Loading...
HomeMy WebLinkAboutTrans 2014-06-09 Item 2B - Bid Award - Miles Resources for 2014 Overlay and Repair Program�J�yJILA wqs .�z City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee 1, FROM: Bob Giberson, Public Works Director BY: David Sorensen, Project Manager DATE: June 6, 2014 SUBJECT: 2014 Overlay and Repair Program Project No. 91410401 Bid Award ISSUE Award the bid for construction of the 2014 Overlay and Repair Program. BACKGROUND This project is to preserve and maintain the street structure in a safe and useable condition. Project construction will include pavement repairs and an asphalt overlay of eight locations citywide. Work will also include new pavement markings. ANALYSIS A call for bids was advertised for the 2014 Overlay and Repair Program on May 14 and 21, 2014 and five bids were opened on May 28, 2014. The lowest apparent bidder was Miles Resources, LLC, with a bid of $1,069,794.00. The engineer's estimate was $1,195,130.00. One math error was found on the bid tabulations. Project design consultant KPG Inc. concurred award to apparent low bidder Miles Resources, LLC. Miles Resources is the current contractor for the Overlay and Repair — East Marginal Way S Project. BUDGET AND BID SUMMARY (All amounts include sales tax) Bid Results Estimate 2014 Budget Bid Schedule "A" Amount $ 891,722.00 $ 971,350.00 $1,225,000.00 Contingency (5 %) 44,586.10 Bid Schedule "B" Fort Dent 178,072.00 223,780.00 200,000.00 Contingency (5 %) 8,903.60 Funds to Thorndyke Elementary 0.00 0.00 ($300,000.00) Total $1,123,283.70 $1.195 130.00 $1.125.000.00 RECOMMENDATION Council is being asked to award the construction contract for the 2014 Overlay and Repair Program to Miles Resources, LLC in the amount of $1,069,794.00 and consider this item on the Consent Agenda at the June 16, 2014 Regular Meeting. Attachments: Vicinity Map 2014 CIP Page 15 & 38 Bid Tabulation Consultant Recommendation W:IPW EngIPROJECTSIA- RW & RS ProjectstAnnual Overlay & Repair Programs12014 Overlay & Repair Program (91410401)1Design\Ad and AwardlAward\Working Docs\Docs to TC Bid Award\Final Docs to TC\Info Memo Bid Award Miles- sb.doc 9 S 152ND ST FORT DENT P City of Tukwila 2014 Overlay Program EVANS BLAC 10 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 PROJECT: Annual Overlay and Repair Program Project No. 91310401 DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets. JUSTIFICATION: Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects. STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay. MAINT. IMPACT: Reduces annual maintenance. COMMENT: Ongoing project. Only one year actuals shown in first column. FINANCIAL Through Estimated in $000's 2012 2013 2014 2015 2016 2017 2018 2019 BEYOND TOT EXPENSES Design 194 100 100 125 125 150 150 175 175 1,294 Land (R/W) 0 Const. Mgmt. 165 175 175 175 200 200 225 225 1,540 Construction 969 1,225 1,250 1,260 1,300 1,320 1,325 1,325 9,974 TOTAL EXPENSES 1,328 100 1,500 1,550 1,560 1,650 1,670 1,725 1,725 12,808 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 1,328 100 1,500 1,550 1,560 1,650 1,670 1,725 1,725 12,808 TOTAL SOURCES 1,328 100 1,500 1,550 1,560 1,650 1,670 1,725 1,725 12,808 2014 - 2019 Capital Improvement Program 15 11 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 PROJECT: Fort Dent Park Project Nos. 90330107 04 -SW02 DESCRIPTION: Regional park of 52 acres requires ongoing capital and maintenance improvements. JUSTIFICATION: The City has assumed major park repairs and maintenance for the picnic area, parking lot, one soccer field, trail, pond and all major infrastructure. A new playground was installed in 2008 and restrooms were remodeled in 2010. Part of the parking STATUS: lot overlay was completed with parking tax dollars in 2011. Portion of remaining parking lot paving is schedule in 2014. Replacement of the small play structure is still needed. MAINT. IMPACT: Ongoing effort from all departments involved; Parks, Streets, Water, Sewer, and Surface Water. COMMENT: King County transferred the park to the City of Tukwila in 2003. Concessionaire agreement with Starfire Sports Complex. FINANCIAL Through Estimated in $000's 2012 2013 2014 2015 2016 2017 2018 2019 BEYOND TOTAL EXPENSES • Project Location iZS* 20 S 9 St Design 275 20 �.. 140 435 Land (RAN) s 150 s� e, s, ; _ 5f.•. 9 160 St s, 1 ( A � : 40- .. sa . -.�� GIS T � ( - / j fig,_ — P s,aea, 0 Const. Mgmt. 30 250 280 Construction 1,292 200 1,550 3,042 TOTAL EXPENSES 1,567 0 250 0 0 0 0 0 1,940 3,757 FUND SOURCES Awarded Grant 694 694 Parking Taxes 50 50 REET 1 (1st Qtr Percen) 140 140 Mitigation 0 City Oper. Revenue 823 0 250 0 0 0 0 0 1,800 2,873 TOTAL SOURCES 1,567 0 250 0 0 0 0 0 1,940 3,757 2014 - 2019 Capital Improvement Program 38 12 • Project Location iZS* 20 S 9 St t , 4/ w �.. rKZetiidbeZ- L s 150 s� e, s, ; _ 5f.•. 9 160 St s, 1 ( A � : 40- .. sa . -.�� GIS T � ( - / j fig,_ — P s,aea, 2014 - 2019 Capital Improvement Program 38 12 KPG �I Ad I .1 \. 0 \1\ CITY OF TUKWILA May 28, 2014 Corrected math error Watson Asphalt Unit Cost Total Cost 15, 000.0011 10,000.00 1 500.00 0 0 . 0 0 0 ,- 128, 400.0011 0 0 . o o Ou) . r T- 0 0 . o 0 . (D 16,800.0011 3,500.0011 8,000.0011 13,050.0011 2,850.0011 0 0 . ti T CD . N co 0 0 . v CD I� . V N 4 N 234,036.0011 17,820.00 0 0 u- O 0 . M 2,450.0011 32,164.00 0 O 0 0 OM . N 0 0 0 0 . (O 2,250.0011 0 0 0 0 OCD . aO 0 0 0 0 . r 10, 000.0011 0 0 0 0 CD 0 0 0 CD CC�N . V 0 0 0 N . N 0 0 0 0 O . u7 5,400.0011 II00'00L 5,200.00 i0S CO EA y,1 UU.UU 5,400.0011 5,400.0011 O 0 0 0 0 . N 2,000.0011 22,500 0011 0 0 0 0 u)6)r . F� 0 0 O u1 . M T- 0 0 N N r $ 450.001 4,950.0011 O 00 . O O O L6 T- U3 O O O O O ,- 64 1$ 500.00 0 000 O O 0 r r U3 0 c5 0 00 N 69, 0 c5 u) 69 I $ 50.00 0 0 O V EA 1 $ 3,500.00 0 0001'-(.0 Ou)u) N EA 0 r 69 0 r EA 0 6) EA 0 M 6) 69. $ 118.80 $ 118.80 0 0) r EA 0 0000 )(O CM 69 0 EA 0 0 0 O N 64 1 $ 350.00 $ 450.00 1 $ 8,000.00 0 0000000 O u EA 0 O N EA 0 N EA 0 6 o 64 - 0 O r EA 0 u) CO EA 0 0 i• N 64 1 $ 350.00 0 0 O 0 N u) 64 0 0 00 O 0 CO r 64 1 $ 1,800.00 0 0 O 0 O N 69- 1 $ 2,000.00 0 0 O u7 N EA $ 2,500.00 � I$ 450.00 0 0 u CO EA Road Construction NW Unit Cost Total Cost 15,000.00 10,000.00 1,000.00 95,000.00 87,500.00 3,960.00 2,860.00 2,940.00 15,000.001 0 0 o 0 0 O N 21,750.00 10,450.00 95,950.00 266,730.001 0 0 o 0) cr) O 0 N 15,300.001 00 0 0 O N Ni'- r r-- O r 35,475.001 0 0 0 0 ti r 4,250.001 8,000.00 2,400.00 15,000.00 100006 5,415.001 100011 000 0 0 0 N 0 0 N 0 0 r O co_ (D (O r 5,000.00 Co00 (O 64 b,8bu.UU 3,600.00 3,600.00 1,200.00 1,200.00 9,900.00 3,600.00 24,800.00 1,600.00 $ 850.001 9,350.00 00'L 00.ZZ $ 00'91 $ 00'00$'L9 $ 00'000'96 $ 00'000'6 $ 00'000'01 $ 00'000'96 $ $ 15,000.00 1 $ 50.00 0 0 0 000 u) 0)u) ("1 1.6 0) U3 69, 64 1 $ 102.00 1 $ 102.00 1 $ 102.00 0 0 000 CV r r EA 64 09L $1 0 0 O 0 0 N 64 1 $ 650.00 $ 850.00 0 0 0 000 O u)O 0 l'.. CO 0 N 69- 69, U3 0 0 O CO U3 0 LO 6) EA 0 ) M EA $ 38.25 $ 3,000.00 $ 650.00 $ 5,000.00 0 0 0 0 0 00000 6) O O O O 70000 N N N N rrrr 64 64 69, 64 0 0 0 0 0000 O O O O r00u) r N o 0 T- 64 69, U3 64 Lakeside Industries Unit Cost Total Cost 15,000.00 10,000.00 2,000.00 130, 000.00 125, 000.00 4,400.00 6,500.00 8,400.00 16,000.00 20,000.00 8,700.00 1,900.00 71,205.00 201,355.00 00.00L 00' 00 6'9 00.002'£6 00' 09£'£L 6 40,205.00 2,000.00 O 0 O 0 7 u9 2,000.00 8,000.00 2,400.00 12,000.00 0 0 O Cr) CD 3,562.50 3,300.00 5,280.00 4,000.00 600.00 4,500.00 EA 00'000'6 00'00 6' 6 00' 00£'£ 00' 00£'£ nn•nt7i'c 6,300.00 3,600.00 12,400.00 480.00 $ 400.001 4,400.00 0 0 0 0 O O 0 O O 0 O O 0 0000000000000') . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 07 N 0 u) r r I� 0 0 0 0 0 0 0)ONOU) (O T r CO N r EA EA EA U3 U) EA EA EA EA EA EA EA EA 00'LL $ 0 0 0 0 0000 CO CO a7 CO r EA EA EA EA 0 0 U)0 M 0 0 0 N EA EA $ 300.00 $ 400.00 $ 8,000.00 $ 75.00 $ 24.00 $ 23.00 u) 0 N0 (O T u-i r EA EA 0 0 0 000 CO 0 0 CO 0 0 O CO N EA EA EA $ 4,500.00 4 "I.UU $ 1,100.00 $ 1,100.00 $ 1,100.00 $ 1,000.00 $ 70.00 $ 1,200.00 $ 400.00 $ 15.00 ICON Materials Unit Cost Total Cost 15,000.00 10,000.00 800.00 85,000.00 40,000.00 1,980.00 3,380.00 3,360.00 2,500.00 20,000.00 26,100.00 6,650.00 60,600.00 219,660.00 173,360.00 15,600.00 8,100.00 700.00 37,840.00 2,000.00 8,100.00 2,750.00 8,000.00 2,400.00 17,500.00 0 0 O u) O r 5,130.00 2,640.00 7,200.00 6,800.00 900.00 0 0 0 0 ,n u) 11 Juu.uu 4,500.00 4,500.00 1,750.00 1,550.00 7,740.00 5,250.00 17,050.00 1,920.00 $ 550.001 6,050.00 00'179 $ 0009 $ 00'9£ $ 00'0£ $ 0005 $ 00'009'2 $ 00'9 $ 00.92 $ 00'6 $ 00'000'017 $ 00'000'99 $ 00'009 $ 00'000'06 $ 00'000'91 $ $ 88.00 $ 104.00 $ 2.00 $ 10.00 0 0 O 0 Cb o 0 0 N EA 64 $ 450.00 $ 550.00 $ 8,000.00 $ 75.00 $ 35.00 0 0 u) CO 64 0 0 0 0 6) (-4 r EA U3 $ 45.00 $ 3,400.00 $ 450.00 0 O 0 0 u) u) U3 !U.uu $ 1,500.00 $ 1,500.00 $ 1,750.00 $ 1,550.00 $ 86.00 $ 1,750.00 $ 550.00 $ 60.00 Miles Resources, LLC Unit Cost Total Cost 15, 000.00 10, 000.00 500.00 89,000.00 60,000.00 2,420.00 4,225.00 3,486.00 500.00 8,000.00 17, 400.00 4,750.00 80,800.00 214, 430.00 197,000.00 12, 300.00 4,050.00 1,050.00 35,475.00 2,000.00 5,400.00 2,000.00 8,000.00 2,240.00 9,625.00 543.001 3,990.00 3,201.00 5,152.00 3,930.00 600.00 0 0 0 0 T u7 CD 64 5, 250.00 5, 250.00 1,935.00 1,935.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Cd 0 077 6) (.6 N r $ 400.001 4,400.00[ $ 15,000.00 $ 10,000.00 $ 500.00 $ 89,000.00 $ 60,000.00 $ 11.00 $ 32.50 $ 8.30 $ 500.00 $ 20.00 $ 20.00 $ 25.00 $ 80.00 $ 82.00 $ 100.00 $ 82.00 $ 1.00 $ 15.00 92.61 $ 00'0L $ 00'000'9 $ 00'0017 $ 00'00£ $ 00'000'Z $ 09'L $ O r T 05 r 64 99'176 $ 00'L $ 0 0 0 NOD O D Nu1O CO (O 0 6)M r U3 64 64 O 0 0 0 0) 64 bL.UU $ 1,750.00 $ 1,750.00 $ 1,935.00 $ 1,935.00 $ 100.00 $ 2,000.00 $ 400.00 $ 15.00 Engineer's Estimate Unit Cost Total Cost 15,000.00 10,000.00 800.00 75,000.00 125,000.00 8,800.00 3,250.00 4,200.00 4,000.00 20,000.00 21,750.00 5,700.00 55,550.00 222,275.00 187,150.00 15,000.00 12,150.00 350.00 00 OOS'L6 00'00t'2 00'000'9 00.005'£ 00'00Z'L 00,000,2 00.099'£2 0 0 O u) O r 0 0 0 0 O O 0 0 t• co u) CO 5,600.00 4,000.00" 800.00 5,500.00 CD EA 4,500.00 4,500.00 1,500.00 1,500.00 00'009' 6 00'0g6'£1, 00.009'17 0•00£'9 $ 650.00I 7,150.00 0 0 0 0 in u) EA $ 70.00 $ 1,500.00 $ 450.00 $ 50.00 00'59 $ 00'99 $ 00'0£ $ 00,6Z $ 00.05 $ 00'000'17 $ 00'06 $ 00.92 $ 00'017 $ 00'000'52 6 $ 00'000'9L $ 00'009 $ 00000'01 $ 00.000'96 $ $ 95.00 $ 100.00 $ 3.00 $ 5.00 $ 5.00 $ 2,000.00 $ 400.00 $ 700.00 $ 8,000.00 $ 75.00 $ 35.00 0 0 u co EA 0 0 0 0 O . u r r EA EA $ 35.00 $ 2,000.00 $ 400.00 0 0 0 0 0 0 0 0 0 0 u) 0 0 0 0 7 0 0 0 0 u) u) u) u) r r r r EA EA 69 69 No. Spec Item Quantity Unit FA FA LS LS LS SY SY LF LS CY TON TON CY TON TON TON LF LF SY FA EA EA FA EA LF LF LF LF LF EA EA 0) -i () >-<<Q<'C W W WW LF EA EA EA < W r 1 1 1 1 1 220 130 420 1 400 870 190 1,010 2,615 1,970 150 4,050 70 4,730 1 18 5 1 32 500 ��N CV COD NN r r 14U 3 3 , 1 1 90 3 31 32 ROADWAY (SCHEDULE A) Minor Change Resolution of Utility Conflicts SPCC Plan Mobilization Project Temporary Traffic Control Asphalt Pavement Removal Incl. Haul Cement Conc. Sidewalk Removal Incl. Haul Cement Conc. Curb Removal Incl. Haul Removal of Structure and Obstruction Unsuitable Foundation Excavation Incl. Haul Gravel Borrow Incl. Haul Crushed Surfacing Top Course Pavement Repair Excavation Incl. Haul HMA Cl. 1/2" PG 64 -22 HMA for Pavement Repair Cl. 1/2" PG 64 -22 HMA for Prelevel Cl. 1/2" PG 64 -22 Thickened Edge Drainage Channel Planing Bituminous Pavement Joint /Crack Sealing Adjust Water Valve Adjust Water Manhole Erosion/Water Pollution Control Inlet Protection Cement Conc. Traffic Curb and Gutter Cement Conc. Traffic Curb Extruded Curb Removing Guardrail Beam Guardrail Type 1 Beam Guardrail Non - Flared Terminal Type TL2 Adjust Monument Case and Cover TRAFFIC SIGNALS (SCHEDULE A) Traffic Signal Vehicle Detection Loops Modifications at the intersection of Tukwila International Blvd. & S 112th Street DEWALK (SCHEDULE A) Cement Conc. Sidewalk Cement Conc. Curb Ramp Type Parallel A Cement Conc. Curb Ramp Type Parallel B Cement Conc. Curb Ramp Type Single Direction A Modified Cement Conc. Curb Ramp Type Perpendicular A II STORM SEWER (SCHEDULE A) I Ductile Iron Storm Sewer Pipe, 12 in. Dam Catch Basin Type 1 Adjust Catch Basin Storm Drain Marker II SANITARY SEWER (SCHEDULE A) I II A42 1 7 -05 'Adjust Manhole 71`-. 1• 0)O N N CO M 777.1' 7777.1'NN r r 777r O O O O r O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r r O 0 0 0 0 r r r r r r N N N N N N 466666 uS 6 ui 1� 1-.1. 05 CA 00 00 CA Cb T rM 05 05 c5 0 N op 7777 u) 05 00 Cb CAO 709 u) u) 0 0 0 0 NI. I.titi N M 7 u1 O ti N Cr) 0 r N CO 7 u) CO 1- CO Cr) 0 r N M V u) CO i,- 00 <<<<<<<<< Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q 6) 0 r Q Q CO N < — 0)0)(01'- N<<< Q Q C001 0 r Q Q<< 13 r 1 ■ I:14 7 May 28, 2014 Corrected math error Watson Asphalt Unit Cost Total Cost 3,454.00 1,350.001 500.00 500.00 1,400.001 1,550.001 1,440.0011 1,400.001 10,000.001 0 O 00 O ' N 0 0 O CO 19,450.001 O O 0 O LC) N 1,131,600.00 3,000.0011 250.001 0 O 0 O CO cr 21,300.001 0 0000 0000 O O 6) 0 O O r 0 6 N I- 0 O N O 3,000.001 2,380.001 O O 6 N- N 6) 45,327.001 127,464.001 0 O 000 O LO N 0 O O CO 0 0 0 CO r 1,440.001 O O 0 O CO N- O O Cn CO ER 1 $ 450.00 1 2,700.0011 500.001 468.00 1,760.0011 $ 3,000.00 1 3,000.001 279,817.00 $ 314.00 $ 450.00 $ 500.00 o O O N ER O 0 O r ER $ 7.75 $ 2.00 O 0 O N ER $ 10,000.00 O 0 O CO ER O 0 O r ER $ 2.50 O 0 O L0 ER O 0 O 0 M ER $ 250.00 O 0 O 0 d' ER $ 21,300.00 0 0 O LC) ER $ 50.00 $ 25.00 O O O N O ER 0009 $ 23.80 $ 23.80 0 r Ni L() 0 $ 135.60 0 O O 0 N ER 0 O O LO ER 0 O O N fR 0 O N ER $ 500.00 $ 234.00 $ 4.00 Road Construction NW Unit Cost Total Cost 2,750.00 1,350.00 00.00 i. 330.00 O 0 O _ O) O 0 O 0 0 r 1,620.00 O O O 00 N 10,000.00 1,440.00 240.00 23,340.00 850.00 1,090,525.00 3,000.00 200.00 31,000.00 15, 500.00 3,240.00 440.00 0 0 O CO 0 N 0 0 O 0 L0 N 0 0 O 0 LO N 2,400.00 28,350.00 42,630.00 0 0 0 0 O O CO 0 d' L0 CO N 00 450.00 2,400.00 1,800.00 O O O CO M c- o 0 CO CO ER $ 750.00 1 4,500.001 1,000.00 330.00 0 0 O 0) 6) $ 3,000.00 1 3,000.00 O 0 p O CO cc; M N 0 O O LO N ER $ 450.00 00.00 v $ 0 O u) Ln ,_ r ER 0 N (fl ER 0 O Ln ER $ 2.25 0 o '� ER $ 10,000.00 $ 48.00 0 0 0 0 0 0 MMr r ER ER ER 0 0 0 0 0 0 000 O N O M co ER ER ER $ 15,500.00 0 0 Eb r ER $ 22.00 00'L $ 0 0 0 0 N ER 0 0 O LC) ER 0 0 04 N ER $ 35.00 0 0 6) ER 0 0 0 0 . 0)0 0) 0 N ER 69 0 0 N- ER 0 0 0 0 . OO M r ER ER 0 0 0 0 000 00 CO r ER ER $ 2.25 Lakeside Industries Unit Cost Total Cost 0 0 I- O r 0 0 0 0 0 0 0 0 0 0 0 d' 0000000 r 0 0 0) 0 CO r O r C-- CO r r r r 0 0 O 0 N- 10,000.00 1,500.00 2,000.00 15, 560.00 5,000.00 O 0) nj O 0) 3,000.00 500.00 20,000.00 10,000.00 3,600.00 1,000.00 5,800.00 5,000.00 2,500.00 1,000.00 8,100.00 25,230.00 72,380.00 2,500.00 450.00 0 0 0 0 010 O N O r r O O O CO , O O W L!') ER $ 400.00 1 2,400.001 500.00 100.00 250.80] $ 3,000.00 1 3,000.00 0 CO uj CA N $ 147.00 $ 370.00 $ 1,000.00 $ 50.00 $ 5.70 $ 3.00 $ 1.57 O O O r ER $ 10,000.00 $ 50.00 $ 25.00 $ 2.00 $ 100.00 $ 3,000.00 $ 500.00 $ 20,000.00 00.000'0L, $ O O O 000 O O O N LO N ER ER ER $ 5,000.00 $ 50.00 $ 10.00 $ 10.00 $ 29.00 00'SL $ 00.009`Z $ 00LL $ $ 25.00 $ 6.25 0 0 O O O O 10 L!i ER ER 1$ 0.57 ICON Materials Unit Cost Total Cost 0 0 O ) W M 1,650.00 2,000.00 600.00 1,680.00 1,800.00 1,800.00 210.00 10,000.00 1,800.00 480.00 15,560.00 4,250.00 0 0 p cr, M cii O CO 3,000.00 800.00 24,000.00 10,000.00 1,980.00 600.00 2,320.00 5,000.00 3,000.00 3,500.00 32,400.00 47,850.00 90,240.00 2,500.00 450.00 2,800.00 1,620.00 $ 82.00 1 1,640.00 $ 550.00 3,300.00 750.00 600.00 0 0 O O N N $ 3,000.00 1 3,000.00 0 0 n in N Vi Cr N $ 350.00 $ 550.00 $ 2,000.00 $ 300.00 $ 12.00 $ 9.00 $ 2.50 $ 3.00 $ 10,000.00 $ 60.00 $ 6.00 $ 2.00 $ 85.00 3,000.00 800.00 24,000.00 10,000.00 11.00 30.00 8.00 5,000.00 60.00 35.00 40.00 55.00 96.00 2,500.00 75.00 00.6 00.9£ $ 750.00 $ 300.00 $ 5.00 ER ER �17764 07 Miles Resources, LLC Unit Cost Total Cost 1,650.001 1,200.00 300.00 100.00 840.00 600.00 1,440.00 1,400.00 10,000.00 1,200.00 1,000.00 1,945.00 2,550.00 891,722.00 3,000.00 250.00 17,500.00 4,500.00 2,700.00 650.00 2,407.00 300.00 1,000.00 1,000.00 24,300.00 27,840.00 79,900.00 2,500.00 420.00 1,540.00 1,260.00 O O O d' N r O O . N CO ER $ 400.00 1 2,400.0011 0 0 O O r0 O r 264.0011 $ 3,000.00 1 3,000.001 0 0 nj n O oi ti O O O LL) r ER 007 $ 00.£ $ 00'9 $ 00'05 $ 00'002 $ 00'0017 $ $ 20.00 $ 10,000.00 $ 40.00 $ 12.50 $ 0.25 $ 51.00 $ 3,000.00 $ 250.00 $ 17,500.00 00.0L $ 00.009`Z $ 0098 $ 007£ $ 00'02 $ 00 04 $ 00.02 $ 00002 $ 02.8 $ 097c $ 00'91 $ 00'009`17 $ LO 0 N O O) I� r ER 0 0 0 O O r 0 LIi 0 ER 09'0 $ Engineer's Estimate Unit Cost Total Cost 1,760.00 1,125.00 7,000.00 200.00 1,400.00 2,000.00 1,440.00 560.00 10,000.00 1,500.00 80.00 15, 560.00 750.00 TOTAL ESTIMATED CONSTRUCTION COST (SCHEDULE A) 971,350.00 0 0 0 O O O 0 0 0 0 0 0 O Ln O co r 10 r 8,000.00 7,200.00 500.00 2,900.00 3,000.00 2,500.00 2,500.00 24,300.00 47,850.00 89,300.00 2,500.00 450.00 2,800.00 1,800.00 O O O O d7 O O LE) ER 1 $ 450.00 1 2,700.00 O O O O 0 0 0 0 O N O O 0 co CO $ 3,000.00 1 3,000.00 TOTAL ESTIMATED CONSTRUCTION COST (SCHEDULE B) 223,780.00 O O O CO ER $ 375.00 $ 7,000.00 $ 100.00 $ 10.00 $ 10.00 $ 2.00 $ 8.00 $ 10,000.00 $ 50.00 $ 1.00 $ 2.00 $ 15.00 $ 3,000.00_ $ 1,500.00 $ 15,000.00 $ 8,000.00 $ 40.00 $ 25.00 $ 10.00 $ 3,000.00 $ 50.00 $ 25.00 $ 30.00 $ 55.00 $ 95.00 $ 2,500.00 $ 75.00 $ 35.00 $ 10.00 0 0 O O O O 0 O 0 r 0 ER 1$ 2.00 No. Spec Item Quantity Unit HUND HUND LS EA LF SF LF SY FA CY SY LF EA FA LS LS LS SY SY LF LS CY TON TON CY TON FA EA LF LF c) W O LS EA LF j W 3 1 2 140 200 720 70 1 30 80 7,780 50 r r r 1 180 20 290 1 50 100 810 870 940 1 6 80 180 r CV 1 440 TRAF. CNTRL. DEVICES (SCHEDULE A) Raised Pavement Marker Type 1 Raised Pavement Marker Type 2 Permanent Signing Plastic Traffic Arrow Plastic Stop Line Plastic Crosswalk Line Plastic Line, 4 Inch IDE DEV. (SCHEDULE A) Temporary Erosion Control Blanket Property Restoration Topsoil Type A Seeded Lawn Installation Edge Restoration PSIPE Cotoneaster salicifolius 'Repens'; 1 Gal. Cont, 36" o.c. ROADWAY (SCHEDULE B) Minor Change SPCC Plan Mobilization Project Temporary Traffic Control Asphalt Pavement Removal Incl. Haul Cement Conc. Sidewalk Removal Incl. Haul Cement Conc. Curb Removal Incl. Haul Removal of Structure and Obstruction Unsuitable Foundation Excavation Incl. Haul Gravel Borrow Incl. Haul Crushed Surfacing Top Course Pavement Repair Excavation Incl. Haul HMA for Pavement Repair Cl. 1/2" PG 64 -22 Erosion /Water Pollution Control Inlet Protection Cement Conc. Traffic Curb and Gutter Extruded Curb DEWALK (SCHEDULE B) 8 -14 (Cement Conc. Sidewalk STORM SEWER (SCHEDULE B) f B19 1 7 -05 'Adjust Catch Basin TRAF. CNTRL. DEVICES (SCHEDULE B) Permanent Signing Plastic Traffic Arrow Paint Line, 4 Inch ROADSIDE DEV. (SCHEDULE B) B23 1 8 -02 I Property Restoration 6) 6) r (‚10.10.10.1 O O N N N CV N 00000000000000 r N N N N N 999999 101010101010 d- N- 0) O O O r r r O N N N N CO CO d' d' d' r r 77 d' r 9999999999999 r N N N N N N •I' LO LO W CO CO CO r N N N 00 00 N N 00 CO d' LC) CO N- CO O) QQQQQQ Q 0 r N CO V LO QQQQQQ N CO CO CO CO 0 r N M d' L) CO d LO CO r` CO 63 _ _ CO CO CO CO CO CO m CO m m m CO m m — N CO CO 0 r CV N CO CO N CV CO 1,411,417.00 1,329,125.00 1,164,088.70 1,149,940.00 1,069,794.00 1,195,130.00 TOTAL BID (SCHEDULE A + B) 14 MFG 753 9`r' Avenue North Seattle, WA 98109 P: 206.286.1640 F: 206,286.1639 www.kpg.com January 22, 2014 Mr. David Sorensen Project Manager City of Tukwila, Department of Public Works 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 RE: East Marginal Way South (S 81st P1 to S Norfolk St) Project No. 91210406 Recommendation for Contract Award Dear David, As requested, KPG has tabulated the bids and reviewed the bid packages submitted for the East Marginal Way South (S 81St P1 to S Norfolk St) project. The lowest bidder in the amount of $1,738,991.50 is Miles Resources, LLC. References listed in the Completed Construction Project Reference List provided by Miles Resources, LLC in their bid package confirmed that recently completed contracts with the contractor on similar roadway overlay projects were successful. We checked the status of Miles Resources LLC on the Washington State Labor and Industries web page to confirm they are currently licensed. We also checked the online System for Award Management and Miles Resources LLC does not have any active exclusion records listed. It is KPG's recommendation that the East Marginal Way South (S 8151 P1 to S Norfolk St) project be awarded to Miles Resources LLC pending an independent review and recommendation by WSDOT. The bid tabulation is enclosed. Sincerely, KPG, Inc. josh Fedora, P.E. Enclosures: Bid Tabulation 15