00 without express written modification of the Agreement signed by the City. B. The Consultant may submit vouchers to the City once per month during the progress of the work for partial payment for that portion of the project completed to date. Such vouchers will be checked by the City and, upon approval thereof, payment shall be made to the Consultant in the amount approved. C. Final payment of any balance due the Consultant of the total contract price earned will be made promptly upon its ascertainment and verification by the City after the completion of the work under this Agreement and its acceptance by the City. D. Payment is provided in this section shall be full compensation for work performed, services rendered, and for all materials, supplies, equipment and incidentals necessary to complete the work. E. The Consultant's records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City and state for a period of three (3) years after final payments. Copies shall be made available upon request. 8 5. Ownership and Use of Documents. All documents, drawings, specifications and other materials produced by the Consultant in connection with the services rendered under this Agreement shall be the property of the City whether the project for which they are made is executed or not. The Consultant shall be permitted to retain copies, including reproducible copies, of drawings and specifications for information, reference and use in connection with the Consultant's endeavors. The Consultant shall not be responsible for any use of the said documents, drawings, specifications or other materials by the City on any project other than the project specified in this Agreement. 6. Compliance with Laws. The Consultant shall, in performing the services contemplated by this Agreement, faithfully observe and comply with all federal, state, and local laws, ordinances and regulations, applicable to the services to be rendered under this Agreement. 7. Indemnification. The Consultant shall indemnify, defend and hold harmless the City, its officers, agents and employees, from and against any and all claims, Losses or liability, including attorney's fees, arising from injury or death to persons or damage to property occasioned by any act, omission or failure of the Consultant, its officers, agents and employees, in performing the work required by this Agreement. With respect to the perform- ance of this Agreement and as to claims against the City, its officers, agents and employees, the Consultant expressly waives its immunity under Title 51 of the Revised Code of Washington, the Industrial Insurance Act, for injuries to its employees, and agrees that the obligation to indemnify, defend and hold harmless provided for in this paragraph extends to any claim brought by or on behalf of any employee of the Consultant. This waiver is mutually negotiated by the parties. This paragraph shall not apply to any damage resulting from the negligence of the City, its agents and employees. To the extent any of the damages referenced by this paragraph were caused by or resulted from the concurrent negligence of the City, its agents or employees, this obligation to indemnify, defend and hold harmless is valid and enforceable only to the extent of the negligence of the Consultant, its officers, agents and employees. 8. Insurance. The Consultant shall secure and maintain in force throughout the duration of this contract comprehensive general liability insurance, with a minimum coverage of $500,000 per occurrence and $1,000,000 aggregate for personal injury; and $500,000 per occurrence/ aggregate for property damage, and professional liability insurance in the amount of $1,000,000. Said general liability policy shall name the City of Tukwila as an additional named insured and shall include a provision prohibiting cancellation of said policy except upon thirty (30) days prior written notice to the City. Certificates of coverage as required by this section shall be delivered to the City within fifteen (15) days of execution of this Agreement. 9. Independent Contractor. The Consultant and the City agree that the Consultant is an inde- pendent contractor with respect to the services provided pursuant to this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer and employee between the parties hereto. Neither the Consultant nor any employee of the Consultant shall 2 9 be entitled to any benefits accorded City employees by virtue of the services provided under this Agreement. The City shall not be responsible for withholding or otherwise deducting federal income tax or social security or for contributing to the state industrial insurance program, otherwise assuming the duties of an employer with respect to the Consultant, or any employee of the Consultant. 10. Covenant Against Contingent Fees. The Consultant warrants that he has not employed or retained any company or person, other than a bonafide employee working solely for the Consultant, to solicit or secure this contract, and that he has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the City shall have the right to annul this contract without liability, or in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. 11. Discrimination Prohibited. The Consultant, with regard to the work performed by it under this Agreement, will not discriminate on the grounds of race, color, national origin, religion, creed, age, sex or the presence of any physical or sensory handicap in the selection and retention of employees or procurement of materials or supplies. 12. Assignment. The Consultant shall not sublet or assign any of the services covered by this Agreement without the express written consent of the City. 13. Non Waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for in this Agreement shall not constitute a waiver of any other provision. 14. Termination. A. The City reserves the right to terminate this Agreement at any time by giving ten (10) days written notice to the Consultant. B. In the event of the death of a member, partner or officer of the Consultant, or any of its supervisory personnel assigned to the project, the surviving members of the Consultant hereby agree to complete the work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar to renegotiations of this Agreement between surviving members of the Consultant and the City, if the City so chooses. 15. Attorneys Fees and Costs. In the event either party shall bring suit against the other to enforce any provision of this Agreement, the prevailing party in such suit shall be entitled to recover its costs, including reasonable attorney's fees, incurred in such suit from the losing party. 3 10 16. Notices. Notices to the City of Tukwila shall be sent to the following address: City Clerk City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Notices to Consultant shall be sent to the following address: PACE Engineers, Inc. 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 17. Integrated Agreement. This Agreement, together with attachments or addenda, represents the entire and integrated Agreement between the City and the Consultant and supersedes all prior negotiations, representations, or agreements written or oral. This Agreement may be amended only by written instrument signed by both the City and the Consultant. DATED this day of 20 CITY OF TUKWILA CONSULTANT By: Mayor Printed Name: Title: Attest /Authenticated: Approved as to Form: City Clerk Office of the City Attorney 4 11 EXHIBIT A SCOPE OF SERVICES STORMWATER PUMP STATION 15 IMPROVEMENTS Project Understanding The existing Lift Station No. 15 serves the Tukwila south property. The general boundaries of the Tukwila south property are South 180 Street to the north, I -5 to the west, Green River to the east and South 204 Street to the south. Lift Station No. 15 was constructed in the late 1970's and has a total capacity of 43.7 cfs (19,614 gpm). Currently, Lift Station No. 15 conveys stormwater flows from the Northeast Basin which is mostly commercial. It will also take future flows related to the new development to the south. To date there have been no major reports of mechanical problems with the lift station. There is currently no on -site emergency back -up power if there were to be a complete failure of the pumps due to a power outage. To resolve this issue the City has requested PACE provide: Bid ready contract documents for the installation of a 600 kW standby generator with a 1,000 gallon subbase -fuel tank adjacent to the lift station to provide power to the pumps during power outages. Provide drawings to seal the electrical room from the wet well Provide power to the new actuated sluice gate that will be constructed as part of the North Pond. Evaluate the cost and benefits to replace the existing motor starters with VFD's and the replacement of the existing control panels. Scope of Services This proposal includes necessary civil and electrical engineering services through the design phase of this project. PACE will be the prime consultant for the entire Scope of Work and will oversee and administer this Scope of Work. PACE will complete all civil engineering and survey services in- house. PACE will subcontract with Follett Engineering for the electrical engineering portion of the project. Based upon our discussions we have not included the services of a professional land acquisition specialist on this project. If during the course of the project, a specialist is required to assist with obtaining an easement for the generator location the scope and budget would need to be modified accordingly. We anticipate starting this work immediately and proceeding on a preliminary layout to submit to the City for review. The estimated cost for this work is approximately $59,839 (see Exhibit B). The budget is based on our 2011 rates. SCOPE OF WORK Task 1- Project Management /Coordination /Meetings PACE will provide administration and coordination of the project. The following items are included in this task: Attend coordination meetings with the City as required. For budgetary purposes 12 12 City of Tukwila February 2, 2011 Page 2 hours have been allotted for meetings. Since the amount of meeting time is not under our control, any time in excess of the budgeted 8 hours will be billed on a time and material basis. Conduct a field reconnaissance of site and other facilities with the design team and City staff. Coordination with subconsuitant. In -house project administration, scheduling, and direction of design team staff. Preparation of monthly progress reports Quality Assurance including a review of all plans and documents at the preliminary design and final design stages of the project Task 2- Site Survey PACE will provide a topographic survey of the project area in accordance with the following items: Vertical Datum will be NAVD 88 based on City of Tukwila control points. Horizontal Datum will be NAD 83/91 Washington State Plane coordinate system, North Zone also based on City of Tukwila control and matching the datum. Right of entry to the site will be provided by the Client. The City will provide available as -built drawings of existing pump station and the adjacent strip mall. The limits of the survey will include the southern half of the parking lot between the two driveways and including two rows of parking stalls in a northerly direction. The existing parking stall locations will be surveyed along with all surface features and subsurface utilities as located in the field. The survey will extend across S 180 Street to the proposed location of the new sluice gate. Task 3 Preliminary Design PACE will prepare a preliminary layout of the proposed improvements to submit to the City for review and comment. This work includes: Prepare preliminary site plan for the proposed generator and appurtenances. Utilize lift station as- builts provided by the City to prepare details associated with sealing of the electrical room from the wet well. Preliminary layout of the CMU wall and access gate to enclose the generator. Prepare preliminary electrical site plan with generator and conduit placement. Instrumentation and control drawings for communication and operation of the generator. Prepare preliminary construction cost estimate. Task 4 Final Design Based upon City comments on the preliminary design as well as input from the property owner, PACE will prepare the final design and contract bid documents in accordance with City standards using the City's standard template and the most recent version of the Washington State Department of Transportation `Standard Specifications for Road, Bridge and Municipal Construction. The design will include the following items: 13 City of Tukwila February 2, 2011 Page 3 Existing Site Conditions TESC Plans and Details Site Plan and Details of the new generator, enclosure, landscaping and associated appurtenances Electrical Design Contract Documents Estimate of Probable Construction Costs PACE will incorporate any City forms or special bid /construction requirements within the bid document. It is assumed that the City will advertise, open bids and award the project with support from PACE. Task 5 Electrical Pre Design Follett Engineers will prepare the following electrical design and evaluation: Determine /confirm the size of generator needed to run 4- 150HP pumps and other appurtenances. Determine automatic transfer switch (ATS) size and options including interface with the existing system. Develop options to replace the motor starters with VFD's. Review the existing control system and develop alternative analysis for replacement. Prepare preliminary electrical drawings. Prepare a preliminary construction cost estimate of the above items Summarize the above items in a Technical Memorandum. Task 6 Final Electrical Design Follett Engineers will prepare the final electrical design for the new generator and appurtenances based upon review comments from the City. This task excludes final design on converting the motor starters to VFD's and the control pan replacement design. Both of those items are optional design elements based upon city comments and available construction budget. If the City decides to add these items to the scope of work the fee estimate would need to be adjusted accordingly/ Task 7- Easement Acquisition PACE will negotiate with the property owner for a permanent easement at the location of the proposed generator. Work under this task will include: PACE will secure the latest title report on the property PACE will prepare Legal exhibit and for the proposed easement as needed. Communication with property owner on the need and benefit of the easement. Determine assessed value of easement based on current square footage value. Finalize easement for recording. It is that the property owner is a willing participant and condemnation will not be required. 14 City of Tukwila February 2, 2011 Page 4 Task 8 Property Appraisal PACE Engineers will secure the services of an appraiser to determine the value of the land required for the proposed generator. This value will be the basis for the easement acquisition. with VFD's. The estimated cost for this work is $2,750.00 Task 9 Construction Services (Option Item Not in Contract) PACE is a full- service engineering and surveying company that will be pleased to provide the following construction services to the City of Tukwila in support of this project if requested by the City. PACE proposes the following services during construction: 1. Bid assistance (City will advertise the project) 2. Construction management 3. Construction surveying /staking 4. Construction inspection 5. Shop drawing review 6. Progress payment processing 7. Record drawing preparation 15 EXHIBIT B PACE Engineers Project Budget Worksheet 2011 Standard Rates Project Name Project Name 15th Street PS w/o optional tasks Location:1Project Location Tukwila I Prepared By: KHN Project Proj Number I Billing Group #:I 00 Task #:I 001 Date: 16- Feb-11 Labor Hours by Classification Staff Type (See Labor Rates Table) 1 12 16 74 41 43 46 48 59 91 Staff Type Hourly Rate $185 $150 $110 $110 $150 $140 $120 $110 $189 689 Labor Senior Project Cad Drafter Principal Project Project Survey Tech 2 -Man Project Hour Dollar Drawing/Task Title Code Principal Manager Engineer II III Surveyor Manager Surveyor II Survey Crew Administrator Total Total Task 1• Project Management 22 I 12 I 0 t 0 I I 0 I 0 i 0 0 I 0 I 4 38 $6,226.00 Meetings 8 4 12.0 $2,080 Field Recon 4 4 8.0 $1,340 Coordination 2 4 4 10.0 $1,326 OA Prelim and Final 8 8.0 $1,480 Task 2 Site Survey 1 4 16 16 4 41.0 $5,890.00 Task 3 Preliminary Design 0 20 0 12 I 0 0 0 0 0 I 0 32 $4,320.00 Site layout 16 12 28.0 $3,720 Cost Estimate 4 4.0 $600 Task 4 Final Design 0 38 4 32 I 0 I 0 I 0 I 0 I 0 I 8 82 $10,372.00 TESC 4 8 12.0 $1,320 Site Plan and Details 24 24 48.0 $6,240 Specifications 10 8 18.0 $2212 Cost Estimate 4 4.0 $600 Task 5 Prelim Electrical (see below) 0.0 $0 Task 6 Final Electrical (see below) 0.0 $0 Task 7 Easement Acquisition 18 8 4 8 I 20 0 0 0 I 0 10 68 69,740.00 Title Report 4 4.0 $600 Exhibits and Legal Description 8 8 8 6 30.0 $3,814 Easement Negotiation 16 16.0 $2960 Determine assesed Value 4 4.0 $440 Finalize Easement 2 8 4 14.0 $1,926 Task 8 Appraisal (see below) Hours Total 40.0 79.0 8.0 52.0 0.0 24.0 0.0 0.0 16.0 16.0 26.0 261.0 Labor Total $7,400 $11,850 $880 $5,720 $0 $3,600 $0 $0 $1,760 $3,024 $2,314 1 $36,548.00 Expenses Reimbursable Subconsultants 1 rate /unit Quantity Cost Task 5 Prelim Elec $6,160 Utility LOCATE $500.00 Task 6 Final Elec $9,590 Title Report $500.00 Task 8 Appraisal $3,500 PACE Billed Labor Total $36,548 PhotoNideo Reimbursable Expenses $1,731 Mileage/Travel/Per Diem Subconsultants $21,560 Miscellaneous SubconsultantSubtotal $19,250 Total Project Budget 1 $59,839 I Technology Fee (2% of labor) $730.96 Markup 12% Total $1,731 Total i $21,560 I R.,. T.,., U,.. 2011 5.,..,.... R I File: PS 15 Final budget EXHIBIT B.xls, Fee Worksheet Page 1 of 1 Printed: 219 /2011,10:28 AM N Q) J ��I ILA o 4*- City of Tukwila Jim Haggerton, Mayor 190 FOURTH QUARTER REPORT TO COUNCIL October 1 December 31, 2010 Prepared for Utilities Committee CITY COUNCIL Due to the Council's need to address the City's budget shortfall during 2010, discussions and actions regarding City Council goals were delayed and /or limited. BUDGET PROGRAM GOALS: 1. Seek out opportunities for Councilmembers to further their knowledge, experience and awareness of the different cultures represented within the Tukwila community: Assigned to Community Affairs Parks Committee for implementation and /or follow -up. 2. Support programs and services that provide a sense of stability. community and unity throughout Tukwila's residential neiahborhoods: Assigned to Community Affairs Parks Committee for implementation and /or follow -up. Councilmembers continue to sponsor a monthly Coffee Chat in the Tukwila community. 3. Work toaether in cooperation with nearby cities to address common problems in the Hiahwav 99 corridor and Military Road: Assigned to Finance Safety Committee for implementation and /or follow -up. A small standing committee of three members from each Council met on April 22, 2010, and July 8, 2010. A joint meeting was not scheduled for the 4th Quarter. 4. Provide legislative support and encouragement to Tukwila residents livina in rental communities through proa rams that hold owners and /or property managers accountable for providing safe places to live throuah the implementation of a rental licensina program: Completed. On April 19, 2010, Council approved a resolution adopting a residential rental business license and inspection program fee schedule. In June, Substitute Senate Bill 6459 regarding rental property inspections, which were actively opposed by Tukwila, became law. 5. Approve and implement standard operating procedures for the Council. Review and update procedures on a reaular basis: Not currently assigned to a specific committee; monitored by the Council President and Legislative Analyst. The Council did not implement any policies for incorporation into the standard operating procedure manual during the fourth quarter. 6. Support the implementation of City endorsed programs (i.e. Walk Roll Plan, Fire Master Plan, Parks Recreation Open Space Plan) throuah policy related decisions not associated with direct program funding: Assigned to Community Affairs Parks Committee for implementation and /or follow -up. 7. Ensure a commitment to continued human services funding in relation to the cost of living through consistent review of regional. state and federal budaets affectina human services programs and services: Assigned to Community Affairs Parks and Finance Safety Committees for implementation and /or follow -up. This item will be scheduled for Committee review as budget reviews deem appropriate. In response to current unstable economic conditions the Council has worked diligently to leaving significant Human Services funds intact. 8. Study the feasibility and implementation of televised City Council meetinas: Assigned to Utilities Committee for implementation and /or follow -up. 9. Continue to foster relationships within local, regional and state entities that encourage opportunities for ioint partnership and outreach: Assigned to Utilities Committee for implementation and /or follow up. Councilmembers serve as representatives and alternates on local, regional and state boards, 17 2010 Fourth Quarter Report Prepared for Utilities Committee Page 2 committees and commissions including but not limited to: SCATBd, SKEDI, WRIA 9, AHAB, Suburban Cities Association, Association of Washington Cities, Highline Forum and Cascade Water Alliance. 10. Formulate an Adoot-a-Neiahborhood proaram that will provide Councilmembers the ooportunity to become more familiar with the chancing faces of communities and neiohborhoods throughout the City: Assigned to Community Affairs Parks Committee for implementation and /or follow -up. 11. Research the viability of sponsoring a City -wide Citizens' Academy: Assigned to Community Affairs Parks and Finance Safety Committees implementation and /or follow -up. 12. Establish a process to provide updates to Council on issues that are brouoht forward at Council meetings durina citizen comment opportunities: Completed. During the second quarter, City Administration formulated an efficient process to update Council of such items. The system is currently managed by the Mayor's Executive Assistant. PUBLIC WORKS DEPARTMENT YEAR END SIGNIFICANT ISSUES: Tukwila International Blvd Improvement Phases II III Project completed on time and under budget. Both Southcenter Parkway and Tukwila Urban Center Access (Klickitat) Projects were awarded by year -end with both bids under the engineer's estimate. Howard Hanson Dam's capacity level still poses a flooding risk this winter. The good news is that the grout curtain installed in 2009 and other interim measures are being effective in controlling seepage. This has supplied the Corps of Engineers with additional confidence in the storage capacity of the dam for the 2010/2011 flood season. A new drainage and erosion control system inside the dam and abutment is scheduled to be completed before the 2011/2012 flood season and should bring the dam back to its designed capacity. Public Works Maintenance and Operations performed more in -house repairs this year on several different levels than ever before. The Street Department patched and repaved portions of Interurban Avenue over a 6 -week period, the Surface Water Department performed property cleanup and demolition at the Duwamish Gardens site, the Water Department completed the automated meter read system, Facilities have now assumed full maintenance coverage and management of the 6300 Building (eliminating a private contract management firm), and Fleet now performs all transmissions repairs, tire work, and towing of all administrative and patrol cars in- house. Also purchased and outfitted the new black and white patrol cars in 2010. 4th QUARTER SIGNIFICANT ISSUES: Construction was substantially completed and within budget for Tukwila International Blvd Improvement Phases II III Project. A ribbon cutting event was held on October 13, 2010 to celebrate the completion. Project close -out is anticipated in the first quarter of 2011. On November 4 bids were opened for construction of the Tukwila Urban Center Access Project (Klickitat). Guy F. Atkinson Construction submitted the lowest bid that was well below the engineer's estimate. Council awarded the project on November 22. Construction is scheduled to begin in the first quarter of 2011 and have the road reopened by November 15, 2011. CH2M Hill was selected for construction management of the TUC Access Project. After ice and snowfall on Monday, 11/22, sanders, plows, and dump trucks were used to clear City streets. Traffic was gridlocked for hours during the evening commute. As of Thursday morning 18 2010 Fourth Quarter Report Prepared for Utilities Committee Page 3 (Thanksgiving), 200 tons of sand and 550 bags of salt were used. All major and secondary arterials were opened by 11/24 including S 178th hill, Slade Way, and S 144th St hill. One signal cabinet was destroyed by a hit and run driver at Andover Park West and Minkler Blvd. BUDGET PROGRAM GOALS: Public Works Administration 1. Prepare and Present a comprehensive Citv Facilities Uoarade and Replacement Plan: Public Works and DCD continue to work on the plan. 2. Evaluate future arant fundina options available and propose a course of action to fund transoortation proiects: Tracking grant opportunities in order to realistically budget capital projects. 3. Implement the Emeraencv Manaaement Community Disaster Education (CDE' Proaram: EM responsibilities were transferred to the Fire Department. 4. Provide auarterlv reports on emeraencv manaaement issues: With departure of the Emergency Operations Coordinator, the EM responsibilities were transferred to the Fire Department. 5. Hold auarterlv community informational meetinas: Goal not met due to staffing levels. Business Services 1. Create a more effective. cost efficient deoartment— proiectina and monitorino department costs: seekina more cost effective purchasing aareements with vendors: Preparing the department's operation. maintenance and capital facilities budaet usina a "needs- basis" approach: Goal met. 2. Review the feasibility of usina Council- approved Local Improvement Districts (LIDs' as a means of financina street improvement proiects for residential and commercial areas: Goal met for the TUC Access (Klickitat) Project. 3. Review "rate model" for establishina appropriate rates for water, sewer and surface water enterprise funds. Investioate the feasibility of a consumption -based sewer rate: Reviewed rate models for the Proposed 2011 -2016 CIP and 2011 -2012 Biennial Budget, including new water and sewer ordinances and rate increases in the Public Works Fee Schedule Resolution. Maintenance Administration 1. Identify operational reauirements (facility space, equipment. and personnel) for all maintenance functions beina performed: Efforts were directed toward facility conditions costs. 2. Implement recurrent technical trainino and operational safety programs to maintain employee certification levels to meet current and updated reaulations: All required training for 2010 has been completed. 3. Initiate a program that will improve the enerav efficiency of City maintenance operations: As part of the City's Green Team, Public Works is assessing potential grants for 2011 implementation. Engineering Administration 1. Assess standardized contractina procedures for construction and repair proiects: City attorney is reviewing all contract templates. 2. Annual assessment and update of transportation impact fees system: A contract with Fehr Peers was executed to provide a review of the impact fees by June 30, 2011. Level -of- service calculations for pedestrians and bicycle users are complete. Traffic modeling is underway. Development General: 1. Maintain and improve the turn around time for Permit review and approval: All performance goals have been met. 2. Work with and support DCD to improve permit processes: Tuesday /Thursday plan review meetings for completeness have been implemented as well as cross training between PW /DCD permit staff. Performance: 1. Zero backlogs of permits waiting for more than 30 days to be reviewed: Goal met. 19 2010 Fourth Quarter Report Prepared for Utilities Committee Page 4 2. Permits for sinale family residences issued within 30 days: Goal met. Facility Maintenance General: 1. Maintain a record keeoina and trackina system for facility maintenance work order allocation: Facilities summary reports and year -end data entry completed. 2. Implement the business plan for facility maintenance: Analyzing maintenance summaries. Performance: 1. Advertise and award 90% of active Fund 303 Projects no later than June 1 On budgetary hold. 2. Reduce facility maintenance costs by 10% through efficiencies: Implementing lighting HVAC efficiencies with routine replacements and preparing for potential grant awards. Street Maintenance /General Admin General: 1. Participate in pavement manaaement for the multi -year street overlay proaram: The 2009/2010 Overlay and Repair Program was completed. 2. Assess the Traffic Operations Center (TOM effectiveness and flexibility with an emphasis on expanding its use by other departments: Completed fiber installation by City crews along E Marginal Way corridor. Installed fiber and coax cable to Police training room for full access to all cameras and recorders. Removed all fiber control switches from the Neighborhood Resource Center in preparation of Police vacating the building. Performance: 1. Repair City -owned streetlights within 72 hours. For Seattle City Liaht/Puaet Sound Enerav streetlights, report within 24 hours: Repairs have been made on City -owned lights as needed. Assessing streetlight system to identify areas that can be converted from a flat rate to a metered system. To date 59 streetlights have been converted to a metered system. 2. Correct all traffic signal problems within 24 hours: Goal met. 3. Perform auarterly preventative maintenance on all City -owned traffic sianals: Goal met. 4. Evaluate reflectivity of all sians once a year: To be completed in early 2011. 5. City street cleanina: Goal met. Residential 100 percent of the streets. twice a year. Arterial residential and commercial /industrial roads six times a year. Arterial commercial /industrial roads eioht times a year. 6. Potholes shall be repaired within 48 hours of notification: Goal met. 7. Provide auarterly reports on the effort to remove araffiti from public property: Year -end report being prepared. Residential Streets General Engineering 1. Prioritize. budaet. and schedule list of residential street improvement proiects. including condition of sidewalks. for inclusion into the City's Capital Improvement Proaram: Funding for 42 Ave S design has been included in the Approved 2011 -2016 CIP. Funding for 53 Ave S design is proposed for 2014/2015. 2. Annual update of pavement manaaement system: Notice to Proceed for design of the 2011 Overlay Repair program was issued November 9. Due to staff workload, the pavement management system will be updated in 2011. Bridges Streets General Engineering 1. Ongoing construction of Phase II III of Tukwila International Blvd. Improvement Proiect: Construction is complete and within budget. Project close -out is underway and is scheduled to be presented to Transportation Committee and Council in early 2011. 2. Award construction contract for Tukwila Urban Access (Klickitat\ Project: Construction bids were opened on 11/4/10. Guy F. Atkinson Construction submitted the lowest bid in the amount of $10,880,180.00, well within budget and below the engineer's estimate of $15,365,000. 20 2010 Fourth Quarter Report Prepared for Utilities Committee Page 5 Construction will begin in early 2011 and road is expected to be open for traffic in November 2011. 3. Award construction contract for Southcenter Parkway Proiect: Work to date includes construction of preload and installation of the sanitary sewer line from Minkler Blvd to S 180 St. Some items of work have been delayed pending issuance of a permit from the U.S. Army Corps of Engineers. Contract completion is currently scheduled for January 2012. Water Utility /Maintenance Operations General: 1. Track backflow prevention compliance for the annual Department of Health report usina the City's cross connection data program: Data updates completed and DOH reports have been submitted. 2. Continue the remaining phase of the automatic meter read program in the residential areas: Final area of Allentown has been completed. 3. Implement a program to test the accuracy of water meters 2- inches and larger into standard preventative maintenance procedures: Goal met. 4. Monitor Water Use Efficiency efforts and provide an annual report: Report sent to Washington State Department of Health. Performance: 1. Install new water meters within 48 hours of the hook -uo reauest: Goal met. 2. Respond to water aualitv concerns within 24 hours: Goal met. 3. Test chlorine residual level bi-monthlv: Goal met as scheduled. 4. Test coliform levels bi- monthly: Goal met. 5. Achieve 10 percent water savings to meet Water Efficiency Goals established by the Municipal Water Law: Data from 11 months shows water savings well within the 10% goal. 6. Regular testing of fire hydrants: Goal met. General Engineering Services Water 1. Complete construction of Andover Park East Water main Replacement Proiect: Design is currently under final review. Plans and specifications will be prepared for advertisement in the first quarter of 2011. Sewer Maintenance Operations General: 1. Evaluate system -wide conditions for possible replacement and /or upgrade: Assessment completed with Infiltration Inflow work. 2. Review results of video loas to identify damaged areas and locations of possible infiltration /inflow: Repairs have been made as needed based on inspection logs. 3. Implement a system for remote monitoring of lift stations response and corrective action can be achieved from a laptop computer: New software installed with more programming scheduled in 2011. Performance: 1. TV inspect 20.000 LF of pipe annually: Unable to implement the TV program for 2010 due to staffing shortage from City hiring freeze. 2. Clean 183.000 LF of pipe annually: Goal met. 3. Clean and maintain 730 manholes annually: Completed. 4. Weekly monitoring of 10 sewer lift stations for pump hours. start counts. and aenerator operation: Routine scheduled monitoring along with cleaning of wet wells. General Engineering Services Sewer 1. Complete construction of the Interurban Ave S Gravity Sewer Proiect: Design has been modified due to right -of -way issues. Final review is underway. Plans and specifications will be prepared for advertisement in the first quarter of 2011. Work will precede Interurban Ave S roadway improvements. 21 2010 Fourth Quarter Report Prepared for Utilities Committee Page 6 Surface Water Maintenance General: 1. Participate in development of a multi -year small drainaae proiect list: Design review for 2010 completed. 2. Provide field support to Enaineerina for GIS inventory: Completed Area 6. 3. Investiaate throuah usaae of TV. GIS and flushino tasks to find unmapped systems: Efforts are underway to begin TV work in areas that still need additional mapping. Performance: 1. TV inspect 15.000 LF of pipe: Work is 80% complete for 2010. 2. Maintain /clean 3.500 LF of ditches and four large water aualitv ponds: Fisheries permits were acquired and work completed within the required time limit. 3. Clean 1,400 catch basins. manholes and stormceotors: Goal met on annual cleaning rotation. 4. Maintain /clean 15.000 LF of storm lines: Completed 80% for 2010. 5. Conduct weekly monitoring of five storm lift stations for pump hours, start counts, and aenerator operation: Goal met with routine scheduled monitoring on- going. Surface Water General Engineering Services 1. Complete small drainaae proiects identified on the approved list for 2009 -2010: Construction has been postponed because the Hydraulic Project Approval (HPA) window expired for 2010. There are 6 sites in the current program. Advertisement and construction will occur in 2011. Plans and specifications are currently 60% complete. 2. Continue adoption and repair of the private storm systems that have been identified: There are 3 sites included with the 2010/2011 Small Drainage Program to be advertised and constructed in 2011. Plans and specifications are currently 60% complete. 3. Continue development of the GIS as- builts of city infrastructure that complies with NPDES: Area 6 work is complete. Area 7 consultant contract will be presented to Council for approval in the first quarter of 2011. Equipment Rental General: 1. Use the Fleet Manaaement Database to recommend a 10 percent reduction in the City's fleet costs: Carpool efforts successful, analyzing surplus policy and formulating recommendations. 2. Fully implement the Vehicle Replacement Guidelines Procedures: Goal met. Performance: 1. Return 100 percent of vehicles for preventive maintenance and checkup within the 30 -day timeframe: Ongoing, goal met. 2. Keep 90 percent of safety vehicles (Police and Fire) available for use: Efforts were concentrated on rolling out the new black and white patrol vehicles. 3. Complete by April 30th. the "Condition of the Citv's Fleet" Report: Completed for budget review. 4. Complete 85 percent of the capital equipment purchases by June 30th: Only 6 black and white patrol vehicles were ordered for 2010. Other purchases have been held to evaluate vehicle life extension or included in 2011 -2012 budget. 22