Loading...
HomeMy WebLinkAboutTrans 2014-06-09 COMPLETE AGENDA PACKETCity of Tukwila Transportation Committee • Allan Ekberg, Chair • Dennis Robertson • Kate Kruller Distribution: A. Ekberg D. Robertson K. Kruller D. Quinn Mayor Haggerton D. Cline L. Humphrey B. Giberson F. Iriarte R. Tischmak G. Labanara P. Brodin S. Kerslake Clerk File Copy 2 Extra Place pkt pdf on Z: \TC -UC Agendas e -mail cover to: A. Le, C. O'Flaherty, D. Almberg, B. Saxton, S. Norris, M. Hart, L. Humphrey AGENDA MONDAY, JUNE 9, 2014 — 5:15 PM FOSTER CONFERENCE ROOM — 6300 BUILDING (formerly known as Conference Room #1) � �It m Recomme ded Actions Pale 1. PRESENTATION(S) 2. BUSINESS AGENDA a) 2014 Bridge Inspections — 196th — 200th Street Bridge Repair a) Information Only Pg. 1 King County Discretionary Assistance b) 2014 Overlay and Repair Program b) Forward to 6/16/14 Pg. 9 Bid Award Regular Consent Agenda c) Tukwila MIC Smart Street Non - Motorized Project c) Forward to 6/16/14 Pg. 17 Acceptance of Federal Highway Administration (FHWA) Grant Regular Consent Agenda d) King County Metro Transit Updates d) Information Only Pg. 21 e) Transportation Committee Goals/Work Item Ideas e) Discussion Only Pg. 25 3. SCATBd f) • Draft Oil Train Letter to Governor Jay Inslee f) Discussion Only Pg. 27 • 11/26/13 Rail Plan Comment Letter to Ron Pate 4. MISCELLANEOUS 5. ANNOUNCEMENTS Future Agendas: Next Scheduled Meeting: Monday, June 23, 2014 6. The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206- 433 -0179 for assistance. City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton FROM: Bob Giberson, Public Works Director By: Grant Griffin, Senior Program Manager DATE: June 6, 2014 SUBJECT: 2014 Bridge Inspections - 196th - 200th Street Bridge Repair Project No. 91410402 King County Discretionary Assistance ISSUE Pursue a project to repair the approach slab seat on the west end of the Tukwila /Kent, jointly owned, 196th -200th Street Bridge under the 2014 Bridge Inspection Program, using the King County Discretionary Work Program. BACKGROUND The approach slab seat on the west end of the 196th -200th Street Bridge has sustained damage due to slab foundation fill settlement and resulting slab movement. The west end sidewalks approaching the bridge have also sustained damage due to pressure from the approach slab movement. DISCUSSION The approach slab fill settlement has been recorded on the routine bridge inspection report for a number of inspection cycles. Settlement has allowed the slab to rotate at the connection to the west bridge abutment causing concrete spalling and a bump at the bridge approach. The movement caused buckling of the sidewalk on the southwest corner of the bridge and was reported to Public Works on May 29, 2014. The settlement has reached the point where a repair is necessary for public safety and to protect the bridge from further damage. The King County Bridge Structural Engineer has inspected the bridge and determined that no restrictions are necessary as we pursue the repair project. FISCAL IMPACT This project is in the early stages of development and repair options are being determined and estimates prepared. The cost of the work is expected to fall within the budget of the 2014 Bridge Inspection Program. Updates to the committee will be presented as the information becomes available. RECOMMENDATION Information only. Attachments: Vicinity Map Bridge Inspection Report W:1PW EngIPROJECTSIA- RW & RS Prajects\Bridge Inspection Programs IBridge Inspections 2014 (91410402)1196th_200th BridgelInfo Memo King Co Discretionary 196th - 200th Bridge - sb.docx 1 Project Site 196TH — 200TH Street Bridge VICINITY MAP 196th -200th Street Bridge — Federal Structure Identifier 8712100 Inspection on June 2, 2014 by Tukwila Public Works, Grant Griffin and Scott Moore. Tukwila Road Maintenance requested an engineering review of the situation on the west end of the 196th- 200th Street Bridge that had caused the sidewalk to buckle on the Southwest approach. Review of the bridge revealed an ongoing problem of roadway fill settlement causing unanticipated movement of the west approach slab. This movement has caused damage to the approach slab seat and a bump at the slab bridge transition. Further investigation and analysis of the bridge plans indicate that no traffic restrictions are necessary but that a repair project is warranted to prevent further damage. The King County Bridge Structural Engineer has inspected the damage and is in concurrence with this assessment. See detailed photos of the damage below: 3 1- Settlement top of traffic barrier above NW corner abutment — approach slab interface. 4 2- Void behind West Abutment wall Spalling Concrete where slab connection is failing. Construction falsework is still in place. Void is approx. 10 feet deep or more. Reinforced fill on roadway side is supporting approx. two - thirds of the slab but is able to rotate causing spalling of the outside edge of the approach slab seat. No movement visible with traffic loads. Settlement is happening for the entire width of the bridge. 5 3- Settlement of slab on SW corner. Barrier with Fractured Fin finish visible. Initial settlement marked to track additional settlement. Void and falsework to left is same location as picture No.2 above. 6 BAN ���ul im ' !PI 4- View of void on NW corner. Slab settlement and falsework visible. Abutment wall column at left. 7 »1 1 5- Slab settlement on NW Corner. Location above void shown in photo No.3 8 City of Tukwila TO: Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director42 BY: David Sorensen, Project Manager DATE: June 6, 2014 SUBJECT: 2014 Overlay and Repair Program Project No. 91410401 Bid Award ISSUE Award the bid for construction of the 2014 Overlay and Repair Program. BACKGROUND This project is to preserve and maintain the street structure in a safe and useable condition. Project construction will include pavement repairs and an asphalt overlay of eight locations citywide. Work will also include new pavement markings. ANALYSIS A call for bids was advertised for the 2014 Overlay and Repair Program on May 14 and 21, 2014 and five bids were opened on May 28, 2014. The lowest apparent bidder was Miles Resources, LLC, with a bid of $1,069,794.00. The engineer's estimate was $1,195,130.00. One math error was found on the bid tabulations. Project design consultant KPG Inc. concurred award to apparent low bidder Miles Resources, LLC. Miles Resources is the current contractor for the Overlay and Repair — East Marginal Way S Project. BUDGET AND BID SUMMARY (All amounts include sales tax) Bid Results Estimate 2014 Budget Bid Schedule "A" Amount $ 891,722.00 $ 971,350.00 $1,225,000.00 Contingency (5 %) 44,586.10 Bid Schedule "B" Fort Dent 178,072.00 223,780.00 200,000.00 Contingency (5 %) 8,903.60 Funds to Thorndyke Elementary 0.00 0.00 ($300,000.00) Total $1,123 283.70 $1195,130.00 $1,125 000.00 RECOMMENDATION Council is being asked to award the construction contract for the 2014 Overlay and Repair Program to Miles Resources, LLC in the amount of $1,069,794.00 and consider this item on the Consent Agenda at the June 16, 2014 Regular Meeting. Attachments: Vicinity Map 2014 CIP Page 15 & 38 Bid Tabulation Consultant Recommendation W:IPW EngIPROJECTSIA- RW & RS ProjectslAnnual Overlay & Repair Programs12014 Overlay & Repair Program (91410401)IDesignlAd and AwardlAward\Working Docs\Docs to TC Bid Award\Final Docs to TC11nfo Memo Bid Award Miles- sb.doc 9 v s m r 49TH AVE S S 107TH ST S 112TH ST GOLF COWRY GOA suinl � �I S 116\ 11114 x\ slotml 1y�14F-17+s1 S 114TH ST sr '51 - -- f __-I s i55 %I_ —�3 sr t d g.51 -. 1 A srtllls +_._ c' 4 r+ s144sr I. Stµ SL 1 — �� " I �!'' -__ 4..§140 5! * - WE :s i''''f ; NF Al \� -_ s 1st 9 751157 5152 7_ nj �lr 5} S[ 515! Sf! "A /'r --- AI S 152ND ST FORT DENT P s 40TH AVE S Ia S ST sl 5 X61 City of Tukwila 2014 Overlay Program EVANS BLAC 10 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 PROJECT: Annual Overlay and Repair Program Project No. 81310401 DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets. JUSTIFICATION: Pmsemeand main�in�eo�eeLoku�ureinoea� and usaaNam��bymau�adnQbe�roh�|uewh�h�oo minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects. STATUS: Each year various sections of roadway throughout the City are designed arid constructed for asphalt overlay. MAINT. IMPACT: Reduces annual mantenance. COMMENT: Ongoing project. OnIy orie year actuals shown in first column, FINANCIAL (in $000's) EXPENSES Design Lund (R8«0 Const. Mgmt. Construction TOTAL EXPENSES FUND SOURCES Awarded Grant Proposed Grant Mitigation Actual Mitigation Expected City Oper. Revenue TOTAL SOURCES Through Estimated 2012 2013 2014 2015 2016 2017 2018 2019 BEYOND TOTAL 194 165 969 1,328 100 100 100 175 1,225 1,500 125 175 1,250 1,550 125 175 1,260 1,560 150 200 1,300 1,650 150 200 1,320 1,670 175 225 1,325 1,725 175 225 1,325 1,725 1,294 0 1,540 9,974 12,808 1,328 1,328 100 100 1,500 1,500 1.550 1,550 1,560 1,560 1,650 1,650 1,670 1,670 1,725 1,725 1,725 1,725 0 0 0 0 12,808 12,808 euw'oo19Capital Improvement Program 15 11 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 90330107 PROJECT: Fort Project ' V'-GVVO2 DESCRIPTION: Regional park of 52 acres requires ongoing capital and maintenance improvements. The City has assumed major park repairs and maintenance for the picnic area, parking lot, one soccer JUSTIFICATION: field, trail, pond and all major irifrastructure. A new playground was installed in 2008 and restrooms were remodeled in 2010. Part of the parking STATUS: lot overlay was completed with parking tax dollars in 2011. Portion of remaining parking lot paving is schedule in 2014. Replacement ef the small play structure is stth needed. MAINT. IMPACT: Ongoing effort from all departments involved; Parks, Streets, Water, Sewer, and Surface Water. King County transferred the park to the City of Tukwila in 2003. Concessionaire agreement withStarfim COMMENT: Sports Complex FINANCIAL (in $000's) EXPENSES Design Land (RAN) Const. Mgmt. Construction TOTAL EXPENSES Through Estimated 2012 2018 20 14 201 20 s 20 17 2018 20 1y BEYOND TOTAL 275 1,292 1,567 20 30 200 250 140 250 1,550 1,940 435 FUND SOURCES Awarded Grant Parking Taxes REET1(1ut Qtr Paroen) Mitigation City Oper. Revenue TOTAL SOURCES 694 50 823 1,567 250 250 140 1,800 1,940 694 50 140 0 2.873 3,757 Project Location 2014 - 2019 Capital Improvement Program 38 12 CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS 2014 Overlay Program Bid Tabulation May 28, 2014 Corrected math error KPG 111111.•11L•..VM 1 Engineer's Estimate Miles Resources, LLC ICON Materials Lakeside Industries Road Construction NW Watson Asphalt No. Spec Item Quantity Unit I Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost ROADWAY (SCHEDULE A) Al 1 -04 Minor Change 1 FA $ 15,000.00 15,000.00 $ 15,000.00 15,000.00 $ 15,000.00 15,000.00 $ 15,000.00 15,000.00 $ 15,000.00 15,000.00 $ 15,000.00 15,000.00 A2 1 -07 Resolution of Utility Conflicts 1 FA $ 10,000.00 10,000.00 $ 10,000.00 10,000.00 $ 10,000.00 10,00000 $ 10,000.00 10,000.00 $ 10,00000 10,000.00 $ 10,000.00 10,000.00 A3 1 -07 SPCC Plan 1 LS $ 800.00 800.00 $ 500.00 500.00 $ 800.00 800.00 $ 2,000.00 2,000.00 $ 1,000.00 1,000.00 $ 500.00 500.00 A4 1 -09 Mobilization 1 LS $ 75,000.00 75,000.00 $ 89,000.00 89,000.00 $ 85,000.00 85,000.00 $ 130,000.00 130,000.00 $ 95,000.00 95,000.00 $ 111,000.00 111,000.00 A5 1 -10 Project Temporary Traffic Control 1 LS $ 125,000.00 125,000.00 $ 60,000.00 60,000.00 $ 40,000.00 40,000.00 $ 125,000.00 125,000.00 $ 87,500.00 87,500.00 $ 128,400.00 128,400.00 A6 2 -02 Asphalt Pavement Removal Incl. Haul 220 SY $ 40.00 8,800.00 $ 11.00 2,420.00 $ 9.00 1,580.00 $ 20.00 4,400.00 $ 18.00 3,960.00 $ 50.00 11,000.00 A7 2 -02 Cement Conc. Sidewalk Removal Incl. Haul 130 SY $ 25.00 3,250.00 $ 32.50 4,225.00 $ 26.00 3,380.00 $ 50.00 6,500.00 $ 22.00 2,860.00 $ 50.00 6,500.00 A8 2 -02 Cement Conc. Curb Removal Incl. Haul 420 LF $ 10.00 4,200.00 $ 8.30 3,486.00 $ 8.00 3,360.00 $ 20.00 8,400.00 $ 7.00 2,940.00 $ 40.00 16,800.00 A9 2 -02 Removal of Structure and Obstruction 1 LS $ 4,000.00 4,000.00 $ 500.00 500.00 $ 2,500.00 2,500.00 $ 16,000.00 16,000.00 $ 15,000.00 15,000.00 $ 3,500.00 3,500.00 A10 2 -03 Unsuitable Foundation Excavation Incl. Haul 400 CY $ 50.00 20,000.00 $ 20.00 8,000.00 $ 50.00 20,000.00 $ 50.00 20,000.00 $ 50.00 20,000.00 $ 20.00 8,000.00 All 2 -03 Gravel Borrow Incl. Haul 870 TON $ 25.00 21,750.00 $ 20.00 17,400.00 $ 30.00 26,100.00 $ 10.00 8,700.00 $ 25.00 21,750.00 $ 15.00 13,050.00 Al2 4 -04 Crushed Surfacing Top Course 190 TON $ 30.00 5,700.00 $ 25.00 4,750.00 $ 35.00 6,650.00 $ 10.00 1,900.00 $ 55.00 10,450.00 $ 15.00 2,850.00 A13 5 -04 Pavement Repair Excavation Incl. Haul 1,010 CY $ 55.00 55,550.00 $ 80.00 80,800.00 $ 60.00 60,600.00 $ 70.50 71,205.00 $ 95.00 95,950.00 $ 91.70 92,617.00 A14 5 -04 HMA C1.1 /2" PG 64 -22 2,615 TON $ 85.00 222,275.00 $ 82.00 214,430.00 $ 84.00 219,660.00 $ 77.00 201,355.00 $ 102.00 266,730.00 $ 93.60 244,764.00 A15 5 -04 HMA for Pavement Repair Cl. 1/2" PG 64 -22 1,970 TON $ 95.00 187,150.00 $ 100.00 197,000.00 $ 88.00 173,360.00 $ 88.00 173,360.00 $ 102.00 200,940.00 $ 118.80 234,036.00 A16 5 -04 HMA for Prelevel Cl. 1/2" PG64 -22 150 TON $ 100.00 15,000.00 $ 82.00 12,300.00 $ 104.00 15,600.00 $ 88.00 13,200.00 $ 102.00 15,300.00 $ 118.80 17,820.00 A17 5 -04 Thickened Edge 4,050 LF $ 3.00 12,150.00 $ 1.00 4,050.00 $ 2.00 8,100.00 $ 2.00 8,100.00 $ 2.50 10,125.00 $ 1.50 6,075.00 A18 5 -04 Drainage Channel 70 LF $ 5.00 350.00 $ 15.00 1,050.00 $ 10.00 70000 $ 10.00 700.00 $ 1100 770.00 $ 35.00 2,450.00 A19 5 -04 Planing Bituminous Pavement 4,730 SY $ 5.00 23,650.00 $ 7.50 35,475.00 $ 8.00 37,840.00 $ 8.50 40,205.00 $ 7.50 35,475.00 $ 6.80 32,164.00 A20 5 -04 Jdnt /Crack Sealing 1 FA $ 2,000.00 2,000.00 $ 2,000.00 2,000.00 $ 2,000.00 2,000.00 $ 2,000.00 2,000.00 $ 2,000.00 2,000.00 $ 2,000.00 2,000.00 A21 7 -12 Adjust Water Valve 13 EA $ 400.00 7,200.00 $ 300.00 5,400.00 $ 450.00 8,100.00 $ 300.00 5,400.00 $ 650.00 11,700.00 $ 350.00 6,300.00 A22 7 -12 Adjust Water Manhole 5 EA $ 700.00 3,500.00 $ 400.00 2,000.00 $ 550.00 2,750.00 $ 400.00 2,000.00 $ 850.00 4,250.00 $ 450.00 2,250.00 A23 8 -01 Erosion/Water Pollution Control 1 FA $ 8,000.00 8,000.00 $ 8,000.00 8,000.00 $ 8,000.00 8,000.00 $ 8,000.00 8,000.00 $ 8,000.00 8,000.00 $ 8,000.00 8,000.00 A24 8 -01 Inlet Protection 32 EA $ 75.00 2,400.00 $ 70.00 2,240.00 $ 75.00 2,400.00 $ 75.00 2,400.00 $ 75.00 2,400.00 $ 50.00 1,600.00 A25 8 -04 Cement Conc. Traffic Curb and Gutter 500 LF $ 35.00 17,500.00 $ 19.25 9,625.00 $ 35.00 17,500.00 $ 24.00 12,000.00 $ 30.00 15,000.00 $ 20.00 10,000.00 A26 8 -04 Cement Conc. Traffic Curb 30 LF $ 35.00 1,050.00 $ 18.10 543.00 $ 35.00 1,050.00 $ 23.00 690.00 $ 30.00 900.00 $ 20.00 600.00 A27 8 -04 Extruded Curb 570 LF $ 10.00 5,700.00 $ 7.00 3,990.00 $ 9.00 5,130.00 $ 6.25 3,562.50 $ 9.50 5,415.00 $ 8.00 4,560.00 A28 8 -11 Removing Guardrail 220 LF $ 15.00 3,300.00 $ 14.55 3,201.00 $ 12.00 2,640.00 $ 15.00 3,300.00 $ 3.50 770.00 $ 10.00 2,200.00 A29 8 -11 Beam Guardrail Type 1 160 LF $ 35.00 5,600.00 $ 32.20 5,152.00 $ 45.00 7,200.00 $ 33.00 5,280.00 $ 38.25 6,120.00 $ 35.00 5,600.00 A30 8 -11 Beam Guardrail Non - Flared Terminal Type TL2 2 EA $ 2,000.00 4,000.00 $ 1,965.00 3,930.00 $ 3,400.00 6,800.00 $ 2,000.00 4,000.00 $ 3,000.00 6,000.00 $ 2,700.00 5,400.00 A31 8 -13 Adjust Monument Case and Cover 2 EA $ 400.00 800.00 $ 300.00 600.00 $ 450.00 900.00 $ 300.00 600.00 $ 650.00 1,300.00 $ 350.00 700.00 TRAFFIC SIGNALS (SCHEDULE A) A32 8 -20 Traffic Signal Vehicle Detection Loops Modifications at the intersection of Tukwila International Blvd. & S 112th Street 1 LS $ 5,506.00 5,500.00 $ 5,100.00 5,100 00 $ 5,500.00 5,500 00 $ 4,500.00 4,500.00 $ 5,000 00 5,000.00 $ 5,200.00 5,200.06 SIDEWALK (SCHEDULE A) A33 8 -14 Cement Conc. Sidewalk 140 SY $ 45.00 6,300.00 $ 62.00 8,680.00 $ 70.00 9,800.00 $ 41.00 5,740.00 $ 49.00 6,860.00 $ 65.00 9,100.00 A34 8 -14 Cement Conc. Curb Ramp Type Parallel A 3 EA $ 1,500.00 4,500.00 $ 1,750.00 5,250.00 $ 1,500.00 4,500.00 $ 1,100.00 3,300.00 $ 1,200.00 3,600.00 $ 1,800.00 5,400.00 A35 8 -14 Cement Conc. Curb Ramp Type Parallel B 3 EA $ 1,500.00 4,500.00 $ 1,750.00 5,250.00 $ 1,500.00 4,500.00 $ 1,100.00 3,300.00 $ 1,200.00 3,600.00 $ 1,800.00 5,400.00 A36 8 -14 Cement Conc. Curb Ramp Type Single Direction A Modified 1 EA $ 1,500.00 1,500.00 $ 1,935.00 1,935.00 $ 1,750.00 1,750.00 $ 1,100.00 1,100.00 $ 1,200.00 1,200.00 $ 2,000.00 2,000.00 A37 8 -15 Cement Conc. Curb Ramp Type Perpendicular A 1 EA $ 1,500.00 1,500.00 $ 1,935.00 1,935.00 $ 1,550.00 1,550.00 $ 1,000.00 1,000.00 $ 1,200.00 1,200.00 $ 2,000.00 2,000.00 STORM SEWER (SCHEDULE A) A38 7 -04 Ductile Iron Storm Sewer Pipe, 12 in. Diam 90 LF $ 70.00 6,300.00 $ 100.00 9,000.00 $ 86.00 7,740.00 $ 70.00 6,300.00 $ 110.00 9,900.00 $ 250.00 22,500.00 A39 7 -05 Catch Basin Type 1 3 EA $ 1,500.00 4,500.00 $ 2,000.00 6,000.00 $ 1,750.00 5,250.00 $ 1,200.00 3,600.00 $ 1,200.00 3,600.00 $ 2,500.00 7,500.00 A40 7 -05 Adjust Catch Basin 31 EA $ 450.00 13,950.00 $ 400.00 12,400.00 $ 550.00 17,050.00 $ 400.00 12,400.00 $ 800.00 24,800.00 $ 450.00 13,950.00 A41 7 -05 Storm Drain Marker 32 EA $ 50.00 1,600.00 $ 15.00 480.00 $ 60.00 1,920.00 $ 15.00 480.00 $ 50.00 1,600.00 $ 35.00 1,120.00 SANITARY SEWER (SCHEDULE A) A42 7 -05 (Adjust Manhole 11 EA $ 650.00 7,150.00 $ 400.00 4,400.00 $ 550.00 6,050.00 $ 400.00 4,400.00 $ 850.00 9,350.00 $ 450.00 4,950.00 CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS 2014 Overlay Program Bid Tabulation May 28, 2014 Corrected math error art 71 I .t 1, 1\ A Engineer's Estimate Miles Resources, LLC ICON Materials Lakeside Industries Road Construction NW Watson Asphalt No. Spec Item Quantity Unit Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost TRAF. CNTRL. DEVICES (SCHEDULE A) A43 8 -09 Raised Pavement Marker Type 1 11 HUND $ 160.00 1,760.00 $ 150.00 1,650.00 $ 350.00 3,850.00 $ 147.00 1,617.00 $ 250.00 2,750.00 $ 314.00 3,454.00 A44 8 -09 Raised Pavement Marker Type 2 3 HUND $ 375.00 1,125.00 $ 400.00 1,200.00 $ 550.00 1,650.00 $ 370.00 1,110.00 $ 450.00 1,350.00 $ 450.00 1,350.00 A45 8 -21 Permanent Signing 1 LS $ 7,000.00 7,000.00 $ 300.00 300.00 $ 2,000.00 2,000.00 $ 1,000.00 1,000.00 $ 1,100.00 1,100.00 $ 500.00 500.00 A46 8 -22 Plastic Traffic Arrow 2 EA $ 100.00 200.00 $ 50.00 100.00 $ 300.00 600.00 $ 50.00 100.00 $ 165.00 330.00 $ 250.00 500.00 A47 8 -22 Plastic Stop Line 140 LF $ 10.00 1,400.00 $ 6.00 840.00 $ 12.00 1,680.00 $ 5.70 798.00 $ 6.50 910.00 $ 10.00 1,400.00 A48 8 -22 Plastic Crosswalk Line 200 SF $ 10.00 2,000.00 $ 3.00 600.00 $ 9.00 1,800.00 $ 3.00 600.00 $ 5.00 1,000.00 $ 7.75 1,550.00 A49 8 -22 Plastic Line, 4 Inch 720 LF $ 2.00 1,440.00 $ 2.00 1,440.00 $ 2.50 1,800.00 $ 1.57 1,130.40 $ 2.25 1,620.00 $ 2.00 1,440.00 ROADSIDE DEV. (SCHEDULE A) A50 8 -01 Temporary Erosion Control Blanket 70 SY $ 8.00 560.00 $ 20.00 1,400.00 $ 3.00 210.00 $ 10.00 700.00 $ 4.00 280.00 $ 20.00 1,400.00 A51 8 -02 Property Restoration 1 FA $ 10,000.00 10,000.00 $ 10,000.00 10,000.00 $ 10,000.00 10,000.00 $ 10,000.00 10,000.00 $ 10,000.00 10,000.00 $ 10,000.00 10,000.00 A52 8 -02 Topsoil Type A 30 CY $ 50.00 1,500.00 $ 40.00 1,200.00 $ 60.00 1,800.00 $ 50.00 1,500.00 $ 48.00 1,440.00 $ 80.00 2,400.00 A53 8 -02 Seeded Lawn Installation 80 SY $ 1.00 80.00 $ 12.50 1,000.00 $ 6.00 480.00 $ 25.00 2,000.00 $ 3.00 240.00 $ 10.00 800.00 A54 8 -02 Edge Restoration 7,780 LF $ 2.00 15,560.00 $ 0.25 1,945.00 $ 2.00 15,560.00 $ 2.00 15,560.00 $ 3.00 23,340.00 $ 2.50 19,450.00 A55 8 -02 PSIPE Cotoneaster salicifolius 'Repens'; 1 Gal. Cont, 36" o.c. 50 EA $ 15.00 750.00 $ 51.00 2,550.00 $ 85.00 4,250.00 $ 100.00 5,000.00 $ 17.00 850.00 $ 50.00 2,500.00 TOTAL ESTIMATED CONSTRUCTION COST (SCHEDULE A) 971,350.00 891,722.00 906,390.00 992,492.90 1,090,525.00 1,131,600.00 ROADWAY (SCHEDULE B) B1 1 -04 Minor Change 1 FA $ 3,000.00 3,000.00 $ 3,000.00 3,000.00 $ 3,000.00 3,000.00 $ 3,000.00 3,000.00 $ 3,000.00 3,000.00 $ 3,000.00 3,000.00 B2 1 -07 SPCC Plan 1 LS $ 1,500.00 1,500.00 $ 250.00 250.00 $ 800.00 800.00 $ 500.00 500.00 $ 200.00 200.00 $ 250.00 250.00 B3 1 -09 Mobilization 1 LS $ 15,000.00 15,000.00 $ 17,500.00 17,500.00 $ 24,000.00 24,000.00 $ 20,000.00 20,000.00 $ 31,000.00 31,000.00 $ 14,800.00 14,800.00 B4 1 -10 Project Temporary Traffic Control 1 LS $ 8,000.00 8,000.00 $ 4,500.00 4,500.00 $ 10,000.00 10,000.00 $ 10,000.00 10,000.00 $ 15,500.00 15,500.00 $ 21,300.00 21,300.00 B5 2 -02 Asphalt Pavement Removal Incl. Haul 180 SY $ 40.00 7,200.00 $ 15.00 2,700.00 $ 11.00 1,980.00 $ 20.00 3,600.00 $ 18.00 3,240.00 $ 50.00 9,000.00 B6 2 -02 Cement Conc. Sidewalk Removal Incl. Haul 20 SY $ 25.00 500.00 $ 32.50 650.00 $ 30.00 600.00 $ 50.00 1,000.00 $ 22.00 440.00 $ 50.00 1,000.00 B7 2 -02 Cement Conc. Curb Removal Incl. Haul 290 LF $ 10.00 2,900.00 $ 8.30 2,407.00 $ 8.00 2,320.00 $ 20.00 5,800.00 $ 7.00 2,030.00 $ 25.00 7,250.00 B8 2 -02 Removal of Structure and Obstruction 1 LS $ 3,000.00 3,000.00 $ 300.00 300.00 $ 5,000.00 5,000.00 $ 5,000.00 5,000.00 $ 2,500.00 2,500.00 $ 10,200.00 10,200.00 B9 2 -03 Unsuitable Foundation Excavation Incl. Haul 50 CY $ 50.00 2,500.00 $ 20.00 1,000.00 $ 60.00 3,000.00 $ 50.00 2,500.00 $ 50.00 2,500.00 $ 60.00 3,000.00 B10 2 -03 Gravel Borrow Incl. Haul 100 TON $ 25.00 2,500.00 $ 10.00 1,000.00 $ 35.00 3,500.00 $ 10.00 1,000.00 $ 24.00 2,400.00 $ 23.80 2,380.00 B11 4 -04 Crushed Surfacing Top Course 810 TON $ 30.00 24,300.00 $ 30.00 24,300.00 $ 40.00 32,400.00 $ 10.00 8,100.00 $ 35.00 28,350.00 $ 23.80 19,278.00 B12 5 -04 Pavement Repair Excavation Incl. Haul 870 CY $ 55.00 47,850.00 $ 32.00 27,840.00 $ 55.00 47,850.00 $ 29.00 25,230.00 $ 49.00 42,630.00 $ 52.10 45,327.00 B13 5 -04 HMA for Pavement Repair Cl. 1/2" PG 64 -22 940 TON $ 95.00 89,300.00 $ 85.00 79,900.00 $ 96.00 90,240.00 $ 77.00 72,380.00 $ 92.00 86,480.00 $ 135.60 127,464.00 B14 8 -01 Erosion/Water Pollution Control 1 FA $ 2,500.00 2,500.00 $ 2,500.00 2,500.00 $ 2,500.00 2,500.00 $ 2,500.00 2,500.00 $ 2,500.00 2,500.00 $ 2,500.00 2,500.00 B15 8 -01 Inlet Protection 6 EA $ 75.00 450.00 $ 70.00 420.00 $ 75.00 450.00 $ 75.00 450.00 $ 75.00 450.00 $ 50.00 300.00 B16 8 -04 Cement Conc. Traffic Curb and Gutter 80 LF $ 35.00 2,800.00 $ 19.25 1,540.00 $ 35.00 2,800.00 $ 25.00 2,000.00 $ 30.00 2,400.00 $ 20.00 1,600.00 B17 8 -04 Extruded Curb 180 LF $ 10.00 1,800.00 $ 7.00 1,260.00 $ 9.00 1,620.00 $ 6.25 1,125.00 $ 10.00 1,800.00 $ 8.00 1,440.00 SIDEWALK (SCHEDULE B) B18 8 -14 Cement Conc. Sidewalk 20 SY $ 45.00 900.00 $ 62.00 1,240.00 $ 82.00 1,640.00 $ 58.00 1,160.00 $ 68.00 1,360.00 $ 65.00 1,300.00 STORM SEWER (SCHEDULE B) B19 7 -05 Adjust Catch Basin 6 EA $ 450.00 I 2,700.00 $ 400.00 I 2,400.00 $ 550.00 3,300.00 $ 400.00 2,400.00 $ 750.00 4,500.00 $ 450.00 I 2,700.00 TRAF. CNTRL. DEVICES (SCHEDULE B) B20 8 -21 Permanent Signing 1 LS $ 1,000.00 1,000.00 $ 1.00 1.00 $ 750.00 750.00 $ 500.00 500.00 $ 1,000.00 1,000.00 $ 500.00 500.00 B21 8 -22 Plastic Traffic Arrow 2 EA $ 100.00 200.00 $ 50.00 100.00 $ 300.00 600.00 $ 50.00 100.00 $ 165.00 330.00 $ 234.00 468.00 B22 8 -22 Paint Line, 4 Inch 440 LF $ 2.00 880.00 $ 0.60 264.00 $ 5.00 2,200.00 $ 0.57 250.80 $ 2.25 990.00 $ 4.00 1,760.00 ROADSIDE DEV. (SCHEDULE B) B23 I 8 -02 !Property Restoration 1 I FA $ 3,000.00 I 3,000.00 $ 3,000.00 I 3,000.00 $ 3,000.00 I 3,000.00 $ 3,000.00 I 3,000.00 $ 3,000.00 I 3,000.00 $ 3,000.00 I 3,000.00 TOTAL ESTIMATED CONSTRUCTION COST (SCHEDULE B) 223,780.00 178,072.00 243,550.00 171,595.80 238,600.00 279,817.00 TOTAL BID (SCHEDULE A+ B) 1,195,130.00 1,069,794.00 1,149,940.00 1,164,088.70 1,329,125.00 1,411,417.00 A 753 " AvenuP North Seattle, WA 981C19 P. 206,286.1640 F: 2061861639 /w.kpg,corn January 22, 201.4 Mr. David Sorensen Project Manager City of Tukwila, Department of Public Works 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 RE: East Marginal Way South (S 81st P1 to S Norfolk St) Project No. 91210406 Recommendation for Contract Award Dear David, As requested, KPG has tabulated the bids and reviewed the bid packages submitted for the East Marginal Way South (S 8151 P1 to S Norfolk St) project. The lowest bidder in the amount of $1,738,991.50 is Miles Resources, LLC. References listed in the Completed Construction Project Reference List provided by Miles Resources, LLC in their bid package confirmed that recently completed contracts with the contractor on similar roadway overlay projects were successful. We checked the status of Miles Resources LLC on the Washington State Labor and Industries web page to confirm they are currently licensed. We also checked the online System for Award Management and Miles Resources LLC does not have any active exclusion records listed. It is KPG's recommendation that the East Marginal Way South (S 81st P1 to S Norfolk St) project be awarded to Miles Resources LLC pending an independent review and recommendation by WSDOT. The hid tabulation is enclosed. Sincerely, KPG, Inc. v La. Josh Fedora, P.E. Enclosures: Bid Tabulation 15 16 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Dave Sorensen, Project Manager DATE: June 6, 2014 SUBJECT: Tukwila Manufacturing /Industrial Center (MIC) Smart Street Non - Motorized Project Project No. 91310406 Acceptance of Federal Highway Administration (FHWA) Grant ISSUE Accept a Federal grant awarded by the Puget Sound Regional Council (PSRC) to construct bicycle facilities on East Marginal Way South, Boeing Access Road, and Airport Way South in the amount of $482,047.00. BACKGROUND In May 2012 the City submitted an application to PSRC in response to a statewide Call for Projects to award Federal grant funds. The City's application had two parts requesting Congestion Management/Air Quality (CMAQ) funds for the design phase which includes bicycle facilities on the corridor of East Marginal Way S /Boeing Access Rd /Airport Way S from SR 599 to the north City limits and a request for funds for the construction phase. PSRC did not fund the construction phase initially, however in October of 2013 PSRC approved the construction grant funding as a separate act. The City was awarded the amount of $482,047 to construct the project. DISCUSSION Acceptance of the awarded Federal grant will enable the City to proceed with construction phase of the Tukwila MIC Smart Street Non - Motorized Project. FINANCIAL IMPACT The total estimated project cost for bicycle facilities, including construction, submitted with the initial grant application was $678,480.00. A city match of 13.5% is required for this project. Construction Tukwila MIC Smart Street Non - Motorized Project PSRC Grant $482,047.00 City Match from 2013 Annual Overlay & Repair 75,233.00 Total $557,280.00 RECOMMENDATION Council is being asked to accept a Federal grant awarded by PSRC in the amount of $482,047.00 for the Tukwila MIC Smart Street Non - Motorized Project and consider this item on the Consent Agenda at the June 16, 2014 Regular Meeting. Attachments: 2014 CIP, page 26 Award Letter from PSRC Vicinity Map W:1PW EngIPROJECTSIA- RW & RS Projects\Tukwila MIC Smart Street Non - Motorized Project (91310406)IDesign\WSDOT CN Auth LM DocsICN Auth Request\Docs To TCIWorking DocstInfo Memo Grant Accept 06- 21- 13.docx 17 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 PROJECT: Tukwila MIC Smart Street Non - Motorized Project Project No. 91310406 DESCRIPTION: Design and construct bicycle lanes /facilities on the corridor of East Marginal Way S (Tuk Intl Blvd to Boeing Access Rd) and Airport Way (BAR to NCL). Manufacturing /Industrial Center (MIC). JUSTIFICATION: Non - motorized improvements are desired throughout the City to reduce traffic congestion and offer alternative modes of travel. STATUS: New project for the 2014 - 2019 CIP. MAINT. IMPACT: Minimal impact, additional pavement markings and minor asphalt widening to maintain. COMMENT: A federal CMAQ grant has been awarded for $104,838 in design funds and $482,047 for construction. FINANCIAL Through Estimated (in $000's) 2012 2013 2014 2015 2016 2017 2018 2019 BEYOND TOTAL EXPENSES Design 58 64 122 Land (RJW) 0 Const. Mgmt. 58 58 Construction 500 500 TOTAL EXPENSES 0 58 622 0 0 0 0 0 0 680 FUND SOURCES Awarded Grant 50 537 587 Proposed Grant 0 Mitigation Actual 0 Traffic Impact Fees 0 City Oper. Revenue 0 8 85 0 0 0 0 0 0 93 TOTAL SOURCES 0 58 622 0 0 0 0 0 0 680 2014 - 2019 Capital Improvement Program 26 18 1C1 October 30th 2013 The Honorable Jim Haggerton, Mayor City of Tukwila 6200 Southcenter Blvd Tukwila, WA 98188 Dear Mayor Haggerton: On behalf of the Puget Sound Regional Council, congratulations on the selection of the Tukwila Manufacturing Industrial Center "Smart Street" Non Motorized Project to receive $482,047 in federal transportation funding. This project was on a prioritized contingency list of projects that are eligible to receive additional funding that becomes available before the next selection process. Funding recently became available through PSRC's project tracking program, and your project was next on the list to receive these funds. PSRC's project selection process is rigorous and helps identify the highest priority projects that will improve local and regional mobility and help achieve our long -range regional transportation plan, Transportation 2040. Final approval by the Governor and federal funding agencies is expected in early 2014. Thank you for your leadership and for the excellent work by your staff to help the region achieve a better transportation system that gets people and goods where they need to go, provides transportation choices, and helps support a strong economy in the region. We look forward to continuing to partner with you in the future. Warm regards, Bob Drewel Executive Director Puget Sound Regional Council CC: Bob Giberson, Public Works Director Robin Tischmak, City Engineer 19 Project Location S Rainier Golf & Country Club High line specialty Center Foster Golf Course City of Tu <wila TUKWILA MIC CENTER SMART STREET NON-MOTORIZED PROJECT June 17, 2013 Vicinity Map 20 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director DATE: June 6, 2014 SUBJECT: King County Metro Transit Updates ISSUE Discuss status of King County Metro (KCM) Transit leased Park - and -Ride Lot on Interurban Ave S and proposed transit service cuts. BACKGROUND KCM owns the large Park - and -Ride Lot on Interurban Ave S. For the last twenty years, KCM has also leased the small vacant parcel at the southwest corner of 52nd Ave S as an auxiliary parking lot to the adjacent large Park - and -Ride Lot. The lease for the small parking lot was terminated effective January 31, 2014 and 41 parking spaces were lost. The City has received a small amount of complaints regarding the closure of the small lot and current usage of the large lot. In an April 24th press release, KCM announced transit service cuts of 16 percent as a result of the failure of Proposition 1 at the ballot. The KCM website shows 72 bus routes slated for deletion and 84 routes for reduced or revised hours. The attached May 27th email regarding Community Mobility Contracts from Victor Obeso, KCM Service Development Manager, includes a list of 5 unchanged routes, 4 deleted routes and 4 revised routes. Under this proposed service restoration framework, KCM is willing to consider service hour restoration if local jurisdictions partner to purchase transit service hours. KCM is currently developing the service restoration cost model. Once the costs are known, they will be brought back to committee for discussion. ANALYSIS KCM is still looking for a suitable replacement auxiliary Park - and -Ride Lot. In the meantime, KCM is patrolling the lot to make sure vehicle usage is not in violation of the KCM usage guidelines. Complaints have included oversize and overweight vehicles taking up multiple spots and use by carpools. KCM does not have a program to issue or track parking stickers to ensure locals have first rights to a Park - and -Ride lot. RECOMMENDATION For information only. Attachments: May 27th E -mail to Victor Obeso Service Reduction Worksheet w:1pw englotherlbob gibersonlcorrespondencelinfo memo kcm updates june 2014.docx 21 From: Obeso, Victor [mailto:Victor.Obeso @kingcounty.gov] Sent: Tuesday, May 27, 2014 5:48 PM To: Bob Giberson Cc: Carlson, Diane; Desmond, Kevin; Lorenzana, Candida Subject: FW: Community Mobility Contract - Tukwila Dear Mr. Giberson: King County Metro is currently putting together a framework for the Community Mobility Contracts, King County Executive Dow Constantine's recent proposal to enable local jurisdictions to purchase transit service. The Community Mobility Contracts program is based on three principles: • Contracts must reflect the full cost of providing service. • Contracts cannot come at the expense of other cities or the regional allocation of service. • The program is intended as a bridge to keep buses on the street until the state legislature provides a sustainable funding tool for local transportation needs. Through Community Mobility Contracts, one or more jurisdictions can purchase transit service that operates within or through their respective areas to avoid proposed service reductions or to respond to other service needs. Metro staff is beginning to outline the process for service requests including contract development, approval, implementation, performance evaluation and termination. More information will be available later this month. Attached please find a resource sheet that details the service reduction proposal for your jurisdiction. This may be helpful in beginning to think about potential investments that may be included in the Community Mobility Contracts program. In addition, Metro is also beginning to evaluate the costs for contracting service. The cost to restore transit service on any particular route depends on several factors and each contract will be evaluated individually. Metro is developing a cost model that considers the following factors: • Hours of service (number of operating hours and whether service is peak -only or all -day) • Miles traveled • Vehicle type (Metro operates primarily 40 -and 60 -foot long diesel hybrid and electric trolley buses) • Bus fleet use or financing costs Metro is designing this model to be transparent and provide clarity in costs associated with purchasing transit service directly. We will provide more information on the process and cost model for Community Mobility Contracts as it is developed. Thank you again for your interest in this new program and we look forward to future discussions on potential transit service investments with your jurisdiction. If you have further questions or comments, please contact Candida Lorenzana, Transportation Planner, at 206 - 477 -5862 or via email at candida .lorenzana(a�kingcounty.gov. Sincerely, Victor Obeso Manager, Service Development Metro Transit Division cc: Kevin Desmond, General Manager, Metro Transit Division, Department of Transportation (DOT), Diane Carlson, Director of Regional Initiatives, Office of the King County Executive, Candida Lorenzana, Transportation Planner, Strategic Planning and Analysis, Service Development, Metro Transit Division, DOT 22 Tukwila Swing W. Wreskola_ Routes.. DO DOH serve Top 25 *Spring 2019 Thresholds- Routes matserve Sea u^/ Top 25 Peak Off WRIR 241 ] 4 245 ] 9 188 6 Pak 0 Pe 46 7 24 ht 43 1fi6 513 154 349 108 An /light hatled field isa ri kfactor Peak Off ueak Night Curd °' Target Servise Family Peak Gretna Co rdor St ms Red coon P Ority Spring 2013 Annual Hours Spring 2013 Annual Rtles Route 2014 Brute Bescriot on Rides' Pass./ PlatHr Flat% Hikes/ PassIvId PlatHr Plat. PlatHr Plat% Time Rltlership Off Peak Peak Night Off Peak Feak Nioht Peak O1 Peak tight Total Peek Off Peak Night Total Reduction P-opocal Summary R n enon Phase Change In Hours Peak Off Peak Night Total Summary of Changes Proposed Freque wa. Span PI °pose, end Tu..- Georgetown - Seattle COP 35 3 12 5 37 7 23 9 Very Frequent B elow Below P erused SOkthcenter- Westwo0] Village- Atlmia) Dis[hct 33 8 109 354 120 Very Frequent Below Below 14,487 46 ,321 4894]8 713,706 200,701 1,403,885 Revised Sep-I5 4,636 4,632 Extend service to Allai In West Seattle. Revise'ouorg to use 12th Avenue SW, SW Genesee Street SW Alaka Street. Caummia Avenue SW a. SW Atlmia Street he.een South Seattle Community Ccuegeand Alla perate scrvice more often int p k p 20 30 30 30 30 3efore 1200 AM 140 Bu len TC- Renton TC 299 99 339 28 8 83 Very Frequent Below At Below 1]930 fit] 35,729 416,822 571,723 133,344 1,121 889 Unchanged WP i 014 H owe p e y eF the 30 30 30 3efore 10.00 PM 40 0 20 4 39 8 Very Frequent B elow At 27 818 I 107 882 284 351 Unchanged NrA Urchanged 154 Tukwila StaOOn- Eoeino Intlufial 184 53 Peak Peat Yes Peak Peak Peak 2,259 2.59 41,565 41,565 Deleted Sep-I5 -2 25C -2,259 Delete Sokmcenter- Searac Aimoh- HIghlme CC 4s 155 100 Frequent Below At Below 8,567 9,419 21,583 129,795 145,965 37,578 313,338 P erused µt5 -3,014 -3,014 Operate service lea peen during the midday E. service earlier. 30 60 60 60 60 Befo'e ]. CO PM 10 7 Peak Feieal Way TC- Fetleal Center South 59 Peak Peat Yes 'e1 Peak Peak Peak 101 774 101 774 Peleted RAW Pelete Peak Peak Peak 1,483 1,483 17,850 17,850 Deleted Sep-I4 -1 48: -1,483 Delete Seattle OPP - Bellevue- Renton 10 0 Wyl Deleted Delete 193.* Feieal way- Firs HuI 24 2 Peak Peat Yes Yet Peak Peak Peak fi 992 fi E92 1]2890 1]2,890 P erused Feb-I5 north part of tlownmwr Seattle o O▪ r ert0 provide amioonal sew apaRty 201E0 Seattle CBD -Group Health (Tukwila) 34 Peak Peat Yes Yet Peak Peak Peak 1,280 1380 11,209 11,609 Unchanged WP Urchanged tine Feieal Way- Tukwila 491 135 54 2 17 39 4 32 Very Frequent At Below 21 274 ",5434 15 699 62 407 1 845 500 1 379 439 617 93] 3 042 8]5 Unchanged WP Urchanged 15 -39 Befo'e 3'. CO AM 06OAR Fa mood - Seuthcenter 184 58 193 101 Local Below Below 9]9 3,580 fi 559 54,825 69,024 123,849 Unchanged WP Urchanged 60 60 60 Befo'e 8'. CO PM 24 Transportation Committee Goals /Work Item Ideas: Transportation 2nd and 4th Monday -5:15 p.m. Allan Ekberg, Chair Dennis Robertson Kate Kruller Priority Item 2013/2014 Priority Area Comment Status Due April Apprentice procedure / process Per resolution COMPLETE 3/17/14 - Council approved apprenticeship guidelines Review and prioritization of residential affected street projects (Consider East /West corridors — 152nd, 130th — prioritization of what's next along with funding discussion on residential streets that don't get grants or awards causing delay.) "Updated Plans and Policies Aligned with the Community Vision" 42 Phase III design 2014 / construction 2015 (CIP) 53rd design 2015/16; construction 2016/17 (CIP) 2/24/14 - Committee reviewed the existing residential street rating matrix (c. 1990s). Chair Ekberg asked for information on existing tools that may exist to accomplish this. Better /Safer Crosswalks on TIB "An Improved Environment for Community Livability" ADA Improvements 2014 (CIP) 2/10/14 - Along with ADA improvements in the CIP, staff reported that Tukwila Village developers are also part of the dialogue regarding safer crosswalks on Tukwila International Boulevard, and frontage improvements factor into negotiations 144th and 42nd - Foster HS corner Stop Light (prioritization of this citizens request) "An Improved Environment for Community Livability" S 144th St Phase II (42 Ave S —TIB); design update 2014; construct 2015 (CIP) 4/28/14: Staff reported at Committee that consultant selection is currently in progress to begin the design work, with construction expected in 2015. Replacement of amber lights to white lights (led replacement) on International BLVD. "Crime Reduction on TIB" What will it take? 2/10/14 - Committee members asked for a 2015 budget initiative for LED replacement bulbs for the 125 pedestrian lights along Tukwila International Boulevard, estimated to cost $241,000. Traffic Cameras Policy (Use thereof) Discussion on their effectiveness, purpose; need... 2/10/14 - Staff agreed to return with a map of red -light related accident locations as well as a primer on photo enforcement legalities. Walking tour of transportation related facilities For general facility insights The Committee is interested in touring transportation related facilities, and staff will return with a list of ideas for discussion. 26 DRAFT June , 2014 Governor Jay Inslee Office of the Governor PO Box 40002 Olympia, WA 98504 -0002 Dear Governor Inslee: We are contacting you to express our deep concerns about oil train safety in our region. The South King County Area Transportation Board (SCATBd) is a collaborative effort of sixteen cities in South King County, King and Pierce counties, the ports of Seattle and Tacoma, the Muckleshoot Indian Tribe and transportation agencies committed to improving our region's transportation system. We have both BNSF & UP tracks running through many our South King County cities. When one takes into account both passenger rail, commuter rail and freight traffic uses this rail system, one can understand SCATBd's safety concerns about the possibility of increased oil train traffic operating through our region We provided comments about the State Rail Plan in the attached November 26, 2013 letter. As one of the most active freight areas in the nation, we have concerns about the impacts from increases in rail traffic. The letter outlined many of these concerns, but it was primarily focused on economic development and overall safety. We now urgently request that you direct attention to an immediate overhaul of the State's capability to respond to potential disasters, such as oil trains and other hazardous materials that are transported through our cities. Like most jurisdictions across the country, we took note of the July 6, 2013 oil train derailment in Lac- Megantic, Quebec. With 47 lives lost in that horrible accident, we compared what might happen in several of our cities if a similar accident took place in our region. According to BNSF presentations, there are one and one half trains of up to 170 tanker oil cars transiting our cities on a daily basis. We believe that a catastrophic train accident will result in a loss of life that could easily be in the many hundreds with residual health problems created for potentially thousands. With the May 7, 2014 USDOT Emergency Order requiring all railroads operating trains containing large amounts of Bakken crude oil to notify State Emergency Response Commissions (SERCs), increased volumes of oil produced, and the operation of these trains through the United States, we believe it is appropriate for you as Governor, to take action with the federal government before an incident occurs along our cities corridors. We suggest that you organize a Summit of all Emergency First Responders and Planners throughout the State to develop an active and sustainable emergency response plan to both help prevent, but also respond to such disasters. There are a limited number of local first responders able to take on a similar disaster without significant help. 27 We have recently met with BNSF representatives and are aware that they have their own emergency responders and do significant training of first responders around the State of Washington. They are certainly part of the important factor in any oil train accident response, however, we know that any response to an oil train accident will also require a coordinated response of state and local agencies. Such a response has to be carefully planned and practiced in advance. In conclusion, we believe a major effort directed and coordinated by your office on oil train accident response is needed or it will not get the attention and funding that is required for the safety of people and property along the railways in our region. We must do all we can to prevent a Lac- Megantic -scale disaster from happening here! Thank you for your consideration and action. Sincerely, Marcie Palmer, Chair Bill Peloza, Vice -Chair Councilmember, City of Renton Councilmember, City of Auburn South County Area Transportation Board Enclosure: State Rail Plan Comment Letter dated November 26, 2013 cc: SCATBd members Senator Mark Mullet Rep. Jay Rodne Rep. Chad Magendanz Senator Bob Hasegawa Rep. Zack Hudgins Rep. Steve Bergquist Senator Tracey Eide Rep. Linda Kochmar Rep. Roger Freeman Senator Pam Roach Rep. Cathy Dahlquist Rep. Christopher Hurst Senator Karen Keiser Rep. Tina Orwall Rep. Dave Upthegrove 28 Senator Sharon Nelson Rep. Eileen Cody Rep. Joe Fitzgibbon Senator Adam Kline Rep. Sharon Tomiko Santos Rep. Eric Pettigrew Senator Steve Litzow Rep. Tana Senn Rep. Judy Clibborn Senator Joe Fain Rep. Mark Hargrove Rep. Pat Sullivan King County Councilmembers KC Executive Pierce County Councilmembers PC Executive RAMP Members Seattle Port Tacoma Port MIT 29 November 26, 2013 Ron Pate, Rail Director PO Box 47407 310 Maple Park Avenue SE Olympia, WA 98504 -7407 Dear Mr. Pate, Thank you for the opportunity to comment on the Washington State Rail Plan, public review draft. The South County Area Transportation Board (SCATBd) is a collaborative effort of local elected officials who are committed to improving the region's transportation system. SCATBd represents an area that encompasses 16 south King County cities including 690,000 city and county residents, and is home to over 300,000 jobs. The south King County area also has one of the largest manufacturing and industrial areas in the Pacific Northwest, and our area's transportation system plays an important role in supporting the economic vitality of the region and state through the efficient movement of people and goods. The State's two Class 1 rail lines run through the south King County area. Local Transportation Funding Short -Falls The draft plan forecasts increasing demand for passenger and freight rail services in Washington State, and an increase in rail traffic will affect traffic delay and safety at at -grade crossings in our valley cities. Table D1 of the draft plan lists a number of partially funded and unfunded grade separation projects in the south King County area. However, because of mounting funding shortfalls, SCATBd jurisdictions are unable to fund these needed grade separation projects. SCATBd members recommend the draft plan highlight the local agency funding shortfalls for these grade separation projects and the impacts of not building these grade separation projects on the movement of people and freight. In order to continue and facilitate state -level revenue and funding discussions, we need to acknowledge our local funding shortfalls in our various local and state transportation planning documents such as the Washington State Rail Plan and the Washington State Freight Mobility Plan. At -Grade Crossings Transportation Impacts to Local Communities One of the themes that emerged from the draft Washington State Rail Plan stakeholders outreach efforts included community impacts of rail. Stakeholders identified the need to address traffic congestion and safety at at -grade crossings, and to evaluate opportunities for freight and passenger rail to contribute to local economic development. The draft rail plan section entitled "Challenges and Other Issues Facing Class 1 Rail Roads, Relationships Between Communities and Class I Railroads (page 46)" should be expanded to include a more in -depth analysis on the impacts of freight rail and passenger rail traffic at at -grade crossings. The analysis should include a focus on the impacts of freight and passenger rail operations on surface movement of people 30 and freight at at -grade crossings. The analysis should also include the economic and social impacts of travel delays experienced by travel of emergency vehicles, truck freight traffic, passenger vehicles and transit. Impacts of Potential Increase in Coal and Crude Oil Train Traffic SCATBd would also like to see an expanded discussion and analysis on the impacts of potential coal and crude oil train traffic on the capacity for existing and future freight and passenger rail traffic. Currently, several proposals are under consideration to enhance port capacity, including a bulk coal export facility at Cherry Point in Whatcom County. If the Cherry Point bulk export facility were to be developed, it could add up to 18 mile- and -a -half long trains per day. Oil refineries in our state have typically received crude oil shipments from Alaska and elsewhere by ship, barges or pipelines, but refiners are increasingly turning to trains to take advantage of a boom in oil from North Dakota's Bakken region. This potential increase in coal and crude oil trail traffic could result in significant impacts to both current and future freight and passenger train traffic in our state, including our region's Sounder Commuter Rail Service. This potential increase in coal and crude oil train traffic is a major concern for SCATBd members because of the possible impacts to south King County cities, our regional and statewide economy. Our region's economy relies on the rail corridor to move parts and finished products and an increase in coal and crude oil train traffic could impact existing and future rail- dependent economic development. This increase in coal and crude oil train traffic would also have significant impacts at at -grade crossings, impacting the flow of freight and goods flowing to and from our ports to the industrial and warehousing areas in the Green River Valley area. SCATBd supports the draft rail plan's vision that is guided by the six transportation system policy goals established by the state legislature which includes: economic vitality, preservation, safety, mobility, environment, and stewardship. SCATBd members are keenly aware of the economic importance of Washington's freight and passenger rail system and the key role it plays in the multimodal transportation system that keeps people, freight and goods moving in Washington State. Our local transportation systems also provide an important foundation for Washington's economy. It provides the vital connections that link our homes to our work places and carry products to market. Again, thank you for the opportunity to comment on the draft Washington State Rail Plan and if you have any questions, please do not hesitate to contact us. Sincerely, Pete Lewis Marcie Palmer Chair Vice Chair South County Area Transportation Board 31