HomeMy WebLinkAboutTrans 2014-06-09 Item 2B - Bid Award - Miles Resources for 2014 Overlay and Repair Program�J�yJILA wqs
.�z City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Transportation Committee 1,
FROM: Bob Giberson, Public Works Director
BY: David Sorensen, Project Manager
DATE: June 6, 2014
SUBJECT: 2014 Overlay and Repair Program
Project No. 91410401
Bid Award
ISSUE
Award the bid for construction of the 2014 Overlay and Repair Program.
BACKGROUND
This project is to preserve and maintain the street structure in a safe and useable condition. Project
construction will include pavement repairs and an asphalt overlay of eight locations citywide. Work
will also include new pavement markings.
ANALYSIS
A call for bids was advertised for the 2014 Overlay and Repair Program on May 14 and 21, 2014
and five bids were opened on May 28, 2014. The lowest apparent bidder was Miles Resources, LLC,
with a bid of $1,069,794.00. The engineer's estimate was $1,195,130.00. One math error was found
on the bid tabulations. Project design consultant KPG Inc. concurred award to apparent low bidder
Miles Resources, LLC. Miles Resources is the current contractor for the Overlay and Repair — East
Marginal Way S Project.
BUDGET AND BID SUMMARY (All amounts include sales tax)
Bid Results Estimate 2014 Budget
Bid Schedule "A" Amount $ 891,722.00 $ 971,350.00 $1,225,000.00
Contingency (5 %) 44,586.10
Bid Schedule "B" Fort Dent 178,072.00 223,780.00 200,000.00
Contingency (5 %) 8,903.60
Funds to Thorndyke Elementary 0.00 0.00 ($300,000.00)
Total $1,123,283.70 $1.195 130.00 $1.125.000.00
RECOMMENDATION
Council is being asked to award the construction contract for the 2014 Overlay and Repair Program
to Miles Resources, LLC in the amount of $1,069,794.00 and consider this item on the Consent
Agenda at the June 16, 2014 Regular Meeting.
Attachments: Vicinity Map
2014 CIP Page 15 & 38
Bid Tabulation
Consultant Recommendation
W:IPW EngIPROJECTSIA- RW & RS ProjectstAnnual Overlay & Repair Programs12014 Overlay & Repair Program (91410401)1Design\Ad and AwardlAward\Working Docs\Docs to TC Bid Award\Final Docs to
TC\Info Memo Bid Award Miles- sb.doc
9
S 152ND ST
FORT DENT P
City of Tukwila
2014 Overlay Program
EVANS BLAC
10
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2014 to 2019
PROJECT: Annual Overlay and Repair Program Project No. 91310401
DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets.
JUSTIFICATION: Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also
minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects.
STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay.
MAINT. IMPACT: Reduces annual maintenance.
COMMENT: Ongoing project. Only one year actuals shown in first column.
FINANCIAL Through Estimated
in $000's
2012 2013 2014
2015
2016
2017
2018
2019
BEYOND TOT
EXPENSES
Design
194
100
100
125
125
150
150
175
175
1,294
Land (R/W)
0
Const. Mgmt.
165
175
175
175
200
200
225
225
1,540
Construction
969
1,225
1,250
1,260
1,300
1,320
1,325
1,325
9,974
TOTAL EXPENSES
1,328
100
1,500
1,550
1,560
1,650
1,670
1,725
1,725
12,808
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
1,328
100
1,500
1,550
1,560
1,650
1,670
1,725
1,725
12,808
TOTAL SOURCES
1,328
100
1,500
1,550
1,560
1,650
1,670
1,725
1,725
12,808
2014 - 2019 Capital Improvement Program
15
11
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2014 to 2019
PROJECT: Fort Dent Park Project Nos. 90330107
04 -SW02
DESCRIPTION: Regional park of 52 acres requires ongoing capital and maintenance improvements.
JUSTIFICATION: The City has assumed major park repairs and maintenance for the picnic area, parking lot, one soccer
field, trail, pond and all major infrastructure.
A new playground was installed in 2008 and restrooms were remodeled in 2010. Part of the parking
STATUS: lot overlay was completed with parking tax dollars in 2011. Portion of remaining parking lot paving is
schedule in 2014. Replacement of the small play structure is still needed.
MAINT. IMPACT: Ongoing effort from all departments involved; Parks, Streets, Water, Sewer, and Surface Water.
COMMENT:
King County transferred the park to the City of Tukwila in 2003. Concessionaire agreement with Starfire
Sports Complex.
FINANCIAL Through Estimated
in $000's
2012 2013 2014
2015 2016 2017 2018 2019 BEYOND TOTAL
EXPENSES
• Project Location
iZS*
20 S
9 St
Design
275
20
�..
140
435
Land (RAN)
s 150 s�
e, s, ;
_ 5f.•.
9 160 St
s,
1
( A
� : 40-
.. sa .
-.�� GIS
T �
( -
/ j
fig,_
—
P s,aea,
0
Const. Mgmt.
30
250
280
Construction
1,292
200
1,550
3,042
TOTAL EXPENSES
1,567
0
250
0
0
0
0
0
1,940
3,757
FUND SOURCES
Awarded Grant
694
694
Parking Taxes
50
50
REET 1 (1st Qtr Percen)
140
140
Mitigation
0
City Oper. Revenue
823
0
250
0
0
0
0
0
1,800
2,873
TOTAL SOURCES
1,567
0
250
0
0
0
0
0
1,940
3,757
2014 - 2019 Capital Improvement Program
38
12
• Project Location
iZS*
20 S
9 St
t ,
4/
w
�..
rKZetiidbeZ- L
s 150 s�
e, s, ;
_ 5f.•.
9 160 St
s,
1
( A
� : 40-
.. sa .
-.�� GIS
T �
( -
/ j
fig,_
—
P s,aea,
2014 - 2019 Capital Improvement Program
38
12
KPG
�I
Ad I .1 \. 0 \1\
CITY OF TUKWILA
May 28, 2014
Corrected math error
Watson Asphalt
Unit Cost Total Cost
15, 000.0011
10,000.00
1 500.00
0
0 .
0
0
0
,-
128, 400.0011
0
0
.
o
o
Ou)
.
r
T-
0
0 .
o
0
.
(D
16,800.0011
3,500.0011
8,000.0011
13,050.0011
2,850.0011
0
0 .
ti
T
CD .
N
co
0
0
.
v
CD
I�
.
V
N 4
N
234,036.0011
17,820.00
0
0
u-
O
0
.
M
2,450.0011
32,164.00
0
O
0
0
OM
.
N
0
0
0
0
.
(O
2,250.0011
0
0
0
0
OCD
.
aO
0
0
0
0
.
r
10, 000.0011
0
0
0
0
CD
0
0
0
CD
CC�N
.
V
0
0
0
N .
N
0
0
0
0
O .
u7
5,400.0011
II00'00L
5,200.00
i0S
CO
EA
y,1 UU.UU
5,400.0011
5,400.0011
O
0
0
0
0 .
N
2,000.0011
22,500 0011
0
0
0
0
u)6)r
.
F�
0
0
O
u1
.
M
T-
0
0
N
N
r
$ 450.001 4,950.0011
O
00
.
O
O
O
L6
T-
U3
O
O
O
O
O
,-
64
1$ 500.00
0
000
O
O
0
r
r
U3
0
c5
0
00
N
69,
0
c5
u)
69
I $ 50.00
0
0
O
V
EA
1 $ 3,500.00
0
0001'-(.0
Ou)u)
N
EA
0
r
69
0
r
EA
0
6)
EA
0
M
6)
69.
$ 118.80
$ 118.80
0
0)
r
EA
0
0000
)(O
CM
69
0
EA
0
0
0
O
N
64
1 $ 350.00
$ 450.00
1 $ 8,000.00
0
0000000
O
u
EA
0
O
N
EA
0
N
EA
0
6 o
64 -
0
O
r
EA
0
u)
CO
EA
0
0
i•
N
64
1 $ 350.00
0
0
O
0
N
u)
64
0 0
00
O
0
CO
r
64
1 $ 1,800.00
0
0
O
0
O
N
69-
1 $ 2,000.00
0
0
O
u7
N
EA
$ 2,500.00 �
I$ 450.00
0
0
u
CO
EA
Road Construction NW
Unit Cost Total Cost
15,000.00
10,000.00
1,000.00
95,000.00
87,500.00
3,960.00
2,860.00
2,940.00
15,000.001
0
0
o
0
0
O
N
21,750.00
10,450.00
95,950.00
266,730.001
0
0
o
0)
cr)
O
0
N
15,300.001
00
0 0
O
N Ni'-
r r--
O
r
35,475.001
0
0
0
0
ti
r
4,250.001
8,000.00
2,400.00
15,000.00
100006
5,415.001
100011
000
0 0 0
N 0 0
N 0 0
r O co_
(D (O r
5,000.00
Co00
(O
64
b,8bu.UU
3,600.00
3,600.00
1,200.00
1,200.00
9,900.00
3,600.00
24,800.00
1,600.00
$ 850.001 9,350.00
00'L
00.ZZ $
00'91 $
00'00$'L9 $
00'000'96 $
00'000'6 $
00'000'01 $
00'000'96 $
$ 15,000.00
1 $ 50.00
0 0 0
000
u) 0)u)
("1 1.6 0)
U3 69, 64
1 $ 102.00
1 $ 102.00
1 $ 102.00
0 0
000
CV r
r
EA 64
09L $1
0
0
O
0
0
N
64
1 $ 650.00
$ 850.00
0 0 0
000
O u)O
0 l'.. CO
0
N
69- 69, U3
0
0
O
CO
U3
0
LO
6)
EA
0
)
M
EA
$ 38.25
$ 3,000.00
$ 650.00
$ 5,000.00
0 0 0 0 0
00000
6) O O O O
70000
N N N N
rrrr
64 64 69, 64
0 0 0 0
0000
O O O O
r00u)
r N o 0
T-
64 69, U3 64
Lakeside Industries
Unit Cost Total Cost
15,000.00
10,000.00
2,000.00
130, 000.00
125, 000.00
4,400.00
6,500.00
8,400.00
16,000.00
20,000.00
8,700.00
1,900.00
71,205.00
201,355.00
00.00L
00' 00 6'9
00.002'£6
00' 09£'£L 6
40,205.00
2,000.00
O
0
O
0
7
u9
2,000.00
8,000.00
2,400.00
12,000.00
0
0
O
Cr)
CD
3,562.50
3,300.00
5,280.00
4,000.00
600.00
4,500.00
EA
00'000'6
00'00 6' 6
00' 00£'£
00' 00£'£
nn•nt7i'c
6,300.00
3,600.00
12,400.00
480.00
$ 400.001 4,400.00
0 0 0 0 O O 0 O O 0 O O 0
0000000000000')
.
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 N 07 N 0 u) r r I�
0 0 0 0 0 0
0)ONOU) (O
T r CO N r
EA EA EA U3 U) EA EA EA EA EA EA EA EA
00'LL $
0 0 0 0
0000
CO
CO a7 CO r
EA EA EA EA
0 0
U)0
M 0
0
0
N
EA EA
$ 300.00
$ 400.00
$ 8,000.00
$ 75.00
$ 24.00
$ 23.00
u) 0
N0
(O T u-i
r
EA EA
0 0 0
000
CO 0 0
CO 0 0
O CO
N
EA EA EA
$ 4,500.00
4 "I.UU
$ 1,100.00
$ 1,100.00
$ 1,100.00
$ 1,000.00
$ 70.00
$ 1,200.00
$ 400.00
$ 15.00
ICON Materials
Unit Cost Total Cost
15,000.00
10,000.00
800.00
85,000.00
40,000.00
1,980.00
3,380.00
3,360.00
2,500.00
20,000.00
26,100.00
6,650.00
60,600.00
219,660.00
173,360.00
15,600.00
8,100.00
700.00
37,840.00
2,000.00
8,100.00
2,750.00
8,000.00
2,400.00
17,500.00
0
0
O
u)
O
r
5,130.00
2,640.00
7,200.00
6,800.00
900.00
0
0
0
0
,n
u)
11
Juu.uu
4,500.00
4,500.00
1,750.00
1,550.00
7,740.00
5,250.00
17,050.00
1,920.00
$ 550.001 6,050.00
00'179 $
0009 $
00'9£ $
00'0£ $
0005 $
00'009'2 $
00'9 $
00.92 $
00'6 $
00'000'017 $
00'000'99 $
00'009 $
00'000'06 $
00'000'91 $
$ 88.00
$ 104.00
$ 2.00
$ 10.00
0 0
O 0
Cb o
0
0
N
EA 64
$ 450.00
$ 550.00
$ 8,000.00
$ 75.00
$ 35.00
0
0
u)
CO
64
0 0
0 0
6) (-4
r
EA U3
$ 45.00
$ 3,400.00
$ 450.00
0
O
0
0
u)
u)
U3
!U.uu
$ 1,500.00
$ 1,500.00
$ 1,750.00
$ 1,550.00
$ 86.00
$ 1,750.00
$ 550.00
$ 60.00
Miles Resources, LLC
Unit Cost Total Cost
15, 000.00
10, 000.00
500.00
89,000.00
60,000.00
2,420.00
4,225.00
3,486.00
500.00
8,000.00
17, 400.00
4,750.00
80,800.00
214, 430.00
197,000.00
12, 300.00
4,050.00
1,050.00
35,475.00
2,000.00
5,400.00
2,000.00
8,000.00
2,240.00
9,625.00
543.001
3,990.00
3,201.00
5,152.00
3,930.00
600.00
0
0
0
0
T
u7
CD
64
5, 250.00
5, 250.00
1,935.00
1,935.00
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 Cd
0 077
6) (.6 N
r
$ 400.001 4,400.00[
$ 15,000.00
$ 10,000.00
$ 500.00
$ 89,000.00
$ 60,000.00
$ 11.00
$ 32.50
$ 8.30
$ 500.00
$ 20.00
$ 20.00
$ 25.00
$ 80.00
$ 82.00
$ 100.00
$ 82.00
$ 1.00
$ 15.00
92.61 $
00'0L $
00'000'9 $
00'0017 $
00'00£ $
00'000'Z $
09'L $
O
r
T 05
r
64
99'176 $
00'L $
0 0 0
NOD O D
Nu1O
CO (O 0
6)M
r
U3 64 64
O
0
0
0
0)
64
bL.UU
$ 1,750.00
$ 1,750.00
$ 1,935.00
$ 1,935.00
$ 100.00
$ 2,000.00
$ 400.00
$ 15.00
Engineer's Estimate
Unit Cost Total Cost
15,000.00
10,000.00
800.00
75,000.00
125,000.00
8,800.00
3,250.00
4,200.00
4,000.00
20,000.00
21,750.00
5,700.00
55,550.00
222,275.00
187,150.00
15,000.00
12,150.00
350.00
00 OOS'L6
00'00t'2
00'000'9
00.005'£
00'00Z'L
00,000,2
00.099'£2
0
0
O
u)
O
r
0 0
0 0
O O
0 0
t• co
u) CO
5,600.00
4,000.00"
800.00
5,500.00
CD
EA
4,500.00
4,500.00
1,500.00
1,500.00
00'009' 6
00'0g6'£1,
00.009'17
0•00£'9
$ 650.00I 7,150.00
0
0
0
0
in
u)
EA
$ 70.00
$ 1,500.00
$ 450.00
$ 50.00
00'59 $
00'99 $
00'0£ $
00,6Z $
00.05 $
00'000'17 $
00'06 $
00.92 $
00'017 $
00'000'52 6 $
00'000'9L $
00'009 $
00000'01 $
00.000'96 $
$ 95.00
$ 100.00
$ 3.00
$ 5.00
$ 5.00
$ 2,000.00
$ 400.00
$ 700.00
$ 8,000.00
$ 75.00
$ 35.00
0
0
u
co
EA
0 0
0 0
O . u
r r
EA EA
$ 35.00
$ 2,000.00
$ 400.00
0 0 0 0 0
0 0 0 0 0
u) 0 0 0 0
7 0 0 0 0
u) u) u) u)
r r r r
EA EA 69 69
No. Spec Item Quantity Unit
FA
FA
LS
LS
LS
SY
SY
LF
LS
CY
TON
TON
CY
TON
TON
TON
LF
LF
SY
FA
EA
EA
FA
EA
LF
LF
LF
LF
LF
EA
EA
0)
-i
()
>-<<Q<'C
W W WW
LF
EA
EA
EA
<
W
r
1
1
1
1
1
220
130
420
1
400
870
190
1,010
2,615
1,970
150
4,050
70
4,730
1
18
5
1
32
500
��N
CV
COD NN
r
r
14U
3
3 ,
1
1
90
3
31
32
ROADWAY (SCHEDULE A)
Minor Change
Resolution of Utility Conflicts
SPCC Plan
Mobilization
Project Temporary Traffic Control
Asphalt Pavement Removal Incl. Haul
Cement Conc. Sidewalk Removal Incl. Haul
Cement Conc. Curb Removal Incl. Haul
Removal of Structure and Obstruction
Unsuitable Foundation Excavation Incl. Haul
Gravel Borrow Incl. Haul
Crushed Surfacing Top Course
Pavement Repair Excavation Incl. Haul
HMA Cl. 1/2" PG 64 -22
HMA for Pavement Repair Cl. 1/2" PG 64 -22
HMA for Prelevel Cl. 1/2" PG 64 -22
Thickened Edge
Drainage Channel
Planing Bituminous Pavement
Joint /Crack Sealing
Adjust Water Valve
Adjust Water Manhole
Erosion/Water Pollution Control
Inlet Protection
Cement Conc. Traffic Curb and Gutter
Cement Conc. Traffic Curb
Extruded Curb
Removing Guardrail
Beam Guardrail Type 1
Beam Guardrail Non - Flared Terminal Type TL2
Adjust Monument Case and Cover
TRAFFIC SIGNALS (SCHEDULE A)
Traffic Signal Vehicle Detection Loops Modifications at the
intersection of Tukwila International Blvd. & S 112th Street
DEWALK (SCHEDULE A)
Cement Conc. Sidewalk
Cement Conc. Curb Ramp Type Parallel A
Cement Conc. Curb Ramp Type Parallel B
Cement Conc. Curb Ramp Type Single Direction A Modified
Cement Conc. Curb Ramp Type Perpendicular A
II STORM SEWER (SCHEDULE A) I
Ductile Iron Storm Sewer Pipe, 12 in. Dam
Catch Basin Type 1
Adjust Catch Basin
Storm Drain Marker
II SANITARY SEWER (SCHEDULE A) I
II
A42 1 7 -05 'Adjust Manhole
71`-. 1• 0)O N N CO M 777.1' 7777.1'NN r r 777r
O O O O r O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r r O 0 0 0 0 r
r r r r r N N N N N N 466666 uS 6 ui 1� 1-.1. 05 CA 00 00 CA Cb
T rM
05 05 c5
0
N
op
7777 u)
05 00 Cb CAO
709 u) u)
0 0 0 0
NI. I.titi
N M 7 u1 O ti N Cr) 0 r N CO 7 u) CO 1- CO Cr) 0 r N M V u) CO i,- 00
<<<<<<<<< Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
6) 0 r
Q Q CO
N
<
— 0)0)(01'-
N<<< Q Q
C001 0 r
Q Q<<
13
r
1 ■
I:14 7
May 28, 2014
Corrected math error
Watson Asphalt
Unit Cost Total Cost
3,454.00
1,350.001
500.00
500.00
1,400.001
1,550.001
1,440.0011
1,400.001
10,000.001
0
O
00
O
'
N
0
0
O
CO
19,450.001
O
O
0
O
LC)
N
1,131,600.00
3,000.0011
250.001
0
O
0
O
CO
cr
21,300.001
0
0000
0000
O
O
6)
0
O
O
r
0
6
N
I-
0
O
N
O
3,000.001
2,380.001
O
O
6
N-
N
6)
45,327.001
127,464.001
0
O
000
O
LO
N
0
O
O
CO
0
0
0
CO
r
1,440.001
O
O
0
O
CO
N-
O
O
Cn
CO
ER
1 $ 450.00 1 2,700.0011
500.001
468.00
1,760.0011
$ 3,000.00 1 3,000.001
279,817.00
$ 314.00
$ 450.00
$ 500.00
o
O
O
N
ER
O
0
O
r
ER
$ 7.75
$ 2.00
O
0
O
N
ER
$ 10,000.00
O
0
O
CO
ER
O
0
O
r
ER
$ 2.50
O
0
O
L0
ER
O
0
O
0
M
ER
$ 250.00
O
0
O
0
d'
ER
$ 21,300.00
0
0
O
LC)
ER
$ 50.00
$ 25.00
O
O
O
N
O
ER
0009
$ 23.80
$ 23.80
0
r
Ni
L()
0
$ 135.60
0
O
O
0
N
ER
0
O
O
LO
ER
0
O
O
N
fR
0
O
N
ER
$ 500.00
$ 234.00
$ 4.00
Road Construction NW
Unit Cost Total Cost
2,750.00
1,350.00
00.00 i.
330.00
O
0
O
_
O)
O
0
O
0
0
r
1,620.00
O
O
O
00
N
10,000.00
1,440.00
240.00
23,340.00
850.00
1,090,525.00
3,000.00
200.00
31,000.00
15, 500.00
3,240.00
440.00
0
0
O
CO
0
N
0
0
O
0
L0
N
0
0
O
0
LO
N
2,400.00
28,350.00
42,630.00
0 0
0 0
O O
CO 0
d' L0
CO N
00
450.00
2,400.00
1,800.00
O
O
O
CO
M
c-
o
0
CO
CO
ER
$ 750.00 1 4,500.001
1,000.00
330.00
0
0
O
0)
6)
$ 3,000.00 1 3,000.00
O
0
p
O
CO
cc;
M
N
0
O
O
LO
N
ER
$ 450.00
00.00 v $
0
O
u) Ln
,_
r
ER
0
N
(fl
ER
0
O
Ln
ER
$ 2.25
0
o
'�
ER
$ 10,000.00
$ 48.00
0 0 0
0 0 0
MMr
r
ER ER ER
0 0 0
0 0 0
000
O N O
M
co
ER ER ER
$ 15,500.00
0
0
Eb
r
ER
$ 22.00
00'L $
0
0
0
0
N
ER
0
0
O
LC)
ER
0
0
04
N
ER
$ 35.00
0
0
6)
ER
0 0
0 0
.
0)0
0) 0
N
ER 69
0
0
N-
ER
0 0
0 0 .
OO
M r
ER ER
0 0
0 0
000
00 CO
r
ER ER
$ 2.25
Lakeside Industries
Unit Cost Total Cost
0
0
I-
O
r
0 0 0 0 0 0
0 0 0 0 0 d'
0000000
r 0 0 0) 0 CO
r O r C-- CO r
r r r
0
0
O
0
N-
10,000.00
1,500.00
2,000.00
15, 560.00
5,000.00
O
0)
nj
O
0)
3,000.00
500.00
20,000.00
10,000.00
3,600.00
1,000.00
5,800.00
5,000.00
2,500.00
1,000.00
8,100.00
25,230.00
72,380.00
2,500.00
450.00
0 0
0 0
010
O N
O r
r
O
O
O
CO
,
O
O
W
L!')
ER
$ 400.00 1 2,400.001
500.00
100.00
250.80]
$ 3,000.00 1 3,000.00
0
CO
uj
CA
N
$ 147.00
$ 370.00
$ 1,000.00
$ 50.00
$ 5.70
$ 3.00
$ 1.57
O
O
O
r
ER
$ 10,000.00
$ 50.00
$ 25.00
$ 2.00
$ 100.00
$ 3,000.00
$ 500.00
$ 20,000.00
00.000'0L, $
O O O
000
O O O
N LO N
ER ER ER
$ 5,000.00
$ 50.00
$ 10.00
$ 10.00
$ 29.00
00'SL $
00.009`Z $
00LL $
$ 25.00
$ 6.25
0 0
O O
O O
10 L!i
ER ER
1$ 0.57
ICON Materials
Unit Cost Total Cost
0
0
O
)
W
M
1,650.00
2,000.00
600.00
1,680.00
1,800.00
1,800.00
210.00
10,000.00
1,800.00
480.00
15,560.00
4,250.00
0
0
p
cr, M
cii O
CO
3,000.00
800.00
24,000.00
10,000.00
1,980.00
600.00
2,320.00
5,000.00
3,000.00
3,500.00
32,400.00
47,850.00
90,240.00
2,500.00
450.00
2,800.00
1,620.00
$ 82.00 1 1,640.00
$ 550.00 3,300.00
750.00
600.00
0
0
O
O
N
N
$ 3,000.00 1 3,000.00
0
0
n
in
N
Vi
Cr
N
$ 350.00
$ 550.00
$ 2,000.00
$ 300.00
$ 12.00
$ 9.00
$ 2.50
$ 3.00
$ 10,000.00
$ 60.00
$ 6.00
$ 2.00
$ 85.00
3,000.00
800.00
24,000.00
10,000.00
11.00
30.00
8.00
5,000.00
60.00
35.00
40.00
55.00
96.00
2,500.00
75.00
00.6
00.9£
$ 750.00
$ 300.00
$ 5.00
ER
ER �17764 07
Miles Resources, LLC
Unit Cost Total Cost
1,650.001
1,200.00
300.00
100.00
840.00
600.00
1,440.00
1,400.00
10,000.00
1,200.00
1,000.00
1,945.00
2,550.00
891,722.00
3,000.00
250.00
17,500.00
4,500.00
2,700.00
650.00
2,407.00
300.00
1,000.00
1,000.00
24,300.00
27,840.00
79,900.00
2,500.00
420.00
1,540.00
1,260.00
O
O
O
d'
N
r
O
O .
N
CO
ER
$ 400.00 1 2,400.0011
0 0
O O
r0
O
r
264.0011
$ 3,000.00 1 3,000.001
0
0
nj
n
O
oi
ti
O
O
O
LL)
r
ER
007 $
00.£ $
00'9 $
00'05 $
00'002 $
00'0017 $
$ 20.00
$ 10,000.00
$ 40.00
$ 12.50
$ 0.25
$ 51.00
$ 3,000.00
$ 250.00
$ 17,500.00
00.0L $
00.009`Z $
0098 $
007£ $
00'02 $
00 04 $
00.02 $
00002 $
02.8 $
097c $
00'91 $
00'009`17 $
LO 0
N O
O) I�
r
ER 0
0 0
O O
r 0
LIi
0 ER
09'0 $
Engineer's Estimate
Unit Cost Total Cost
1,760.00
1,125.00
7,000.00
200.00
1,400.00
2,000.00
1,440.00
560.00
10,000.00
1,500.00
80.00
15, 560.00
750.00
TOTAL ESTIMATED CONSTRUCTION COST (SCHEDULE A) 971,350.00
0 0 0
O O O
0 0 0
0 0 0
O Ln O
co r 10
r
8,000.00
7,200.00
500.00
2,900.00
3,000.00
2,500.00
2,500.00
24,300.00
47,850.00
89,300.00
2,500.00
450.00
2,800.00
1,800.00
O
O
O
O
d7
O
O
LE)
ER
1 $ 450.00 1 2,700.00
O O
O O
0 0
0 0
O N
O
O
0
co
CO
$ 3,000.00 1 3,000.00
TOTAL ESTIMATED CONSTRUCTION COST (SCHEDULE B) 223,780.00
O
O
O
CO
ER
$ 375.00
$ 7,000.00
$ 100.00
$ 10.00
$ 10.00
$ 2.00
$ 8.00
$ 10,000.00
$ 50.00
$ 1.00
$ 2.00
$ 15.00
$ 3,000.00_
$ 1,500.00
$ 15,000.00
$ 8,000.00
$ 40.00
$ 25.00
$ 10.00
$ 3,000.00
$ 50.00
$ 25.00
$ 30.00
$ 55.00
$ 95.00
$ 2,500.00
$ 75.00
$ 35.00
$ 10.00
0 0
O O
O O
0 O
0
r
0 ER
1$ 2.00
No. Spec Item Quantity Unit
HUND
HUND
LS
EA
LF
SF
LF
SY
FA
CY
SY
LF
EA
FA
LS
LS
LS
SY
SY
LF
LS
CY
TON
TON
CY
TON
FA
EA
LF
LF
c)
W
O
LS
EA
LF j
W
3
1
2
140
200
720
70
1
30
80
7,780
50
r r r
1
180
20
290
1
50
100
810
870
940
1
6
80
180
r CV
1 440
TRAF. CNTRL. DEVICES (SCHEDULE A)
Raised Pavement Marker Type 1
Raised Pavement Marker Type 2
Permanent Signing
Plastic Traffic Arrow
Plastic Stop Line
Plastic Crosswalk Line
Plastic Line, 4 Inch
IDE DEV. (SCHEDULE A)
Temporary Erosion Control Blanket
Property Restoration
Topsoil Type A
Seeded Lawn Installation
Edge Restoration
PSIPE Cotoneaster salicifolius 'Repens'; 1 Gal. Cont, 36" o.c.
ROADWAY (SCHEDULE B)
Minor Change
SPCC Plan
Mobilization
Project Temporary Traffic Control
Asphalt Pavement Removal Incl. Haul
Cement Conc. Sidewalk Removal Incl. Haul
Cement Conc. Curb Removal Incl. Haul
Removal of Structure and Obstruction
Unsuitable Foundation Excavation Incl. Haul
Gravel Borrow Incl. Haul
Crushed Surfacing Top Course
Pavement Repair Excavation Incl. Haul
HMA for Pavement Repair Cl. 1/2" PG 64 -22
Erosion /Water Pollution Control
Inlet Protection
Cement Conc. Traffic Curb and Gutter
Extruded Curb
DEWALK (SCHEDULE B)
8 -14 (Cement Conc. Sidewalk
STORM SEWER (SCHEDULE B)
f B19 1 7 -05 'Adjust Catch Basin
TRAF. CNTRL. DEVICES (SCHEDULE B)
Permanent Signing
Plastic Traffic Arrow
Paint Line, 4 Inch
ROADSIDE DEV. (SCHEDULE B)
B23 1 8 -02 I Property Restoration
6) 6) r (‚10.10.10.1
O O N N N CV N
00000000000000
r N N N N N
999999
101010101010
d- N- 0)
O O O
r r r
O N N N N CO CO d' d' d' r r 77 d'
r 9999999999999
r N N N N N N •I' LO LO W CO CO CO
r N
N N
00 00
N
N
00
CO d' LC) CO N- CO O)
QQQQQQ
Q
0 r N CO V LO
QQQQQQ
N CO
CO CO CO
0 r N M d' L) CO
d LO CO r` CO 63 _ _
CO CO CO CO CO CO m CO m m m CO m m
—
N
CO
CO
0 r
CV N
CO CO
N
CV
CO
1,411,417.00
1,329,125.00
1,164,088.70
1,149,940.00
1,069,794.00
1,195,130.00
TOTAL BID (SCHEDULE A + B)
14
MFG
753 9`r' Avenue North
Seattle, WA 98109
P: 206.286.1640
F: 206,286.1639
www.kpg.com
January 22, 2014
Mr. David Sorensen
Project Manager
City of Tukwila, Department of Public Works
6300 Southcenter Blvd, Suite 100
Tukwila, WA 98188
RE: East Marginal Way South (S 81st P1 to S Norfolk St)
Project No. 91210406
Recommendation for Contract Award
Dear David,
As requested, KPG has tabulated the bids and reviewed the bid packages submitted for the East
Marginal Way South (S 81St P1 to S Norfolk St) project. The lowest bidder in the amount of
$1,738,991.50 is Miles Resources, LLC.
References listed in the Completed Construction Project Reference List provided by Miles
Resources, LLC in their bid package confirmed that recently completed contracts with the
contractor on similar roadway overlay projects were successful.
We checked the status of Miles Resources LLC on the Washington State Labor and Industries web
page to confirm they are currently licensed. We also checked the online System for Award
Management and Miles Resources LLC does not have any active exclusion records listed.
It is KPG's recommendation that the East Marginal Way South (S 8151 P1 to S Norfolk St) project be
awarded to Miles Resources LLC pending an independent review and recommendation by WSDOT.
The bid tabulation is enclosed.
Sincerely,
KPG, Inc.
josh Fedora, P.E.
Enclosures: Bid Tabulation
15